Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Line outage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Integration of Uncertainty Information into Power System Operations

Contemporary power systems face uncertainties coming from multiple sources, including forecast errors of load, wind and solar generation, uninstructed deviation and forced outage of traditional generators, loss of transmission lines, and others. With increasing amounts of wind and solar generation being integrated into the system, these uncertainties have been growing significantly. It is critical important to build knowledge of major sources of uncertainty, learn how to simulate them, and then incorporate this information into the decision-making processes and power system operations, for better reliability and efficiency. This paper gives a comprehensive view on the sources of uncertainty in power systems, important characteristics, available models, and ways of their integration into system operations. It is primarily based on previous works conducted at the Pacific Northwest National Laboratory (PNNL).

24 POWER TRANSMISSION AND DISTRIBUTION↗

DWPF SMECT PVV Sample Characterization and Remediation

On April 2, 2013, a solid sample of material collected from the Defense Waste Processing Facility’s Process Vessel Vent (PVV) jumper for the Slurry Mix Evaporator Condensate Tank (SMECT) was received at the Savannah River National Laboratory (SRNL). DWPF has experienced pressure spikes within the SMECT and other process vessels which have resulted in processing delays while a vacuum was re-established. Work on this sample was requested in a Technical Assistance Request (TAR). This document reports the results of chemical and physical property measurements made on the sample, as well as insights into the possible impact to the material using DWPF’s proposed remediation methods. DWPF was interested in what the facility could expect when the material was exposed to either 8M nitric acid or 90% formic acid, the two materials they have the ability to flush through the PVV line in addition to process water once the line is capped off during a facility outage.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling & Analysis of a Small Hydropower Plant and Battery Energy Storage System Connected as a Microgrid

Puget Sound Energy (PSE) is a utility with headquarters in Bellevue, WA that provides electric and gas service to customers in many regions of western Washington State. PSE is undertaking the implementation of a battery energy storage system pilot project in Glacier, WA, a small town located in the North Cascade Mountains near Mt. Baker Ski Area. Glacier experiences power outages that are both somewhat frequent and lengthy (roughly 2.8 outages per year with a duration of 7.5 hours average). The primary cause of the outages is faults on a long 55 kV transmission line that serves the town of Glacier from the Kendall substation. This approximately 10-mile long line is shown in the upper left of Figure 1 below. The Kendall-Glacier transmission line extends through an area of heavy forest with few reasonable options for increasing the line’s reliability. The substation in Glacier (also shown on figure below) serves over 1000 customers that are mostly residential but includes over 50 small businesses. The town has approximately 250 year-round residents, and a peak in visitors during the winter ski season when storms are also more likely to cause power outages. Figure 1: Proposed Microgrid in Glacier, WA Given the reliability challenges in Glacier, PSE is assessing the feasibility of a 2MW/4.4MWh battery energy storage system (BESS) that would allow for improved reliability. The BESS would also allow for the ability to investigate other applications for utility-scale energy 5 storage. This energy storage system is being considered for operation in “planned islanding” and “microgrid” mode. “Planned islanding” indicates use of the BESS to provide power to part or potentially all of the load in the town of Glacier during an outage. “Microgrid” indicates utilization (during an outage) of the BESS in parallel with Nooksack Falls Hydroelectric Power Plant, a small (nameplate 1.5 MW/2000 HP) hydro power plant less than 10 miles from the town of Glacier. Nooksack is a run-of river small hydro generation plant with a gross head of 226 ft. The site has a 5-foot diameter penstock which enters the powerhouse and goes into a pelton turbine with six runners on one shaft. It was originally constructed by Stone & Webster in 1906, which makes it the second oldest operating power generation facility in Western Washington. It was placed on the National Register of Historic places in December of 1988. The plant operated until 1997 when a fire destroyed the generator. The project continued operations in 2003 after the replacement of the generator and other updates.

