Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LEASING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Financial Innovation Among the Community Wind Sector in the United States

In the relatively brief history of utility-scale wind generation, the 'community wind' sector - defined here as consisting of relatively small utility-scale wind power projects that are at least partly owned by one or more members of the local community - has played a vitally important role as a 'test bed' or 'proving ground' for wind turbine manufacturers. In the 1980s and 1990s, for example, Vestas and other now-established European wind turbine manufacturers relied heavily on community wind projects in Scandinavia and Germany to install - and essentially field-test - new turbine designs. The fact that orders from community wind projects seldom exceeded more than a few turbines at a time enabled the manufacturers to correct any design flaws or manufacturing defects fairly rapidly, and without the risk of extensive (and expensive) serial defects that can accompany larger orders. Community wind has been slower to take root in the United States - the first such projects were installed in the state of Minnesota around the year 2000. Just as in Europe, however, the community wind sector in the U.S. has similarly served as a proving ground - but in this case for up-and-coming wind turbine manufacturers that are trying to break into the broader U.S. wind power market. For example, community wind projects have deployed the first U.S. installations of wind turbines from Suzlon (in 2003), DeWind (2008), Americas Wind Energy (2008) and later Emergya Wind Technologies (2010),1 Goldwind (2009), AAER/Pioneer (2009), Nordic Windpower (2010), Unison (2010), and Alstom (2011). Just as it has provided a proving ground for new turbines, so too has the community wind sector in the United States served as a laboratory for experimentation with innovative new financing structures. For example, a variation of one of the most common financing arrangements in the U.S. wind market today - the 'partnership flip structure' - was first developed by community wind projects in Minnesota more than a decade ago (and is therefore sometimes referred to as the 'Minnesota flip' model) before being adapted by the broader wind market. More recently, a handful of community wind projects built in the United States over the past year have been financed via new and creative structures that push the envelope of wind project finance in the U.S. - in many cases, moving beyond the now-standard partnership flip structures. These projects include: (1) a 4.5 MW project in Maine that combines low-cost government debt with local tax equity, (2) a 25.3 MW project in Minnesota using a sale/leaseback structure, (3) a 10.5 MW project in South Dakota financed by an intrastate offering of both debt and equity, (4) a 6 MW project in Washington state that taps into 'New Markets Tax Credits' using an 'inverted' or 'pass-through' lease structure, and (5) a 9 MW project in Oregon that combines a variety of state and federal incentives and loans with unconventional equity from high-net-worth individuals. In most cases, these are first-of-their-kind financing structures that could serve as useful examples for other projects - both community and commercial wind alike. This new wave of financial innovation occurring in the community wind sector has been facilitated by policy changes, most of them recent. Most notably, the American Recovery and Reinvestment Act of 2009 ('the Recovery Act') enables, for a limited time, wind power (and other types of) projects to elect either a 30% investment tax credit ('ITC') or a 30% cash grant (the 'Section 1603 grant') in lieu of the federal incentive that has historically been available to wind projects in the U.S. - a 10-year production tax credit ('PTC'). This flexibility, in turn, enables wind power projects to pursue lease financing for the first time - leasing is not possible under the PTC. Because they are based on a project's cost rather than energy generation, the 30% ITC and Section 1603 grant also reduce performance risk relative to the PTC - this, too, is an important enabler of lease financing. Finally, by providing a cash rather than tax incentive, the Section 1603 grant alone reduces (but does not eliminate) the need for tax appetite among project owners. All of these policy changes can be particularly useful to community wind projects, and have helped to support the different financial structures mentioned above. This special report - which is distilled from a longer Berkeley Lab report - briefly describes just two of these innovative new financing structures: the sale/leaseback structure used in Minnesota and the intrastate offering conducted in South Dakota. Readers interested in more detail on these two structures, as well as the other three projects not covered here, are encouraged to reference the full Berkeley Lab report.

