Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MUON SYSTEM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

The calorimeter system of the new muon g -2 experiment at Fermilab

The electromagnetic calorimeter for the new muon ( g −2) experiment at Fermilab will consist of arrays of PbF 2 Čerenkov crystals read out by large-area silicon photo-multiplier (SiPM) sensors. We report here the requirements for this system, the achieved solution and the results obtained from a test beam using 2.0–4.5 GeV electrons with a 28-element prototype array.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Energy Frontier Research With ATLAS: Final Report

The Boston University (BU) group is playing key roles across the ATLAS experiment: in detector operations, the online trigger, the upgrade, computing, and physics analysis. Our team has been critical to the maintenance and operations of the muon system since its installation. During Run 1 we led the muon trigger group and that responsibility continues into Run 2. BU maintains and operates the ATLAS Northeast Tier 2 computing center. We are actively engaged in the analysis of ATLAS data from Run 1 and Run 2. Physics analyses we have contributed to include Standard Model measurements (W and Z cross sections, t\bar{t} differential cross sections, WWW^* production), evidence for the Higgs decaying to \tau^+\tau^-, and searches for new phenomena (technicolor, Z' and W', vector-like quarks, dark matter).

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The Performance and Long Term Stability of the D0 Run II Forward Muon Scintillation Counters

The performance of the D0 experiment forward muon scintillation counters system during Run II of the Tevatron from 2001 to 2011 is described. The system consists of 4214 scintillation counters in six layers. The long term stability of the counters amplitude response determined using LED calibration system and muons produced in proton-antiproton collisions is presented. The average signal amplitude for counters of all layers has gradually decreased over ten years by 11%. The reference timing, determined using LED calibration, was stable within 0.26 ns. Average value of muon timing peak position was used for periodic D0 clock signal adjustments to compensate seasonal drift caused by temperature variations. Counters occupancy for different triggers in physics data collection runs and for minimum bias triggers are presented. The single muon yields versus time and the luminosity dependence of yields were stable for the forward muon system within 1% over 10 years.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Performance of CMS muon reconstruction in pp collision events at √s = 7 TeV

The performance of muon reconstruction, identification, and triggering in CMS has been studied using 40 inverse picobarns of data collected in pp collisions at $ \sqrt{s}=7 $ TeV at the LHC in 2010. A few benchmark sets of selection criteria covering a wide range of physics analysis needs have been examined. For all considered selections, the efficiency to reconstruct and identify a muon with a transverse momentum pT larger than a few GeV is above 95% over the whole region of pseudorapidity covered by the CMS muon system, abs(eta) < 2.4, while the probability to misidentify a hadron as a muon is well below 1%. The efficiency to trigger on single muons with pT above a few GeV is higher than 90% over the full eta range, and typically substantially better. The overall momentum scale is measured to a precision of 0.2% with muons from Z decays. The transverse momentum resolution varies from 1% to 6% depending on pseudorapidity for muons with pT below 100 GeV and, using cosmic rays, it is shown to be better than 10% in the central region up to pT = 1 TeV. Observed distributions of all quantities are well reproduced by the Monte Carlo simulation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Alignment validation

The four experiments, ALICE, ATLAS, CMS and LHCb are currently under constructionat CERN. They will study the products of proton-proton collisions at the Large Hadron Collider. All experiments are equipped with sophisticated tracking systems, unprecedented in size and complexity. Full exploitation of both the inner detector andthe muon system requires an accurate alignment of all detector elements. Alignmentinformation is deduced from dedicated hardware alignment systems and the reconstruction of charged particles. However, the system is degenerate which means the data is insufficient to constrain all alignment degrees of freedom, so the techniques are prone to converging on wrong geometries. This deficiency necessitates validation and monitoring of the alignment. An exhaustive discussion of means to validate is subject to this document, including examples and plans from all four LHC experiments, as well as other high energy experiments.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Performance of the CMS ME1/1 muon station

ME1/1 is a part of the endcap muon system of the CMS detector at the LHC (CERN). It plays the key role in the muon detection providing muon track matching with the CMS inner tracker. ME1/1 should provide high spatial and time resolution. The station is composed of 72 6-layer cathode strip chambers. The chambers were designed and produced at JINR (Dubna). ME1/1 is the innermost muon detector and operates in the strong axial magnetic field (B = 3 T) in the presence of high background of secondary particles. The paper presents the chamber design features and the ME1/1 station characteristics in the CMS runs with proton-proton collisions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The status of the CMS experiment

The CMS experiment was completely assembled in the fall of 2008 after a decade of design, construction and installation. During the last two years, cosmic ray data were taken on a regular basis. These data have enabled CMS to align the detector components, both spatially and temporally. Initial use of muons has also established the relative alignment of the CMS tracking and muon systems. In addition, the CMS calorimetry has been crosschecked with test beam data, thus providing an initial energy calibration of CMS calorimetry to about 5%. The CMS magnet has been powered and field mapped. The trigger and data acquisition systems have been installed and run at full speed. The tiered data analysis system has been exercised at full design bandwidth for Tier0, Tier1 and Tier2 sites. Monte Carlo simulation of the CMS detector has been constructed at a detailed geometric level and has been tuned to test beam and other production data to provide a realistic model of the CMS detector prior to first collisions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

High Multiplicity Trigger for long-lived particles in CMS detector

Searches for long-lived particles (LLPs) at the CMS experiment often involve unconventional event topologies that are difficult to efficiently select using standard trigger strategies. To improve sensitivity to such signatures during LHC Run 3 operation, a dedicated High Multiplicity Trigger (HMT) has been developed and deployed in the CMS trigger system. The trigger targets events containing unusually large numbers of hits in the CMS cathode strip chamber (CSC) muon detectors, a characteristic signature of several LLP scenarios involving displaced decays in the muon system. The HMT implementation, trigger logic, rate dependence with pileup, and operational stability are described. Optimized hit multiplicity thresholds are used to maintain acceptable trigger rates under high-luminosity and high-pileup conditions while preserving high efficiency across a broad range of LLP lifetimes and kinematic regimes. The trigger performance is evaluated using both simulated event samples and proton-proton collision data collected during Run 3 of the LHC. The HMT substantially extends the CMS sensitivity to non-standard signatures associated with LLP decays and provides a flexible platform for future searches for physics beyond the Standard Model.

47 OTHER INSTRUMENTATION↗

Search for 𝑏-hadron decays to long-lived particles in the CMS endcap muon detectors

A search for long-lived particles originating from the decay of 𝑏 hadrons produced in proton-proton collisions with a center-of-mass energy of 13 TeV at the LHC is presented. The analysis is performed on a dataset recorded in 2018, corresponding to an integrated luminosity of 41.6 fb −1 . Interactions of the long-lived particles in the CMS endcap muon system would create hadronic or electromagnetic showers, producing clusters of detector hits. Selected events contain at least one such high-multiplicity cluster in the muon endcaps and require the presence of a displaced muon. The most stringent upper limits to date on the branching fraction ℬ⁡(𝐵 →𝐾⁢Φ), where the long-lived particle Φ decays to a pair of hadrons, are obtained for Φ masses of 0.3–3.0 GeV and Φ mean proper decay lengths in the range of 1–500 cm.

Hayrapetyan, A. [Yerevan Physics Institute]↗

Electron beam test of key elements of the laser-based calibration system for the muon g - 2 experiment

We report the test of many of the key elements of the laser-based calibration system for muon g - 2 experiment E989 at Fermilab. The test was performed at the Laboratori Nazionali di Frascati's Beam Test Facility using a 450 MeV electron beam impinging on a small subset of the final g - 2 lead-fluoride crystal calorimeter system. The calibration system was configured as planned for the E989 experiment and uses the same type of laser and most of the final optical elements. We show results regarding the calorimeter's response calibration, the maximum equivalent electron energy which can be provided by the laser and the stability of the calibration system components.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Fermilab Muon Campus g-2 Cryogenic Distribution Remote Control System

The Muon Campus (MC) is able to measure Muon g-2 with high precision and comparing its value to the theoretical prediction. The MC has four 300 KW screw compressors and four liquid helium refrigerators. The centerpiece of the Muon g-2 experiment at Fermilab is a large, 50-foot-diameter superconducting muon storage ring. This one-of-a-kind ring, made of steel, aluminum and superconducting wire, was built for the previous g-2 experiment at Brookhaven. Due to each subsystem has to be far away from each other and be placed in the distant location, therefore, Siemens Process Control System PCS7-400, Automation Direct DL205 & DL05 PLC, Synoptic and Fermilab ACNET HMI are the ideal choices as the MC g-2 cryogenic distribution real-time and on-Line remote control system. This paper presents a method which has been successfully used by many Fermilab distribution cryogenic real-time and On-Line remote control systems.

43 PARTICLE ACCELERATORS↗

40 MHz Level-1 Trigger Scouting for CMS

The CMS experiment will be upgraded for operation at the HighLuminosity LHC to maintain and extend its physics performance under extreme pileup conditions. Upgrades will include an entirely new tracking system, supplemented by a track finder processor providing tracks at Level-1, as well as a high-granularity calorimeter in the endcap region. New front-end and back-end electronics will also provide the Level-1 trigger with high-resolution information from the barrel calorimeter and the muon systems. The upgraded Level-1 processors, based on powerful FPGAs, will be able to carry out sophisticated feature searches with resolutions often similar to the offline ones, while keeping pileup effects under control. In this paper, we discuss the feasibility of a system capturing Level-1 intermediate data at the beam-crossing rate of 40 MHz and carrying out online analyzes based on these limited-resolution data. This 40 MHz scouting system would provide fast and virtually unlimited statistics for detector diagnostics, alternative luminosity measurements and, in some cases, calibrations. It has the potential to enable the study of otherwise inaccessible signatures, either too common to fit in the Level-1 accept budget, or with requirements which are orthogonal to “mainstream” physics, such as long-lived particles. We discuss the requirements and possible architecture of a 40 MHz scouting system, as well as some of the physics potential, and results from a demonstrator operated at the end of Run-2 using the Global Muon Trigger data from CMS. Plans for further demonstrators envisaged for Run-3 are also discussed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A new ATLAS muon CSC readout system with system on chip technology on ATCA platform

The ATLAS muon Cathode Strip Chamber (CSC) backend readout system has been upgraded during the LHC 2013-2015 shutdown to be able to handle the higher Level-1 trigger rate of 100 kHz and the higher occupancy at Run-2 luminosity. The readout design is based on the Reconfigurable Cluster Element (RCE) concept for high bandwidth generic DAQ implemented on the Advanced Telecommunication Computing Architecture (ATCA) platform. The RCE design is based on the new System on Chip XILINX ZYNQ series with a processor-centric architecture with ARM processor embedded in FPGA fabric and high speed I/O resources. Together with auxiliary memories, all of these components form a versatile DAQ building block that can host applications tapping into both software and firmware resources. The Cluster on Board (COB) ATCA carrier hosts RCE mezzanines and an embedded Fulcrum network switch to form an online DAQ processing cluster. More compact firmware solutions on the ZYNQ for high speed input and output fiberoptic links and TTC allowed the full system of 320 input links from the 32 chambers to be processed by 6 COBs in one ATCA shelf. The full system was installed in September 2014. In conclusion, we will present the RCE/COB design concept, the firmware and software processing architecture, and the experience from the intense commissioning for LHC Run 2.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A new ATLAS muon CSC readout system with system on chip technology on ATCA platform

The ATLAS muon Cathode Strip Chamber (CSC) back-end readout system has been upgraded during the LHC 2013-2015 shutdown to be able to handle the higher Level-1 trigger rate of 100 kHz and the higher occupancy at Run 2 luminosity. The readout design is based on the Reconfiguration Cluster Element (RCE) concept for high bandwidth generic DAQ implemented on the ATCA platform. The RCE design is based on the new System on Chip Xilinx Zynq series with a processor-centric architecture with ARM processor embedded in FPGA fabric and high speed I/O resources together with auxiliary memories to form a versatile DAQ building block that can host applications tapping into both software and firmware resources. The Cluster on Board (COB) ATCA carrier hosts RCE mezzanines and an embedded Fulcrum network switch to form an online DAQ processing cluster. More compact firmware solutions on the Zynq for G-link, S-link and TTC allowed the full system of 320 G-links from the 32 chambers to be processed by 6 COBs in one ATCA shelf through software waveform feature extraction to output 32 S-links. Furthermore, the full system was installed in Sept. 2014. We will present the RCE/COB design concept, the firmware and software processing architecture, and the experience from the intense commissioning towards LHC Run 2.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The fast non-ferric kicker system for the Muon g–2 Experiment at Fermilab

Here we describe the installation, commissioning, and characterization of the new injection kicker system in the Muon g – 2 Experiment (E989) at Fermilab, which makes a precision measurement of the muon magnetic anomaly. Three Blumlein pulsers drive each of the 1.27-m-long non-ferric kicker magnets, which reside in a storage ring vacuum (SRV) that is subjected to a 1.45 T magnetic field. The new system has been redesigned relative to Muon g – 2 ’s predecessor experiment, and we present those details in this manuscript.

43 PARTICLE ACCELERATORS↗

Search for Charged Massive Long-Lived Particles Using the D0 Detector

A search for charged massive stable particles has been performed with the D0 detector using 1.1 fb -1 of data. The speed of the particle has been calculated based on the time-of-flight and position information in the muon system. The present research is limited to direct pair-production of the charged massive long-lived particles. We do not consider CMSPs that result from the cascade decays of heavier particles. In this analysis, the exact values of the model parameters of the entire supersymmetric particle mass spectrum, relevant for cascade decays, are not important. We found no evidence of the signal. 95% CL cross-section upper limits have been set on the pair-productions of the stable scaler tau lepton, the gaugino-like charginos, and the higgsino-like charginos. The upper cross section limits vary from 0.31 pb to 0.04 pb, for stau masses in the range between 60 GeV and 300 GeV. We use the nominal value of the theoretical cross section to set limits on the mass of the pair produced charginos. We exclude the pair-produced stable gaugino-like charginos with mass below 206 GeV, and higgsino-like charginos below 171 GeV, respectively. Although the present sensitivity is insufficient to test the model of the pair produced stable staus, we do set cross section limits which can be applied to the pair production of any charged massive stable particle candidates with similar kinematics. These are the most restrictive limits to the present on the cross sections for CMSPs and the first published from the Tevatron Collider Run II. The manuscript has been published by Physical Review Letters in April 2009 and is available at arXiv as.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Characterizing the Noise Performance of the KPiX ASIC Readout Chip

AKPiX is a prototype front-end readout chip designed for the Silicon Detector Design Concept for the International Linear Collider (ILC). It is targeted at readout of the outer tracker and the silicon-tungsten calorimeter and is under consideration for the hadronic calorimeter and muon systems. This chip takes advantage of the ILC timing structure by implementing pulsed-power operation to reduce power and cooling requirements and buffered readout to minimize material. Successful implementation of this chip requires optimal noise performance, of which there are two measures. The first is the noise on the output signal, previously measured at 1500e{sup -}, which is much larger than the anticipated 500e{sup -}. The other is the noise on the trigger logic branch, which determines where thresholds must be set in order to eliminate noise hits, thus defining the smallest signals to which the chip can be sensitive. A test procedure has been developed to measure the noise in the trigger branch by scanning across the pedestal in trigger threshold and taking self-triggered data to measure the accept rate at each threshold. This technique measures the integral of the pedestal shape. Shifts in the pedestal mean from injection of known calibration charges are used to normalize the distribution in units of charge. The shape of the pedestal is fit well by a Gaussian, the width of which is determined to be 2480e{sup -}, far in excess of the expected noise. The variation of the noise as a function of several key parameters was studied, but no significant source has been clearly isolated. However, several problems have been identified that are being addressed or are under further investigation. Meanwhile, the techniques developed here will be critical in ultimately verifying the performance goals of the KPiX chip.

43 PARTICLE ACCELERATORS↗