Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LAN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Numerical Simulations of Homogeneous Turbulence Using Lagrangian-Averaged Navier-Stokes Equations

The Lagrangian-averaged Navier-Stokes (LANS) equations are numerically evaluated as a turbulence closure. They are derived from a novel Lagrangian averaging procedure on the space of all volume-preserving maps and can be viewed as a numerical algorithm which removes the energy content from the small scales (smaller than some a priori fixed spatial scale alpha) using a dispersive rather than dissipative mechanism, thus maintaining the crucial features of the large scale flow. We examine the modeling capabilities of the LANS equations for decaying homogeneous turbulence, ascertain their ability to track the energy spectrum of fully resolved direct numerical simulations (DNS), compare the relative energy decay rates, and compare LANS with well-accepted large eddy simulation (LES) models.

Mohseni, Kamran↗

Novel spherical hohlraum with cylindrical laser entrance holes and shields

Our recent works [K. Lan et al., Phys. Plasmas 21, 010704 (2014); K. Lan et al., Phys. Plasmas 21, 052704 (2014)] have shown that the octahedral spherical hohlraums are superior to the cylindrical hohlraums in both higher symmetry during the capsule implosion and lower backscatter without supplementary technology. However, both the coupling efficiency from the drive laser energy to the capsule and the capsule symmetry decrease remarkably when larger laser entrance holes (LEHs) are used. In addition, the laser beams injected at angles > 45° transport close to the hohlraum wall, thus the wall blowoff causes the LEH to close faster and results in strong laser plasma interactions inside the spherical hohlraums. In this letter, we propose a novel octahedral hohlraum with LEH shields and cylindrical LEHs to alleviate these problems. From our theoretical study, with the LEH shields, the laser coupling efficiency is significantly increased and the capsule symmetry is remarkably improved in the spherical hohlraums. The cylindrical LEHs take advantage of the cylindrical hohlraum near the LEH and mitigate the influence of the blowoff on laser transport inside a spherical hohlraum. The cylindrical LEHs can also be applied to the rugby and elliptical hohlraums.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Lunanet Position, Navigation, and Timing Services and Signals, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. In September 2022 the National Aeronautics and Space Administration (NASA) introduced the Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever mission launched by a commercial launch service provider aiming to land on the lunar surface. The NASA Artemis program plans initial crewed landings and surface traverses in 2025, supported by the Lunar Gateway. Regular launches will follow to build the lunar systems for a sustained presence as presented in the Artemis Plan (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with commercial providers through the Commercial Lunar Payload Services program (CLPS, (NASA, n.d.)) will deliver science and technology demonstration missions to the Moon starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) program plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services, that may be combined with onboard sensors. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, surface crew, rovers, and deployed science payloads). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that would be provided by a system that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This paper includes a description of the high-level LANS concept, and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗

The Design of a Flexible, Interoperable Navigation Signal for Future Lunar Missions

The LunaNet Interoperability Specification (LNIS) is a set of standards currently under development by NASA, ESA, and JAXA, which define a common, interoperable set of services and interfaces for lunar communication and navigation. The LNIS includes specifications for the GNSS-like Augmented Forward Signal (AFS). The LANS (Lunar Augmented Navigation Service) will be comprised of Multiple LunaNet Service Provider (LNSP) nodes broadcasting the AFS, such as NASA’s LCRNS (Lunar Communications Relay and Navigation Systems), ESA’s Moonlight LCNS (Lunar Communication and Navigation Services) and the Japan LNSS (Lunar Navigation Satellite System). The LANS will provide a GNSS-like capability enabling orbiting and surface users in lunar space (such as Artemis) to estimate their position, velocity and time as described in Giordano et al., (2023). Initial capabilities will focus on providing service to the lunar South pole region. The specification of AFS defines two orthogonal signal components on a single carrier, with the in-phase component (AFS-I) being a lower-chip-rate data channel tailored for applications where low SWaP is critical (e.g., IoT devices or search and rescue), and the quadrature component (AFS-Q) being a high-chip-rate data-less pilot signal for high-precision, robust lunar navigation and positioning applications. An initial description of AFS was provided in the LNIS, (2023), and initial analysis results were shown in Dafesh, et al., (2024). In this work, we provide rationale for updates to the LNIS that define key aspects of the signal including the primary spreading code designs for the data and pilot channels, and a three-tiered overlay code approach for the pilot channel that provides flexible signal acquisition alternatives, rapid time dissemination and robust frame Sync. The paper also describes a robust data sync word that is designed to enable frame Sync. for low-SWaP receivers that only use the I channel, as well as a low-density parity check code (LDPC) data message encoding design and interleaving definition. The work further describes the impact of the updated AFS design in terms of improved acquisition performance, interference resistance, navigation message capabilities and rapid absolute time dissemination for users able to access clock and ephemeris data over an external network. The cross-correlation and synchronization performance of the AFS design is also compared to potential alternatives, further providing rationale for the final signal design configuration.

