Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Mixed Integer Programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Optimal Membrane Cascade Design for Critical Mineral Recovery Through Logic-based Superstructure Optimization

Critical minerals and rare earth elements play an important role in our climate change initiatives, particularly in applications related with energy storage. Here, we use discrete optimization approaches to design a process for the recovery of Lithium and Cobalt from battery recycling, through membrane separation. Our contribution involves proposing a Generalized Disjunctive Programming (GDP) model for the optimal design of a multistage diafiltration cascade for Li-Co separation. By solving the resulting nonconvex mixed-integer nonlinear program model to global optimality, we investigated scalability and solution quality variations with changes in the number of stages and elements per stage. Results demonstrate the computational tractability of the nonlinear GDP formulation for design of membrane separation processes while opening the door for decom-position strategies for multicomponent separation cascades. Future work aims to extend the GDP formulation to account for stage installation and explore various decomposition techniques to enhance solution efficiency.

Ovalle, Daniel

Partition-based Feasible Integer Solution Pre-computation for Hybrid Model Predictive Control

For multiparametric mixed-integer convex programming problems such as those encountered in hybrid model predictive control, we propose an algorithm for generating a feasible partition of a subset of the parameter space. The result is a static map from the current parameter to a suboptimal integer solution such that the remaining convex program is feasible. Convergence is proved with a new insight that the overlap among the feasible parameter sets of each integer solution governs the partition complexity. The partition is stored as a tree which makes querying the feasible solution efficient. The algorithm can be used to warm start a mixed integer solver with a real-time guarantee or to provide a reference integer solution in several suboptimal MPC schemes. The algorithm is tested on randomly generated systems with up to six states, demonstrating the effectiveness of the approach.

Bayard, David S.

Autonomous Guidance of Agile Small-scale Rotorcraft

This report describes a guidance system for agile vehicles based on a hybrid closed-loop model of the vehicle dynamics. The hybrid model represents the vehicle dynamics through a combination of linear-time-invariant control modes and pre-programmed, finite-duration maneuvers. This particular hybrid structure can be realized through a control system that combines trim controllers and a maneuvering control logic. The former enable precise trajectory tracking, and the latter enables trajectories at the edge of the vehicle capabilities. The closed-loop model is much simpler than the full vehicle equations of motion, yet it can capture a broad range of dynamic behaviors. It also supports a consistent link between the physical layer and the decision-making layer. The trajectory generation was formulated as an optimization problem using mixed-integer-linear-programming. The optimization is solved in a receding horizon fashion. Several techniques to improve the computational tractability were investigate. Simulation experiments using NASA Ames 'R-50 model show that this approach fully exploits the vehicle's agility.

Mettler, Bernard

Optimizing the design and operation of water networks: Two decomposition approaches

We consider the design and operation of water networks simultaneously. Water network problems can be divided into two categories: the design problem and the operation problem. The design problem involves determining the appropriate pipe sizing and placements of pump stations, while the operation problem involves scheduling pump stations over multiple time periods to account for changes in supply and demand. Our focus is on networks that involve water co-produced with oil and gas. While solving the optimization formulation for such networks, we found that obtaining a primal (feasible) solution is more challenging than obtaining dual bounds using off-the-shelf mixed-integer nonlinear programming solvers. Therefore, we propose two methods to obtain good primal solutions. One method involves a decomposition framework that utilizes a convex reformulation, while the other is based on time decomposition. To test our proposed methods, we conduct computational experiments on a network derived from the PARETO case study.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH

An Optimization Approach to Support Science Decision Making for Lunar Surface Exploration