17 WIND ENERGY↗

Solar Technology Center

The Department of Energy, Golden Field Office, awarded a grant to the UNLV Research Foundation (UNLVRF) on August 1, 2005 to develop a solar and renewable energy information center. The Solar Technology Center (STC) is to be developed in two phases, with Phase I consisting of all activities necessary to determine feasibility of the project, including design and engineering, identification of land access issues and permitting necessary to determine project viability without permanently disturbing the project site, and completion of a National Environmental Policy Act (NEPA) Environmental Assessment. Phase II is the installation of infrastructure and related structures, which leads to commencement of operations of the STC. The STC is located in the Boulder City designated 3,000-acre Eldorado Valley Energy Zone, approximately 15 miles southwest of downtown Boulder City and fronting on Eldorado Valley Drive. The 33-acre vacant parcel has been leased to the Nevada Test Site Development Corporation (NTSDC) by Boulder City to accommodate a planned facility that will be synergistic with present and planned energy projects in the Zone. The parcel will be developed by the UNLVRF. The NTSDC is the economic development arm of the UNLVRF. UNLVRF will be the entity responsible for overseeing the lease and the development project to assure compliance with the lease stipulations established by Boulder City. The STC will be operated and maintained by University of Nevada, Las Vegas (UNLV) and its Center for Energy Research (UNLV-CER). Land parcels in the Eldorado Valley Energy Zone near the 33-acre lease are committed to the construction and operation of an electrical grid connected solar energy production facility. Other projects supporting renewable and solar technologies have been developed within the energy zone, with several more developments in the horizon.

14 SOLAR ENERGY↗

The Birth of a Data Center

Since 2005, Research and Education Campus serves as the gateway to INL University Boulevard Consolidates scientific studies, increased interaction and educational opportunities Teams with local commercial developers, the State of Idaho, and Idaho universities Developed University Boulevard 7 major R&D Leased facilities (388,000 sq. ft.) $122M capital value of leased property Some facilities are at and others forecasted to exceed capacity within 2-3 years as mission growth continues DOE awarded the INL contract to BEA, Feb. 2005. Purpose; transform two uniquely different National Laboratories into the newly formed Idaho National Laboratory Become the pre-eminent, internationally recognized nuclear energy research, development and demonstration laboratory within 10 years. Aggressively streamline, upgrade and plan for new infrastructure INL Infrastructure Transformation Plan, Sept 2005, an overall roadmap for transforming INL to meet the new vision. Key goal; procure 400,000 sq ft of new facility space DOE-NE approved Mission Need document for consolidating the INL Research and Education Campus (REC), Dec. 2005; add or replace 200,000 to 500,000 sq ft of professional scientific space, existing facilities were fair to poor condition. Master Campus Plan requirements document and Environmental Assessment approved January and March 2007 respectively. Defined campus location and REC boundaries. INL and DOE-ID decided, in 2007, to suspend quest for third-party financing, because unlikely to succeed. The strategy was; Keep original target of 200,000 to 500,000 sq ft new space Consolidate existing scattered leases Pursue developer-financed facilities in smaller incremental sizes All leased general purpose buildings;No DOE capital investments (except for utility corridor), developed by others (local developers, State, University, private funding), no government land involved INL-funded tenant improvements

99 GENERAL AND MISCELLANEOUS↗

U.S. Department of Energy Office of Legacy Management Legacy Uranium Mine Site Reclamation - Lessons Learned - 12384

The U.S. Department of Energy (DOE) Office of Legacy Management is responsible for administering the DOE Uranium Leasing Program (ULP) and its 31 uranium lease tracts located in the Uravan Mineral Belt of southwestern Colorado (see Figure 1). In addition to administering the ULP for the last six decades, DOE has also undertaken the significant task of reclaiming a large number of abandoned uranium (legacy) mine sites and associated features located throughout the Uravan Mineral Belt. In 1995, DOE initiated a 3-year reconnaissance program to locate and delineate (through extensive on-the-ground mapping) the legacy mine sites and associated features contained within the historically defined boundaries of its uranium lease tracts. During that same time frame, DOE recognized the lack of regulations pertaining to the reclamation of legacy mine sites and contacted the U.S. Bureau of Land Management (BLM) concerning the reclamation of legacy mine sites. In November 1995, The BLM Colorado State Office formally issued the United States Department of the Interior, Colorado Bureau of Land Management, Closure/Reclamation Guidelines, Abandoned Uranium Mine Sites as a supplement to its Solid Minerals Reclamation Handbook (H-3042-1). Over the next five-and-one-half years, DOE reclaimed the 161 legacy mine sites that had been identified on DOE withdrawn lands. By the late 1990's, the various BLM field offices in southwestern Colorado began to recognize DOE's experience and expertise in reclaiming legacy mine sites. During the ensuing 8 years, BLM funded DOE (through a series of task orders) to perform reclamation activities at 182 BLM mine sites. To date, DOE has reclaimed 372 separate and distinct legacy mine sites. During this process, DOE has learned many lessons and is willing to share those lessons with others in the reclamation industry because there are still many legacy mine sites not yet reclaimed. DOE currently administers 31 lease tracts (11,017 ha) that collectively contain over 220 legacy (abandoned) uranium mine sites. This contrasts to the millions of hectares administered by the BLM, the U.S. Forest Service, and other federal, tribal, and state agencies that contain thousands of such sites. DOE believes that the processes it has used provide a practical and cost-effective approach to abandoned uranium mine-site reclamation. Although the Federal Acquisition Regulations preclude DOE from competing with private industry, DOE is available to assist other governmental and tribal agencies in their reclamation efforts. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Capacity Density Considerations for Offshore Wind Plants in the United States