LANS↗

The Design of a Flexible, Interoperable Navigation Signal for Future Lunar Missions

The LunaNet Interoperability Specification (LNIS) is a set of standards currently under development by NASA, ESA, and JAXA, which define a common, interoperable set of services and interfaces for lunar communication and navigation. The LNIS includes specifications for the GNSS-like Augmented Forward Signal (AFS). The LANS (Lunar Augmented Navigation Service) will be comprised of Multiple LunaNet Service Provider (LNSP) nodes broadcasting the AFS, such as NASA’s LCRNS (Lunar Communications Relay and Navigation Systems), ESA’s Moonlight LCNS (Lunar Communication and Navigation Services) and the Japan LNSS (Lunar Navigation Satellite System). The LANS will provide a GNSS-like capability enabling orbiting and surface users in lunar space (such as Artemis) to estimate their position, velocity and time as described in Giordano et al., (2023). Initial capabilities will focus on providing service to the lunar South pole region. The specification of AFS defines two orthogonal signal components on a single carrier, with the in-phase component (AFS-I) being a lower-chip-rate data channel tailored for applications where low SWaP is critical (e.g., IoT devices or search and rescue), and the quadrature component (AFS-Q) being a high-chip-rate data-less pilot signal for high-precision, robust lunar navigation and positioning applications. An initial description of AFS was provided in the LNIS, (2023), and initial analysis results were shown in Dafesh, et al., (2024). In this work, we provide rationale for updates to the LNIS that define key aspects of the signal including the primary spreading code designs for the data and pilot channels, and a three-tiered overlay code approach for the pilot channel that provides flexible signal acquisition alternatives, rapid time dissemination and robust frame Sync. The paper also describes a robust data sync word that is designed to enable frame Sync. for low-SWaP receivers that only use the I channel, as well as a low-density parity check code (LDPC) data message encoding design and interleaving definition. The work further describes the impact of the updated AFS design in terms of improved acquisition performance, interference resistance, navigation message capabilities and rapid absolute time dissemination for users able to access clock and ephemeris data over an external network. The cross-correlation and synchronization performance of the AFS design is also compared to potential alternatives, further providing rationale for the final signal design configuration.

LunaNet↗

Theoretical investigation of La monopnictides: Electronic properties and pressure-induced phase transition

The NaCl-type La monopnictides are proper reference materials for the study of strongly correlated rare-earth pnictides. Yet, despite the simple crystal structure of this system, traditional density functional theory (DFT) calculations have dramatic failures in describing their electronic properties: DFT severely underestimates the band gaps and thus predicts incorrect transport characters of them. Here, we perform a corrected DFT calculation to rectify this failure. Our results show that LaN, LaP, and LaAs are semiconductor with band gaps of 0.82, 0.25, and 0.12 eV, respectively, and LaSb is semimetallic with an overlap of conduction and valence bands approximately 0.28 eV, in agreement with the available experiments. Additionally, under high-pressure, we find that LaN displays a new sequence of phase-transition, B1 → anti-B10 → B2, which is different from the previous theoretical predictions but consistent with the recent experiment.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

SU-F-J-13: Choosing An IMRT Technique in the Treatment of Head and Neck Cancer with Daily Localization Uncertainties

Purpose: Head and Neck cancer treatment with IMRT/VMAT has two choices: split-filed IMRT(SFI), in which the LAN is treated with a separate anterior field and the extended whole-field IMRT(WFI) in which LAN is included with the IMRT/VMAT field. This study shows that under the same dose limit criteria, choosing the technique becomes a critical issue if daily localization and immobilization altered the dose distribution. Methods: Nine common head-and-neck cancer cases were chosen to illustrate how the daily localization and immobilization uncertainties affect to choose between SFI and WFI. Both SFI and WFI at upper target coverage were generated with VMAT. For each case, the same planning criteria were applied to the target and critical structures; therefore, similar target coverage and dose falloff can be observed in both techniques. Thirty days of kV cone beam CT(CBCT) images on each case were also delineated with contralateral and ipsilateral target as well as larynx as critical structure. About 300 CBCT images with daily delivered doses were analyzed and compared in a form of dose-volume histograms. Results: While both plans for SFI and WFI with VMAT planning utilized and meet the criteria of D95>prescription dose and for not-involved larynx with mean dose <35Gy and V55<10%, the daily localization and immobilization has a great contribution to the resulted dose delivery. With WFI, the better daily contralateral and ipsilateral neck target coverage can reflect a simpler or shorter localization; however, a much superior avoidance (WFI: mean dose a 42.5Gy; SFI: mean dose a 18.9Gy) of the non-involved larynx from the SFI is preferred. Conclusion: Dosimetrically, SFI and WFI are equally well for head and Neck cancer treatment with VMAT technique; however, if considering the contribution of daily localization(CBCT) method uncertainties, SFI is better with sparing non-involved larynx and WFI has better target coverage.