13 HYDRO ENERGY↗

Impact assessment of geomagnetic induced current neutral blocking devices with power electronics sources on distance relay for 230 kV transmission lines

Electrical grids increased the integration of power electronics sources onto transmission lines. In addition, recent reports show a significant rise in geomagnetic storms occurring in 2024. These geomagnetic storms can affect transmission lines by inducing electrical currents within them, potentially causing power outages due to overloaded power transformers. Geomagnetic induced current neutral blocking devices (GIC-NBDs) are capacitors on the ground of wye power transformers, to avoid damage caused by geomagnetic storms. The integration of distance relays and transmission lines with power electronics sources and GIC-NBDs needs to be studied to observe if GIC-NBDs and power electronics sources could adversely affect operation of the electrical grid. In this analysis, the effect of 2 MW power electronics sources and GIC-NBDs on distance relays is assessed for different 230 kV transmission line lengths in radial and nonradial power systems. The simulations measured the apparent impedances, with different electrical faults. Results for a typical 2,650 μF GIC-NBD application were presented on impedance plots, and the distance relay model operations were assessed. In conclusion, the tests for radial and nonradial power systems showed the behavior of the distance elements and source impedance ratios, assessing the effect of power electronics sources and GIC-NBDs on 230 kV transmission lines.

Distance relays↗

Real-time digital simulation to improve advanced microgrid design

In this study, there are several ways to address energy reliability concerns during an extended power outage. This can include hardening the energy infrastructure to reduce potential loss of power, adding redundant backup systems with larger fuel tanks, and improving generator reliability through better maintenance. While each is valid, they are often expensive to adequately implement. The traditional emergency power approach for decades has been the use of building-tied emergency generators to start up and supply emergency power until the utility can come back on line. Unfortunately, operational experience from many recent extended power outages has shown that emergency backup generators are often mismatched in size with the building energy load, under-maintained such that their operational reliability is well below expected values, and have insufficient fuel to operate for the entire power outage. Here we describe how energy reliability and security can be enhanced with the use of Advanced Microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Statistical Analysis of Abnormal Electric Power Grid Behavior

Pacific Northwest National Laboratory is developing a technique to analyze Phasor Measurement Unit data to identify typical patterns, atypical events and precursors to a blackout or other undesirable event. The approach combines a data-driven multivariate analysis with an engineering-model approach. The method identifies atypical events, provides a plane English description of the event, and the capability to use drill-down graphics for detailed investigations. The tool can be applied to the entire grid, individual organizations (e.g. TVA, BPA), or specific substations (e.g., TVA_CUMB). The tool is envisioned for (1) event investigations, (2) overnight processing to generate a Morning Report that characterizes the previous days activity with respect to previous activity over the previous 10-30 days, and (3) potentially near-real-time operation to support the grid operators. This paper presents the current status of the tool and illustrations of its application to real world PMU data collected in three 10-day periods in 2007.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Arc burst pattern analysis fault detection system

A method and apparatus are provided for detecting an arcing fault on a power line carrying a load current. Parameters indicative of power flow and possible fault events on the line, such as voltage and load current, are monitored and analyzed for an arc burst pattern exhibited by arcing faults in a power system. These arcing faults are detected by identifying bursts of each half-cycle of the fundamental current. Bursts occurring at or near a voltage peak indicate arcing on that phase. Once a faulted phase line is identified, a comparison of the current and voltage reveals whether the fault is located in a downstream direction of power flow toward customers, or upstream toward a generation station. If the fault is located downstream, the line is de-energized, and if located upstream, the line may remain energized to prevent unnecessary power outages.

Russell, B. Don↗

On-line maintenance methodology development and its applications

With the increasing economic pressures being faced and the potential for shortening outage times under the conditions of deregulated electricity markets in the world, licensees are motivated to get an increasing amount of the on-line maintenance (OLM). The benefits of the OLM includes increased system and plant reliability, reduction of plant equipment and system material condition deficiencies that could adversely impact operations, and reduction of work scope during plant refueling outages. In Korea, allowance guidelines of risk assessment is specified in the safety regulation guidelines 16.7 and 16.8 of the Korea Inst. of Nuclear Safety (KINS), which is 'General guidelines of Risk-informed application for requesting permission of changes' and 'Requesting permission of changes of Risk-informed application for Technical Specification'. We select the emergency diesel generator (EDG) of the Ulchin unit 3 and 4 for risk assessment analysis by applying configuration changes. The EDG which has plant safety level IE belongs to on-site standby power (A, B train EDG) in electric distribution system. The EDG is important component because it should maintain standby status during plant is operating, therefore we select the EDG for target component of risk assessment analysis. The risk assessment is limited to CDF. The risk assessment is performed by using AIMS-PSA Release2. We evaluate CDF by applying the configuration changes with some assumptions. Evaluation of the full power operation and Low power/Shut down operation was performed. This study has been performed for introducing a methodology and performing risk assessment. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Security constrained optimal power shutoff for wildfire risk mitigation

