Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NEW HIRES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

13 HYDRO ENERGY↗

The Clustering of Galaxies and Dark Matter at Intermediate Redshifts

Theoretical work in the study of weak lensing was begun while the Scientific PI (Jain) was at the Johns Hopkins University. A new postdoctoral fellow, Rita Kim, was hired to work for 0.5 years on the proposed research. She was unable to join JHU until March 2001 owing to delays in her PhD work. Meanwhile PI Jain moved to the University of Pennsylvania in January 2001. Owing to the above circumstances, the work for the proposed research was delayed and was expected to be carried out in the remainder of 2001. New measures of lensing based on the magnification effect were to be investigated by Drs. Jain and Kim. The simulations needed to test the analytical computations were already in place; hence the work was expected to proceed fairly rapidly. Owing to the close proximity of JHU and UPenn, the collaborative work was expected to proceed smoothly. It was requested therefore that the funds for the first grant year (2000-2001) be transferred to the second year. Part of the funding was spent at JHU on the salary for the Postdoctoral Fellow, Rita Kim, and the remainder at the University of Pennsylvania. The work from this grant is incomplete and will be continued under another grant.

Jain, Bhuvnesh↗

A four-planet system orbiting the K0V star HD 141399

We present precision radial velocity (RV) data sets from Keck-HIRES and from Lick Observatory's new Automated Planet Finder Telescope and Levy Spectrometer on Mt. Hamilton that reveal a multiple-planet system orbiting the nearby, slightly evolved, K-type star HD 141399. Our 91 observations over 10.5 yr suggest the presence of four planets with orbital periods of 94.35, 202.08, 1070.35, and 3717.35 days and minimum masses of 0.46, 1.36, 1.22, and 0.69 M{sub J} , respectively. The orbital eccentricities of the three inner planets are small, and the phase curves are well sampled. The inner two planets lie just outside the 2:1 resonance, suggesting that the system may have experienced dissipative evolution during the protoplanetary disk phase. The fourth companion is a Jupiter-like planet with a Jupiter-like orbital period. Its orbital eccentricity is consistent with zero, but more data will be required for an accurate eccentricity determination.

79 ASTRONOMY AND ASTROPHYSICS↗

Building Efficiency Technologies by Tomorrow’s Engineers and Researchers (BETTER) Capstone. Final Technical Report

BETTER Capstone supported 29 student project teams consisting of 155 students over two years in developing transformative building energy efficiency technologies through a capstone design experience. Capstone is the culmination of an undergraduate student’s engineering education. Interdisciplinary teams of students spent a semester designing and prototyping a technological solution for a variety building energy efficiency problems. During this experience students utilized the full design process, including the manufacturing and testing of a prototype solution, as well as publically demonstrating the solution at the Capstone Design Expo. As part of this project, students explored modern manufacturing techniques and gained hands-on experience with these techniques to produce their prototype technologies. This research added to the understanding of the challenges within building technology education and engagement with industry. One goal of the project was to help break the chicken-and-egg problem with getting students to engage more deeply with the building technology industry. It was learned however that this industry is less interested in trying innovative new concept but rather interested in hiring graduates for existing conventional building efforts. While none of the projects yielded commercial success, much individual student growth and learning was accomplished, which is a long-term benefit to the public at large.

42 ENGINEERING↗

On-Board Sensor Diagnostics for Catalytic Converters Final Report CRADA No. TC-0882-94

