Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors

The framework developed in this study is provided both as an excel sheet (https://inl.gov/content/uploads/2023/11/Nuclear-Reactor-Cost-Reduction-Pathway-Spreadsheet-Tool.xlsx) and a Python (Jupyter) Notebook (link: https://github.com/accert-dev/ACCERT/tree/main/Cost%20Reduction). Capital cost considerations are one of the primary inhibitors to the large-scale deployment of nuclear power plants. While it is widely accepted that first units will likely be expensive and relatively uncompetitive, it is reasonable to expect that subsequent units, built in relative quick succession, will be cheaper as they benefit from the so-called “learning effects”. However, the large degree of uncertainty associated with this parameter renders it challenging for first movers to invest in the first few expensive units. To resolve this impasse, the U.S. Department of Energy’s Advanced Nuclear Liftoff study advocated for the formation of large, committed order books of plants of the same technology to spread the costs across several units and kickstart the nuclear supply chain. The study also advocated best practices for avoiding overruns and keeping reactors on budget. This report builds on these key recommendations by attempting to quantify specific pathways toward cost reduction for nuclear energy. A capital cost estimation framework was built to untangle the effect of learning into a subset of key cost drivers, referred to as “levers”. Collectively, the choice of these levers is intended to reflect the decision-making of high-level stakeholders like plant owners and the government. In addition to the size of the firm orderbook, these levers included (a) cost drivers that are most often attributed to cost overruns such as architect/engineering (A/E) proficiency, construction proficiency, procurement service proficiency, design completion prior to the start of construction, and design maturity, and (b) cost reduction strategies such as modular construction, cross-site standardization, safety classification of the reactor building, and of the balance of plant. Two advanced reactor designs were leveraged as use cases and bottom-up cost estimates made with assumptions consistent with a well-executed first-of-a-kind project (WE-FOAK, i.e., almost no overruns) were used as baselines for the models. Cost correlations were surveyed from the literature to determine the impact of important variables on projected timelines and costs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Machining of Alloy 709 Creep-fatigue Specimens from G. O. Carlson Heat

Alloy 709 has been selected as the next candidate material for Section III, Division 5 qualification in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC) for elevated-temperature nuclear construction. The qualification data package requires an assortment of information and material data including tensile, creep, and creep-fatigue performance at elevated temperatures from different material heats. The goal of the project is to generate a dataset to support qualification of Alloy 709 material for ASME BPVC design code. Working towards the project goal, Idaho National Laboratory needs to conduct a series of tests on three different heats to support the A709 code case development. At present, there is a gap in the data package for one of the heats: Heat number 58776 manufactured by G.O. Carlson. To address this data gap, Argonne National Laboratory transmitted five plates of A709 heat 58776 manufactured by G.O. Carlson to Idaho National Laboratory. These plates were solution annealed at 1150°C and heat treated at 775°C for 10 hours. The objective of this specification is to procure a series of creep-fatigue specimens to support the qualification data package. The creep-fatigue specimen design captures the cyclic material performance at elevated temperature. The material performance data generated from specimens machined herein will support the ASME BPVC code case development and establish design limits, and design life curves for Alloy 709 material.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Decarbonization Considerations: Grid-Interactive Efficient Buildings [Slides]

The Federal Energy Management Program (FEMP) is helping federal agencies understand how to meet decarbonization goals with grid interactive efficient buildings (GEB). This training will provide attendees with an introduction to GEB, how to work with utilities, and opportunities for federal sites.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SPC-70791 Rev 0 MARVEL Inert Gas Subsystem, Secondary Coolant Management Subsystem, and Secondary Coolant Cover Gas Subsystem Tubing and Valve Specification

This specification covers the requirements and details for the selection, testing, cleaning, marking, shipping, inspection and installation (including welding) of the Inert Gas Subsystem, Secondary Coolant Management Subsystem, and Secondary Cover Gas Management Subsystem from the Valve Panel up to the classification division, the patch panel of the upper confinement. Including NaK, argon, eutectic gallium indium tin (eGaInSn), and helium fill tubing, valves, and hangers. These systems consist of the necessary straight lengths, elbows, reducers, fittings, tube connections, instrument taps, and valves called for by applicable drawings. All components shall be procured as ASME Section III Class 2 unless otherwise modified hereinafter. Pressure relief valves have been sized to prevent overpressure in the event there is full regulator flow. This is documented in ECAR-7365.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Robotics Plan in Support of DOME Testbed Operations