Introduction: Scientific exploration is one of the three pillars of NASA’s Moon2Mars architecture, with crew surface extra vehicular activities (EVA) serving a critical enabling function. Development of surface EVA operational planning and execution, specifically integrating science and flight control teams (FCT), is currently being explored through analog scenarios. This integration, exercised, for example, through the Joint EVA and Hu-man Surface Mobility Test Team (JETT), allows for science input on EVA activities in near real-time through a Science Evaluation Room (SER), or Arte-mis science backroom, which integrates with the broader FCT through the Science Officer. The SER works within the FCT to support dynamic EVA planning in response to changes in operational constraints as well as science opportunities and re-prioritization, increasing the mission science return and accelerating the accomplishment of the Moon2Mars science objectives. The SER works within the FCT to provide recommendations to traverse execution in near real-time. One challenge is the requirement to deliver SER inputs to the FCT on operationally relevant timelines. Failure to do so may result in suboptimal execution of science exploration EVAs or even loss of key science objectives. To close this gap, we present a network optimization tool to allow the SER to provide rapid input to the FCT in response to changes in operational constraints or science opportunities. Inputs are predicated on approved science objectives, and clear rationale must be provided to the FCT for any requested change. Accordingly, this tool incorporates the Science Traceability Matrix (STM), SER prioritization scheme, and station characterization and action planning with operational constraints such as duration, traverse speed, and distance to maximize science objectives based on SER priorities, consistent with FCT operational requirements. Method: As a proof of concept, we used an existing linear programing software package used to simulate optimal routes through cellular metabolism. We built a Demonstrative Model with three STM objectives and four stations on a region of the Moon. The objectives were given an arbitrary prioritization and mapped to the stations through four possible crew actions. (Figs. 1 and 2). This station to STM mapping is consistent with the method used by the JETT5 Science Team to develop analog surface EVA science planning. We used a grid system with the landing site at the origin and the four stations placed across the positive x,y quadrant. Actions were assigned to each station and the accomplishment of those actions resulted in a numerical “reward” based on the ability of that action to achieve science objectives. The aggregate reward from each individual STM objective contributes to a global score (Science Yield), weighted by its priority. Operational constraints included a requirement to start and end at the landing site, 5 minutes each for initial station characterization and “clean up,” and variable total EVA time, traverse rate (fixed to 0.5 meters per second in our example), and time to perform each action (10, 5, 7, and 15 min for actions 1, 2, 3, and 4, respectively). Additional constraints and variables will be added in the future (e.g., sample mass, number of stations, traverse route constraints, illumination). Optimization. We converted the connections (arcs) between these stations (nodes) into a mixed integer linear programming optimization problem (arcs = constraints, nodes = variables) with the objective to maximize Science Yield. For any action, the Science Yield is equal to the relevance of that action to an STM objective [3, 2, and 1 point(s) for High, Med., and Low relevance, respectively], multiplied by the STM Objective Priority [3, 2, and 1 point(s) for High, Med., and Low priority, respectively]. This resulted in a model that computes the optimal station and action combination to maximize the Science Yield. These weightings can be adjusted by the SER as desired. Results: We explored three test cases for the Demonstrative Model. First, we set the maximum EVA duration to 120 minutes and computed the optimal route (Fig. 3A). The model suggested per-forming Actions 1 and 2 at Station P01, followed by Actions 1 and 2 at Station P02, and finally Actions 1 and 3 at Station P04 before returning to the Landing Site. Second, we adjusted the STM Objective Priori-ty order and computed the new optimal route (Fig. 3B). Under this situation, the model suggested per-forming all Actions at Station P02 followed by all Actions at Station P03. The previous test cases were relevant to SER planning activities. Next, we explored providing mid-EVA replanning input to the FCT. Scenario: While executing the Route in Fig. 3A the crew finishes at Station P01 and FCT decides that the EVA needs to finish in 45 minutes back at the Landing Site. FCT asks SER to recommend changes to the plan to accommodate this operation-al change. Using the model and incorporating these new constraints (start at Station P01, max. time of 45 min), the model suggested performing Actions 2 and 4 at Station P03 (Fig. 4), requiring 41 minutes to complete and return to the Landing Site. Interestingly, Station 3 was not part of the original route. Using the model, we determined the EVA would need 66 minutes, instead of 45, in order for the original Station P04 to yield a larger Science Yield than Station P03. The parametrization and simulation was per-formed in less than a minute, demonstrating the operational relevance of the approach. Future Efforts: The results from the Demonstrative Model suggest this tool can accelerate SER decision making on operationally relevant timelines. Use in analog activities, such as JETT5 or follow-ons, which have over a dozen stations for a crew to explore and over a dozen actions per station, will provide needed validation of the utility of this tool for planning EVAs, replanning mid-EVA, or planning follow-on EVAs based on previous results. Further integration with FCT execution monitoring tools may provide additional efficiency gains, al-lowing rapid and iterative exploration of operation-al and science decision space by the FCT and SER.

