At least 73 records · Page 4

Charging Infrastructure Technologies: Development of a Multiport, >1 MW Charging System for Medium- and Heavy-Duty Electric Vehicles

Development of a Multiport, >1 MW Charging System for Medium- and Heavy-Duty Electric Vehicles project will develop research tools for a framework to design, optimize, and demonstrate key components of a multi-port 1+ MW medium-voltage connected charging system. The objectives of this effort are to develop strategies and technologies for multi-port 1+ MW grid-connected stations to recharge MD/HD electric vehicles at fast-charging travel plazas or at fleet depots; through industry engagement, charging station utilization and load analysis, grid impacts and interconnection analysis, detailed power electronics component design and controller demonstration, site and battery charge control design and controller demonstration; and charging connector design.

1+MW charging↗

Morphing Downwind-Aligned Rotor Concept Based on a 13-MW Wind Turbine

To alleviate the mass-scaling issues associated with conventional upwind rotors of extreme-scale wind turbines (>/=10 MW), a morphing downwind-aligned rotor (MoDaR) concept is proposed herein. The concept employs a downwind rotor with blades whose elements are stiff (no intentional flexibility) but with hub-joints that can be unlocked to allow for moment-free downwind alignment. Aligning the combination of gravitational, centrifugal and thrust forces along the blade path reduces downwind cantilever loads, resulting in primarily tensile loading. For control simplicity, the blade curvature can be fixed with a single morphing degree of freedom using a near-hub joint for coning angle: 22 degrees at rated conditions. The conventional baseline was set as the 13.2-MW Sandia 100-m all glass blade in a three-bladed upwind configuration. To quantify potential mass savings, a downwind load-aligning, two-bladed rotor was designed. Because of the reduced number of blades, the MoDaR concept had a favorable 33% mass reduction. The blade reduction and coning led to a reduction in rated power, but morphing increased energy capture at lower speeds such that both the MoDaR and conventional rotors have the same average power: 5.4 MW. A finite element analysis showed that quasi-steady structural stresses could be reduced, over a range of operating wind speeds and azimuthal angles, despite the increases in loading per blade. However, the concept feasibility requires additional investigation of the mass, cost and complexity of the morphing hinge, the impact of unsteady aeroelastic influence because of turbulence and off-design conditions, along with system-level Levelized Cost of Energy analysis.

17 WIND ENERGY↗

Design of the 1.5 MW, 30-96 MHz ultra-wideband 3 dB high power hybrid coupler for Ion Cyclotron Resonance Frequency (ICRF) heating in fusion grade reactor

Design and developmental procedure of strip-line based 1.5 MW, 30-96 MHz, ultra-wideband high power 3 dB hybrid coupler has been presented and its applicability in ion cyclotron resonance heating (ICRH) in tokamak is discussed. For the high power handling capability, spacing between conductors and ground need to very high. Hence other structural parameters like strip-width, strip thickness coupling gap, and junction also become large which can be gone upto optimum limit where various constrains like fabrication tolerance, discontinuities, and excitation of higher TE and TM modes become prominent and significantly deteriorates the desired parameters of the coupled lines system. In designed hybrid coupler, two 8.34 dB coupled lines are connected in tandem to get desired coupling of 3 dB and air is used as dielectric. The spacing between ground and conductors are taken as 0.164 m for 1.5 MW power handling capability. To have the desired spacing, each of 8.34 dB segments are designed with inner dimension of 3.6 × 1.0 × 40 cm where constraints have been significantly realized, compensated, and applied in designing of 1.5 MW hybrid coupler and presented in paper.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Rapid approach for structural design of the tower and monopile for a series of 25 MW offshore turbines

The goal of further reducing the Levelized Cost of Energy (LCOE) has driven the investigation of large-scale wind turbines. This work presents a simple, rapid and detailed approach for the structural design of the tower and monopile without a controller, but with frequency and high fidelity structural verification. The approach uses an optimization to reduce the mass of the structures while meeting strength, buckling and geometric constraints by using analytical equations. A verification of frequency constraints is performed with BModes, and ANSYS Mechanical APDL is used for high fidelity verification of stress and buckling. The approach is applied to study the design space of three 25 MW offshore wind turbines with different rotor diameters and cone angles, and to evaluate the nacelle center of mass fore-aft location effect. Results obtained show that the tower and monopile are more susceptible to changes in the rotor thrust than the overturning moment even for designs with high pre-cone angle and large distance of the nacelle center of mass from the tower axis. But it is possible to obtain structurally feasible tower and monopile designs for the three 25 MW turbines studied while not exceeding diameter and wall thickness limits. However, mass penalties can be decreased by 0.8-14%, to further reduce the cost of energy, by increasing the diameter limit which may require manufacturing technology development. The approach applied and studies serve to understand the design space of the tower and monopile for a 25 MW turbine, and provide baseline designs that can be used in the development of a controller and evaluation of a full suite of design load cases.

