Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NSLS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Construction of Cryogen-Free 4.3T Superconducting Wiggler for NSLS-II Ring

With the 3 GeV electron beam energy for the National Synchrotron Light Source II (NSLS-II) ring, only superconducting wigglers (SCW) producing greater than 4T peak field can cover the photon energy range of 20 keV and 200 keV with sufficient number of photons. The High energy Engineering X-ray (HEX) Diffraction beamline, which is primarily funded by the New York State Energy Research and Development Authority (NYSERDA) and NSLS-II, will be equipped with a 1.2m-long SCW with 70 mm period length and 4.3 T on-axis field. This SCW is free from the use of liquid Helium and is cooled only with cryo-coolers. The Electron Beam Chamber (EBC) with vertical aperture of 8 mm is made from 316LN stainless steel and copper plating is applied both surface and +-12.5mm wide from the center in the inner surface. The expected heat load from the electron beam of the NSLS-II ring is estimated to be 10 W/m. Here, we describe the design principles and engineering challenges for the device.

36 MATERIALS SCIENCE↗

ALARA Review of NSLS-II Shielding Design

Radiation exposure to staff and users as the result of National Synchrotron Light Source II (NSLS-II) operations must comply with Brookhaven National Laboratory (BNL) and Department of Energy (DOE) radiation requirements and must be maintained as low as reasonably achievable (ALARA). The purpose of this document is to review the basis for the design choices used to limit radiation exposure at NSLS-II and demonstrate that the shielding and other radiological design features have been effectively and optimally integrated into the design of NSLS-II facilities.

36 MATERIALS SCIENCE↗

Operation of the NSLS-II Injector with a Lower Booster Injection Energy

The NSLS-II injector consists of a 200 MeV linac and a 3 GeV full-energy booster synchrotron. The linac contains five traveling-wave S-band accelerating structures driven by two high-power klystrons. Optimization of the NSLS-II injector has continued since user operation started in October 2014. Beam losses have been minimized by the injector tuning and stabilization, and high level software has been developed to characterize the booster and injection parameters. However, due to the recently increased frequency of klystrons arcing which shortens the lifetime of the klystron, operation of the linac with lowered klystron output power would allow injection to be maintained with fewer trips and extended lifetime of klystrons. Apart from the energy difference, the low energy klystron operation is quite similar to the nominal 200 MeV operation. Injection trials were carried out with scaled magnet settings of the linac, linac-to- booster (LtB) transport line, and the booster. The beam was successfully injected into the booster on May 31, 2017 at the low energy mode of the 170 MeV LtB injection. Overall transfer efficiency from the linac to the storage ring is identical to the standard 200 MeV operation. The 170 MeV injection mode has been adopted in NSLS-II user operation ever since the beam study. In the most recent injector studies on June 28 and July 3, 2017, the booster injection energy was further decremented to the final target value of 100 MeV via applying the same method established in the 170 MeV operation. The ultimate value of 100 MeV is determined by the special requirement of operating the injector at single klystron while repairing the other klystron or with two klystrons with significantly reduced outputs for the purpose of maximizing klystron lifetimes.

36 MATERIALS SCIENCE↗

BPM Offset of NSLS-II Storage Ring Based on BBA Measurement

Beam based alignment (BBA) is the final calibration of the Beam position monitor (BPM) readings based on the quadrupole centers and it becomes essential process for the modern synchrotron light sources. For the convenient BBA implementation, usually BPMs are placed close to the quadrupoles and the beam is adjusted to pass the center of the quadrupoles. Therefore, measured BPM BBAs are, in fact, the BPM offsets relative to the quadrupole centers, and by observing their variations, we can estimate the relative movements of the BPMs. In NSLS-II, the BPM BBAs are measured whenever the beam-time allows and the variations are being observed. However, because changing BBAs in the BPM readings has direct and significant impact on the machine operation as well as the user experiments, they are not applied instantly. Instead, in NSLS-II, the official BBA values are managed by the snapshot archiving and retrieving system, called MASAR (MAchine Snapshot Archiving and Retrieve), so that they are well organized and can be easily set to any stored set of BBAs values. NSLS-II is implementing MASAR as a part of EPICS control system for the convenient and mistake-free machine operation. Each snapshot is a group of key-value pairs where keys are EPICS Process Variables (PVs). The snapshots are organized by configurations where each configuration has specific PV sets. And each configuration saves snapshots with titles corresponding their purposes such as normal user operations or specific beam studies. Anyone with control system account can save snapshots and they can be restored whenever needed. One of the configurations is “SR_BPM_BBAS" and the configuration includes the set of EPICS PVs for the storage ring BPM BBA values. This configuration also includes the BBAs of the in the straight sections, called ID (insertion device) BPMs playing important roles in user experiments. The ID BPM BBAs are also directly engaged in the active interlock (AI) machine protection system, which prevents the mechanical damage from the ID radiation. However, in estimating ID BPM BBAs, because there is no quadrupoles around them, interpolations from the surrounding sector BPM BBAs are used. This note focuses on the BPM offset variations based on the BBA measurement data and does not discuss about the ID BPM BBAs because they are not the direct measures of the offsets.

36 MATERIALS SCIENCE↗

The NSLS-II Control Network Design

The required positioning tolerances are an essential part of the survey and alignment design. The following tables show the requirement of storage ring. Table 1 provides the required global tolerances, while Table 2 outlines the relative tolerances for the NSLS-II girder-to-girder positioning. These tolerances dictate the instruments and methods necessary to obtain the positioning goals. The global tolerance is a little bit relaxed, but the ± 0.10 mm positioning requirement of adjacent girders is rather strict if the larger dimension and probable foundation settlement is considered. control network. Therefore, whether the goals can be obtained is mainly dependent on the performance of control network. The shape of control network defines the global alignment accuracy, while the relative position relationships of monuments determine the relative positioning accuracy between girders. When deciding the strategy of survey and alignment techniques, the instrumentation and approach of light sources have been built and are still in construction are investigated. State-of-the art equipment and methods will be employed. NSLS-II covers an area of about one-eighth of a square kilometer with a radius of ~126 m and a circumference of ~792 m. Depending on the size of the system to be constructed, primary and secondary control networks are required to achieve these tolerances. Primary control network will provide global control for different tunnels, and it should possess a relative point accuracy of better than ± 3 mm for all the storage ring monuments. Secondary control network will direct the alignment of girders in tunnel with the ability to ensure the final ± 0.10 mm positioning accuracy. The experiences from accomplished light source indicate that: for a dimension like NSLS2, primary control network can obtain a point accuracy of better than ± 1 mm easily, while secondary control network can obtain a relative point accuracy of ± 0.08 mm. With this expectation, the tolerance can be achieved for both the global and relative situation. Take the relative positioning requirement as an example, with 2 control network error of ± 0.08 mm, instrument tie-in error of ± 0.04 mm, and residual error of ± 0.04 mm, according to error propagation formula, the final alignment error should be better than ± 0.1 mm. Correspondingly, if a better control network accuracy can be achieved, the requirement for the residuals can be looser. The further alignment accuracy improvement will be realized by a smoothing process to assure the better position relationship between adjacent girders. The following simulation will perform error analysis to evaluate the estimated accuracy of NSLS II control network.

36 MATERIALS SCIENCE↗

Considerations for NSLS-II Synchrotron Radiation Protection When Operating Damping Wigglers at Low Machine Energy

The NSLS-II storage ring vacuum chamber, including frontends (FE) and beamlines (BL), is protected from possible damage from synchrotron radiation (SR) emitted from insertion devices (IDs) by a dedicated active interlock system (AIS). The system monitors electron beam position and angle and triggers a beam dump if the beam orbit is outside of the active interlock envelope (AIE). The AIE was calculated under the assumptions of 3 GeV beam energy and ID gaps set to their minimum operating values (i.e. “fully closed”). Recently it was proposed to perform machine studies that would ramp the stored beam energy significantly below the nominal operational value of 3 GeV. These studies may potentially include the use of NSLS-II damping wigglers (DWs) for electron beam emittance reduction and control. These DWs have the minimum operating gap of g min =15 mm with the corresponding peak magnetic field B 0 =1.8 T. During regular machine operations or studies at 3 GeV, DWs are usually held at this minimum gap (thus maximum field), or, alternatively, they are fully opened to the gap of 150 mm, which corresponds to a negligible residual magnetic field. However, any intermediate values of wiggler gap can be easily set through the control system with micron level precision, so wiggler fields in the range of 0< B < B 0 can be precisely set and maintained. For the low energy studies two likely modes of DW operation must be considered: 1) the maximum allowable wiggler filed is proportional to the storage ring energy, B ( E )= B 0 E /E 0 ; and 2) the maximum allowable wiggler field (and thus the minimum allowable gap) is energy independent and is equal to its nominal 3 GeV value of 1.8 T (i.e. wiggler gap is fixed at 15 mm). The aim of this technical note is to consider the synchrotron radiation protection (SRP) implications of DW use during low energy machine studies, when DWs are operated in either of these two modes. For consistency with earlier SRP documents we will quote all the powers and power densities at the nominal NSLS-II design beam current of 500 mA, even though the low energy studies will be done at significantly lower beam currents, hence the SR power will be proportionally smaller.