Various robotic tooling options have been evaluated for the NRIC DOME concept of operations (ConOps). Framatome was contracted to develop a wide-ranging list of commercial off the shelf (COTS) and custom robotic systems to be considered for performing the DOME ConOps functions. Subsequent project tasks from Framatome narrowed down the list and scored the most viable options. The abbreviated list, and associated scoring, has been reviewed and assessed to provide formal recommendations for the robotic ConOps functions of DOME. The overhead telescoping mast & Kraft arm assembly is recommended as the primary system for reactor demobilization and removal. The estimated cost is $\$700$K with a timeline to develop and deliver of about 2.5 years. The mast & Kraft arm would still require an overhead lift system for mobilization and installation. Either the refurbished polar crane or a new gantry crane delivery platform could both serve as the overhead lift and delivery system. The estimated costs for the refurbishment polar crane and new gantry crane systems are, respectively, $\$4.4$M and $\$3$M with about 2.5 years to develop and deliver. A Brokk + Kraft crawler & arm is recommended as a secondary robotic system to support the overhead mast & Kraft arm system. The Brokk + Kraft crawler & arm would cost an estimated $\$726$k and would take about 1.5 years to develop and deliver. The Boston Dynamics SPOT robot is also recommended for the in-service monitoring during experimentation operations. The estimated cost is $\$220$K with a timeline to deliver of 8-14 months. The Elios 3 aerial drone is recommended to perform large area radiation dose rate mapping and visual inspections. The estimated cost is a $\$100$K and will also need about 8-14 months to develop and deliver. A mockup rig is also recommended to be procured an employed to test & verify the robotic capabilities as well as provide needed training for operations personnel. It is estimated that a mockup rig would cost about $\$500$k and would take up to a year to develop and build.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

INECP Country Engagement Plans and Transformational Events [Slides]

The International Nonproliferation Export Control Program (INECP) harnesses the expertise of the U.S. Department of Energy (DOE) national laboratories to assist partners internationally in implementing and adopting strategic trade control measures that can effectively counter WMD procurement efforts. This presentation includes discussion of work with LANL INECP technical leads to update the engagement plan for Turkey, which involved researching Turkey’s WMD related legal framework, relevant export control agencies, and WMD-relevant industries (e.g. advanced manufacturing and aerospace).

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Utilization of the LMP Methodology in Support of the VTR Conceptual Safety Design Report

The Versatile Test Reactor (VTR) is a fast spectrum test reactor currently being developed in the United States under the direction of the US Department of Energy (DOE), Office of Nuclear Energy. The VTR is utilizing a risk-informed performance-based (RIPB) approach for design support and authorization by the DOE, derived from recent efforts by the US industry led Licensing Modernization Project (LMP). This document contains an overview of the implementation of the LMP approach in support of the VTR Conceptual Safety Design Report (CSDR). The work reported here is the result of studies supporting a VTR conceptual design, cost, and schedule estimate for DOE-NE to make a decision on procurement. As such, it is preliminary. The VTR RIPB authorization approach utilizes information from the probabilistic risk assessment (PRA), coupled with deterministic analyses, to aid in decision-making regarding the identification and categorization of safety basis events (SBEs), the classification of structures, systems, and components (SSCs), and the evaluation of defense-in-depth (DID) adequacy. As part of initial reactor design efforts, a VTR conceptual design PRA was developed to support the RIPB process, which focused on at-power internal events, with scoping analyses for seismic and sodium fire hazards. In addition to supporting numerous design studies, preliminary results from the RIPB approach and the VTR conceptual design PRA were utilized as the basis of the VTR CSDR. The initial identification and categorization of SBEs, SSC classification, and DID evaluation were contained within the CSDR, which was submitted to DOE in 2019 as part of the CD-1 submittal package. Following review, DOE approved the CSDR in April 2020 and the CD-1 package in late 2020. Valuable experience was gained through the implementation of the RIPB approach for design and authorization during the VTR conceptual design phase, which is summarized in this document. To the extent possible, this experience has been shared with the advanced reactor industry, through publications and participation in licensing tabletops, in addition to informing DOE:NE advanced reactor regulatory development efforts. Furthermore, the approval of the CSDR by the DOE as part of CD-1 represents a significant milestone in the use of RIPB approaches for advanced reactor licensing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