17 WIND ENERGY↗

Design and Techno-Economic Analysis of a 150-MW Hybrid CSP-PV Plant

The interest in concentrated solar power (CSP) has increased significantly over the years since it is dispatchable and requires thermal storage instead of electric storage. When compared to photovoltaics (PV), CSP has a higher Levelized Cost of Electricity (LCOE). In this paper, we present the design of a hybrid power plant using CSP and PV technologies. The hybrid system offers a lower LCOE than CSP but will still have dispatchability. The 150-MW hybrid system consists of 100-MW CSP and 50-MW PV capacity. Furthermore, the CSP system (central receiver system) has a molten salt-based thermal storage of 12 hours. The geographical focus of this study is Pakistan, which is a developing country struggling with energy crises, but which has high solar potential. The hybrid system is modeled using the System Advisor Model (SAM). The results show that by hybridizing CSP with PV, the LCOE can be reduced by 18.5%.

concentrated solar power↗

Conceptual Design of a Tension Leg Platform With 22.3 MW Vertical Axis Turbine

Here, this paper presents the conceptual design of a tension leg platform (TLP) for the ARCUS “towerless” vertical-axis wind turbine (VAWT). VAWTs are ideal for floating offshore sites and have several advantages over horizontal-axis wind turbines (HAWT) including reduced top mass, lower center of gravity, increased energy capture, and in turn lower cost. The towerless ARCUS VAWT drives these advantages further through increased structural efficiency and by enabling more optimized TLP designs with simplified installation procedures. For hull sizing, we have studied three turbine sizes with corresponding power ratings of 5.1 MW, 10.4 MW and 22.3 MW. The largest turbine was identified as having the greatest potential to reduce the levelized cost of energy (LCOE) and is the reference size used for the further detailed design process. The conceptual design of the VAWT TLP has been awarded with an ABS Approval in Principle Certificate. This paper contains brief analysis results and design findings for a TLP designed to house a VAWT, including the following topics: • Applicable Design Codes • Metocean Conditions • ARCUS Turbine Loads • Design Load Cases and Requirements - Pre-service TLP Stability - In-place TLP Global Performance • Platform Configurations, Hull Structure Scantling Design, Weight and CG Estimation, and General Arrangement Drawings • Hull Ballast Plan for both Pre-service and In-place Conditions • Pre-service Quayside Integration, Transportation and Wet Tow Stability Analysis • Global Performance Analysis for Motions and Tendon tensions • Summary of cost components and system levelized cost of energy

17 WIND ENERGY↗

High-speed silicon microresonator modulators with high optical modulation amplitude (OMA) at input powers >10 mW

A high-speed silicon photonic microdisc modulator is used with more than 10 mW optical power in the bus waveguide, extending the optical power handling regime used with compact silicon resonant modulators at 1550 nm. We present an experimental study of the wavelength tuning range and biasing path required to shift the resonant frequency to the optimal point versus on chip power. We measure the optical modulation amplitude (OMA) along different biasing trajectories of the microdisc under active modulation and demonstrate an OMA of 4.1 mW with 13.5 mW optical power in the bus waveguide at 20 Gbit/s non-return to zero (NRZ) data modulation.

Wang, Xiaoxi↗

Operations Experience of SNS at 1.4MW and Upgrade Plans for Doubling the Beam Power

In 2018, the SNS begins operation at the design proton beam power of 1.4 MW. This talk will present the critical technical challenges that were overcome in order to take the final step in beam power with a higher than 90% reliability. In addition, the future project of the SNS for doubling the beam power from 1.4 MW to 2.8 MW and construction of second target station will be discussed.

Galambos, John D↗

Economic Development Impact of 1,000 MW of Wind Energy in Texas

Texas has approximately 9,727 MW of wind energy capacity installed, making it a global leader in installed wind energy. As a result of the significant investment the wind industry has brought to Texas, it is important to better understand the economic development impacts of wind energy in Texas. This report analyzes the jobs and economic impacts of 1,000 MW of wind power generation in the state.The impacts highlighted in this report can be used in policy and planning decisions and can be scaled to get a sense of the economic development opportunities associated with other wind scenarios. This report can also inform stakeholders in other states about the potential economic impacts associated with the development of 1,000 MW of new wind power generation and the relationships of differentelements in the state economy.