The United States is a rapidly emerging market for offshore wind energy, with a project pipeline estimated at over 52 GW as of May 31, 2023 (Musial et al. 2023). The capacity density, measured in megawatts per square kilometer (MW/km 2 ), is a crucial parameter for estimating the magnitude of the development pipeline and the nameplate potential of existing lease areas. The offshore wind energy industry is comprised of diversity of participants, including developers, governmental bodies, investors, environmental advocacy groups, and researchers. These various stakeholders use capacity density in different ways as a key metric for evaluating the potential of individual offshore wind lease area or even a section of ocean space. This report presents our assessment of capacity density values in the current pipeline of emerging U.S. offshore wind farms and a detailed list of the main factors that influence capacity density. This understanding is critical for planning of future lease areas, for estimating the technical resource potential for offshore wind on the U.S. outer continental shelf (OCS), and for estimating ocean space requirements needed for meeting state and national goals for a carbon neutral energy transition.

17 WIND ENERGY↗

Challenges and Opportunities for Floating Offshore Wind Energy in Ultradeep Waters of the Central Atlantic

This study, funded under an interagency agreement between the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) and Bureau of Ocean Energy Management (BOEM), is intended to provide BOEM with key information to inform their decision making about current and future leasing in the Central Atlantic region of the United States. The report will also benefit state governments, developers, research institutions, and the public which are seeking technical and market-based information about the unique aspects of the offshore wind energy development along the outer continental shelf of the Central Atlantic region of the United States. The study provides a broad top-level assessment of the key challenges and opportunities that are unique to offshore wind energy development in the Central Atlantic region. It focuses on BOEM's Central-Atlantic region Call areas. The research is based on the most current technology, deployment, and stakeholder information available to NREL. The topics include assessments of the physical environment, current leasing status and major stakeholder issues, state and federal energy policy, an assessment of future leasing requirements based on state targets, status and limitations of the technology, and supply chain status. The primary intent is to inform the readers about the prospects for deploying offshore wind in the designated deep water Call areas, E and F, identified by BOEM. The report makes recommendations regarding development in these regions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Crossing the Barriers: An Analysis of Land Access Barriers to Geothermal Development and Potential Improvement Scenarios

Developers have identified many non-technical barriers to geothermal power development, including access to land. Activities required for accessing land, such as environmental review and private and public leasing can take a considerable amount of time and can delay or prevent project development. This paper discusses the impacts to available geothermal resources and deployment caused by land access challenges, including tribal and cultural resources, environmentally sensitive areas, biological resources, land ownership, federal and state lease queues, and proximity to military installations. In this analysis, we identified challenges that have the potential to prevent development of identified and undiscovered hydrothermal geothermal resources. We found that an estimated 400 MW of identified geothermal resource potential and 4,000 MW of undiscovered geothermal resource potential were either unallowed for development or contained one or more significant barriers that could prevent development at the site. Potential improvement scenarios that could be employed to overcome these barriers include (1) providing continuous funding to the U.S. Forest Service (USFS) for processing geothermal leases and permit applications and (2) the creation of advanced environmental mitigation measures. The model results forecast that continuous funding to the USFS could result in deployment of an additional 80 MW of geothermal capacity by 2030 and 124 MW of geothermal capacity by 2050 when compared to the business-as-usual scenario. The creation of advanced environmental mitigation measures coupled with continuous funding to the USFS could result in deployment of an additional 97 MW of geothermal capacity by 2030 and 152 MW of geothermal capacity by 2050 when compared to the business-as-usual scenario. The small impact on potential deployment in these improvement scenarios suggests that these 4,400 MW have other barriers to development in addition to land access. In other words, simply making more resources available for development does not increase deployment; however, impacts to deployment could increase when coupled with other improvements (e.g., permitting, market and/or technology improvements).

