Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Launch authorization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

147 records · Page 4

Turbomachinery Simulation Impact on Design, Understanding, and Optimization

This presentation shows the impact of Turbomachinery Simulation from simple analytical simulation to high fidelity CFD and Finite Element Analysis on the design of turbomachinery and the understanding of flow physics that is then used to improve design approaches. The impact of Optimization is also presented. The best approach for the tool development is to work with a compressor, fan, or turbine designer or to work on the design process directly. The presentation represents the work and impact of the author over his 45-year career and provides insight for both new and experienced engineers. The presentation explores applications of distortion from a downstream fan frame, the first uses of 3D CFD for fan, compressor and turbine design, and approaches to optimization for performance and structures.

optimization

Uranus Orbiter and Probe: Mission Challenges and Concept Updates Since the Origins, Worlds, and Life Decadal Survey

Origins, Worlds, and Life: Planetary Science and Astrobiology in the Next Decade identified a Uranus Orbiter and Probe as the highest-priority strategic mission for the decade 2023–2032, as it enables broad cross-disciplinary science in the largely unexplored Uranian system. The mission architecture evaluated by the Decadal Survey was a singular proof of concept demonstrating that a moderately instrumented mission could deliver Decadal-priority science with a reduced cost and risk posture by leveraging existing technologies to the maximum extent possible. With revised assumptions since the Decadal, we have explored a large trade space including launch vehicles, propulsion options, cruise trajectories, available power sources, viable concept of operations, and science data return for later launch dates without a Jupiter gravity assist. The most repeatable trajectory solutions employ either a commercially derived solar electric propulsion (SEP) transfer stage or the availability of a more capable launch vehicle under development, such as the SpaceX Starship. Orbit insertion has been moved farther from Uranus to acknowledge the remaining uncertainty in Uranian ring structure. A streamlined, SEP-adaptable, orbiter design was developed using two Next Gen Radioisotope Thermoelectric Generators, and the probe design was matured, reducing the entry gravitational acceleration, and assuming the largest Decadal-recommended payload to provide margin for future instrument selections. With this updated design, we also constructed a detailed concept of operations for three representative science cases, returning 13–15 Gbit of science data and spacecraft telemetry per ∼34 day orbit.

Amy A Simon

Thermal Design

An essential phase of the Explorer XIII development was a thermal study and design to provide an acceptable temperature environment for the electronics components and external surfaces of the satellite during ascent and in orbit. It was necessary to establish by preflight analysis and tests that tolerable temperatures could be maintained in three regimes of flight. In the first regime (from launch until release of the heat shield) the satellite was subjected to radiative and conductive heat from the shield. In the second regime, after release of the shield at 350,000 feet, the satellite was heated by free molecular flow. In the third regime - the orbit phase - it was necessary that temperatures within limits for a 1-year lifetime be established. In addition to these three regimes, a study was made to investigate the effect of elevated rocket-motor temperatures during launch and after burnout. This chapter will deal with some pertinent preflight estimates and correlation of these estimates with flight data.

Explorer XIII Satellite

Columbia Accident Investigation Board Report: Volume One

The Columbia Accident Investigation Board's independent investigation into the February 1, 2003, loss of the Space Shuttle Columbia and its seven-member crew lasted nearly seven months. A staff of more than 120, along with some 400 NASA engineers, supported the Board's 13 members. Investigators examined more than 30,000 documents, conducted more than 200 formal interviews, heard testimony from dozens of expert witnesses, and reviewed more than 3,000 inputs from the general public. In addition, more than 25,000 searchers combed vast stretches of the Western United States to retrieve the spacecraft's debris. In the process, Columbia's tragedy was compounded when two debris searchers with the U.S. Forest Service perished in a helicopter accident. This report discusses the attributes of an organization that could more safely and reliably operate the inherently risky Space Shuttle, but does not provide a detailed organizational prescription. Among those attributes are: a robust and independent program technical authority that has complete control over specifications and requirements, and waivers to them; an independent safety assurance organization with line authority over all levels of safety oversight; and an organizational culture that reflects the best characteristics of a learning organization. This report concludes with recommendations, some of which are specifically identified and prefaced as "before return to flight." These recommendations are largely related to the physical cause of the accident, and include preventing the loss of foam, improved imaging of the Space Shuttle stack from liftoff through separation of the External Tank, and on-orbit inspection and repair of the Thermal Protection System. The remaining recommendations, for the most part, stem from the Board's findings on organizational cause factors. While they are not "before return to flight" recommendations, they can be viewed as "continuing to fly" recommendations, as they capture the Board's thinking on what changes are necessary to operate the Shuttle and future spacecraft safely in the mid- to long-term.