The auto industry is one of the largest and most important sectors of the U;S. economy. At the time of the CRADA, the Big Three U.S. auto makers (Chrysler, Ford and GM) alone employed··608,000 workers·in this country and marketed some eight million new cars and trucks worth approximately $200 billion in sales revenues. When the impact of part suppliers, steel, aluminum, and electronics producers were included, the effect of a downturn in U.S. car manufacturing had a nationwide impact on jobs and the economy. For example, U.S. auto makers used 1/7 of all U.S. steel production and 1/6 of all U.S. aluminum production. Transplant Japanese factories cannot be expected to compensate for reductions by U.S. auto makers; in fact, transplants resulted in a net loss of U.S. jobs. In 1991, the Big Three U.S. auto makers sold 8.8 million new cars and trucks with over 620,000 employees while the Big Three Japanese firms (Toyota, Nissan, and Honda) sold 2.4 million new cars and trucks with only 37,000 U.S. employees. It was estimated that the Japanese­ owned, U.S.-located, auto assembly facilities enjoyed an $8-$9 an hour labor cost advantage over the U.S. Big Three by building new plants in rural areas and hiring young workers with smaller health care and pension needs. Most of the parts in the 2.4 million cars and trucks sold by Japanese auto makers come directly from Japan and the engineering activities were mostly performed in Japan before U.S. assembly began. The effect of these issues was reflected in the U.S. Japan trade imbalance; about two-thirds of Japan's trade surplus was attributable to autos and auto parts.

47 OTHER INSTRUMENTATION↗

Chemical Compositions and Abundance Anomalies in Stellar Coronae ADP 99

Progress has been made using both EUVE (Extreme Ultraviolet Explorer) and ASCA (Advanced Satellite for Cosmology and Astrophysics) data and a new postdoctoral scientist has now been hired. Stars studied to date include YY Gem (dMe binary), xi Boo A (intermediate activity G8 V), xi UMa (more active G quadruple system) HR1099 (K1 IV + G5 V) RS CVn-like, AU Mic (dMe). In addition to a paper that concentrated on abundancies in HR1099, a paper was recently submitted on the coronal abundances of AR(tilde)Lac that revealed an interesting pattern of overabundances of very low FIP elements (Al and Ca) compared to the low FIP elements Si, Mg and Fe. Two papers are nearing completion on methods of analysis and on the abundances in the corona of AU(tilde)Mic. Additionally, two invited conference proceedings papers are being published on this work. The main conclusion of the study to date is that our existing ideas of coronal abundance anomalies need complete revision. The solar-like FIP effect is replaced by a pattern than appears to enhance high FIP elements rather than low FIP elements in very active stars. The archival studies we are undertaking now are revealing some key details of these patterns, and are beginning to map out the anomalies as a function of spectral type, a key goal of this study.

Drake, Jeremy↗

THE HD 192263 SYSTEM: PLANETARY ORBITAL PERIOD AND STELLAR VARIABILITY DISENTANGLED

As part of the Transit Ephemeris Refinement and Monitoring Survey, we present new radial velocities and photometry of the HD 192263 system. Our analysis of the already available Keck-HIRES and CORALIE radial velocity measurements together with the five new Keck measurements we report in this paper results in improved orbital parameters for the system. We derive constraints on the size and phase location of the transit window for HD 192263b, a Jupiter-mass planet with a period of 24.3587 {+-} 0.0022 days. We use 10 years of Automated Photoelectric Telescope photometry to analyze the stellar variability and search for planetary transits. We find continuing evidence of spot activity with periods near 23.4 days. The shape of the corresponding photometric variations changes over time, giving rise to not one but several Fourier peaks near this value. However, none of these frequencies coincides with the planet's orbital period and thus we find no evidence of star-planet interactions in the system. We attribute the {approx}23 day variability to stellar rotation. There are also indications of spot variations on longer (8 years) timescales. Finally, we use the photometric data to exclude transits for a planet with the predicted radius of 1.09 R{sub J} , and as small as 0.79 R{sub J} .

79 ASTRONOMY AND ASTROPHYSICS↗

WIPP Hazardous Waste Facility Permit - 2008 Update

Important new changes to the Hazardous Waste Facility Permit (HWFP) were implemented during 2007. The challenge was to implement these changes without impacting shipping schedules. Many of the changes required advanced preparation and coordination in order to transition to the new waste analysis paradigm, both at the generator sites and at the WIPP without interrupting the flow of waste to the disposal facility. Not only did aspects of waste characterization change, but also a new Permittees' confirmation program was created. Implementing the latter change required that new equipment and facilities be obtained, personnel hired, trained and qualified, and operating procedures written and approved without interruption to the contact-handled (CH) transuranic (TRU) waste shipping schedule. This was all accomplished successfully with no delayed or cancelled shipments. Looking forward to 2008 and beyond, proposed changes that will deal with waste in the DOE TRU waste complex is larger than the TRUPACT-IIs can handle. Size reduction of the waste would lead to unnecessary exposure risk and ultimately create more waste. The WIPP is working to have the Nuclear Regulatory Commission (NRC) certify the TRUPACT-III. The TRUPACT-III will be able to accommodate larger sized TRU mixed waste. Along with this new NRC-certified shipping cask, a new disposal container, the Standard Large Box, must be proposed in a permit modification. Containers for disposal of TRU mixed waste at the WIPP must meet the DOT 7A standards and be filtered. Additionally, as the TRUPACT-III/Standard Large Box loads and unloads from the end of the shipping cask, the proposed modification will add horizontal waste handling techniques to WIPP's vertical CH TRU waste handling operations. Another major focus will be the Hazardous Waste Facility Permit reapplication. The WIPP received its HWFP in October of 1999 for a term of ten years. The regulations and the HWFP require that a new permit application be submitted 180-days before the expiration date of the HWFP. At that time, the WIPP will request only one significant change, the permitting of Panel 8 to receive TRU mixed waste. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laboratory Directed Research and Development Program FY 2020 Annual Summary of Completed Projects

ORNL has established a program with four complementary subprograms to meet its LDRD objectives and to fulfill the particular needs of the laboratory. A provision for multiple routes of access to ORNL LDRD funds maximizes the likelihood that novel ideas with scientific and technological merit will be recognized and supported. The ORNL LDRD Program comprises the following four subprograms: 1) The Director’s R&D Program supports projects that advance research frontiers, capabilities, and expertise at ORNL in key strategic areas. 2) The Seed Program supports innovative high-risk/high-reward research to the proof-of-principle stage. 3) The Strategic Hire Program supports the research of key new staff whose expertise and capabilities address a critical strategic need for the laboratory. 4) The Distinguished Staff Fellowships assist the laboratory in bringing in exceptional early-career scientists to refresh and expand its scientific and technical expertise. The total ORNL LDRD Program budget authorized by DOE for FY 2020 was $\$$55 million. FY 2020 allocations totaled $\$$52.5 million and supported 153 projects. An additional $\$$95,827 was allocated to administrative costs for conducting proposal reviews. Overall, 96.4% of the allocated funds were spent. The expenditure of $\$$50.6 million was about 3.2% of the laboratory’s total budget of $\$$1,572 million for operating and capital expenses, which is well below the maximum of 6% allowed by DOE Order 413.2C and is in accordance with Section 309 of Division D of the Consolidated Appropriations Act.

99 GENERAL AND MISCELLANEOUS↗

Incentivizing Cold-Climate Efficiency in Juneau (Final Report)

This is the final technical report for the DOE EERE BTO project Incentivizing Cold-Climate Efficiency in Juneau. The project implemented a community energy campaign to deploy heat pumps and efficiency for residents of Juneau, in Southeast Alaska. The project helped Juneau make progress towards its renewable energy goal of reaching 80% renewable energy for space heating by 2045. The Incentivizing Cold-Climate Efficiency in Juneau (ICE-Juneau) project began in 2020 and concluded three years later in 2023. During that time, a group of implementation partners and a research advisory team instituted a beneficial electrification campaign to promote energy savings and carbon reduction in residences of Juneau, Alaska. The campaign, Thermalize Juneau, focused on the installation of single head ductless mini-split heat pumps along with other efficiency upgrades. Thermalize Juneau was the first campaign of its kind in Alaska. After several months of planning, registration opened to the public in early 2021, and over the course of six months 164 participants enrolled. Campaign staff provided education to homeowners on heat pumps and efficiency, and each participant received a one-on-one heat pump assessment using a custom Microsoft Excel-based calculator that estimated energy savings for their residence based on building characteristics and past utility bills. Participants could also obtain a free energy audit from one of the two local energy auditors to further inform their decision. A heat pump installer, electrician, and builder were selected via a competitive RFP process. Participants who felt ready to install a heat pump or other efficiency upgrades received a site visit and custom quote from each of these contractors free of charge, and if they still felt energy upgrades were right for them, could move forward with an individual contract. Participants received a $400 heat pump installation rebate, offered by the installer if 40 heat pump installations occurred through the campaign. Overall, the campaign facilitated 75 heat pump installations (including participants that went with another contractor or heat pump model) and 30 efficiency upgrades (including participants that went with another builder or did DIY upgrades). The campaign created 3 new jobs as the heat pump installer hired an administrative assistant and two apprentices over the course of the campaign. It also helped Juneau work toward achieving its renewable energy goal of 80% renewable energy for space heating by 2045 by upgrading houses from fuel oil to heat pumps powered by the hydropower electric grid. Researchers conducted four surveys to inform Thermalize Juneau and future energy campaigns. The first surveyed existing and prospective heat pump owners in Juneau to identify barriers the campaign could address and inform recruitment efforts. Entry and exit surveys provided information on participant demographics, goals, outcomes, and suggestions for improving future campaigns. And a final survey of community members who had not participated in Thermalize Juneau gave insight on ways future campaigns could include a greater diversity of participants so they could realize similar benefits. Researchers also used pre-campaign energy modeling to predict energy savings, which was then compared to the savings estimated through aggregation of heat pump assessments and energy audits, and later to actual energy savings of 10 participants who installed a heat pump and were able to provide complete energy use data sets. In addition to energy savings, and to assist the electric utility in future planning efforts, researchers analyzed the overall change in electric use across participants with energy data and heat pump installations. They also completed a life cycle cost analysis, showing positive net present values for those displacing a fuel oil appliance, and a more mixed case for those switching from electric baseboard. This project proved the feasibility of energy campaigns, with a goal of beneficial electrification, in cold, remote locations. The Thermalize Juneau team compiled a Guidebook to Thermalize Campaigns, available online. In addition to documenting what occurred in Alaska’s first thermalize campaign, it provides tips and resources for other communities wishing to implement a similar program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

THE CALIFORNIA PLANET SURVEY IV: A PLANET ORBITING THE GIANT STAR HD 145934 AND UPDATES TO SEVEN SYSTEMS WITH LONG-PERIOD PLANETS

We present an update to seven stars with long-period planets or planetary candidates using new and archival radial velocities from Keck-HIRES and literature velocities from other telescopes. Our updated analysis better constrains orbital parameters for these planets, four of which are known multi-planet systems. HD 24040 b and HD 183263 c are super-Jupiters with circular orbits and periods longer than 8 yr. We present a previously unseen linear trend in the residuals of HD 66428 indicative of an additional planetary companion. We confirm that GJ 849 is a multi-planet system and find a good orbital solution for the c component: it is a 1 M {sub Jup} planet in a 15 yr orbit (the longest known for a planet orbiting an M dwarf). We update the HD 74156 double-planet system. We also announce the detection of HD 145934 b, a 2 M {sub Jup} planet in a 7.5 yr orbit around a giant star. Two of our stars, HD 187123 and HD 217107, at present host the only known examples of systems comprising a hot Jupiter and a planet with a well constrained period greater than 5 yr, and with no evidence of giant planets in between. Our enlargement and improvement of long-period planet parameters will aid future analysis of origins, diversity, and evolution of planetary systems.

79 ASTRONOMY AND ASTROPHYSICS↗

The California-Kepler Survey. I. High-resolution Spectroscopy of 1305 Stars Hosting Kepler Transiting Planets

The California-Kepler Survey (CKS) is an observational program developed to improve our knowledge of the properties of stars found to host transiting planets by NASA’s Kepler Mission. The improvement stems from new high-resolution optical spectra obtained using HIRES at the W. M. Keck Observatory. The CKS stellar sample comprises 1305 stars classified as Kepler objects of interest, hosting a total of 2075 transiting planets. The primary sample is magnitude-limited (Kp<14.2) and contains 960 stars with 1385 planets. The sample was extended to include some fainter stars that host multiple planets, ultra-short period planets, or habitable zone planets. The spectroscopic parameters were determined with two different codes, one based on template matching and the other on direct spectral synthesis using radiative transfer. We demonstrate a precision of 60 K in T{sub eff}, 0.10 dex in logg, 0.04 dex in [Fe/H], and 1.0 km s{sup −1} in Vsin i. In this paper, we describe the CKS project and present a uniform catalog of spectroscopic parameters. Subsequent papers in this series present catalogs of derived stellar properties such as mass, radius, and age; revised planet properties; and statistical explorations of the ensemble. CKS is the largest survey to determine the properties of Kepler stars using a uniform set of high-resolution, high signal-to-noise ratio spectra. The HIRES spectra are available to the community for independent analyses.

79 ASTRONOMY AND ASTROPHYSICS↗

Software engineering ethics

Software engineering ethics is reviewed. The following subject areas are covered: lack of a system viewpoint; arrogance of PC DOS software vendors; violation od upward compatibility; internet worm; internet worm revisited; student cheating and company hiring interviews; computing practitioners and the commodity market; new projects and old programming languages; schedule and budget; and recent public domain comments.

Bown, Rodney L.↗

Magnetic Microcalorimeters with Ultra-High Energy Resolution (FY17 Q2 report)

We will continue to characterize the Ag:Er MMC in detail to compare it with existing models and understand its limiting performance, both in New Mexico and at LLNL. For best resolution, it will be important to reduce external electromagnetic interference and ensure good thermal coupling to the cryostat. Improved resolution will be important for our presentations at the LTD-17 conference in Japan in Q3. We have also hired Cameron Flynn, a junior in physics at the university of New Hampshire, as a summer student to work on the MMC detector project. If he turns out to be as smart and as strong in the lab as his letters of recommendation and his interview performance suggests, we will try to attract him into one of the bay area universities for his Ph.D. and recruit him to LLNL for his thesis research.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Future U.S. Energy Infrastructure - And Who Will Do the Work?