Science Operations

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As lunar missions increase in complexity inspired by NASA’s Artemis Program, they will require reliable and sufficient capability of the Position, Navigation, and Timing (PNT) system to support their scientific objectives. In addition, NASA's Commercial Lunar Payload Services (CLPS) program initiates the proliferation of public and private exploration partnerships using small satellites from commercial and private organizations, expanding traditionally confined low Earth orbit to be used for missions beyond geosynchronous orbit (Zucherman et al., 2022). Therefore, the Lunar PNT system is also required to provide navigation services compatible with the smaller platforms being sent by the public and private sectors, like CubeSats. However, traditional approaches to deep space missions’ navigation based on ground radio facilities have difficulties in providing sufficient support for the increasing number of users and communication at a distance from the Earth (Kaplev et al., 2022). In particular, the existing Lunar navigation technologies such as weak signal global positioning system (GPS) and deep space network (DSN) are not able to ensure operations of the upcoming small-scale Lunar missions due to their limitations in localization performance as well as capacity aspects. Another way to provide Lunar PNT service is to create a dedicated Lunar global navigation satellite system (GNSS) constellation, like GNSS systems on Earth. Space agencies like NASA, ESA, and JAXA are now developing the lunar communications relay and navigation systems (LCRNS) and Lunar navigation satellite systems (LNSS). In their systems, satellites will be deployed in moon orbits to provide the communication, positioning, navigation, and timing (CPNT) service at the lunar south pole region where the Artemis base camp will be expected (Murata et al., 2022). Meanwhile, common challenges considered in lunar PNT research arise from poor geometry of the terrestrial GNSS satellites when seen from the lunar user, highly perturbed lunar orbits, and limitations in power, size, and cost of the equipment on lunar satellites (Iiyama et al., 2023). It is also not clear if there will be enough Lunar users to support the cost and resources this would require as the Low-cost surface missions may not be able to support the large power, mass, and weight requirements that these navigation solutions entail (Niemoeller et al., 2022). As an alternative, existing Lunar science and exploration assets could be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions (Hagenau et al., 2021). Introducing the non-dedicated and ad-hoc Lunar navigation constellation gives a way to provide PNT services on-demand. The non-dedicated swarm assets of Lunar constellations are designed to localize themselves with minimal interaction with Earth by adding cooperative autonomous localization to lunar missions, freeing up valuable bandwidth and ground segment resources. An autonomous localization of Lunar constellations is based on the concept of the decentralized PNT system with a distributed extended Kalman filter (DEKF) approach to state estimation for minimal onboard operating costs. In the distributed data processing algorithm, computation is broken down and assigned to each satellite, resulting in a considerably decreased computational amount while maintaining the accuracy of the orbit ephemeris and clock offsets as the result of centralized data processing (Wen et al., 2019). The DEKF requires spacecraft to perform two-way ranging operations with each other to communicate simultaneously, leveraging neighbor two-way intersatellite link (ISL) measurements such as pseudoranges to, and relative velocities between, visible satellites as sensor values (Frank et al., 2021). The Lunar autonomous PNT simulation (LAPS) demonstrated the feasibility of orbital asset localization among ad-hoc Lunar small-sat constellations based on the DEKF in Hagenau et al. (2021) and evaluated the matching algorithm proposed by Frank et al. (2021) in scheduling position estimation updates. In previous papers, all assets and measurements are assumed to be always available without consideration of the impact of intermittent and permanent communication failure. This study presents localization performance with increasing levels of network degradation for swarm assets and users to demonstrate the robustness of the decentralized Lunar PNT service in more realistic scenarios. Main issues arising from communication failure include spacecraft permanent or transient loss, antenna failures, message delays, etc. We tested four possible reasons for network degradation for 7 days in 21 satellites frozen with an altitude of 5500 km, evenly spaced around 3 circular, 40 inclination orbital planes where each spacecraft has two directional antennas. As anchor nodes with an independent estimate of their position are required in the DEKF approach, two ground nodes in each pole and one node in the gateway were implemented in the simulation. First, the most probable failure scenario involves the loss of a single spacecraft due to solar interference and technical malfunctions of the assets. Losing the availability of a single spacecraft means losing the two-way ISL measurement of the asset in the DEKF update. In order to provide the best possible quality of PNT service with limited time and resources, the distributed Lunar constellations must schedule the communication activities. The scheduler leverages mixed-integer linear programming (MILP) for the coordination and scheduling of the desired “as-needed” localization service (Niemoeller et al., 2022). We assume the scheduler has completely excluded the spacecraft information before the DEKF update in the failure scenario. When a random spacecraft has been turned off at a specific time, the robustness of the autonomous Lunar PNT system is evaluated. The simulation results give an 11.5% degradation in median position accuracy compared to the idealized performance excluding the asset loss. Second, a large number of assets may vanish due to major hardware problems or meteor strikes around the moon. A multiple spacecraft loss can degrade the localization performance very fast by losing the communication ability to do cross-plane measurements and in-plane measurements in a 3-plane constellation. When the matching-based scheduler is aware of ISL availability, we investigate a large number of in-plane and cross-plane asset vanishments both in close proximity and equally spaced throughout the orbital plane. According to the simulations, the loss of in-plane measurements gives 40.2% degradation while cross-plane measurements degrade 50.5% of asset localization performance among available assets. Therefore, it is concluded that cross-plane measurements are more important in improving the position estimation accuracy. Third, spacecraft failure information can be lost due to the internal message delay, resulting in the DEKF update scheduler to solve the matching problem with unavailable assets. The DEKF update cycle is comprised of network setup, communication, and computations where a global broadcast network and a 2-way ISL network setup take 6 minutes in total (Frank et al., 2021). Once the broadcast network successfully transmits and receives information, a random spacecraft may lose its availability right before solving the matching problem. This means the matching solution is no longer optimal, resulting in degradation in the localization performance. A numerical assessment shows the matching-based scheduler with knowing failure holds 11.5% of position accuracy degradation, whereas the scheduler without knowing failure gives 34% degraded localization performance without asset loss. Fourth, a transient loss of a single or multiple spacecraft may occur due to their antenna outages. After losing the two-way ISL availability for a few DEKF update cycles, the availability of spacecraft can easily be recovered as their states have been independently updated using measurements from anchor nodes. It is likely that the longer failure will result in worse localization performance. We have tested the transient failure of a random single asset for 30 min in the simulation, which is losing 3 update cycles in the DEKF system. From the simulation results, the position accuracy has been degraded to 4.84% which is better than the degraded localization performance of 11.5% from the permanent loss scenario among available assets. In conclusion, the autonomous Lunar PNT system based on the DEKF approach shows the ability to maintain resilience and robustness in the possible communication failure scenarios, ensuring that localization accuracy is preserved across various network degradation and outages. Future studies on investigating user localization performance near the South Pole and the broadcast network system will be continued in the following months.