17 WIND ENERGY↗

Ultra Clean 1.1MW High Efficiency Natural Gas Engine Powered System

Dresser, Inc. (GE Energy, Waukesha gas engines) will develop, test, demonstrate, and commercialize a 1.1 Megawatt (MW) natural gas fueled combined heat and power reciprocating engine powered package. This package will feature a total efficiency > 75% and ultra low CARB permitting emissions. Our modular design will cover the 1 – 6 MW size range, and this scalable technology can be used in both smaller and larger engine powered CHP packages. To further advance one of the key advantages of reciprocating engines, the engine, generator and CHP package will be optimized for low initial and operating costs. Dresser, Inc. will leverage the knowledge gained in the DOE - ARES program. Dresser, Inc. will work with commercial, regulatory, and government entities to help break down barriers to wider deployment of CHP. The outcome of this project will be a commercially successful 1.1 MW CHP package with high electrical and total efficiency that will significantly reduce emissions compared to the current central power plant paradigm.

20 FOSSIL-FUELED POWER PLANTS↗

Design & development fo a 20-MW flywheel-based frequency regulation power plant : a study for the DOE Energy Storage Systems program.

This report describes the successful efforts of Beacon Power to design and develop a 20-MW frequency regulation power plant based solely on flywheels. Beacon's Smart Matrix (Flywheel) Systems regulation power plant, unlike coal or natural gas generators, will not burn fossil fuel or directly produce particulates or other air emissions and will have the ability to ramp up or down in a matter of seconds. The report describes how data from the scaled Beacon system, deployed in California and New York, proved that the flywheel-based systems provided faster responding regulation services in terms of cost-performance and environmental impact. Included in the report is a description of Beacon's design package for a generic, multi-MW flywheel-based regulation power plant that allows accurate bids from a design/build contractor and Beacon's recommendations for site requirements that would ensure the fastest possible construction. The paper concludes with a statement about Beacon's plans for a lower cost, modular-style substation based on the 20-MW design.

01 COAL, LIGNITE, AND PEAT↗

Design and test of a 2.25-MW transformer rectifier assembly

A new 2.25-MW transformer rectifier assembly was fabricated for DSS-13 at Goldstone, California. The transformer rectifier will provide constant output power of 2.25 MW at any voltage from 31 kV to 125 kV. This will give a new capability of 1 MW of RF power at X-band, provided appropriate microwave tubes are in the power amplifier. A description of the design and test results is presented.

Cormier, R.↗

A 1 MW, 100 kV, less than 100 kg space based dc-dc power converter

A 1 MW dc-dc power converter has been designed which has an input voltage of 5 kV +/-3 percent, an output voltage of 100 kV +/- 0.25 percent, and a run time of 1000 s at full power. The estimated system mass is 83.8 kg, giving a power density of 11.9 kW/kg. The system exceeded the weight goal of 10 kW/kg through the use of innovative components and system concepts. The system volume is approximately 0.1 cu m, and the overall system efficiency is estimated to be 87 percent. Some of the unique system features include a 50-kHz H-bridge inverter using MOS-controlled thyristors as the switching devices, a resonance transformer to step up the voltage, open-cycle cryogenic hydrogen gas cooling, and a nonrigid, inflatable housing which provides on-demand pressurization of the power converter local environment. This system scales very well to higher output powers. The weight of the 10-MW system with the same input and output voltage requirements and overall system configuration is estimated to be 575.3 kg. This gives a power density of 17.4 kW/kg, significantly higher than the 11.9 kW/kg estimated at 1 MW.

Cooper, J. R.↗

500 MW X-BAND RF SYSTEM OF A 0.25 GEV ELECTRON LINAC FOR ADVANCED COMPTON SCATTERING SOURCE APPLICATION

A Mono-Energetic Gamma-Ray (MEGa-Ray) Compton scattering light source is being developed at LLNL in collaboration with SLAC National Accelerator Laboratory. The electron beam for the Compton scattering interaction will be generated by a X-band RF gun and a X-band LINAC at the frequency of 11.424 GHz. High power RF in excess of 500 MW is needed to accelerate the electrons to energy of 250 MeV or greater for the interaction. Two high power klystron amplifiers, each capable of generating 50 MW, 1.5 msec pulses, will be the main high power RF sources for the system. These klystrons will be powered by state of the art solid-state high voltage modulators. A RF pulse compressor, similar to the SLED II pulse compressor, will compress the klystron output pulse with a power gain factor of five. For compactness consideration, we are looking at a folded waveguide setup. This will give us 500 MW at output of the compressor. The compressed pulse will then be distributed to the RF gun and to six traveling wave accelerator sections. Phase and amplitude control are located at the RF gun input and additional control points along the LINAC to allow for parameter control during operation. This high power RF system is being designed and constructed. In this paper, we will present the design, layout, and status of this RF system.

