Engineering PapersSearch

SEARCH · Engineering Papers

Results for “MANPOWER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Modularized instrument system for turbojet engine test facilities

A new modular instrument system is being developed to handle the many channels of data commonly encountered in turbojet engine testing. Each module contains a group of transducers and all the signal conditioning, multiplexing, and digitizing electronics necessary for direct interface with a digital computer. The digital interface within each module is the same for all modules. Each module provides a controlled environment for its contents. A minicomputer in the control room gathers the data, performs some on-line calculation and display, and interfaces with a shared recording and computing system. The advantages of this system are (1) reduced manpower for system installation, setup, and checkout; (2) standardized equipment interfaces; (3) increased reliability through automatic system testing and through minimization of manual adjustments; and (4) reduced cost through minimization of wiring and simplification of control room display.

Nieberding, W. C.

MEGASTAR: The Meaning of Energy Growth: An Assessment of Systems, Technologies, and Requirements

A methodology for the display and analysis of postulated energy futures for the United States is presented. A systems approach that includes the methodology of technology assessment is used to examine three energy scenarios--the Westinghouse Nuclear Electric Economy, the Ford Technical Fix Base Case and a MEGASTAR generated Alternate to the Ford Technical Fix Base Case. The three scenarios represent different paths of energy consumption for the present to the year 2000. Associated with these paths are various mixes of fuels, conversion, distribution, conservation and end-use technologies. MEGASTAR presents the estimated times and unit requirements to supply the fuels, conversion and distribution systems for the postulated end uses for the three scenarios and then estimates the aggregate manpower, materials, and capital requirements needed to develop the energy system described by the particular scenario. The total requirements and the energy subsystems for each scenario are assessed for their primary impacts in the areas of society, the environment, technology and the economy.

Source record

Space shuttle orbiter vehicle star tracker test program plan

The development model test program was written to provide guidance for essential star tracker test support to the Space Shuttle Orbiter Program. The program organization included test equipment preparation, prototype baseline/acceptance tests, prototype total performance tests, and prototype special tests. Test configurations, preparation phase, documentation, scheduling, and manpower requirements are discussed. The test program permits an early evaluation of the tracker's performance prior to completion and testing of the final flight models.

Smith, R. A.

MEGASTAR: The meaning of growth. An assessment of systems, technologies, and requirements

A methodology for the display and analysis of postulated energy futures for the United States is presented. A systems approach methodology including the methodology of technology assessment is used to examine three energy scenarios--the Westinghouse Nuclear Electric Economy, the Ford Technical Fix Base Case and a MEGASTAR generated Alternate to the Ford Technical Fix Base Case. The three scenarios represent different paths of energy consumption from the present to the year 2000. Associated with these paths are various mixes of fuels, conversion, distribution, conservation and end-use technologies. MEGASTAR presents the estimated times and unit requirements to supply the fuels, conversion and distribution systems for the postulated end uses for the three scenarios and then estimates the aggregate manpower, materials, and capital requirements needed to develop the energy system described by the particular scenario.

Source record

User community development for the space transportation system/Skylab

The New User Function plan for identifying beneficial uses of space is described. Critical issues such as funding, manpower, and protection of user proprietary rights are discussed along with common barriers which impede the development of a user community. Studies for developing methodologies of identifying new users and uses of the space transportation system are included.

Archer, J. L.

USDI requirements and programs

Interior Department plans for the utilization of data collection systems such as the one on ERTS-1 and others scheduled for future use are very briefly discussed. The savings offerred in manpower, acquisition and dissemination of useful data, and the operational potential of data collection systems are described.

Denoyer, J. M.

Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

Source record

A FORTRAN program for determining aircraft stability and control derivatives from flight data

A digital computer program written in FORTRAN IV for the estimation of aircraft stability and control derivatives is presented. The program uses a maximum likelihood estimation method, and two associated programs for routine, related data handling are also included. The three programs form a package that can be used by relatively inexperienced personnel to process large amounts of data with a minimum of manpower. This package was used to successfully analyze 1500 maneuvers on 20 aircraft, and is designed to be used without modification on as many types of computers as feasible. Program listings and sample check cases are included.

Maine, R. E.

Feasibility study for the implementation of NASTRAN on the ILLIAC 4 parallel processor

The ILLIAC IV, a fourth generation multiprocessor using parallel processing hardware concepts, is operational at Moffett Field, California. Its capability to excel at matrix manipulation, makes the ILLIAC well suited for performing structural analyses using the finite element displacement method. The feasibility of modifying the NASTRAN (NASA structural analysis) computer program to make effective use of the ILLIAC IV was investigated. The characteristics are summarized of the ILLIAC and the ARPANET, a telecommunications network which spans the continent making the ILLIAC accessible to nearly all major industrial centers in the United States. Two distinct approaches are studied: retaining NASTRAN as it now operates on many of the host computers of the ARPANET to process the input and output while using the ILLIAC only for the major computational tasks, and installing NASTRAN to operate entirely in the ILLIAC environment. Though both alternatives offer similar and significant increases in computational speed over modern third generation processors, the full installation of NASTRAN on the ILLIAC is recommended. Specifications are presented for performing that task with manpower estimates and schedules to correspond.