15 GEOTHERMAL ENERGY↗

Build Out to Save Money - Small Office

This fact sheet for small office leases provides guidance on how property teams, leasing agents, and brokers can communicate the value of considering energy efficiency during tenant improvements.

small office, commercial real estate, lease, leasi↗

Build Out to Save Money

This fact sheet for large office leases provides guidance on how property teams, leasing agents, and brokers can communicate the value of considering energy efficiency during tenant improvements.

large office, commercial real estate, lease, leasi↗

Wind power production from very large offshore wind farms

In this work, we provide the first quantitative assessment of power production and wake generation from offshore wind energy lease areas along the U.S. east coast. Deploying 15-MW wind turbines, with spacing equal to the European average, yields electricity production of 116 TWh/year or 3% of current national supply. However, power production is reduced by one-third due to wakes caused by upwind wind turbines and wind farms. Under some flow conditions whole wind-farm wakes can extend up to 90 km downwind of the largest lease areas, and the frequency-weighted average area with a 5% velocity deficit is 2.6 times the footprint of the lease areas. Simulations including maritime corridors demonstrate reduction in the wake effects leading to power-efficiency gains and may offer contingent benefits. First-order scaling rules are developed that describe how “wake shadows” from large offshore wind farms scale with prevailing meteorology and wind turbine installed densities.

15 MW↗

Finding Large Aperture Fractures in Geothermal Resource Areas Using a Three-Component Long-Offset Surface Seismic Survey, PSInSAR and Kinematic Structural Analysis

The DOE cost-share program applied innovative and cutting edge seismic surveying and processing, permanent scatter interferometry-synthetic aperture radar (PSInSAR) and structural kinematics to the exploration problem of locating and mapping largeaperture fractures (LAFs) for the purpose of targeting geothermal production wells. The San Emidio geothermal resource area, which is under lease to USG, contains production wells that have encountered and currently produce from LAFs in the southern half of the resource area (Figure 2). The USG lease block, incorporating the northern extension of the San Emidio geothermal resource, extends 3 miles north of the operating wellfield. The northern lease block was known to contain shallow thermal waters but was previously unexplored by deep drilling. Results of the Phase 1 exploration program are described in detail in the Phase 1 Final Report (Teplow et al., 2011). The DOE cost shared program was completed as planned on September 30, 2014. This report summarizes results from all of Phase 1 and 2 activities.

15 GEOTHERMAL ENERGY↗

Wind Resource Assessment and Requested Wind Turbine Recommendations

Alternate Energy Solutions, Inc. (“AESWR”) was engaged by the Town of Brookston (“Brookston”) to assemble, erect and maintain one 60 m XHD meteorological tower manufactured by NRG Systems, Inc.; for monitoring, recording and evaluating collected wind data. It is the opinion of AESWR staff that study results support the development of a wind turbine project at the Bol Family Farm provided: a) additional land is leased for the project; b) project construction costs are controlled; and c) a prudent power purchase agreement is negotiated with a power take-off entity. We believe that a project having an aggregate nameplate rating sized from 6.0 MW to 20 MW would be appropriate for this location. We recommend 100-125 acres of land per installed MW be used as a general rule for acquiring wind energy land lease agreements, total land lease holdings to be acquired would then approach 750 acres to 2,500 acres.