36 MATERIALS SCIENCE↗

NSLS-II Booster Survey and Alignment Systems

This section outlines the survey and alignment requirements and the technology and tools for achieving the NSLS-II equipment positioning goals. The required alignment tolerances are defined primarily by the physics requirements of the accelerator. The tight tolerances dictated by the physics requirements are an order of magnitude tighter than the tolerances of second generation light sources (NSLS) and on level with those at third generation light sources (Soleil, Diamond). These extraordinary position requirements necessitate a concerted R&D engineering effort to identify and develop the survey methodology needed to meet these requirements. As of this date, the methodology is still evolving to balance cost and time constraints while still maintaining the integrity of the survey and alignment systems. State-of-the art equipment including Laser Trackers and Laser Arms have been purchased and used extensively in the pursuit of meeting the NSLS-II survey tolerances. No new technology will need to be developed to meet the alignment requirements but new techniques will be pursued and developed.

36 MATERIALS SCIENCE↗

Accelerator Physics at NSLS-II Research Accomplishments in 2016-2017

The main duty of the Accelerator Physics group at NSLS-II is to support user operations. At the same time, the accelerator physicists carry out a number of studies of topical accelerator physics problems. These studies cover a wide range of accelerator physics including advanced techniques of magnet lattice correction and optimization, nonlinear beam dynamics, collective effects and impedances, low-emittance upgrade options for NSLS-II, and new approaches to lattice design for circular accelerators. A review of recent accomplishments of the NSLS-II Accelerator Physics group is presented in this report.

36 MATERIALS SCIENCE↗

Accelerator physics at NSLS-II: research accomplishments in 2020

NSLS-II accelerator physicists provide scientific support for user operations, as well as for improvements and developments of the accelerator systems. This work includes optimization of the NSLS-II performance with high beam current and low vertical emittance, improvement of the beam stability, development of new software tools for operations and beam studies. The accelerator physicists productively worked on a number of research activities such as the conceptual design of NSLS-II accelerator upgrade; design and optimization of advanced low-emittance lattices; development of novel methods to study nonlinear beam dynamics; ultrafast electron diffraction and microscopy. The physicists also contributed to the BNL electron-ion collider project, to the APS and ALS upgrade projects. Research accomplishments achieved in 2020, are summarized in this report.

43 PARTICLE ACCELERATORS↗

Accelerator Physics at NSLS-II: Research Accomplishments in 2022

NSLS-II accelerator physicists are working on scientific support of the NSLS-II operations and start-up of the accelerator systems including Storage Ring, Injector, beam diagnostics, and top-off injection; improvement of beam stability and orbit feedbacks; commissioning of a superconducting wiggler for the HEX beamline; development of a new operation mode for time-resolved experiments. The routine lattice characterization is continued to keep tracking the machine, the storage ring lattice model including strong coupling is developed, and seasonal variations of the ring circumference are studied. The collaboration with the EIC project is ongoing. In the frameworks of three LDRD projects, the physicists are working on the lattice development, studies of collective effects, and specifications of alignment and stability for the NSLS-II accelerator upgrade; novel methods of lattice design and optimization; studies of free-electron laser options; ultrafast electron diffraction and microscopy. Research accomplishments achieved in 2022, are summarized in this report.

43 PARTICLE ACCELERATORS↗

Brightness for Current NSLS-II In-Vacuum Undulator Technology in Different Lattice Scenarios

In this note the peak and effective magnetic field for In-Vacuum Undulators at NSLS-II is characterized by the well-known Halbach formula. This gives a reasonably good approximation of an IVU of any period and any magnetic gap within the range currently used at NSLS-II (≥ 18mm). This parameterization is then used in conjunction with known stay-clear requirements from the ring aperture definition as well as an absolute minimum of 4.5mm to calculate the maximum achievable brightness at any photon energy by scanning the parameters of period, gap, and length. This maximum achievable brightness is calculated for both devices centered at the lattice center as well as in a center-split configuration for the long and short straight sections of NSLS-II. In addition results are shown for a hypothetical single and center-split long straight section where the horizontal and vertical beta functions for a long straight have been modified to match at 2.5m. These are compared to a hypothetical canted double min-β configuration using the long straight section where the vertical beta function minimum is 1.6m and the horizontal as low as 3.2m. The latter case may provide significant benefit for medium and high photon energy beamlines seeking high brightness.