Field, E. I.

Management systems research study

The development of a Monte Carlo simulation of procurement activities at the NASA Ames Research Center is described. Data cover: simulation of the procurement cycle, construction of a performance evaluation model, examination of employee development, procedures and review of evaluation criteria for divisional and individual performance evaluation. Determination of the influences and apparent impact of contract type and structure and development of a management control system for planning and controlling manpower requirements.

Bruno, A. V.

Integrated life sciences technology utilization development program

The goal of the TU program was to maximize the development of operable hardware and systems which will be of substantial benefit to the public. Five working prototypes were developed, and a meal system for the elderly is now undergoing evaluation. Manpower utilization is shown relative to the volume of requests in work for each month. The ASTP mobile laboratories and post Skylab bedrest study are also described.

Source record

Man power/cost estimation model: Automated planetary projects

A manpower/cost estimation model is developed which is based on a detailed level of financial analysis of over 30 million raw data points which are then compacted by more than three orders of magnitude to the level at which the model is applicable. The major parameter of expenditure is manpower (specifically direct labor hours) for all spacecraft subsystem and technical support categories. The resultant model is able to provide a mean absolute error of less than fifteen percent for the eight programs comprising the model data base. The model includes cost saving inheritance factors, broken down in four levels, for estimating follow-on type programs where hardware and design inheritance are evident or expected.

Kitchen, L. D.

Spacelab cost reduction alternatives study. Volume 1: Executive summary

Alternative approaches to payload operations planning and control and flight crew training are defined for spacelab payloads with the goal of: lowering FY77 and FY 78 costs for new starts; lowering costs to achieve Spacelab operational capability; and minimizing the cost per Spacelab flight. These alternatives attempt to minimize duplication of hardware, software, and personnel, and the investment in supporting facility and equipment. Of particular importance is the possible reduction of equipment, software, and manpower resources such as comtational systems, trainers, and simulators.

Source record

PPP effectiveness study

This design note presents a study of the Procedures and Performance Program (PPP) effectiveness. The intent of the study is to determine manpower time savings and the improvements in job performance gained through PPP automated techniques. The discussion presents a synopsis of PPP capabilities and identifies potential users and associated applications, PPP effectiveness, and PPP applications to other simulation/training facilities. Appendix A provides a detailed description of each PPP capability.

Arbet, J. D.

Requirements and specifications of the space telescope for scientific operations

Requirements for the scientific operations of the Space Telescope and the Science Institute are used to develop operational interfaces between user scientists and the NASA ground system. General data systems are defined for observatory scheduling, daily science planning, and science data management. Hardware, software, manpower, and space are specified for several science institute locations and support options.

West, D. K.

The Multimission Modular Spacecraft for the 80's

The challenge to NASA is to prepare for the missions of tomorrow with manpower and funding constraints of today. The Goddard Space Flight Center has met this challenge with the Multimission Modular Spacecraft (MMS). This spacecraft design has evolved over the past six years while studying various potential missions. The key to the concept of the MMS is modularity and flexibility to accept mission unique hardware with minimum impact on the basic spacecraft bus. Beyond this, it was imperative that this multiple mission bus be cost effective even though it would not be of an optimum design for many missions having minimum performance requirements. The MMS performance and cost will capture 34 of the 43 potential spacecraft missions which have been initially studied. Gamma Ray Explorer (GRE) will be the first mission to utilize the MMS.

Bartlett, R. O.

Satellite laser ranging work at the Goddard Space Flight Center

The paper describes the satellite laser ranging system at the Goddard Space Flight Center, its range and accuracy capabilities, and planned improvements for future systems. Major subsystems are described, including the laser, optical/mechanical, receiver, computer/software, timing, and laser data preprocessing subsystems. Operational considerations are examined, with attention given the mobile station layout, manpower requirements, and transportability. System performance is considered, with emphasis on system accuracy (calibration, stability, clock synchronization, atmospheric propagation correction) and range capability.

Mcgunigal, T. E.

Organizing for low cost space operations - Status and plans

Design features of the Space Transportation System (vehicle reuse, low cost expendable components, simple payload interfaces, standard support systems) must be matched by economical operational methods to achieve low operating and payload costs. Users will be responsible for their own payloads and will be charged according to the services they require. Efficient use of manpower, simple documentation, simplified test, checkout, and flight planning are firm goals, together with flexibility for quick response to varying user needs. Status of the Shuttle hardware, plans for establishing low cost procedures, and the policy for user charges are discussed.

Lee, C.