Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Neutron Source”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

43 PARTICLE ACCELERATORS↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

Barbier, Charlotte↗

A realistic guide misalignment model for the Second Target Station instruments at the Spallation Neutron Source

The Second Target Station (STS) at the Spallation Neutron Source, including a suite of initial instrument concepts, are being designed in Oak Ridge. The moderator size at STS is significantly smaller than that of the First Target Station, making the guide misalignment a more prominent concern. Here a realistic misalignment model based on Monte Carlo neutron ray tracing simulation was developed to evaluate the impacts of both the random misalignment and floor settlement on the performance of a toy model of 150 m straight guide system, and MENUS, an STS instrument concept with a typical guide design of two opposing Montel mirrors. The study shows that longer instruments, and instruments with complex curved mirrors/guides are sensitive to significant performance penalties due to misalignments.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Plasma window performance and scaling for an accelerator-based neutron source

A “plasma window” was developed for use with a SHINE accelerator-based neutron source. In this work, the design of the plasma window is presented along with results demonstrating successful operation in deuterium over a range of aperture diameters (5–12 mm), gas flow rates (3.5 to 12.5 slm), and input powers (10–55 kW). Here, an empirically determined relationship between the aperture diameter, deuterium gas flow rate, input power, and plasma window pressure differential is also presented.

43 PARTICLE ACCELERATORS↗

Measurement and modeling of beam transport in the FODO line of the Spallation Neutron Source Beam Test Facility

Ongoing studies at the Spallation Neutron Source (SNS) Beam Test Facility (BTF) seek to understand and model bunch dynamics in a high-power LINAC front-end. The BTF has recently been upgraded with a reconfiguration from a U-shaped line to a Straight line. We report the current state of model benchmarking, with a focus on RMS beam sizes within the FODO line. The beam measurement is obtained via three camera/screen pairs in the FODO line. This presentation discusses the methodology and results of this measurement.

Thompson, Trent↗

Python-EPICS RF Conditioning Automatic Control System at the Spallation Neutron Source

The RF Test Facility (RFTF) at the Spallation Neutron Source (SNS) is used for the conditioning of RF compo-nents such as ceramic vacuum windows and power cou-plers prior to their installation in the H- ion linear accel-erator. This process exposes components to high-power RF fields and thermal cycling to improve performance and remove surface impurities. To automate and optimize this process, a Python-based EPICS control system was developed alongside targeted hardware upgrades. The system enables real-time monitoring and control of RF power levels, temperature, and vacuum pressure. A user-friendly graphical interface was implemented using CS-Studio (Phoebus), allowing operators to adjust parameters and collect data efficiently. The system integrates a High-Power Protection Module (HPM) for interlocks based on vacuum and arc detection, ensuring safe operation. These upgrades have significantly improved the efficiency, accuracy, and safety of RF conditioning at the SNS RFTF. This paper describes the updated RF conditioning sys-tem, highlighting the software and hardware develop-ments and their application in support of the Proton Pow-er Upgrade (PPU) project.

Lee, Sung-Woo [ORNL] (ORCID:000000030915835X)↗

Progress on the Proton Power Upgrade at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory will double the proton power capability from 1.4 to 2.8 MW. This will be accomplished through an energy increase from 1.0 to 1.3 GeV and a beam current increase from 26 to 38 mA. The energy increase will be accomplished through the addition of 7 cryomodules to the linear accelerator (Linac). The beam current increase will be supported by upgrading several radio-frequency systems in the normal-conducting section of the Linac. Upgrades to the accumulator ring injection and extraction regions will accommodate the increase in beam energy. A new 2-MW-capable target and supporting systems will be developed and installed. Conventional facility upgrades include build-out of the existing klystron gallery and construction of a tunnel stub to facilitate future beam transport to the second target station. The project received approval to proceed with construction in October 2020. Procurements are in progress, and some installation activities have already occurred. Most of the installation will take place during three outages in 2022-2023. The project early finish is planned for 2025.

Barbier, Charlotte↗

Design and structural assessment of the Spallation Neutron Source 2.0 MW target

The Proton Power Upgrade (PPU) project is underway at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory. The project will double the proton accelerator power from 1.4 MW to 2.8 MW, increase power to the First Target Station (FTS), and enable a future Second Target Station (STS). The power increase partly comes from raising proton energy from 1.0 GeV to 1.3 GeV. The STS will operate at 0.7 MW at 15 Hz when completed. Until then, PPU will provide the capability to operate the FTS at 2.0 MW at 60 Hz. Maximum power at the FTS to date has been 1.4 MW at 60 Hz with 1.0 GeV protons. A new mercury target module design to operate reliably under PPU conditions has been completed after a multi-year effort. The design philosophy and assessment of the structural analysis are described here. This target underwent an unprecedented design and analysis process for SNS using the latest engineering techniques and incorporating years of operating lessons and outcomes from R&D to meet structural design criteria. Finally, it also incorporates high-flow gas injection to further mitigate pulse fatigue stresses as well as cavitation damage to the mercury vessel.