Abstract Electric grid faults are increasingly the source of ignition for major wildfires. To reduce the likelihood of such ignitions in high risk situations, utilities use preemptive de‐energization of power lines, commonly referred to as Public Safety Power Shutoffs (PSPS). Besides raising challenging trade‐offs between power outages and wildfire safety, PSPS removes redundancy from the network at a time when component faults are likely to happen. This may leave the network particularly vulnerable to unexpected line faults that may occur while the PSPS is in place. Previous works have not explicitly considered the impacts of these outages. To address this gap, the Security Constrained Optimal Power Shutoff problem is proposed which uses post‐contingency security constraints to model the impact of unexpected line faults when planning a PSPS. This model enables, for the first time, the exploration of a wide range of trade‐offs between both wildfire risk and pre‐ and post‐contingency load shedding when designing PSPS plans, providing useful insights for utilities and policy makers considering different approaches to PSPS. The efficacy of the model is demonstrated using the EPRI 39‐bus system as a case study. The results highlight the potential risks of not considering security constraints when planning PSPS and show that incorporating security constraints into the PSPS design process improves the resilience of current PSPS plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Distributionally Robust Resilience Enhancement Strategy for Distribution Networks Considering Decision-Dependent Contingencies

When performing the resilience enhancement for distribution networks, there are two obstacles to reliably model the uncertain contingencies: 1) decision-dependent uncertainty (DDU) due to various line hardening decisions, and 2) distributional ambiguity due to limited outage information during extreme weather events (EWEs). Here, to address these two challenges, this paper develops scenario-wise decision-dependent ambiguity sets (SWDD-ASs), where the DDU and distributional ambiguity inherent in EWE-induced contingencies are simultaneously captured for each possible EWE scenario. Then, a two-stage tri-level decision-dependent distributionally robust resilient enhancement (DD-DRRE) model is formulated, whose outputs include the optimal line hardening, distributed generation (DG) allocation, and proactive network reconfiguration strategy under the worst-case distributions in SWDD-ASs. Subsequently, the DD-DRRE model is equivalently recast to a mixed-integer linear programming (MILP)-based master problem and multiple scenario-wise subproblems, facilitating the adoption of a customized column-and-constraint generation (C&CG) algorithm. Finally, case studies demonstrate a remarkable improvement in the out-of-sample performance of our model, compared to its prevailing stochastic and robust counterparts. Moreover, the potential values of incorporating the ambiguity and distributional information are quantitatively estimated, providing a useful reference for planners with different budgets and risk-aversion levels.

decision-dependent uncertainty↗

Dynamic Transmission Line Switching Amid Wildfire-Prone Weather Under Decision-Dependent Uncertainty

During dry and windy seasons, environmental conditions significantly increase the risk of wildfires, exposing power grids to disruptions caused by transmission line failures. Wildfire propagation exacerbates grid vulnerability, potentially leading to prolonged power outages. To address this challenge, we propose a multistage optimization model that dynamically adjusts transmission grid topology in response to wildfire propagation, aiming to develop an optimal response policy. By accounting for decision-dependent uncertainty, where line survival probabilities depend on usage, we employ distributionally robust optimization to model uncertainty in line survival distributions. We adapt the stochastic nested decomposition algorithm and derive a deterministic upper bound for its finite convergence. To enhance computational efficiency, we exploit the Lagrangian dual problem structure for a faster generation of Lagrangian cuts. Using realistic data from the California transmission grid, we demonstrate the superior performance of dynamic response policies against two-stage alternatives through a comprehensive case study. In addition, after solving the multistage formulation, we construct easy-to-implement policies that significantly reduce computational burden while maintaining good performance in real-time deployment. History: Accepted by Russell Bent, Area Editor for Network Optimization: Algorithms and Applications. Funding: This work was supported by the U.S. Department of Energy, Office of Electricity [Grant DE-AC02-05CH11231]. The work of R. Jiang was supported in part by the U.S. National Science Foundation, Division of Electrical, Communications and Cyber Systems [Grant ECCS-1845980] and the U.S. Air Force Office of Scientific Research [Grant FA9550-23-1-0323]. Supplemental Material: The software that supports the findings of this study is available within the paper and its Supplemental Information ( https://pubsonline.informs.org/doi/suppl/10.1287/ijoc.2025.1210 ) as well as from the IJOC GitHub software repository ( https://github.com/INFORMSJoC/2025.1210 ). The complete IJOC Software and Data Repository is available at https://informsjoc.github.io/ .