43 PARTICLE ACCELERATORS↗

Reducing beta functions in the NSLS-II long straight section for NEXT-III beamlines

The NSLS-II Experimental Tools III (NEXT-III) Project with the goal of building 8-12 new beamlines is ongoing. We were requested to explore the possibility of modifying the long straight section in Cell 26 to accommodate two new undulators for Advanced Nanoscale Imaging (ANI) Beamline and Tender X-ray Nanoprobe (TXN) Beamline. The scope of work includes: linear lattice matching; confirmation of the minimum ID gaps consistent with beam stay-clear limitations; calculation of the X-ray brightness; optimization of the dynamic aperture and momentum acceptance; multi-particle tracking to confirm the injection efficiency does not deteriorate significantly. The beam simulations have to be done using the most recent NSLS-II lattice model with all present insertion devices and realistic magnet errors, misalignments, and apertures. Originally two lattice options were considered for the assessment:1) with single -minimum beta functions and 2) NSLS-II with double-minimum beta functions. However, since the beamlines are not interested in the reduction of the horizontal beta function, just the vertical one, we decided to stop considering the single-minimum option because the current vertical beta is already low (3.3m) and further reducing it at the straight section center can increase it too much at the edge of a long ID, and limit the beam stay-clear. So, this report is focused on the double mini-beta scheme only.

43 PARTICLE ACCELERATORS↗

PROGRESS ON INSERTION DEVICE RELATED ACTIVITIES AT THE NSLS-II AND ITS FUTURE PLANS

National Synchrotron Light Source-II (NSLS-II) project is now in the construction stage. A new insertion device (ID) magnetic measurement facility (MMF) is being set up at Brookhaven National Laboratory in order to satisfy the stringent requirement on the magnetic field measurement of IDs. ISO-Class7 temperature stabilized clean room is being constructed for this purpose. A state-of-the-art Hall probe bench and integrated field measurement system will be installed therein. IDs in the project baseline scope include six damping wigglers, two elliptically polarizing undulators (EPUs), three 3.0m long in-vacuum undulators (IVUs) and one 1.5m long IVU. Three-pole wigglers with peak field over 1 Tesla will be utilized to accommodate the users of bending magnet radiation at the NSLS. Future plans includes: (1) an in-vacuum magnetic measurement system, (2) use of PrFeB magnet for improved cryo undulator, (3) development of advanced optimization program for sorting and shimming of IDs, (4) development of a closed loop He gas refrigerator, (5) switchable quasi-periodic EPU. Design features of the baseline devices, IDMMF and the future plans for NSLS-II ID activities are described.

43 PARTICLE ACCELERATORS↗

NSLS-II INJECTION STRAIGHT DIAGNOSTICS

The ultra-bright light source being developed by the NSLS-II project will utilize top-up injection and fine tuning of the injection process is mandatory. In this paper we present the diagnostics installed in the injection straight. Its use for commissioning and tuning of the injection cycle is also described. The NSLS-II storage ring will utilize a 9.3 meter long injection straight section shown in Fig. 1. Injection will be preformed with two septa (one pulsed, one DC) and four kickers. The stored beam will be shifted towards the pulsed septum up to IS mm and the nominal distance between centers of the injected and the bumped beam is 9.5mm. The NSLS-II beam position monitors will have turn-by-turn and first-turn capabilities and will be used for the commissioning and tuning the injection process. However, there are three additional BPMs and two beam intercepting OTR screens (flags) installed in the injection straight.