47 OTHER INSTRUMENTATION↗

SEEMS: A Single Event Effects and Muon Spectroscopy facility at the Spallation Neutron Source

This study outlines a concept that would leverage the existing proton accelerator at the Spallation Neutron Source (SNS) of Oak Ridge National Laboratory to enable transformative science via one world-class facility serving two missions: Single Event Effects (SEE) and Muon Spectroscopy (μSR). The μSR portion would deliver the world’s highest flux and highest resolution pulsed muon beams for material characterization purposes, with precision and capabilities well beyond comparable facilities. The SEE capabilities deliver neutron, proton, and muon beams for aerospace industries that are facing an impending challenge to certify equipment for safe and reliable behavior under bombardment from atmospheric radiation originating from cosmic and solar rays. With negligible impact on the primary neutron scattering mission of the SNS, the proposed facility will have enormous benefits for both science and industry. Herein, we have designated this facility “SEEMS.”

47 OTHER INSTRUMENTATION↗

Mitigating Cathode Overcurrent Faults at the Spallation Neutron Source

The high-power klystron amplifiers at the Spallation Neutron Source (SNS) have been in operation for over 100,000 hours. Overcurrent faults from the klystron cathodes comprise the bulk of RF System downtime. Reliable operation is of particular interest to the SNS, and data from over a decade of operation is used to help mitigate repetitive overcurrent conditions.

Moss, John↗

Spallation Neutron Source Hydrogen Relief Analysis for the Cryogenic Moderator System

The Spallation Neutron Source at Oak Ridge National Laboratory operates the Cryogenic Moderator System (CMS) which provides hydrogen cooling at 20K to three neutron moderators. Each hydrogen loop is protected by multiple burst discs and reclosing relief valves. As a result of the Proton Power Upgrade project, the CMS moderator loops will hold more hydrogen and thus require piping modifications. Operational experience has demonstrated that transient pressure increases in these hydrogen loops occasionally result in the rupture of the burst discs. The causes for pressure transients in the system that might lead to hydrogen venting are varied and complex, for example loss of vacuum or cooling. Dynamic simulation and analysis of the parameters considered as the worst-case relief venting scenario were performed and will be presented.

47 OTHER INSTRUMENTATION↗

Quantification and evaluation of strain reduction from small-bubble gas injection in Spallation Neutron Source target vessels

Small-bubble gas injection has been routinely utilized in the operation of Spallation Neutron Source (SNS) mercury targets since 2017 to mitigate cavitation-induced erosion damage to target vessels. Strain measurements of target vessels collected in-situ during initial operation with gas injection were used to study the gas injection effect on the structural response of targets to proton pulses. A significant strain reduction owing to gas injection was found by comparing the strain measurement data during operation with and without gas injection. The research presented here focuses on quantifying strain reductions in SNS targets and evaluating the effect of small-bubble gas injection by comparing different bubbler types and target designs. The strain measurement results show the gas injection significantly reduced strain in SNS target vessels; strain values decreased by 30% to 80% for targets operating with gas injection. Stress and strain responses of SNS targets were simulated to numerically evaluate the gas injection effect. Based on the predicted stresses with and without gas injection, the fatigue lifetimes of SNS jet-flow design target were estimated using fe-safe fatigue analysis software. The simulations show these reductions should improve the fatigue life of target vessels and allow SNS targets to meet their fatigue design goal.

Fatigue life estimation↗

CENTAUR - The small- and wide-angle neutron scattering diffractometer/spectrometer for the Second Target Station of the Spallation Neutron Source

CENTAUR has been selected as one of the eight initial instruments to be built at the Second Target Station (STS) of the Spallation Neutron Source at Oak Ridge National Laboratory. It is a small-angle neutron scattering (SANS) and wide-angle neutron scattering (WANS) instrument with diffraction and spectroscopic capabilities. This instrument will maximally leverage the high brightness of the STS source, the state-of-the-art neutron optics, and a suite of detectors to deliver unprecedented capabilities that enable measurements over a wide range of length scales with excellent resolution, measurements on smaller samples, and time-resolved investigations of evolving structures. Notably, the simultaneous WANS and diffraction capability will be unique among neutron scattering instruments in the United States. This instrument will provide much needed capabilities for soft matter and polymer sciences, geology, biology, quantum condensed matter, and other materials sciences that need in situ and operando experiments for kinetic and/or out-of-equilibrium studies. Beam polarization and a high-resolution chopper will enable detailed structural and dynamical investigations of magnetic and quantum materials. CENTAUR’s excellent resolution makes it ideal for low-angle diffraction studies of highly ordered large-scale structures, such as skyrmions, shear-induced ordering in colloids, and biomembranes. Additionally, the spectroscopic mode of this instrument extends to lower momentum transfers than are currently possible with existing spectrometers, thereby providing a unique capability for inelastic SANS studies.

47 OTHER INSTRUMENTATION↗

Assessment of simulated and observed cavitation-induced erosion damage in Spallation Neutron Source target vessels

Cavitation-induced erosion damage in different Spallation Neutron Source (SNS) target designs are simulated using explicit finite element–based techniques and compared with observations of erosion in targets after operation. The efficacy of the previously developed method, called saturation time, was evaluated using erosion-damaged samples from new target designs. A new metric called maximum bubble size was implemented under the rationale that larger cavitation bubbles will collapse more intensely. The maximum cavitation bubble size over 1 ms of simulated time was calculated based on the Rayleigh–Plesset equation for each element integration point and presented as a contour map at the vessel surface for assessing with erosion observations. SNS targets are now operated with helium gas injection to reduce cavitation damage. A simulation method using a material model for the mixture of mercury and gas bubbles was recently developed and used to account for the effect of small gas bubbles on the structural response of the target vessel. Furthermore, this work compares the new method's results with observed cavitation damage. Maps of the calculated maximum bubble size for targets operated with and without gas injection were compared with photographs of erosion damage observed in SNS targets. The patterns in maximum bubble size maps correlated well with observations of erosion patterns in target vessels after service. Advantages and challenges of the maximum bubble size simulation technique are provided, and differences between results from the previous and the newly proposed metric are discussed.

Jiang, Hao↗

High-resolution neutron time-of-flight measurements for light water at the Spallation Neutron Source (SNS), Oak Ridge National Laboratory

Series of light water inelastic neutron scattering experiments have been made at the Oak Ridge National Laboratory (ORNL), Spallation Neutron Source (SNS) covering temperatures ranging from 295 K to 600 K and pressures of 1 bar and 150 bar. The temperatures and pressures ranges correspond to that of pressurized light water reactors. The inelastic scattering measurements will help the development of light water thermal scattering kernels, also known as S (α,β) thermal scattering law (TSL), in a consistent fashion given the amount and the quality of the measured data. Light water thermal scattering evaluations available in existing nuclear data libraries have certain limitations and pitfalls. This paper introduces the state of the art of the light water thermal scattering cross-section data not only for room temperature but as well as for reactor operating temperatures, i.e. 550 - 600 K. During the past few years there has been a renewed interest in re-investigating the existing TSL models and utilize the recent experimental data or perform molecular dynamics simulations. It should be pointed out that no single TSL evaluation is based entirely on experimental data and one has to rely on TSL models or a combination of both. New TOF measurement of light water at the SNS, with a detailed description of the experimental setup, measurement conditions, and the associated foreseen results is presented in this paper. The analysis of the experimental data would help in validating the existing approach based on old experimental data or based on molecular dynamic simulations using classical water models, knowledge of which is very important to generate TSL libraries at reactor operating conditions.

Leal, Luiz C.↗

Optimization of neutron chopper and optics for CENTAUR, the SANS/WANS diffractometer at the spallation neutron source second target station

Herein this report presents the physics design and optimization of the neutron chopper and optics systems for the CENTAUR instrument, a multifunctional small-angle and wide-angle neutron scattering diffractometer for the Spallation Neutron Source Second Target Station. This instrument will offer a wide range of capabilities, including small-angle neutron scattering with wide Q coverage (e.g., 0.001–20 Å –1 ), providing a tool to investigate structures from atomic to mesoscopic scales simultaneously. To efficiently transport desired neutrons from the compact high-brightness cold source, several innovative designs are utilized: a time-zero chopper with a straight guide system for short-wavelength neutrons, octagonal guides for higher flux, and a correlation chopper to reduce inelastic scattering. The optimization process considers factors such as useable time-integrated flux, instrument resolution, brilliance transfer, divergence, and acceptance diagram uniformity. The overall design prioritizes flexibility to accommodate diverse user requirements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Analyses of Dose Rates for Second Inner Reflector Plug Replacement at Spallation Neutron Source

The Inner Reflector Plug (IRP) is a central component of the Spallation Neutron Source (SNS) target monolith, which houses the liquid mercury target and four liter-sized neutron moderator units. It is exposed to high-level radiation fields during routine operation and builds up significant activity. The IRP needs to be replaced due to moderator neutron poison and decoupler burn-out, which is used for shaping neutron pulses. The first IRP exchange took place in March 2018 and next one, which is IRP2, is planned to be replaced during the facility maintenance period in the end of December 2025, beginning of January 2026 calendar year. The replacement of IRP is a complex task due to its location in the area receiving high irradiation, being under significant amount of shielding, and size, which requires removal in segments. For planning the replacement workflow to help to reduce radiation exposure to workers dose rates for each stage of extraction/replacement operation are predicted.

42 ENGINEERING↗