Estrada-Garcia, Juan-Alberto↗

Real-Time Detection and Localization of Line Trip Event Via Relative Phase Angles

Line trip events widely exist in power systems. They can result in power outages and a huge economic loss if not promptly detected and localized. To provide a fast and precise solution, this paper presents a Complete Coverage of Voltage Measurement (CCVM)-based line trip event detection algorithm and a Relative Phase Angle (RPA)-based line trip event localization algorithm. First, frequency and relative phase angle features during a line trip event are calculated. Then, the CCVM-based algorithm is proposed from both frequency and rate of change of frequency estimation algorithm aspects. Additionally, the RPA-based algorithm is presented, and two cases are studied to demonstrate the uniqueness of the proposed algorithm. Various experiments are conducted, where the simulation results demonstrate that the proposed CCVM-based algorithm can detect a line trip event as short as 2.07 ms. In addition, the RPA-based algorithm has 1.26 times higher localization accuracy compared with the frequency magnitude-based and phase angle-based algorithms. In conclusion, the experiment results on the examples from two interconnected power systems in the U.S. verified the performance of the proposed algorithms in wide-area power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design of Refractory Linings for Balanced Energy Efficiency, Uptime, and Capacity in Lime Kilns

The rotary kilns used by the pulp and paper industry to regenerate lime in the Kraft process are very energy intensive. Throughout the 90 s, in response to increasing fuel prices, the industry used back up insulation in conjunction with the high alumina brick used to line the burning zones of their kilns. While this improved energy efficiency, the practice of installing insulating brick behind the working lining increased the inner wall temperatures. In the worst case, due to the increased temperatures, rapid brick failures occurred causing unscheduled outages and expensive repairs. Despite these issues, for the most part, the industry continued to use insulating refractory linings in that the energy savings were large enough to offset any increase in the cost of maintaining the refractory lining. Due to the dramatic decline in the price of natural gas in some areas combined with mounting pressures to increasing production of existing assets, over the last decade, many mills are focusing more on increasing the uptime of their kilns as opposed to energy savings. To this end, a growing number of mills are using basic (magnesia based) brick instead of high alumina brick to line the burning zone of the kiln since the lime mud does not react with these bricks at the operating temperatures of the burning zone of the kiln. In the extreme case, a few mills have chosen to install basic brick in the front end of the kiln running a length equivalent to 10 diameters. While the use of basic brick can increase the uptime of the kiln and reduce the cost to maintain the refractory lining, it does dramatically increase the heat losses resulting from the increased operating temperatures of the shell. Also, over long periods of time operating at these high temperatures, damage can occur in the shell. There are tradeoffs between energy efficiency, capacity and uptime. When fuel prices are very high, it makes sense to insulate the lining. When fuel prices are lower, trading some thermal efficiency for increased uptime and capacity seems reasonable. This paper considers a number of refractory linings in an effort to develop optimized operating strategies that balance these factors. In addition to considering a range of refractory materials, the paper examines other factors such as the chain area, discharge dams and other operating variables that impact the service life of the refractory lining. The paper provides recommendations that will help mill personnel develop a strategy to select a refractory lining that is optimized for their specific situation.

Computational Modeling↗

Multi-Instrument Observations of an MSTID over Arecibo Observatory

The Penn State All-Sky Imager (PSASI) at Arecibo Observatory provides planar horizontal context to the vertical ionospheric profiles obtained by the Incoherent Seatter Radar (TSR). Electric field measurements from the Communication/Navigation Outage Forecast System (C/NOFS) satellite are mapped down geomagnetic field lines to the height of the airglow layer; allowing multi-instrument studies of field-aligned irregularities with radar, imager, and satellite. A Medium-Scale Traveling Ionospheric Disturbance (MSTID) was observed during such a conjunction near the December solstice of 2009.