42 ENGINEERING↗

50 MW X-BAND RF SYSTEM FOR A PHOTOINJECTOR TEST STATION AT LLNL

In support of X-band photoinjector development efforts at LLNL, a 50 MW test station is being constructed to investigate structure and photocathode optimization for future upgrades. A SLAC XL-4 klystron capable of generating 50 MW, 1.5 microsecond pulses will be the high power RF source for the system. Timing of the laser pulse on the photocathode with the applied RF field places very stringent requirements on phase jitter and drift. To achieve these requirements, the klystron will be powered by a state of the art, solid-state, high voltage modulator. The 50 MW will be divided between the photoinjector and a traveling wave accelerator section. A high power phase shifter is located between the photoinjector and accelerator section to adjust the phasing of the electron bunches with respect to the accelerating field. A variable attenuator is included on the input of the photoinjector. The distribution system including the various x-band components is being designed and constructed. In this paper, we will present the design, layout, and status of the RF system.

42 ENGINEERING↗

A 4-MW Target Station for a Muon Collider or Neutrino Factory

We outline a program of engineering design and simulation for a target station and pion production/capture system for a 4-MW proton beam at the front end of a Muon Collider or a Neutrino Factory. The target system consists of a free liquid-metal (nominally mercury) jet immersed in a high-field solenoid magnet capture system that also incorporates the proton beam dump. Topics to be studied include optimization of proton beam and jet target parameters, of the magnetic configuration for capture and subsequent transport of pions and muons, of the beam dump, of the radiation/thermal shielding of the capture magnets, and of the beam windows. While the principle of a liquid-metal jet target inside a 20-T solenoid has been validated by the MERIT experiment for beam pulses equivalent to 4-MW beam power at 50 Hz, substantial effort is still required to turn this concept into a viable engineering design. We are embarking on a several-year program of simulation and technical design for a 4-MW target station in preparation for the Muon Collider Design Feasibility Study and the International Design Study for a Neutrino Factory.

43 PARTICLE ACCELERATORS↗

500 MW X-Band RF System of a 0.25 GeV Electron LINAC for Advanced Compton Scattering Source Application

A Mono-Energetic Gamma-Ray (MEGa-Ray) Compton scattering light source is being developed at LLNL in collaboration with the SLAC National Accelerator Laboratory. The electron beam for the Compton scattering interaction will be generated by a X-band RF gun and a X-band LINAC at the frequency of 11.424 GHz. High power RF in excess of 500 MW is needed to accelerate the electrons to energy of 250 MeV or greater for the interaction. Two high power klystron amplifiers, each capable of generating 50 MW, 1.5 msec pulses, will be the main high power RF sources for the system. These klystrons will be powered by state of the art solid-state high voltage modulators. A RF pulse compressor, similar to the SLED II pulse compressor, will compress the klystron output pulse with a power gain factor of five. For compactness consideration, we are looking at a folded waveguide setup. This will give us 500 MW at output of the compressor. The compressed pulse will then be distributed to the RF gun and to six traveling wave accelerator sections. Phase and amplitude control are located at the RF gun input and additional control points along the LINAC to allow for parameter control during operation. This high power RF system is being designed and constructed. In this paper, we will present the design, layout, and status of this RF system.

43 PARTICLE ACCELERATORS↗

LBNF 1.2 MW TARGET: CONCEPTUAL DESIGN & FABRICATION

Fermilab’s Long-Baseline Neutrino Facility (LBNF) will utilize a modified design based on the NuMI low energy target that is reconfigured to accommodate beam operation at 1.2 MW. Achieving this power with a graphite target material and ancillary systems originally rated for 400 kW requires several design changes and R&D efforts related to material bonding and electrical isolation. Target cooling, structural design, and fabrication techniques must address higher stresses and heat loads that will be present during 1.2 MW operation, as the assembly will be subject to cyclic loads and thermal expansion. Mitigations must be balanced against compromises in neutrino yield. Beam monitoring and subsystem instrumentation will be updated and added to ensure confidence in target positioning and monitoring. Remote connection to the target hall support structure must provide for the eventual upgrade to a 2.4 MW target design, without producing excessive radioactive waste or unreasonable exposure to technicians during reconfiguration. Current designs and assembly layouts will be presented, in addition to current findings on processes and possibilities for prototype and final assembly fabrication.

43 PARTICLE ACCELERATORS↗