CAIB

Hubble Space Telescope nickel hydrogen battery system briefing

The topics covered are presented in viewgraph form and include the following: the Hubble Space Telescope (HST) Mission; system constraints; battery specification; battery module; simplified block diagram; cell design summary; present status; voltage decay; system depth of discharge; pressure since launch; system capacity; eclipse time vs. trickle charge; capacity test objectives; and capacity during tests.

Nawrocki, David

Nickel-hydrogen battery design for the Transporter Energy Storage Subsystem (TESS)

Information is given in viewgraph form on nickel hydrogen battery design for the transporter energy storage subsystem (TESS). Information is given on use in the Space Station Freedom, the launch configuration, use in the Mobile Servicing Center, battery design requirements, TESS subassembley design, proof of principle testing of a 6-cell battery, possible downsizing of TESS to support the Mobile Rocket Servicer Base System (MBS) redesign, TESS output capacity, and cell testing.

Lapinski, John R.

Effects of Adverse Weather on Aerodynamics [Les Effets des Conditions Météorologiques Adverses sur I'Aérodynamique]

The 19 technical papers developed for the AGARD Fluid Dynamics Panel (FDP) Specialists' Meeting on "Effects of Adverse Weather on Aerodynamics" held from 28th April—i May 1991 in Toulouse, France are documented in this Conference Proceedings. In addition, introductory material from the Program Chairman and the results of the Round Table Discussion held after the meeting are also included. The FDP organized this meeting to provide a timely review of the progress being made in advancing the state-of-the-art of predicting, simulating, and measuring the effects of icing, anti-icing fluids, and various forms of precipitation on the aerodynamic characteristics of flight vehicles. Topics included results from both theoretical and experimental programs and material related to procedures and regulations for certification and operation. International participation for the meeting included authors from eight nations and representatives from most of the 16 NATO nations.

Precipitation - meteorology

Nickel-hydrogen battery state of charge during low rate trickle charging

The NASA AXAF-I program requires high battery state of charge at launch. Traditional approaches to providing high state of charge, during prelaunch operations, require significant battery cooling. The use of active cooling, in the AXAF-I prelaunch environment, was considered and proved to be difficult to implement and very expensive. Accordingly alternate approaches were considered. An approach utilizing adiabatic charging and low rate trickle charge, was investigated and proved successful.

Lurie, C.

Hubble space telescope onboard battery performance

The performance of six 88 Ah Nickel-Hydrogen (Ni-H2) batteries that are used onboard in the Hubble Space Telescope (Flight Spare Module (FSM) and Flight Module 2 (FM2)) is discussed. These batteries have 22 series cells per battery and a common bus that would enable them to operate at a common voltage. It is launched on April 24, 1990. This paper reviews: the cell design, battery specification, system constraints, operating parameters, onboard battery management, and battery performance.

Rao, Gopalakrishna M.