17 WIND ENERGY↗

Structural and Stratigraphic Controls on Methane Hydrate occurrence and distribution: Gulf of Mexico, Walker Ridge 313 and Green Canyon 955: Final Report

The goal of this project was to determine structural and stratigraphic controls on hydrate occurrence and distribution in Green Canyon (GC) 955 and Walker Ridge (WR) 313 blocks using seismic and well data. Gas hydrate was discovered in these blocks in coarse- and fine-grained sediments during the 2009 Joint Industrial project (JIP) Leg 11 drilling expedition. Although the immediate interest of the exploration community is exclusively hydrate which is present in coarse–grained sediments, factors that control hydrate and free gas distribution in the two blocks and whether coarse and fine-grained hydrate-bearing units are related in any manner, formed the core of this research. The project spanned from 10/01/2012 to 07/31/2016. In the project, in both the leased blocks, the interval spanning the gas hydrate stability zone (GHSZ) was characterized using a joint analysis of sparse Ocean Bottom Seismic (OBS) and dense, surface–towed multichannel seismic (MCS) data. The project team had the luxury of calibrating their results with two well logs. Advance processing methods such as depth migration and full-waveform inversion (FWI) were used for seismic data analysis. Hydrate quantification was achieved through interpretation of the FWI velocity field using appropriate rock physics models at both blocks. The seismic modeling/inversion methodology (common to both GC955 and WR313 blocks) was as follows. First, the MCS data were depth migrated using a P-wave velocity (VP) model constructed using inversion of reflection arrival times of a few (four in both cases) key horizons carefully picked in the OBS data to farthest possible offsets. Then, the resolution of the traveltime VP model was improved to wavelength scale by inverting OBS gathers up to the highest frequency possible (21.75 Hz for GC955 and 17.5 for WR313) using FWI. Finally, the hydrate saturation (or the volume fraction) was estimated at the well location assuming one of the other hydrate morphology (filling the primary or the secondary porosity) was extrapolated out from the wells using the FWI VP as a guide. General outcomes were as follows. First and foremost, an imaging methodology using sparse seismic data, which is easily replicable at other sites with similar datasets, has been demonstrated. The end product of this methodology at both the leased blocks is quantitative estimates of hydrate distribution. Second, at both locations there is strong evidence that the base of the GHSZ, which does not appear as a clear Bottom Simulating Reflection (BSR), manifests in the VP perturbations created by FWI, suggesting that FWI is sensitive to subtle compositional changes in shallow sediments and establishes it as a valuable tool for investigations of hydrate-bearing basins. Third, through joint interpretation of the depth migrated image and the FWI VP model, how structure and stratigraphy jointly determine hydrate and free gas distribution in both blocks could be clearly visualized. The joint interpretation also suggests that the coarse and fine grained hydrate-bearing sediments at both leased are connected. Site specific results, in addition to general results, are as follows. At GC955 the overlying fine-grained hydrate-bearing unit could have been sourced from the underlying hydrate coarse-grained channel-levee complex through a chimney feature. The channel-levee system at GC955 is compartmentalized by faults, of which only a few may be impermeable. Although compartmentalized, the channel-levee system in the GC955 as a whole might be in communication except selected zones. At WR313 the overlying fine-grained fracture-filled hydrate unit appears to be sourced from below the GHSZ. The reason that only a particular fine-grained unit has hydrate, despite having lower porosity that the bounding units, could be the presence of secondary porosity (such as those formed from clay dewatering under compaction). In conclusion, the project was a pioneering effort in in joint analysis of OBS and MCS datasets for advancing the knowledge about a hydrate and free–gas system dynamics using advanced processing methods such as FWI and depth migration. Results obtained in this project can greatly advance the tools and techniques used for delineating specific hydrate prospects. Results obtained in this project can also be seamlessly incorporated into other DOE funded project on modeling the potential productivity and commercial viability of hydrate from sand-dominated reservoirs. The OBS and MCS data in this project were acquired in 2012 (after the JIP II drilling) by the USGS and therefore the results are a posteriori. Nonetheless, the seismic inversion workflow established through this project can be used to generate various what-if quantification scenarios even in absence of logs and serve as a valuable tool for guiding drilling operations. Results from this project can augment other DOE sponsored projects on determining the commercial viability of methane production from the Gulf of Mexico.