60 APPLIED LIFE SCIENCES↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Los Alamos National Security, LLC Request for Information from industrial entities that desire to commercialize Laboratory-developed Extremely Low Resource Optical Identifier (ELROI) tech

Los Alamos National Security, LLC (LANS) is the manager and operator of the Los Alamos National Laboratory for the U.S. Department of Energy National Nuclear Security Administration under contract DE-AC52-06NA25396. LANS is a mission-centric Federally Funded Research and Development Center focused on solving the most critical national security challenges through science and engineering for both government and private customers.

47 OTHER INSTRUMENTATION↗

Los Alamos National Laboratory Request for Proposals: Trident Laser System (TLS) Redeployment and Life Extension, October 5, 2016

In May 2016, LANS announced that the Trident Laser Facility would cease operating effective September 15, 2016. That date was subsequently extended. The current plan is to operate for an additional, limited period in early CY 2017, and to leverage that activity to provide a training opportunity to the party that will redeploy the TLS. The TLS will then be disassembled and packaged for shipping to the new site, where it may be reconstituted and continue to be used by the physics research community. It is LANS’ intent that Trident will be sited with an organization that will supply its own funding for TLS installation, calibration, and lifecycle operation. Ideally, the receiving party will plan to upgrade TLS with new capability. The equipment to be transferred includes the laser, its power supply, target station and chamber, and a suite of diagnostic instrumentation. Under a Joint Use Agreement it is anticipated that all equipment will remain property of the Laboratory and subject to on-site configuration verification.

99 GENERAL AND MISCELLANEOUS↗

2016 Results for Avian Monitoring at the TA-36 Minie Site, TA-39 Point 6, and TA-16 Burn Ground at Los Alamos National Laboratory

Los Alamos National Security, LLC (LANS) biologists in the Environmental Compliance and Protection Division at Los Alamos National Laboratory (LANL) initiated a multi-year program in 2013 to monitor avifauna at two open detonation sites and one open burn site on LANL property. Monitoring results from these efforts are compared among years and with avifauna monitoring conducted at other areas across LANL. The objectives of this study are to determine whether LANL firing site operations impact bird abundance or diversity. LANS biologists completed the fourth year of this effort in 2016. The overall results from 2016 continue to indicate that operations are not negatively affecting bird populations. Data suggest that community structure may be changing at some sites and this trend will continue to be monitored.

54 ENVIRONMENTAL SCIENCES↗

2017 Results for Avian Monitoring at the TA-36 Minie Site, TA-39 Point 6, and TA-16 Burn Ground at Los Alamos National Laboratory

Los Alamos National Security, LLC (LANS) biologists in the Environmental Compliance and Protection Division at Los Alamos National Laboratory (LANL) initiated a multi-year program in 2013 to monitor avifauna (birds) at two open detonation sites and one open burn site on LANL property. Monitoring results from these efforts were compared among years to monitor trends. The objectives of this study were to determine whether LANL operations impact bird species richness, diversity, abundance, or composition. Additionally, nesting success of secondary-cavity nesting birds was examined using nestboxes. LANS biologists completed the fifth year of this effort in 2017. The overall results from 2017 continue to indicate that operations are not negatively affecting bird populations; however, we are seeing some species turnover through time and that will continue to be monitored. Three bird point count surveys were completed at each of the treatment sites at the Technical Area (TA) 36 Minie site, the TA-39 point 6, and the TA-16 burn ground between May and July 2017. A total of 785 birds representing 59 species were recorded at the treatment sites. Three bird point count surveys were also completed at each of the control sites between May and July 2017. Occupancy and nest success data from nestboxes at treatment sites were compared with the overall avian nestbox monitoring network. Species richness and diversity at the treatment sites were not statistically different than their associated controls. Avian abundance showed more variability but treatment and controls were trending together year to year. Species composition seems to indicate some species turnover in the habitat types but very little difference between treatment and control sites.

54 ENVIRONMENTAL SCIENCES↗

Video-Based Dynamic Measurement & Analysis for Structural Health Monitoring

LANS has invented and holds patents for a unique platform/suite of tools and methods for the emerging Structural Health Monitoring (SHM) marketplace which may hold value within several industry market sectors. Los Alamos is seeking a commercialization partner for this SHM technology as an OEM or field services company operating in one or more of these markets that is capable of crafting and executing a savvy go to market plan that utilizes or leverages this novel suite of Structural Health Monitoring intellectual property and know-how that LANS has available for exclusive or non-exclusive licensing.