Hubble Space Telescope On-orbit NiH2 Battery Performance

This paper summarizes the Hubble Space Telescope (HST) nickel-hydrogen (NiH2) battery performance from launch to the present time. Over the life of HST vehicle configuration, charge system degradation and failures together with thermal design limitations have had a significant effect on the capacity of the HST batteries. Changes made to the charge system configuration in order to protect against power system failures and to maintain battery thermal stability resulted in undercharging of the batteries. This undercharging resulted in decreased usable battery capacity as well as battery cell voltage/capacity divergence. This cell divergence was made evident during on-orbit battery capacity measurements by a relatively shallow slope of the discharge curve following the discharge knee. Early efforts to improve the battery performance have been successful. On-orbit capacity measurement data indicates increases in the usable battery capacity of all six batteries as well as improvements in the battery cell voltage/capacity divergence. Additional measures have been implemented to improve battery performance, however, failures within the HST Power Control Unit (PCU) have prevented verification of battery status. As this PCU fault prevents the execution of on-orbit capacity testing, the HST Project has based the battery capacity on trends, which utilizes previous on-orbit battery capacity test data, for science mission and servicing mission planning. The Servicing Mission 38 (SM-3B) in March 2002 replaced the faulty PCU. Following the servicing mission, on-orbit capacity test resumed. A summary of battery performance is reviewed since launch in this paper.

Rao, Gopalakrishna M.

Air Force Phillips Laboratory Battery Program overview

Battery development and testing efforts at Phillips Laboratory fall into three main categories: nickel hydrogen, sodium sulfur, and solid state batteries. Nickel hydrogen work is broken down into a Low Earth Orbit (LEO) Life Test Program, a LEO Pulse Test Program, and a Hydrogen Embrittlement Investigation. Sodium sulfur work is broken down into a Geosynchronous Earth Orbit (GEO) Battery Flight Test and a Hot Launch Evaluation. Solid state polymer battery work consists of a GEO Battery Development Program, a Pulse Power Battery Small Business Innovation Research (SBIR), and an in-house evaluation of current generation laboratory cells. An overview of the program is presented.

House, Shaun

1998 Research and Technology

This report selectively summarizes the NASA Lewis Research Center's research and technology accomplishments for the fiscal year 1998. It comprises 134 short articles submitted by the staff scientists and engineers. The report is organized into five major sections: Aeronautics, Research and Technology, Space, Engineering and Technical Services, and Commercial Technology. A table of contents and an author index have been developed to assist readers in finding articles of special interest. This report is not intended to he a comprehensive summary of all the research and technology work done over the past fiscal year. Most of the work is reported in Lewis-published technical reports, journal articles, and presentations prepared by Lewis staff and contractors. In addition, university grants have enabled faculty members and graduate students to engage in sponsored research that is reported at technical meetings or in journal articles. For each article in this report, a Lewis contact person has been identified, and where possible, reference documents are listed so that additional information can be easily obtained. The diversity of topics attests to the breadth of research and technology being pursued and to the skill mix of the staff that makes it possible. At the time of publication, NASA Lewis was undergoing a name change to the NASA John H. Glenn Research Center at Lewis Field.

Donald J Campbell

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 1

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 2

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory

Returning an Entire Near-Earth Asteroid in Support of Human Exploration Beyond Low-Earth Orbit

This paper describes the results of a study into the feasibility of identifying, robotically capturing, and returning an entire Near-Earth Asteroid (NEA) to the vicinity of the Earth by the middle of the next decade. The feasibility of such an asteroid retrieval mission hinges on finding an overlap between the smallest NEAs that could be reasonably discovered and characterized and the largest NEAs that could be captured and transported in a reasonable flight time. This overlap appears to be centered on NEAs roughly 7 m in diameter corresponding to masses in the range of 250,000 kg to 1,000,000 kg. The study concluded that it would be possible to return a approx.500,000-kg NEA to high lunar orbit by around 2025. The feasibility is enabled by three key developments: the ability to discover and characterize an adequate number of sufficiently small near-Earth asteroids for capture and return; the ability to implement sufficiently powerful solar electric propulsion systems to enable transportation of the captured NEA; and the proposed human presence in cislunar space in the 2020s enabling exploration and exploitation of the returned NEA. Placing a 500-t asteroid in high lunar orbit would provide a unique, meaningful, and affordable destination for astronaut crews in the next decade. This disruptive capability would have a positive impact on a wide range of the nation's human space exploration interests. It would provide a high-value target in cislunar space that would require a human presence to take full advantage of this new resource. It would offer an affordable path to providing operational experience with astronauts working around and with a NEA that could feed forward to much longer duration human missions to larger NEAs in deep space. It represents a new synergy between robotic and human missions in which robotic spacecraft would retrieve significant quantities of valuable resources for exploitation by astronaut crews to enable human exploration farther out into the solar system. The capture, transportation, examination, and dissection of an entire NEA would provide valuable information for planetary defense activities that may someday have to deflect a much larger near-Earth object. Transportation of the NEA to lunar orbit with a total flight time of 6 to 10 years would be enabled by a ~40-kW solar electric propulsion system with a specific impulse of 3,000 s. The flight system could be launched to low-Earth orbit (LEO) on a single Atlas V-class launch vehicle, and return to lunar orbit a NEA with at least 28 times the mass launched to LEO. Longer flight times, higher power SEP systems, or a target asteroid in a particularly favorable orbit could increase the mass amplification factor from 28-to-1 to 70-to-1 or greater. The NASA GRC COMPASS team estimated the full life-cycle cost of an asteroid capture and return mission at approx.$2.6B.