MRP: Qualification of Powder Metallurgy Hot Isostatic Pressed (PM HIP) Materials for Elevated-Temperature Nuclear Construction

PM HIP is a mature technology that offers many advantages that are attractive to the microreactor industry. The elevated-temperature creep-fatigue properties of the PM HIP 316H SS bar that has been characterized are reduced compared to the wrought material. Work will be carried out in fiscal year 2022 to identify the mechanisms responsible for the reduced creep-fatigue properties. Confirmatory testing of optimized material will be conducted to demonstrate long-term PM HIP properties comparable to the wrought-product form. The lessons learned for PM HIP 316H SS will be applied to the procurement and confirmatory testing of PM HIP Alloy 800H.

316H stainless steel↗

Lifecycle Management of Nuclear Security Radiation Detection Systems: Testing and Evaluation

The lifecycle of radiation detection systems functioning within a State’s Nuclear Security Detection Architecture encompasses all activities associated with acquisition, deployment, and eventual disposal. Throughout a system’s lifecycle, testing and evaluation activities are needed to ensure requirements are continually met, as underscored by recent experiences.This paper provides:1.A discussion of reasons why testing should be part of the radiation detection equipment lifecycle before, during, and after acquisition.2.A general process for determining applicable evaluation methods.3.A discussion of issues related to integrating testing and evaluation into procurement and operational processes and mitigation strategies.

Harris, Tyrone↗

Completion of Milestone for Receiving Reinstrumentation Equipment from IFE

This set of powerpoint slides demonstrates how milestone "M2CT-21IN0702026: Receive prototype drilling and defueling modules for the re-instrumentation facility procured from the Institute For Energy (Halden, Norway) at the Idaho National Laboratory" was met. It supports an entry in PICS claiming achievement of the milestone. These slides provide a good summary of the purpose and impact of the milestone for our DOE Headquarters colleagues.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development of a New Neutron Electric Dipole Moment Experiment at LANL [Slides]

Conclusion: New timing filter amps and power supplies for the PMTs have been procured. The second switcher is built and will be tested with UCN soon. The second simultaneous spin analyzer is being built at Indiana University and will be tested this year. We plan to start taking production data from next year

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Development and Assessment of Deployed Sensors and Technologies Supporting Molten Salt Loop Operations

During FY24, Argonne conducted a variety of activities to develop and assess new monitoring and control technologies towards enabling long-duration operations of molten salt reactor systems. The first objective of the work completed this year was to deploy technologies capable of reliably and rapidly monitoring the operational health of a molten salt loop. To achieve this, the project focused on specific tasks, including: (1) electroanalytical technique development for use in deployed sensors, and (2) operations of sensors on the Facility to Alleviate Salt Technology Risks (FASTR) loop at Oak Ridge National Laboratory. The second objective of the work this year focused on creating a pumped actinide flow loop to enable long-duration salt chemistry and corrosion studies using uranium-bearing fuel salts. Toward that end, we designed and procured a loop capable of being installed into a radiological glovebox at Argonne. A corrosion control system was also designed for integration into this loop. These combined systems will enable the feasibility of corrosion control and management systems to be investigated with complex chloride fuel salt mixtures.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of the Volatile Species Associated with the K-Area Complex Blend Cans (D5043)

In the K-Area Complex (KAC), blend cans are used to down blend plutonium oxide for future disposal at the Waste Isolation Pilot Plant (WIPP). The blend can is a thin walled screw lid container that is used to down blend a measured amount of plutonium oxide with adulterant to reduce the attractiveness of the plutonium. The oxide and adulterant are mixed within the blend can and the blend can is packaged into a thick walled outer container. The blend cans are procured from an offsite vendor that uses a lubricant in the can manufacturing process. A thin coating of the lubricant adheres to the outer surface of the blend can and both inner and outer surfaces of the blend can cap.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experimental Testing of Personal Dosimetry Interference from a Portable X-ray Generator