43 PARTICLE ACCELERATORS↗

PROGRESS WITH NSLS-II INJECTION STRAIGHT SECTION DESIGN

The NSLS-II injection straight section (SR) consists of pulsed and DC bumps, septa system, beam trajectory correction and diagnostics systems. In this paper we discuss overall injection straight layout, preliminary element designs, specifications for the pulsed and DC magnets and their power supplies, vacuum devices and chambers and diagnostics devices. Prior to selecting the current 'conventional' design of the injection straight section we analyzed an option of injection via pulsed multipole pioneered at PF-AR. We found that this promising approach was not suited to the NSLS-II storage ring optics, since it would require a impractically compact arrangement of the injection straight section components and a complex modification of the transport line optics due to the strong focusing of the injected beam passing off the pulsed multipole axis. In addition, the requirement for a small injection transient of the stored beam orbit severely constrains the vertical alignment tolerance of the pulsed multipole. The design of the NSLS-II injection straight section is now completed with exception of transition chamber details, which will be adjusted to accommodate the actual layouts of the pulsed magnets.

43 PARTICLE ACCELERATORS↗

CURRENT STATUS OF INSERTION DEVICE DEVELOPMENT AT THE NSLS-II AND ITS FUTURE PLANS

National Synchrotron Light Source-II (NSLS-II) project is currently under construction. Procurement of various insertion devices (IDs) has begun. This ring assumes a very high beam stability requirement which imposes tighter field specifications on insertion devices (IDs) compared to the rings of previous generation. The state of the art ID Magnetic Measurement Facility is being set up in order to be able to certify the stringent requirements on the magnetic field of NSLS-II IDs. The IDs in the project baseline scope include six 3.5m long damping wigglers (DWs) with 100mm period length and 15mm pole gap, two 2.0m Elliptically Polarizing Undulator (EPU) with 49mm period and 11.5mm minimum magnetic gap, two 3.0m long 20mm period and one 1.5m long 21mm period IVU, which the minimum gap of these is 5mm and 5.5mm, respectively. Recently a special device for inelastic X-ray scattering (IXS) beamline has been added to the collection of baseline devices. Three pole wigglers with a 28mm magnetic gap and a peak field over 1 Tesla will be utilized to accommodate the users of the type of radiation which is currently produced with bending magnets at the NSLS.

43 PARTICLE ACCELERATORS↗

Study of Single and Coupled-Bunch Instabilities for NSLS-II

We study single and coupled-bunch instabilities for the NSLS-II storage ring with a recently developed parallel tracking code. For accurate modelling of the coupled-bunch instability, we investigate improvements to current point-bunch models to take into account finite bunch-size effects. Accurate modelling of single and coupled-bunch instabilities is of crucial importance for the machine performance of light sources such as NSLS-II, that provide high current beams. The complexity of the model consists in the accurate calculation of the impedance of the various components of the ring that can excite single and multibunch instabilities via short and long range wakefields. Moreover, a full account of the coupling between transverse and longitudinal dynamics must be taken into account to study effects such as chromaticity and Landau cavity effects. A parallel algorithm for the study of single and coupled-bunch instabilities has been implemented in a particle tracking code. The theoretical framework for single bunch instabilities is the same used in the code TRANFT, while for coupled-bunch instabilities a self-consistent algorithm has been implemented to allow the study of finite bunch-size effects and multibunch effects in arbitrary filling modes. In this paper we present numerical studies of the microwave instability for NSLS-II and discuss the self-consistent algorithm for simulation of coupled-bunch instabilities.

43 PARTICLE ACCELERATORS↗

Development of a Superconducting Adaptive Gap Undulator Prototype for NSLS-II

The photon flux and brightness of synchrotron radiation, crucial parameters for any light source, vary significantly depending on the type of source employed. Among the 23 Insertion Device (ID) sources at the National Synchrotron Light Source II (NSLS-II) at Brookhaven National Lab (BNL), the 12-year-old 3m-long In-Vacuum Undulator (IVU20) stands out for its superior performance, although it no longer represents the cutting edge of technology. Recently, there has been a shift in focus towards developing next-generation sources, particularly Superconducting Undulators (SCUs), characterized by smaller gaps, shorter periods, and maximum lengths. However, despite ongoing research and development efforts, SCUs have yet to surpass their predecessors, the Cryogenic Permanent Magnet Undulators (CPMUs), in terms of performance. This is largely attributed to the limitations posed by traditional superconducting wire, as well as challenges in the design of the magnetic structure and vacuum chamber. In this paper, we aim to overcome such limitations through the development of a unique prototype Superconducting Adaptive Gap Undulator (SC-AGU) magnet core and vacuum chamber design. This paper will outline a novel technical approach aimed at constructing a compact prototype magnet array utilizing state-of-the-art superconducting wire technology. This approach provides a more efficient magnetic structure, allowing for enhanced magnetic field strength and stability.

36 MATERIALS SCIENCE↗