03 NATURAL GAS↗

Risk Assessment for Marine Vessel Traffic and Wind Energy Development in the Atlantic

The Bureau of Ocean Energy Management (BOEM) is initiating leasing of the seabed for offshore wind energy development on the outer continental shelf (OCS) in the Atlantic from Maine to Florida, with initial development planned for a series of Wind Energy Areas (WEAs) designated by the Department of Interior. Additional wind areas are under development and are currently considered to be Wind Call Areas (WCAs), leasing areas, and other set asides. Some of the proposed sites are located at or near the entrances to major ports, others are located at the seaward terminus of existing Traffic Separation Schemes (TSS), and many of the wind areas occupy locations along historical shipping routes. The siting of offshore wind farms has the potential to affect existing shipping along the Atlantic Coast; modifications to safe-access routes may be required. The United States Coast Guard (USCG) has the authority to ensure navigational safety in U.S. waters. The USCG has undertaken the Atlantic Coast Port Access Study (ACPARS) to assess future port access and navigation needs for the Atlantic coast, at a time when the mix of shipping routes and vessels are likely to change due to factors such as the widening of the Panama Canal and opening of the Arctic Ocean to shipping. The presence of wind turbines off the Atlantic coast has the potential to affect shipping routes and activities. In order to safely incorporate the presence of offshore wind farms into ACPARS, the USCG requires information on the following: the effects of offshore renewable energy infrastructure on potential traffic density; the impacts of offshore wind infrastructure on shipping traffic including rerouting, funneling, and obstructions to navigation; and whether changes to safe access routes for vessels are needed with the installation of offshore wind farms, including modifications to fairways or TSSs. BOEM entered into an Interagency Agreement in August 2012 with the US Department of Energy (DOE) to provide risk assessment expertise to the USCG development of ACPARS and BOEM’s OCS leasing. DOE assigned Pacific Northwest National Laboratory (PNNL) to provide an assessment of navigational safety risks (including collision, contact, grounding, and stranding). PNNL structured the project around several activities: 1) acquisition and processing of Automated Identification System (AIS) data; 2) geospatial analysis to elucidate historical shipping routes; 3) development of a data-driven numerical model to predict vessel movements in the presence of offshore wind farms; 4) enlisting expertise in navigation from an experts’ panel; 5) assessment of navigational risks from the presence of offshore wind farms; and 6) recommendations for changes to the navigation system to accommodate those changes. This report focuses on the activities carried out by PNNL, in close coordination with BOEM and USCG, from August 2012 to November 2013, and indicates the priority actions for additional enhancement to the modeling system to be carried out from December 2013 through November 2014. The body of the report briefly introduces each step of the process, and reports on notable outcomes. Detailed descriptions, computations, and figures that represent each step are included in ten technical appendices.

17 WIND ENERGY↗

Canadian MSAT field trial program user requirements

A wide range of mobile satellite service offerings will be available in late 1993 with the launch of Canada's first satellite devoted almost exclusively to mobile and transportable services. During the last seven years, the Dept. of Communications has been meeting with potential MSAT users in government and the private sector as part of a $20M Communications Trials Program. User trials will be conducted using leased capacity as well as capacity on Canada's MSAT satellite. User requirements are discussed which were identified under the Communications Trials Program. Land, marine, aeronautical, and fixed applications are described from the perspective of the end users. Emphasis is placed on field trials being accomplished using leased capacity such as the marine data trial being implemented by Ultimateast Data Communications, trials using transportable briefcase terminals and additional field trials being considered for implementation with the TMI Mobile Data Service. The pre-MSAT trials that will be conducted using leased capacity are only a limited sample of the overall end user requirements that have been identified to date. Additional end user applications are discussed, along with a summary of user benefits.

Pedersen, Allister↗

Capacity Density Considerations for Floating Offshore Wind Farms in Ultradeep Waters

Capacity density describes the concentration of wind energy development in an area and is often specified in terms of megawatts-per-square-kilometer (MW/km2). Understanding capacity density trends in wind energy projects helps to inform both energy system and spatial planning efforts. Borrman et al. (2018) and Mulas Hernando et al. (2023) analyze capacity density trends for fixed-bottom offshore wind farms in Europe and the United States, respectively, and Cooperman et al. (2022) explores how floating offshore wind mooring technology choices may impact wind plant layout through setbacks from lease area boundaries in waters up to 1,300 m deep. Technical challenges facing floating offshore wind development in ultradeep waters (beyond 1,300 m) could impact achievable capacity densities, with potential implications to marine spatial planning and project economics. When compared to fixed-bottom commercial-scale wind farms, mooring system footprints from floating offshore wind systems can constrain capacity density in some circumstances. In this study, we conduct an initial investigation of how taut mooring configurations may constrain floating offshore wind turbine placement and estimate capacity density for representative floating wind plants in generic lease areas. In addition, we explore floating wind plant capacity density drivers in ultradeep waters by characterizing area utilization for a range of lease area characteristics. This analysis highlights the primary challenges that floating offshore wind systems may encounter in achieving capacity densities comparable to commercial-scale fixed-bottom projects at ultradeep water depths, from a technical standpoint.