Yeji Kim

A mixed-integer PDE-constrained optimization formulation for constructing electromagnetic cloaks with multiple materials

We study the design of an electromagnetic cloak from multiple materials with an additional constraint on the mass of the cloak. Our problem is an example of a topology optimization problem, and we formulate this problem as a mixed-integer partial-differential equation constrained optimization (MIPDECO) problem, where Maxwell’s equation models the propagation of the wave through the cloak and surrounding medium. We use binary variables to model the assignment of the different materials, and their relevant properties (permittivity and density). The mass constraint adds a nontrivial constraint to this problem. We propose a two-phase strategy to solve this problem. In the first phase, we solve a continuous relaxation, and then propose a new variant of the feasibility pump that exploits the structure of the PDE to obtain an initial integral solution candidate. In the second phase, we use a trust-region approach to improve this incumbent. We also consider a continuation or mesh-sequencing approach to find better solutions faster on consecutively finer meshes. We present detailed numerical results to illustrate the effectiveness of our approaches for constructing multi-material cloaks with a mass constraint.

Calculus of Variations and Optimization

Capacitated p -hub approach for park-and-ride facility location problem under nested logit demand function: polyhedral approaches

By generalizing the unconstrained p-hub approach for the park-and-ride (P&R) facility location problem under the multinomial logit demand function, the capacitated p-hub approach for the problem under the nested logit demand function captures a broader range of real-world cases. To solve this problem optimally, we introduce a mixed-integer linear program and accelerate its solution by enhancing the branch-and-cut procedure. To address the problem at a large scale, we introduce two other polyhedral approaches: variable neighborhood search (VNS) and adaptive randomized rounding (ARR). Downtown areas in Seoul have a high modal share of public transportation and congested road traffic, yet P&R has not been widely implemented. Therefore, we apply the ARR procedure to solve a real-world problem using traffic and geographic data from the Seoul metropolitan area. ARR performs better than VNS and addresses real-world cases. The solutions obtained by ARR present a phased expansion plan that encourages policymakers to start installing a small number of P&Rs immediately.