The determination of the disposition route for a legacy drum in a nuclear facility at the Y-12 National Security Complex is supported by non-destructive testing of the drum and its contents. An advanced radiation measurements organization at the Y-12 National Security Complex proposed a series of active measurements using a portable x-ray generator, imaging the drum and its contents with 360-degree visualization. In rooms near the current storage location for the drum, Criticality Accident Alarm System (CAAS) annunciation is degraded, and Personal Radiation Dosimetry Instruments (PRDI’s) are routinely worn by personnel. The Y-12 Development Organization has procured advanced radiation detection devices and a variety of radiation sources for use in active measurements. These devices are being used to support Y-12 operations and safety engineering disciplines to safely address complex challenges throughout the complex. This paper presents the results of experimental testing of the PRDI’s used at Y-12 with the x-ray generator [1], and notes the unique utilization of a decommissioned facility for this work.

61 RADIATION PROTECTION AND DOSIMETRY↗

Rescue of Unique Liquid IP-2 Portable Tanks at Savannah River Site

Introduction • Savanah River Site procured six large IP-2 portable tanks capable of transporting liquids in 2003 to support layup of F Canyon at SRS. • Tanks are being rescued and recertified to support eventual disposition of up to 171,000 L of contaminated solvent solutions from H Canyon at SRS and to potentially transport Depleted Uranium solutions to support the ABD Program.

Fee, Nathaniel C. [Savannah River Nuclear Solution↗

Results of an In-Field Validation Exercise in Support of Wide-Area Environmental Sampling

The National Nuclear Security Administration’s (NNSA) Office of Nonproliferation and Arms Control (NA-24) is evaluating Wide-Area Environmental Sampling (WAES) as an additional safeguards verification tool for the International Atomic Energy Agency to detect undeclared nuclear activities. The NNSA is evaluating strategies for conducting a generic WAES campaign, the cost of a WAES campaign, and the effect of technological advancements that have occurred since the last major WAES review in 1999. Until now, the NNSA effort has focused on tabletop exercises (TTXs) in which high-performance computing allows for advanced modeling and simulation efforts to be applied to the WAES question. Although the modeling and simulations used in the TTXs are extremely valuable, field campaigns are still needed to validate the assumptions that underpin the models and the modeling process itself. During a 7 week period beginning in May 2023 and ending in June 2023, which included 4 weeks of active field collections, a multilaboratory team conducted its first in-field validation exercise. Prior to the in-field exercise, abbreviated TTXs were conducted to estimate the performance of all collection systems to be used during the field test. These TTXs guided the selection of materials to be released and the placement of the collection system. Based on these determinations, materials were procured to use in the field test, and an injection/release system was designed, built, and installed at the test facility. Background samples were collected during weeks one and four, and environmental collections against active releases were conducted during weeks two and three. The goals of this validation exercise included a demonstration of (1) the ability to provide controlled releases of particulates of surrogate materials, (2) the fielding and operation of collection systems (including deposition and active air collectors), and (3) the flexibility to revise equipment and campaign plans in the field. This paper presents the results and preliminary conclusions for this initial validation test. Based on these results, subsequent field campaigns are anticipated and will include the addition of other released materials.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SPC-70734 Rev 1 MARVEL Primary Coolant System (PCS) Fill and Eutectic NaK Procurement

This specification contains the requirements for the filling the Microreactor Applications Research Validation and Evaluation (MARVEL) reactor Primary Coolant System (PCS) with eutectic sodium-potassium (NaK). The subcontractor will design and fabricate a NaK filling system (referred to herein as the PCS Fill System), the requisite volume of high purity NaK, and perform filling operations in conjunction with the Contractor Operations. The MARVEL reactor system will be operated by the Contractor, and the PCS fill system will be operated by Subcontractor personnel.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Surveillance LANL-ASMT-2026-0059 Procurement – NNSS Supplier Review

The Institutional Quality and Performance Assurance Division's Quality Support Services Group conducted a surveillance of IQPA-IQ Supplier Evaluation group's required assessments of suppliers providing items and services relevant to the Nevada National Security Site. Based upon records examined, the surveillance team has determined that all supplier evaluation/oversight requirements are being met, and no Findings or Opportunities for Improvement are noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