Klenzing, J. H.↗

Guidance on EPAct section 707 Emergency Repair and Restoration Vehicle Exclusions: EPAct State and Alternative Fuel Provider Fleet Program Guidance Document

Section 707 of the Energy Policy Act of 2005 (EPAct 2005) amended section 301(9)(E) of EPAct 1992 by adding to the list of vehicles excluded from the definition of "fleet" a new subcategory of emergency motor vehicles, i.e., "vehicles directly used in the emergency repair of transmission lines and in the restoration of electricity service following power outages, as determined by the Secretary." Like other excluded vehicles, these light-duty vehicles (LDVs) do not count (1) when determining whether a fleet is covered under the U.S. Department of Energy's (DOE) State and Alternative Fuel Provider Fleet Program (Program), and (2) for fleets that are covered under the Program, when calculating annual alternative fuel vehicle (AFV)-acquisition requirements. If AFV models of excluded vehicles are acquired, however, a fleet may count them toward their acquisition requirement by including them in the calculation of the number of AFVs acquired. Exclusion Process.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Light Water Reactor Sustainability Program: Digital Architecture Requirements

The Digital Architecture effort is a part of the Department of Energy (DOE) sponsored Light-Water Reactor Sustainability (LWRS) Program conducted at Idaho National Laboratory (INL). The LWRS program is performed in close collaboration with industry research and development (R&D) programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants (NPPs). One of the primary missions of the LWRS program is to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. Therefore, a major objective of the LWRS program is the development of a seamless digital environment for plant operations and support by integrating information from plant systems with plant processes for nuclear workers through an array of interconnected technologies. In order to get the most benefits of the advanced technology suggested by the different research activities in the LWRS program, the nuclear utilities need a digital architecture in place to support the technology. A digital architecture can be defined as a collection of information technology (IT) capabilities needed to support and integrate a wide-spectrum of real-time digital capabilities for nuclear power plant performance improvements. It is not hard to imagine that many processes within the plant can be largely improved from both a system and human performance perspective by utilizing a plant wide (or near plant wide) wireless network. For example, a plant wide wireless network allows for real time plant status information to easily be accessed in the control room, field workers’ computer-based procedures can be updated based on the real time plant status, and status on ongoing procedures can be incorporated into smart schedules in the outage command center to allow for more accurate planning of critical tasks. The goal of the digital architecture project is to provide a long-term strategy to integrate plant systems, plant processes, and plant workers. This include technologies to improve nuclear worker efficiency and human performance; to offset a range of plant surveillance and testing activities with new on-line monitoring technologies; improve command, control, and collaboration in settings such as outage control centers and work execution centers; and finally to improve operator performance with new operator aid technologies for the control room. The requirements identified through the activities in the Digital Architecture project will be used to estimate the amount of traffic on the network and hence estimating the minimal bandwidth needed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Off-line tracking of series parameters in distribution systems using AMI data

Electric distribution systems have historically lacked measurement points, and equipment is often operated to its failure point, resulting in customer outages. The widespread deployment of sensors at the distribution level is enabling observability. This paper presents an off-line parameter value tracking procedure that takes advantage of the increasing number of measurement devices being deployed at the distribution level to estimate changes in series impedance parameter values over time. The tracking of parameter values enables non-diurnal and non-seasonal change to be flagged for investigation. The presented method uses an unbalanced Distribution System State Estimation (DSSE) and a measurement residual-based parameter estimation procedure. Measurement residuals from multiple measurement snapshots are combined in order to increase the effective local redundancy and improve the robustness of the calculations in the presence of measurement noise. Data from devices on the primary distribution system and from customer meters, via an AMI system, form the input data set. Results of simulations on the IEEE 13-Node Test Feeder are presented to illustrate the proposed approach applied to changes in series impedance parameters. A 5% change in series resistance elements can be detected in the presence of 2% measurement error when combining less than 1 day of measurement snapshots into a single estimate.

Williams, Tess L.↗