99 GENERAL AND MISCELLANEOUS↗

Los Alamos National Laboratory Request for Proposals Investment Mentor Participation in UC/LANL Postdoc Entrepreneurship Fellowship Pilot Program

The scope and practical elements of this Pilot are explicitly narrow to allow all parties (LANS, UC, our investment partners, and the Postdoc Fellows) to operate in an unconstrained setting. Given LANL’s unique role as an FFRDC, care will be exercised to balance speed, flexibility, and broad exposure within the Pilot, with the challenges and complexities of a full and unconstrained entrepreneurial effort. In seeking this balance, LANS is committed to operating within certain limits that define this second year of the Pilot, and which will guide learning toward the program beyond the two-year pilot.

99 GENERAL AND MISCELLANEOUS↗

The Electromagnetic Counterpart of the Binary Neutron Star Merger LIGO/Virgo GW170817. IV. Detection of Near-infrared Signatures of r -process Nucleosynthesis with Gemini-South

We present a near-infrared spectral sequence of the electromagnetic counterpart to the binary neutron star merger GW170817 detected by Advanced Laser Interferometer Gravitational-wave Observatory (LIGO)/Virgo. Our data set comprises seven epochs of J + H spectra taken with FLAMINGOS-2 on Gemini-South between 1.5 and 10.5 days after the merger. In the initial epoch, the spectrum is dominated by a smooth blue continuum due to a high-velocity, lanthanide-poor blue kilonova component. Starting the following night, all of the subsequent spectra instead show features that are similar to those predicted in model spectra of material with a high concentration of lanthanides, including spectral peaks near 1.07 and 1.55 μ m. Our fiducial model with 0.04 M {sub ⊙} of ejecta, an ejection velocity of v = 0.1 c , and a lanthanide concentration of X {sub lan} = 10{sup −2} provides a good match to the spectra taken in the first five days, although it over-predicts the late-time fluxes. We also explore models with multiple fitting components, in each case finding that a significant abundance of lanthanide elements is necessary to match the broad spectral peaks that we observe starting at 2.5 days after the merger. These data provide direct evidence that binary neutron star mergers are significant production sites of even the heaviest r -process elements.

79 ASTRONOMY AND ASTROPHYSICS↗

Arrangement of vortex lattices

A new method is developed for solving the lifting-surface equation for thin wings. The solution requires the downwash equation to be in the form of Cauchy integrals which can be interpreted as a vortex lattice with the positions of the vortices and control points dictated by the finite sum used to approximate the integrals involved. Lan's continuous loading method is employed for the chordwise integral since it properly accounts for the leading-edge singularity, Cauchy singularity, and Kutta condition. Unlike Lan, the spanwise loading is also continuous and the Cauchy singularity in the spanwise integral is also properly accounted for by using the midpoint trapezoidal rule and the theory of Chebyshev polynomials. This technique yields the exact classical solution to Prandtl's lifting-line equation.The solution to the lifting-surface equation for rectangular wings was found to compare well with other continuous loading methods, but with much smaller computational times, and to converge faster than other vortex lattice methods.

Dejarnette, F. R.↗

LaRC local area networks to support distributed computing

The Langley Research Center's (LaRC) Local Area Network (LAN) effort is discussed. LaRC initiated the development of a LAN to support a growing distributed computing environment at the Center. The purpose of the network is to provide an improved capability (over inteactive and RJE terminal access) for sharing multivendor computer resources. Specifically, the network will provide a data highway for the transfer of files between mainframe computers, minicomputers, work stations, and personal computers. An important influence on the overall network design was the vital need of LaRC researchers to efficiently utilize the large CDC mainframe computers in the central scientific computing facility. Although there was a steady migration from a centralized to a distributed computing environment at LaRC in recent years, the work load on the central resources increased. Major emphasis in the network design was on communication with the central resources within the distributed environment. The network to be implemented will allow researchers to utilize the central resources, distributed minicomputers, work stations, and personal computers to obtain the proper level of computing power to efficiently perform their jobs.

Riddle, E. P.↗

Intelligent Resource Management for Local Area Networks: Approach and Evolution

The Data Management System network is a complex and important part of manned space platforms. Its efficient operation is vital to crew, subsystems and experiments. AI is being considered to aid in the initial design of the network and to augment the management of its operation. The Intelligent Resource Management for Local Area Networks (IRMA-LAN) project is concerned with the application of AI techniques to network configuration and management. A network simulation was constructed employing real time process scheduling for realistic loads, and utilizing the IEEE 802.4 token passing scheme. This simulation is an integral part of the construction of the IRMA-LAN system. From it, a causal model is being constructed for use in prediction and deep reasoning about the system configuration. An AI network design advisor is being added to help in the design of an efficient network. The AI portion of the system is planned to evolve into a dynamic network management aid. The approach, the integrated simulation, project evolution, and some initial results are described.

Meike, Roger↗