Capacitated p-hub approach

Multi-objective sizing and dispatch for building thermal and battery storage towards economic and environmental synergy

The role of building thermal and battery storage is pivotal in advancing smart cities and achieving sustainability goals through effective energy management. Despite their significance, there are several limitations in the sizing approach and value stream analysis with various objectives for their widespread adoption in buildings. This work proposes a flexible and scalable multi-objective optimization framework for optimal sizing and dispatch of building thermal and battery storage, addressing conflicting objectives simultaneously using mixed-integer linear programming. The weighted-sum method is adapted, combining multiple objectives into a single function. The two-stage procedure iterates over different weights, generating optimal solutions and forming the Pareto front. Case studies are performed to assess the energy, economic, and environmental benefits of building energy storage systems for a large office building in three climate locations. The results demonstrate that the proposed framework efficiently determines optimal sizing and dispatch strategies, addressing the balance between economic viability and emission reduction. The dynamic relationship between time-of-use energy charges and emission factors leads to significantly different strategies based on whether economic or environmental concerns are prioritized. This research enhances our understanding of the benefits of TES and BES systems in buildings, providing valuable guidance to stakeholders.

25 ENERGY STORAGE

A Vehicle-to-Grid planning framework incorporating electric vehicle user equilibrium and distribution network flexibility enhancement

The rapid surge in electric vehicle (EV) adoption, coupled with advancements in charging technologies, emphasizes the critical necessity for expanding EV recharging infrastructure. Simultaneously, the Distribution Network (DN) encounters escalating challenges in meeting charging demand during peak traffic periods. Consequently, there is a mounting demand for the deployment of innovative Vehicle-to-Grid (V2G) technologies to augment the DN’s flexibility in power dispatch and alleviate travel costs for EV users. Hence, this paper proposes an EV-user-equilibrium-(UE)-constrained V2G planning framework that enhances flexibility in the DN. The framework aims to ascertain the optimal placement and capacity of EV charging stations (EVCSs) and V2G charging piles within the Transportation Network (TN). It takes into account the equilibrium condition stemming from competitive EV charging and routing behaviors alongside the optimal expansion of DN energy resources to accommodate the electricity supplied by the V2G piles. This study commences by analyzing EV drivers’ travel decisions, considering the influence of charging and V2G pile locations and sizes. Subsequently, we tackle the Traffic Assignment Problem with User Equilibrium (TAP-UE) model to characterize the steady-state traffic flow distribution of EVs. Following this, we formulate the optimization model for the Coordinated Power and Transportation Network (CPTN), which encompasses the optimal expansion of DN facilities and traffic flow regulation under UE conditions. To mitigate the computational complexity associated with the V2G planning model, we introduce a series of linearization methods to obtain a manageable Mixed-Integer Linear Programming (MILP) solution. Finally, to validate the efficacy of our proposed planning framework, we apply it to two test systems, including a real-world case study. Through these case studies, we explore the necessity and potential benefits of V2G technologies.

24 POWER TRANSMISSION AND DISTRIBUTION

Relaxations of the steady optimal gas flow problem for a non-Ideal gas

Natural gas ranks second in U.S. primary energy consumption. Because most production sites are remote, gas must be transported through pipeline networks equipped with compressors, valves, and other components. For both economic efficiency and system reliability, it is desirable to operate these networks optimally. The governing physics across pipeline components entails nonlinear, non-convex equality and inequality constraints, and the most general steady-flow operations problem is a Mixed-Integer Nonlinear Program (MINLP).This work focuses on one such steady-flow problem-the Optimal Gas Flow (OGF) for a natural gas pipeline network-which minimizes production cost subject to the steady-flow physics. For day-to-day operations, the ability to quickly compute a globally optimal solution and a strong lower bound for varying demand profiles is crucial. A promising strategy is to build tight relaxations of the OGF’s nonlinear constraints. However, many nonlinearities arising from non-ideal equations of state either lack relaxations or have relaxations that do not scale to realistic network sizes. We address this gap by combining recent advances in polyhedral relaxations for univariate functions to construct tight, computationally efficient relaxations of the OGF with a non-ideal equation of state. These relaxations solve within seconds on a standard laptop. In conclusion, we demonstrate their quality through extensive numerical experiments on very large-scale test networks from the literature and find that the proposed approach proves optimality in 92% of tested instances.