capacity density↗

A Simple Data-Centric Methodology for Producible Geothermal Well Determinations: Preprint

The Bureau of Land Management (BLM) has traditionally lacked a standardized methodology for determining if a newly drilled geothermal well is "producible," a designation essential for deciding whether a lease should be "held by production." This is a straightforward problem to solve in oil and gas: Demonstrate that a well is economically viable, meaning it produces sufficient oil or gas to exceed direct operating costs and lease-related expenses, such as rentals or minimum royalties. In geothermal, the problem is more complex: Geothermal wells are tightly coupled with the downstream infrastructure - specifically, the power plant, which is often not designed until well after a lease is deemed as "held by production." Although this designation is critical for advancing geothermal power plant development on BLM-managed lands, current geothermal well assessments often rely on ad hoc approaches that can be complex, operator-biased, and heavy in assumptions related to economic viability. To address this, we have developed two complementary methodologies: a minimum power requirement-based approach and a productivity index (PI)-based approach. These methods leverage key flow test data - pressure, temperature, flow rate, and specific enthalpy - to provide reliable and standardized producible well determinations. The minimum power requirement-based approach evaluates wells against specific power output thresholds informed by reservoir experts and the associated temperature requirements. The PI-based approach assesses well productivity using widely accepted reservoir engineering metrics, proposing a threshold of 2.5 kg/s/bar. Both methods are data-driven and grounded in empirical production data from operational geothermal wells, avoiding uncertain economic assumptions while maintaining decision-making accuracy. Wells falling below key performance thresholds (i.e., PI, specific power) are deemed non-producible. These methodologies aim to streamline BLM's decision-making process, reduce nontechnical barriers to geothermal energy adoption, and enable regulatory expansion into states lacking geothermal expertise. Preliminary results indicate clear trends and thresholds in production data that provide actionable insights for evaluating well producibility. Validation using well completion report (WCR) data is ongoing, with promising results demonstrating the potential for these standardized methodologies to impact geothermal development significantly.

15 GEOTHERMAL ENERGY↗

Studies of the Surface Treatment and Sizing of Carbon Fiber Surfaces on the Mechanical Properties of Composites Containing Carbon Fibers

Carbon fiber reinforced composites are materials where carbon fibers are used to reinforce a matrix to produce a light and strong material with important applications in the aerospace industry. There are many aspects of the preparation of these materials that would benefit from a study which combines the research of groups involved in the production, testing and analysis of these materials, and studies of the basic surface chemistry involved. This final reports presents the results of a project that has developed a collaboration between groups in all three of the major research universities in the State of Kansas, and promises to lead to a collaborative program that covers the major aspects of composite development and application. Sherwood has provided initial fiber surface treatment and sizing together with fiber and composite surface analysis; Lease, Tomblin and Wang have worked together toward the goal of preparing pre-preg and fabrication of laminated panels; Locke has developed computational models to evaluate the effect of surface treatment (and chemistry) on mechanical properties; Lease, Tomblin and Wang have worked together to perform all necessary mechanical testing. The research has been focused on materials that would benefit the High Speed Civil Transport (HSCT) program. The group has visited Dr. Howard Maars and his colleagues at NASA Langley, and has focused their studies on the NASA requirements discussed in this meeting. An important development, requested by NASA scientists, has been the acquisition and study of K3B as a matrix material for the composites. The project has led to the successful acquisition and surface analysis of K3B, together with the successful deposition of this material onto surface oxidized carbon fibers. Mechanical testing, modelling and the construction of composite preparation equipment has been achieved during the grant period.

Sherwood, Peter M. A.↗