This paper identifies the current state and future implications of power generating capacity in the U.S. It also discusses workforce planning and hiring options to support the anticipated staffing needs that will be required to construct and eventually operate these new plants. The Energy Information Administration forecasts that electricity consumption will increase approximately 40% by 2030. Therefore, new power plants, equivalent to 730 new base-load 400-megawatt power plants, will be required to ensure adequate electricity supplies for the future. Of the 104 operating nuclear plants in the U.S., a majority of them have already been operating approximately 20 to 30 years, and even longer. Over the next 50 years, many of these plants, both nuclear and non-nuclear, will have reached their maximum design basis operating lifetimes. Relatively young plants achieving 20 years of operation today will be completing a 40-year run by the year 2028 and a 70-year run, if allowed to do so, by the year 2058. Furthermore, as the oldest 'baby-boomers' begin retiring over the next several years, the lack of an experienced workforce may indirectly affect the needed workforce required to support the U.S. energy infrastructure from new construction through the safe operation of existing and next-generation nuclear plants. With the prospects of companies needing to hire 'passive' candidates, (i.e., experienced '40-something' workers who are not necessarily looking for a job, but are willing to discuss a career move if it offers a significant upside opportunity) to fill employment vacancies, there are 10 factors to consider when evaluating potential opportunities: 1) the job fit; 2) the job stretch; 3) opportunity for future learning and growth; 4) the chance to make an impact; 5) the hiring manager as mentor; 6) the quality of the team; 7) the company's prospects and strategy; 8) the company culture; 9) work/life balance; and 10) compensation and benefits. If the company is clearly not superior on the first nine factors, the candidate will likely reject the offer. Furthermore, if history serves as a guide to the future, failing to follow through with a cohesive, well-defined energy strategy offered by new plant construction will likely produce the same results following the indefinite deferral to reprocess commercial spent nuclear fuel. Since the deferral in 1977, billions of dollars have been spent, while producing few, if any, substantial results. The significance of maintaining the U.S. energy infrastructure and hiring a combination of both newly-graduated and experienced employees to perform the work must be recognized and acknowledged today to ensure that we have adequate, affordable, and reliable electricity for the future. If these programs fail, expect these scenarios to be repeated again over the next 30 years, instead of achieving energy independence - a truly substantial result. (authors)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SPSP Phase III Recruiting, Selecting, and Developing Secure Power Systems Professionals: Behavioral Interview Guidelines by Job Roles

The Secure Power Systems Professional Phase III final report was released last year which an appendix of Behavioral Interview Guidelines by Job Roles. This new report is that appendix broken out as a standalone document to assist utilities in recruiting and developing Secure Power Systems Professionals at their site. The complete list of knowledge, skills, and abilities required in each of the studied job roles was assembled into the Behavioral Interview Guidelines. The guidelines were developed to apply the results of Phases I and II in a format that can be used in part or in whole to align workforce capabilities with the strategic goals and tactical focus of a power grid organization. These guidelines may 1) be applied to develop performance reviews or to produce individual professional development programs for existing staff; 2) assist in specifying learning objectives for a training or education program; and 3) be easily incorporated into most human capital software to facilitate development of job descriptions that comply with guidelines established by the Society of Human Resource Management. The guidelines can be immediately applied by human resources professionals, recruiters, and hiring managers to assist in recruiting and interviewing candidates for new SPSP position openings.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The NASA Astrobiology Program’s Professional Advancement Workshop Series: Next Steps

Introduction: In the modern-day competitive job search, it is not enough for a candidate to have an excellent academic resume. Candidates must also present themselves well in various styles of interviews, have managerial skills, and be capable of engaging in complex interpersonal relationships and team building. The NASA Astrobiology Program’s Professional Advancement Workshop Series (PAWS) addresses the need for professional skills development that is not traditionally taught in graduate programs. PAWS is designed to supplement academic teachings by providing a space where early career scientists can learn new skills to help them explore, interview for, and be hired in the jobs and careers they want. This is especially true for jobs that are outside of the traditional academic “pipeline” (the path of student to postdoc to tenure-track professor). PAWS embraces the braided river model of career development [1], which emphasizes flexibility as a scientist’s needs change throughout their life. PAWS also presents an opportunity for other early career scientists to meet and network with each other outside of conferences and other formal events. This is especially important as the world emerges from the ongoing COVID-19 pandemic. Finally, PAWS creates an informative space full of resources available to everyone, which lowers institutional barriers regarding knowledge of opportunities and potentially provides mentorship to those in need. Both items are identified as supportive of a more diverse and inclusive future workforce [2–4]. PAWS began in August 2021 and was originally intended to last until the Astrobiology Science Conference in May 2022. The NASA Astrobiology Program initially sponsored PAWS, allowing the PAWS Leadership to bring in expert speakers from outside of NASA. These external speakers exposed the event attendees to new techniques and perspectives. PAWS has been able to continue beyond May 2022 because of many people volunteering their time for panels and a good balance between panels and expert-led workshops. Here, we share how PAWS works, what the results have been so far, and the future plans for PAWS.

Worshop↗