03 NATURAL GAS

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION

Joint scheduling of energy, fast and primary frequency response reserves in integrated transmission–distribution networks

Inverter-based distributed energy resources (DERs) connected to distribution networks (DNs) can provide fast frequency support, but their reserve deliverability depends on feeder constraints and differs from synchronous primary frequency response (PFR). Existing transmission–distribution coordination studies usually treat reserve generically or neglect feeder-level feasibility, while frequency-security scheduling studies rarely represent distribution feeders explicitly. This paper develops a bi-level day-ahead scheduling framework for integrated transmission–distribution networks that jointly clears energy, transmission-side PFR, and distribution-side fast frequency response (FFR) under exogenous hourly inertia and largest-loss inputs from an external unit commitment (UC) schedule. The transmission problem is modeled with DC-optimal power flow (OPF) and closed-form second-order cone (SOC) frequency-security constraints, whereas each DN is represented by a reserve-aware branch-flow AC-OPF so that scheduled fast reserves remain deliverable during activation. The bi-level problem is reformulated through Karush–Kuhn–Tucker (KKT) conditions into a mixed-integer SOC program, and a penalty term is used to tighten the distribution-network relaxation. In the reduced test system, lower exogenous inertia increased the required primary response from 179.64 MW to 191.08 MW, distribution-side fast response reduced total frequency-response procurement by up to 4.9%, and neglecting distribution constraints overstated the combined distribution-side energy and reserve award by up to 18%. In the expanded study, the largest case was solved in 2.02 s with a 0.00% optimality gap. Time-domain simulations kept the frequency nadir above 59.0 Hz in all tested hours. These results demonstrate the value of fast-response modeling and distribution-feasible reserve delivery in coordinated market clearing.

Noh, Seung-Gil

An analysis of physics limited dispatch of nuclear renewable integrated energy systems using deep reinforcement learning and dynamic modeling

Previous approaches to dispatching nuclear integrated energy systems (NIES) have focused on the profitability and flexibility of these systems to operate on energy grids with highly variable pricing. However, due to the complexity involved in modeling and designing these systems, there has been less emphasis on ensuring that these dispatch strategies are physically achievable. It is imperative to develop methods that allow the system to remain within the desired NIES operating conditions and perform this based on realistic limited forecasted information. This research employs next generation artificial intelligence, namely deep reinforcement learning (DRL), and a dynamic system model written in Modelica to find a safe and profitable dispatch strategy for a solar nuclear hybrid design. The DRL agent is shown to find a novel dispatch strategy that manages both power ramping and power levels while respecting operational limits. This DRL-based dispatch is compared to other dispatching strategies including an optimal design solution from mixed integer linear programming (MILP). It is found that incorporating the physics of such a tightly coupled NIES limits the profitability of the MILP-based dispatch strategy. As a result, the MILP solution overestimates the design’s generated revenue. In contrast, DRL significantly reduces the number of breaches of safe operational conditions during energy arbitrage while maintaining profitability. Furthermore, this work paves the way for a more detailed assessment of NIES profitability and could be used to aid operator decisions on future NIES projects.

14 - SOLAR ENERGY

Techno-economic analysis and network design for CO 2 conversion to jet fuels in the United States

The conversion of carbon dioxide (CO 2 ) into jet fuel holds significant potential for reducing CO 2 emissions, providing an alternative to carbon-based resources, and offering a renewable means of energy storage. The objective of this study is to conduct a techno-economic analysis and optimize the supply chain network for converting CO 2 to jet fuel in the United States, aiming to minimize total costs while assessing the environmental and economic feasibility of two CO 2 conversion pathways. This first pathway is based on Fischer-Tropsch synthesis (FTS), and the other one is based on the valorization and upgrading of light methanol (MeOH). Incorporating spatial and techno-economic data, a mixed-integer linear programming model was developed to select source plants and conversion pathways, locations of conversion refinery sites, and the amount of captured CO 2 across the United States. The optimal results indicate that the FTS pathway is adopted at all selected refineries when the hydrogen price is 1000 dollars/t and the operating cost, mainly electricity used in conversion, is reduced to 5 % of its current level. Under this scenario, the total annual profit is 8 billion dollars, and the net carbon emissions are -88,783,284 tons. The sensitivity analyses reveal that the prices of electricity and hydrogen significantly contribute to total production costs. The CO 2 recycle percentage of the FTS pathway influences the choice of applied pathways at refineries. Additionally, a higher conversion rate holds a substantial promise for reducing the total production cost and can make the MeOH pathway a viable choice.