asteroid mining

Manned Mars Systems Study

A study is underway to determine attractive system options, perform trade studies, and provide comparative data for astronaut missions to Mars. Because of an emphasis in this work on deriving requirements and candidates for the transportation and facility infrastructure for such missions, all relevant technologies and mission constraints are also being considered. These include on-orbit assembly, trajectory type, launch opportunities, propellant storage, crew size, cabin pressure, artificial gravity, life-support systems, radiation hazards, power/energy storage, thermal control, human factors, communications, abort scenarios, landing techniques, exploration strategies and science activities. It is planned to scope several example missions and to identify enabling and significantly enhancing technologies for accomplishing the goals of the human exploration of Mars.

Benton C Clark

Ulysses navigation

Ulysses, a cooperative NASA and ESA project, measures charged and neutral particles, magnetic fields, and electromagnetic wave emissions from the Sun's polar regions and the out of elliptic heliospheric environment. ESA supplied the spacecraft and one half of the instruments, and is in control of the spacecraft and its attitude. NASA supplied the power supply, one half of the instruments, the launch vehicle, and tracks the spacecraft and performs the navigation. Orbit determination results mapped to the time of Jupiter's arrival show improved accuracy and consistency over the course of the mission to date. Solar radiation pressure model uncertainties are major contributors to orbit determination errors, but are being estimated more accurately as data are accumulated.

H. J. Gordon

Laser Beam Welding Advancements for In-Space Servicing, Assembly, and Manufacturing

NASA is currently working to develop in-space servicing, assembly, and manufacturing (ISAM) capabilities for low Earth orbit and the lunar surface. One crucial technology for this effort is laser beam welding. Laser systems can perform joining, cleaning, cutting, and repair activities, which will enable the construction of large in-space structures that could not fit on a single launch vehicle, such as trusses for solar panels, radiators, or communications infrastructure. Multiple projects studying laser welding for space applications are currently underway at NASA Marshall Space Flight Center. One of these, the DIsk-Shaped Configurable and Modular vAcuum uNit (DISCMAN), is a compact vacuum chamber designed to support parameter development for laser welding in microgravity. It contains a rotating platen with weld samples made from aluminum, steel, and titanium, a high-power infrared laser, and integrated pumps for pulling vacuum inside the sample cartridge. The DISCMAN payload is planned to launch to the International Space Station, where welds will be performed under sustained microgravity inside the Bishop Airlock. Another effort underway at Marshall is the Lunar Assembly and Servicing by Autonomous Robotics (LASAR) initiative. This project uses a space-rated robotic arm equipped with a laser weld head, wire feeder, and multiple cameras to perform welds in a thermal vacuum chamber simulating the lunar surface environment. Some of these welds are done on snowflake joints, which are specially designed to slot together to join segments of trussN structures, allowing for the construction of tall surface infrastructure. DISCMAN, LASAR, and other projects are being carried out to advance the technological maturity of in-space laser beam welding, collect data to inform computational models, and learn reliable processes for creating weld joints in space. This work supports NASA’s greater goals to expand humanity’s presence in low Earth orbit, establish a permanent moon base, and eventually send crewed missions to Mars and beyond.

Robotics