Comparative Ergonomic Evaluation of Spacesuit and Space Vehicle Design

With the advent of the latest human spaceflight objectives, a series of prototype architectures for a new launch and reentry spacesuit that would be suited to the new mission goals. Four prototype suits were evaluated to compare their performance and enable the selection of the preferred suit components and designs. A consolidated approach to testing was taken: concurrently collecting suit mobility data, seat-suit-vehicle interface clearances, and qualitative assessments of suit performance within the volume of a Multi-Purpose Crew Vehicle mockup. It was necessary to maintain high fidelity in a mockup and use advanced motion-capture technologies in order to achieve the objectives of the study. These seemingly mutually exclusive goals were accommodated with the construction of an optically transparent and fully adjustable frame mockup. The construction of the mockup was such that it could be dimensionally validated rapidly with the motioncapture system. This paper describes the method used to create a space vehicle mockup compatible with use of an optical motion-capture system, the consolidated approach for evaluating spacesuits in action, and a way to use the complex data set resulting from a limited number of test subjects to generate hardware requirements for an entire population. Kinematics, hardware clearance, anthropometry (suited and unsuited), and subjective feedback data were recorded on 15 unsuited and 5 suited subjects. Unsuited subjects were selected chiefly based on their anthropometry in an attempt to find subjects who fell within predefined criteria for medium male, large male, and small female subjects. The suited subjects were selected as a subset of the unsuited medium male subjects and were tested in both unpressurized and pressurized conditions. The prototype spacesuits were each fabricated in a single size to accommodate an approximately average-sized male, so select findings from the suit testing were systematically extrapolated to the extremes of the population to anticipate likely problem areas. This extrapolation was achieved by first comparing suited subjects performance with their unsuited performance, and then applying the results to the entire range of the population. The use of a transparent space vehicle mockup enabled the collection of large amounts of data during human-in-the-loop testing. Mobility data revealed that most of the tested spacesuits had sufficient ranges of motion for the selected tasks to be performed successfully. A suited subject's inability to perform a task most often stemmed from a combination of poor field of view in a seated position, poor dexterity of the pressurized gloves, or from suit/vehicle interface issues. Seat ingress and egress testing showed that problems with anthropometric accommodation did not exclusively occur with the largest or smallest subjects, but also with specific combinations of measurements that led to narrower seat ingress/egress clearance.

England, Scott↗

Asteroid Redirect Crewed Mission Space Suit and EVA System Maturation

The Asteroid Redirect Crewed Mission (ARCM) requires a Launch/Entry/Abort (LEA) suit capability and short duration Extra Vehicular Activity (EVA) capability from the Orion spacecraft. For this mission, the pressure garment that was selected, for both functions, is the Modified Advanced Crew Escape Suit (MACES) with EVA enhancements and the life support option that was selected is the Exploration Portable Life Support System (PLSS). The proposed architecture was found to meet the mission constraints, but much more work is required to determine the details of the required suit upgrades, the integration with the PLSS, and the rest of the tools and equipment required to accomplish the mission. This work has continued over the last year to better define the operations and hardware maturation of these systems. EVA simulations have been completed in the NBL and interfacing options have been prototyped and analyzed with testing planned for late 2014. For NBL EVA simulations, in 2013, components were procured to allow in-house build up for four new suits with mobility enhancements built into the arms. Boots outfitted with clips that fit into foot restraints have also been added to the suit and analyzed for possible loads. Major suit objectives accomplished this year in testing include: evaluation of mobility enhancements, ingress/egress of foot restraint, use of foot restraint for worksite stability, ingress/egress of Orion hatch with PLSS mockup, and testing with two crew members in the water at one time to evaluate the crew's ability to help one another. Major tool objectives accomplished this year include using various other methods for worksite stability, testing new methods for asteroid geologic sampling and improving the fidelity of the mockups and crew equipment. These tests were completed on a medium fidelity capsule mockup, asteroid vehicle mockup, and asteroid mockups that were more accurate for an asteroid type EVA than previous tests. Another focus was the design and fabrication of the interface between the MACES and the PLSS. The MACES was not designed to interface with a PLSS, hence an interface kit must accommodate the unique design qualities of the MACES and provide the necessary life support function connections to the PLSS. A prototype interface kit for MACES to PLSS has been designed and fabricated. Unmanned and manned testing of the interface will show the usability of the kit while wearing a MACES. The testing shows viability of the kit approach as well as the operations concept. The design will be vetted through suit and PLSS experts and, with the findings from the testing, the best path forward will be determined. As the Asteroid Redirect Mission matures, the suit/life support portion of the mission will mature along with it and EVA Tools & Equipment can be iterated to accommodate the overall mission objectives and compromises inherent in EVA Suit optimization. The goal of the EVA architecture for ARCM is to continue to build on the previously developed technologies and lessons learned, and accomplish the ARCM EVAs while providing a stepping stone to future missions and destinations.

Bowie, Jonathan T.↗

Development of space telescope non-ORU hardware

Since 1979 work has progressed in the development of the Hubble Space Telescope (HST) mockup. Underwater simulations to evaluate proposed on-orbit servicing tasks have also been done. These tasks involve the planned changeout of scientific instruments and the unscheduled changeout of other orbital replacement units (ORUs) such as batteries and computers. The HST components and subsystems that originally were designated ORUs were the items that were mission critical and were designed for easy changeout. Mockups of 14 non-ORU items were designed and fabricated for the purpose of evaluating the EVA changetasks in the MSFC Neutral Buoyancy Simulator (NBS). The objectives of this design/fabrication/test activity were to design and fabricate the potential ORUs so they contained realistic interfaces and were compatible with the NBS environments. The attachment of the mockup hardware to the spacecraft mockup was similar to the flight version. Also, the hardware connectors were flight-like.

Robertson, K. B.↗

Application of transport techniques to the analysis of NERVA shadow shields

A radiation shield internal to the NERVA nuclear rocket reactor required to limit the neutron and photon radiation levels at critical components located external to the reactor was evaluated. Two significantly different shield mockups were analyzed: BATH, a composite mixture of boron carbide, aluminum and titanium hydride, and a borated steel-liquid hydrogen system. Based on the comparisons between experimental and calculated neutron and photon radiation levels, the following conclusions were noted: (1) The ability of two-dimensional discrete ordinates code to predict the radiation levels internal to and at the surface of the shield mockups was clearly demonstrated. (2) Internal to the BATH shield mockups, the one-dimensional technique predicted the axial variation of neutron fluxes and photon dose rates; however, the magnitude of the neutron fluxes was about a factor of 1.8 lower than the two-dimensional analysis and the photon dose rate was a factor of 1.3 lower.

Capo, M. A.↗

Servicers system demonstration plan and capability development

A plan for the demonstration of the exchange of Multi-Mission Modular Spacecraft (MMS) modules using the servicer mechanism Engineering Test Unit (ETU) was prepared and executed. The plan included: establishment of requirements, conceptual design, selection of MMS spacecraft mockup configuration, selection of MMS module mockup configuration, evaluation of adequacy of ETU load capability, and selection of a stowage rack arrangement. The MMS module exchange demonstration mockup equipment was designed, fabricated, checked out, shipped, installed, and demonstrated.

Bulboaca, M. A.↗

Autonomous sensor-based dual-arm satellite grappling

Dual-arm satellite grappling involves the integration of technologies developed in the Sensing and Perception (S&P) Subsystem for object acquisition and tracking, and the Manipulator Control and Mechanization (MCM) Subsystem for dual-arm control. S&P acquires and tracks the position, orientation, velocity, and angular velocity of a slowly spinning satellite, and sends tracking data to the MCM subsystem. MCM grapples the satellite and brings it to rest, controlling the arms so that no excessive forces or torques are exerted on the satellite or arms. A 350-pound satellite mockup which can spin freely on a gimbal for several minutes, closely simulating the dynamics of a real satellite is demonstrated. The satellite mockup is fitted with a panel under which may be mounted various elements such as line replacement modules and electrical connectors that will be used to demonstrate servicing tasks once the satellite is docked. The subsystems are housed in three MicroVAX II microcomputers. The hardware of the S&P Subsystem includes CCD cameras, video digitizers, frame buffers, IMFEX (a custom pipelined video processor), a time-code generator with millisecond precision, and a MicroVAX II computer. Its software is written in Pascal and is based on a locally written vision software library. The hardware of the MCM Subsystem includes PUMA 560 robot arms, Lord force/torque sensors, two MicroVAX II computers, and unimation pneumatic parallel grippers. Its software is written in C, and is based on a robot language called RCCL. The two subsystems are described and test results on the grappling of the satellite mockup with rotational rates of up to 2 rpm are provided.

Wilcox, Brian↗

Project M: Scale Model of Lunar Landing Site of Apollo 17: Focus on Lighting Conditions and Analysis

This document captures the research and development of a scale model representation of the Apollo 17 landing site on the moon as part of the NASA INSPIRE program. Several key elements in this model were surface slope characteristics, crater sizes and locations, prominent rocks, and lighting conditions. This model supports development of Autonomous Landing and Hazard Avoidance Technology (ALHAT) and Project M for the GN&C Autonomous Flight Systems Branch. It will help project engineers visualize the landing site, and is housed in the building 16 Navigation Systems Technology Lab. The lead mentor was Dr. Timothy P. Crain. The purpose of this project was to develop an accurate scale representation of the Apollo 17 landing site on the moon. This was done on an 8'2.5"X10'1.375" reduced friction granite table, which can be restored to its previous condition if needed. The first step in this project was to research the best way to model and recreate the Apollo 17 landing site for the mockup. The project required a thorough plan, budget, and schedule, which was presented to the EG6 Branch for build approval. The final phase was to build the model. The project also required thorough research on the Apollo 17 landing site and the topography of the moon. This research was done on the internet and in person with Dean Eppler, a space scientist, from JSC KX. This data was used to analyze and calculate the scale of the mockup and the ratio of the sizes of the craters, ridges, etc. The final goal was to effectively communicate project status and demonstrate the multiple advantages of using our model. The conclusion of this project was that the mockup was completed as accurately as possible, and it successfully enables the Project M specialists to visualize and plan their goal on an accurate three dimensional surface representation.

Vanik, Christopher S.↗

Enabling Large Focal Plane Arrays through Mosaic Hybridization

We have demonstrated the hybridization of large mosaics of far-infrared detectors, joining separately fabricated sub-units into a single unit on a single, large substrate. We produced a single detector mockup on a 100mm diameter wafer and four mockup readout quadrant chips from a separate 100mm wafer. The individually fabricated parts were hybridized using a Suss FC150 flip chip bonder to assemble the detector-readout stack. Once all of the hybridized readouts were in place, a single, large and thick silicon substrate was placed on the stack and attached with permanent epoxy to provide strength and a Coefficient of Thermal Expansion (CTE) match to the silicon components underneath. Wirebond pads on the readout chips connect circuits to warm readout electronics; and were used to validate the successful superconducting electrical interconnection of the mockup mosaic-hybridized detector. This demonstration is directly scalable to 150 mm diameter wafers, enabling pixel areas over ten times the area currently demonstrated.

Miller, Timothy M.↗

Heart Rate Responses to Unaided Orion Side Hatch Egress in the Neutral Buoyancy Laboratory

NASA is developing the Orion capsule as a vehicle for transporting crewmembers to and from the International Space Station (ISS) and for future human space exploration missions. Orion and other commercial vehicles are designed to splash down in the ocean where nominally support personnel will assist crewmembers in egressing the vehicle. However, off-nominal scenarios will require crewmembers to egress the vehicle unaided, deploy survival equipment, and ingress a life raft. PURPOSE: To determine the heart rate (HR) responses to unaided Orion side hatch egress and raft ingress as a part of the NASA Crew Survival Engineering Team's evaluation of the PORT Orion mockup in the Neutral Buoyancy Laboratory (NBL). METHODS: Nineteen test subjects, including four astronauts (N=19, 14 males/5 females, 38.6+/-8.4 y, 174.4+/-9.6 cm, 75.7+/-13.1 kg), completed a graded maximal test on a cycle ergometer to determine VO2peak and HRpeak and were divided into five crews of four members each; one subject served on two crews. Each crew was required to deploy a life raft, egress the Orion vehicle from the side hatch, and ingress the life raft with two 8 kg emergency packs per crew. Each crew performed this activity one to three times; a total of ten full egresses were completed. Subjects wore a suit that was similar in form, mass, and function to the Modified Advanced Crew Escape Suit (MACES) including helmet, gloves, boots, supplemental O2 bottles, and a CO2-inflated life preserver (approx.18 kg); subjects began each trial seated supine in the PORT Orion mockup with seat belts and mockup O2 and communication connections and ended each trial with all four crewmembers inside the life raft. RESULTS: VO2peak was 40.8+/-6.8 mL/kg/min (3.1+/-0.7 L/min); HRpeak was 181+/-10 bpm. Total egress time across trials was 5.0+/-1.6 min (range: 2.8-8.0 min); all subjects were able to successfully complete all trials. Average maximum HR at activity start, at the hatch opening, in the water, and in the raft, was 108, 137, 147, and 153 bpm, respectively; these values corresponded to 59+/-10%, 73+/-8%, 82+/-3%, and 84+/-6% of HRpeak, respectively. The highest HRs were seen after raft ingress and ranged from 72-99% HRpeak. Across all trials, cumulative averages of 5.4, 3.0, 1.1, and 0.2 min were spent at HRs >60%, >70%, >80%, and >90% HRpeak, respectively. CONCLUSION: Unaided Orion side hatch egress in the NBL is a relatively short-duration activity that elicits a high HR response for several min. Although all crewmembers successfully completed this activity, additional factors such as high seas, poor visibility, an incapacitated crewmember, neurovestibular perturbation, and neuromuscular deconditioning characteristic of a true operational environment may increase the physiologic demand (or decrease crewmembers' physiologic capacity) of unaided Orion side hatch egress. Additionally, landing conditions may require the crewmembers to egress from the top hatch, which is expected to be even more physiologically demanding; this condition will be evaluated in subsequent collaborative testing with the NASA Crew Survival Engineering Team.

English, Kirk L.↗

Computational Modeling to Limit the Impact Displays and Indicator Lights Have on Habitable Volume Operational Lighting Constraints

NASA has demonstrated an interest in improving astronaut health and performance through the installment of a new lighting countermeasure on the International Space Station. The Solid State Lighting Assembly (SSLA) system is designed to positively influence astronaut health by providing a daily change to light spectrum to improve circadian entrainment. Unfortunately, existing NASA standards and requirements define ambient light level requirements for crew sleep and other tasks, yet the number of light-emitting diode (LED) indicators and displays within a habitable volume is currently uncontrolled. Because each of these light sources has its own unique spectral properties, the additive lighting environment ends up becoming something different from what was planned or researched. Restricting the use of displays and indicators is not a solution because these systems provide beneficial feedback to the crew. The research team for this grant used computer-based computational modeling and real-world lighting mockups to document the impact that light sources other than the ambient lighting system contribute to the ambient spectral lighting environment. In particular, the team was focused on understanding the impacts of long-term tasks located in front of avionics or computer displays. The team also wanted to understand options for mitigating the changes to the ambient light spectrum in the interest of maintaining the performance of a lighting countermeasure. The project utilized a variety of physical and computer-based simulations to determine direct relationships between system implementation and light spectrum. Using real-world data, computer models were built in the commercially available optics analysis software Zemax Optics Studio(c). The team also built a mockup test facility that had the same volume and configuration as one of the Zemax models. The team collected over 1200 spectral irradiance measurements, each representing a different configuration of the mockup. Analysis of the data showed a measurable impact on ambient light spectrum. This data showed that obvious design techniques exist that can be used to bind the ambient light spectrum closer to the planned spectral operating environment for the observer's eye point. The following observations should be considered when designing an operational environment that is dominated by computer displays. When more light is directed into the field of view of the observer, the greater the impact it will make on various human factors issues that depend on spectral shape and intensity. Because viewing angle has a large part to play in the amount of light flux on the crewmember's retina, beam shape, combined with light source location is an important factor for determining percent probable incident flux on the observer from any combination of light sources. Computer graphics design and display lumen output are major factors influencing the amount of spectrally intense light projected into the environment and in the viewer's direction. Use of adjustable white point display software was useful only if the predominant background color was white and if it matched the ambient light system's color. Display graphics that used a predominantly black background had the least influence on unplanned spectral energy projected into the environment. Percent reflectance makes a difference in total energy reflected back into an environment, and within certain architectural geometries, reflectance can be used to control the amount of a light spectrum that is allowed to perpetuate in the environment. Data showed that room volume and distance from significant light sources influence the total spectrum in a room. Smaller environments had a homogenizing effect on total light spectrum, whereas light from multiple sources in larger environments was less mixed. The findings indicated above should be considered when making recommendations for practice or standards for architectural systems. The ambient lighting system, surface reflectance, and display and indicator implementation all factor into the users' spectral environment. A variety of low-cost solutions exist to mitigate the impact of light from non-architectural lighting systems, and much potential for system automation and integration of display systems with the ambient environment. This team believes that proper planning can be used to avoid integration problems and also believes that human-in-the-loop evaluations, real-world test and measurement, and computer modeling can be used to determine how changes to a process, display graphics, and architecture will help maintain the planned spectral operating lighting environment.

Clark, T. A.↗

Space station ventilation study

A ventilation system design and selection method which is applicable to any manned vehicle were developed. The method was used to generate design options for the NASA 33-foot diameter space station, all of which meet the ventilation system design requirements. System characteristics such as weight, volume, and power were normalized to dollar costs for each option. Total system costs for the various options ranged from a worst case $8 million to a group of four which were all approximately $2 million. A system design was then chosen from the $2 million group and is presented in detail. A ventilation system layout was designed for the MSFC space station mockup which provided comfortable, efficient ventilation of the mockup. A conditioned air distribution system design for the 14-foot diameter modular space station, using the same techniques, is also presented. The tradeoff study resulted in the selection of a system which costs $1.9 million, as compared to the alternate configuration which would have cost $2.6 million.

Colombo, G. V.↗

Development of termination and utilization concepts for flat conductor cables. Volume 3: Cost study comparison, flat versus round conductor cable

A cost study comparing flat conductor cable (FCC) with small-gage wire (SGW) and conventional round conductor cable (RCC) is presented. This study was based on a vehicle wiring system consisting of 110,000 ft of conventional RCC equally divided between AWG sizes 20,22, and 24 using MIL-W-81044-type wire and MIL-C-26500 circular connectors. Basic cost data were developed on a similar-sized commercial jet airplane wiring system on a previous company R&D program in which advanced wiring techniques were carried through equivalent installations on an airplane mockup; and on data developed on typical average bundles during this program. Various cost elements included were engineering labor, operations (manufacturing) labor, material costs, and cost impact on payload. Engineering labor includes design, wiring system integration, wiring diagrams and cable assembly drawings, wire installations, and other related supporting functions such as the electronic data processing for the wiring. Operations labor includes mockup, tooling and production planning, fabrication, assembly, installation, and quality control cost impact on payload is the conversion of wiring system weight variations through use of different wiring concepts to program payload benefits in terms of dollars.

Source record↗

Experimental detailed power distribution in a fast spectrum thermionic reactor fuel element at the core/BeO reflector interface region

A zero-power critical assembly was designed, constructed, and operated for the prupose of conducting a series of benchmark experiments dealing with the physics characteristics of a UN-fueled, Li-7-cooled, Mo-reflected, drum-controlled compact fast reactor for use with a space-power conversion system. The critical assembly was modified to simulate a fast spectrum advanced thermionics reactor by: (1) using BeO as a reflector in place of some of the existing molybdenum, (2) substituting Nb-1Zr tubing for some of the existing Ta tubing, and (3) inserting four full-scale mockups of thermionic type fuel elements near the core and BeO reflector boundary. These mockups were surrounded with a buffer zone having the equivalent thermionic core composition. In addition to measuring the critical mass of this thermionic configuration, a detailed power distribution in one of the thermionic element stages in the mixed spectrum region was measured. A power peak to average ratio of two was observed for this fuel stage at the midplane of the core and adjacent to the reflector. Also, the power on the outer surface adjacent to the BeO was slightly more than a factor of two larger than the power on the inside surface of a 5.08 cm (2.0 in.) high annular fuel segment with a 2.52 cm (0.993 in. ) o.d. and a 1.86 cm (0.731 in.) i.d.

Klann, P. G.↗

Space shuttle/food system study. Volume 2, Appendix G: Ground support system analysis. Appendix H: Galley functional details analysis

The capabilities for preflight feeding of flight personnel and the supply and control of the space shuttle flight food system were investigated to determine ground support requirements; and the functional details of an onboard food system galley are shown in photographic mockups. The elements which were identified as necessary to the efficient accomplishment of ground support functions include the following: (1) administration; (2) dietetics; (3) analytical laboratories; (4) flight food warehouse; (5) stowage module assembly area; (6) launch site module storage area; (7) alert crew restaurant and disperse crew galleys; (8) ground food warehouse; (9) manufacturing facilities; (10) transport; and (11) computer support. Each element is discussed according to the design criteria of minimum cost, maximum flexibility, reliability, and efficiency consistent with space shuttle requirements. The galley mockup overview illustrates the initial operation configuration, food stowage locations, meal assembly and serving trays, meal preparation configuration, serving, trash management, and the logistics of handling and cleanup equipment.

Source record↗

Thruster array thermal control

This paper presents the results of a preliminary investigation of the thermal interactions between elements in the thruster array for a proposed Encke flyby mission. A clustered eight-thruster array was considered as the trial configuration in the current study. Electrically heated dummy thrusters were calibrated to represent the thruster thermal performance. The thermal behavior of the thruster array thermal mockup and the effects of thermal coating applications were investigated. Temperature measurements of the thruster array mockup were performed under various operational modes to substantiate the analytical results. A resultant analytical thermal network model was established to provide pertinent information for thruster array design tradeoff studies.

Wen, L.↗

Simulation of man-machine interaction on shuttle payload manipulator

The main objective of this simulation was to evaluate the feasibility of a simplified control system for a remote manipulator for space shuttle payloads. The motion commanded by the operator through the control system to the six degree of freedom manipulator approximates that of a backhoe. Compatibility of low arm damping, heavy payloads, small clearances in the shuttle cargo bay and stringent mission timelines were evaluated. The effects of various devices to enhance visual cues were evaluated. Phase I of the simulation was capture of a payload flying free in space relative to the shuttle. Phase II was simulation of cargo stowage into a mockup of the space shuttle cargo bay. A shuttle remote manipulator control station mockup including TV monitors and hand controllers is used in the simulation. Results evaluating various parameters of the control system and the task, including arm flexibility, are presented.

Hookway, R. O.↗

Space telescope neutral buoyancy simulations: The first two years

Neutral Buoyancy simulations which were conducted to validate the crew systems interface as it relates to space telescope on-orbit maintenance and contingency operations is discussed. The initial concept validation tests using low fidelity mockups is described. The entire spectrum of proposed space telescope refurbishment and selected contingencies using upgraded mockups which reflect flight hardware are reported. Findings which may be applicable to future efforts of a similar nature are presented.

Sanders, F. G.↗

Development of robotics facility docking test hardware

Design and fabricate test hardware for NASA's George C. Marshall Space Flight Center (MSFC) are reported. A docking device conceptually developed was fabricated, and two docking targets which provide high and low mass docking loads were required and were represented by an aft 61.0 cm section of a Hubble space telescope (ST) mockup and an upgrading of an existing multimission modular spacecraft (MSS) mockup respectively. A test plan is developed for testing the hardware.

Loughead, T. E.↗