10 SYNTHETIC FUELS

Optimizing Desalination Operations for Energy Flexibility

Despite the value of energy optimization in desalination processes, modeling dynamic operations for monthly billing periods has remained a computational challenge. This work proposes a framework for energy flexibility optimization, which includes new modeling features for independent operation of parallel skids, start-up delays associated with chemical stabilization, the consideration of industrial energy tariff structures, and inclusion of hourly electrical carbon intensities. This is done using a modular and computationally efficient formulation that guarantees a globally optimal solution with standard optimization solvers. In this study, the approach is demonstrated in two distinct case studies: a seawater desalination plant in Santa Barbara, CA, and an indirect potable reuse facility in San Jose, CA. Trends predicted from the model are validated against operational facility measurements from a demand response shutdown event. Preliminary results show that optimizing energy flexibility can result in 18.51% monthly cost savings over energy efficiency-optimized operation. The value extracted from a facility-wide shutdown during peak electricity price hours is hampered by start-up delays in post-treatment chemical stabilization. In cases in which a facility does not have much excess capacity, using a flow equalization tank or operating over a wide recovery range may be cost-effective.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH

Stochastic Microgrid Scheduling With Chance‐Constrained Resilience Consideration

Traditionally, it is assumed that microgrids transition seamlessly from grid‐connected operation to islanded mode in the event of sudden main grid outages. In reality, the islanding process, especially unintentional islanding, is rarely seamless. Instead, it is subject to voltage and frequency fluctuations caused by the instantaneous disconnection of the point of common coupling (PCC) switch, variations in loads and renewable generation output and even the protection tripping of distributed energy resources (DERs). To mitigate these fluctuations and facilitate a smooth islanding process, we propose a stochastic microgrid scheduling model that incorporates chance‐constrained resilience measures. Specifically, the resilience measure is defined as the probability of successful islanding (PSI), that is, the probability that a microgrid can mitigate the generation‐demand imbalance caused by the disconnection of the PCC switch, variations in load and renewable generation and DER tripping. This measure is modelled using chance constraints. Unlike existing reliability and resilience indices, which typically neglect the possibility of microgrid/DER failure under extreme events and assume their survival while primarily focussing on reducing impact duration or magnitude, the proposed PSI‐based framework explicitly addresses microgrid and DER survival during the islanding transition. The formulated nonlinear chance constraints are approximated using a multiinterval approach and equivalently represented as a mixed‐integer linear programming (MILP) formulation. Case study results validate the proposed method, showing that the PSI estimation error is reduced to less than 8%, compared to approximately 28% with existing methods. Various sensitivity analyses on the DER tripping rate and PSI settings were performed to validate the robustness of the proposed method. In particular, the necessity of accounting for DER tripping in the PSI calculation was demonstrated.

chance constrained optimization

Optimal Economic Dispatch and Load-Following Strategies for Nuclear Integrated Energy Systems

The need for distributed and adaptable energy resources that can handle the growing unpredictability in both supply and demand is rising as the power system continues to modernize. In order to satisfy those needs and maintain grid resilience, nuclear power plants can dynamically control their output, despite typically being used as baseload generators. By incorporating energy storage and renewable energy sources, nuclear integrated energy systems are designed to satisfy the electrical and thermal demands of different end-user applications while ensuring flexible power operation. These systems generate revenue by participating in both wholesale and ancillary services electricity markets, as well as commodity markets for various byproducts generated from coupled industrial processes. This study addresses the economic dispatch efficiency of a tightly coupled nuclear integrated energy system comprising a gigawatt-scale light water reactor, commercialized in the U.S., a high-temperature steam electrolysis unit, a district heating network, and specified electrical loads. To demonstrate the nuclear power plant’s flexibility within the day-ahead unit commitment and economic dispatch framework, while maintaining equilibrium even during periods of refueling outages, this paper develops a mixed-integer linear programming framework that models the subsystems and components of its nuclear steam supply system. A systematic comparative analysis of flexible versus baseload nuclear power plant operation under varying levels of renewable energy integration indicates that flexible operation enhances system profitability by more than 18% while also increasing energy storage utilization, improving reactor responsiveness to load fluctuations, and allowing for greater participation across numerous electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY