Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Jobs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Post University On-the-Job Training for Engineers

Our national need for qualified scientists and engineers is greater now than at any other time in our history. Fortunately, we can point with pride to this need as a measure of the impact of science and technology on our way of life. In effect, we have made such rapid strides In advancing established sciences and in opening new technological fields that we have proved the value of the scientist and engineer to society, and, as a-result, have created an expanding demand for their services which we must now attempt to satisfy. This demand we face is also due to the changing skills and high degree of specialization required to perform in these new technological fields. The colleges and universities are doing their part to provide current graduates with a modern technical foundation, but we cannot afford to ignore the thousands of experienced engineers and scientists already employed by private industry and government. As employers, we have an obligation to these men and women to see that they are provided with an understanding of the latest advances that modern technology has to offer; that we develop them in particular specialty areas characteristic of a given field of work; and, equally important, that we assist them in the transition from one field to another as the technological emphasis shifts. Practically all technological industries have experienced and continue to experience rapid changes in their activities. The aerospace business, in particular, has been characterized by extremely rapid, in fact revolutionary, changes during the relatively short period of its existence0 At the National Aeronautics and Space Administration, successor to the National Advisory Committee for Aeronautics, for example, we have encountered the fun impact of a changing science and technology. Indeed, as a research organization, we have undoubtedly contributed, in some measure, to this change. Within the NASAs Lewis Research Center, we have approximately 800 research scientists and engineers who have matured professionally in an environment which is essentially one of continuous learning - an experience which comes close to being a form of post graduate training in itself. This environment, in addition to providing continuous evolutionary changes, has also provided two major revolutions which have made this development picture more complex. We will describe these environmental changes which have occurred at the Lewis Research Center and discuss the various techniques and programs we have employed to provide for the professional development of our staff. The Lewis Research Center has had an Interesting and exciting l8-year history of aerospace propulsion research and development. It began during the early years of World War II as an expansion of the Power Plant Division of the NCA Langley Center with the mission of conducting research required for the development of improved reciprocating engines and to study the associated problems of subsonic propulsion aerodynamics, It was only a few years later, however, that turbojet and ramjet propulsion and supersonic flight research became our main concern. This transition to jet type engines and higher speeds was our first major technological change. The aerodynamics of propellers became the aerodynamics of high speed turbine and compressor blades; the fuel ignition and carbon deposition problems were transferred from a cyclical or Intermittent high compression combustion chamber to a continuous combustion zone within a thin-walled metal shell; aerodynamics problems were thrust into the supersonic range; and high temperature materials began to play an increasingly critical role. Although this transition still required the same basic knowledge and principles as before, the new engine types did involve a different emphasis and variety of consideration not generally familiar to our scientists and engineers.

Manganiello, Eugene J.↗

Preparing Earth Data Scientists for 'The Sexiest Job of the 21st Century'

What Exactly do Earth Data Scientists do, and What do They Need to Know, to do It? There is not one simple answer, but there are many complex answers. Data Science, and data analytics, are new and nebulas, and takes on different characteristics depending on: The subject matter being analyzed, the maturity of the research, and whether the employed subject specific analytics is descriptive, diagnostic, discoveritive, predictive, or prescriptive, in nature. In addition, in a, thus far, business driven paradigm shift, university curriculums teaching data analytics pertaining to Earth science have, as a whole, lagged behind, andor have varied in approach.This presentation attempts to breakdown and identify the many activities that Earth Data Scientists, as a profession, encounter, as well as provide case studies of specific Earth Data Scientist and data analytics efforts. I will also address the educational preparation, that best equips future Earth Data Scientists, needed to further Earth science heterogeneous data research and applications analysis. The goal of this presentation is to describe the actual need for Earth Data Scientists and the practical skills to perform Earth science data analytics, thus hoping to initiate discussion addressing a baseline set of needed expertise for educating future Earth Data Scientists.

data analytics↗

A Journey to the Coolest Job on the Planet!

NASA's missions to explore our world, solar system, galaxy and universe presents extraordinary complex challenges. These challenges can only be met with excellence in science, technology, engineering, and math (STEM) education, innovation, and a lot of rigorous team work. Where does excellence in STEM begin?

Science↗

Extreme Problem Solving II: How Can 4 Astronauts do the Jobs of 80 Experts?

On past and present space missions, resilience is largely dependent on the problem-solving expertise of flight controllers at Mission Control on the ground. Missions to Mars will instead experience long communication delays and blackouts that require a small crew to detect, diagnose, and respond to critical events with only intermittent and limited real-time ground support. Our 2021 SpaceCHI paper “Extreme Problem Solving: The New Challenges of Deep Space Exploration” introduced the paradigm shift of increasingly Earth-independent mission operations and identified the capabilities that are not currently available on-board but will be needed to enable safe exploration beyond low-Earth orbit [1]. This paper investigates how the ground team achieves resilience today to inform what will be needed to achieve human-systems resilience on future long duration exploration missions – how can a crew of four generalists achieve the same outcomes as a team of 80+ experts? An actual ISS anomaly is analyzed and then reimagined under Mars transit conditions, to reveal critical decision-points and the onboard capabilities that will be needed for successful resolution. This paper also presents criteria for what makes urgent, unanticipated events so challenging to resolve.

human-systems integration architecture↗

The Impact of Organization Culture on Satisfaction of Engineers in Technology

In today's technological workplace with the shortage of qualified knowledge workers, the factors that lead to job satisfaction have increasing importance. Several past studies have indicated that knowledge worker job satisfaction increases when Herzberg motivators are present. Other research has indicated that job satisfaction improves as the degree of organic organizational culture increases. After examining the factors that led to knowledge worker job satisfaction, the current study was undertaken. Knowledge workers in varying organizational cultures were surveyed in an effort to determine if there is a relationship between the degree of knowledge worker job satisfaction and the measure of organic organization culture. Two survey instruments, the Organizational Cultural Assessment (OCA) developed by Riegle, and the Minnesota Satisfaction Questionnaire (MSQ), were utilized. The OCA delineates degree of organic culture present whereas the MSQ measures job satisfaction. Results of both surveys were statistically analyzed to determine if knowledge workers experience higher satisfaction levels in organic organizational cultures. Once data was analyzed and the hypothesis proven, this could lead companies to move toward an organic culture with emphasis on motivators in an effort to make their organizational culture more conducive to higher employee retention. Through understanding the factors that lead to increased job satisfaction, corporate resources could more efficiently utilized. A total of eight high technology workplaces were surveyed. Five of the eight workplaces yielded statistically significant positive correlation between a positive organizational culture and increased job satisfaction. These initial results indicate the connection between culture and job satisfaction. The relationship will be further analyzed through future surveys of numerous high technology workplaces.

Westbrook, Jerry W.↗

Conservative parallel simulation of priority class queueing networks

A conservative synchronization protocol is described for the parallel simulation of queueing networks having C job priority classes, where a job's class is fixed. This problem has long vexed designers of conservative synchronization protocols because of its seemingly poor ability to compute lookahead: the time of the next departure. For, a job in service having low priority can be preempted at any time by an arrival having higher priority and an arbitrarily small service time. The solution is to skew the event generation activity so that the events for higher priority jobs are generated farther ahead in simulated time than lower priority jobs. Thus, when a lower priority job enters service for the first time, all the higher priority jobs that may preempt it are already known and the job's departure time can be exactly predicted. Finally, the protocol was analyzed and it was demonstrated that good performance can be expected on the simulation of large queueing networks.

Nicol, David M.↗

Conservative parallel simulation of priority class queueing networks

A conservative synchronization protocol is described for the parallel simulation of queueing networks having C job priority classes, where a job's class is fixed. This problem has long vexed designers of conservative synchronization protocols because of its seemingly poor ability to compute lookahead: the time of the next departure. For, a job in service having low priority can be preempted at any time by an arrival having higher priority and an arbitrarily small service time. The solution is to skew the event generation activity so that the events for higher priority jobs are generated farther ahead in simulated time than lower priority jobs. Thus, when a lower priority job enters service for the first time, all the higher priority jobs that may preempt it are already known and the job's departure time can be exactly predicted. Finally, the protocol was analyzed and it was demonstrated that good performance can be expected on the simulation of large queueing networks.

Nicol, David↗

Scheduling with genetic algorithms

In many domains, scheduling a sequence of jobs is an important function contributing to the overall efficiency of the operation. At Boeing, we develop schedules for many different domains, including assembly of military and commercial aircraft, weapons systems, and space vehicles. Boeing is under contract to develop scheduling systems for the Space Station Payload Planning System (PPS) and Payload Operations and Integration Center (POIC). These applications require that we respect certain sequencing restrictions among the jobs to be scheduled while at the same time assigning resources to the jobs. We call this general problem scheduling and resource allocation. Genetic algorithms (GA's) offer a search method that uses a population of solutions and benefits from intrinsic parallelism to search the problem space rapidly, producing near-optimal solutions. Good intermediate solutions are probabalistically recombined to produce better offspring (based upon some application specific measure of solution fitness, e.g., minimum flowtime, or schedule completeness). Also, at any point in the search, any intermediate solution can be accepted as a final solution; allowing the search to proceed longer usually produces a better solution while terminating the search at virtually any time may yield an acceptable solution. Many processes are constrained by restrictions of sequence among the individual jobs. For a specific job, other jobs must be completed beforehand. While there are obviously many other constraints on processes, it is these on which we focussed for this research: how to allocate crews to jobs while satisfying job precedence requirements and personnel, and tooling and fixture (or, more generally, resource) requirements.

Fennel, Theron R.↗

A microeconomic scheduler for parallel computers

We describe a scheduler based on the microeconomic paradigm for scheduling on-line a set of parallel jobs in a multiprocessor system. In addition to the classical objectives of increasing the system throughput and reducing the response time, we consider fairness in allocating system resources among the users, and providing the user with control over the relative performances of his jobs. We associate with every user a savings account in which he receives money at a constant rate. When a user wants to run a job, he creates an expense account for that job to which he transfers money from his savings account. The job uses the funds in its expense account to obtain the system resources it needs for execution. The share of the system resources allocated to the user is directly related to the rate at which the user receives money; the rate at which the user transfers money into a job expense account controls the job's performance. We prove that starvation is not possible in our model. Simulation results show that our scheduler improves both system and user performances in comparison with two different variable partitioning policies. It is also shown to be effective in guaranteeing fairness and providing control over the performance of jobs.

Stoica, Ion↗

Autotasked Performance in the NAS Workload: A Statistical Analysis

A statistical analysis of the workload performance of a production quality FORTRAN code for five different Cray Y-MP hardware and system software configurations is performed. The analysis was based on an experimental procedure that was designed to minimize correlations between the number of requested CPUs and the time of day the runs were initiated. Observed autotasking over heads were significantly larger for the set of jobs that requested the maximum number of CPUs. Speedups for UNICOS 6 releases show consistent wall clock speedups in the workload of around 2. which is quite good. The observed speed ups were very similar for the set of jobs that requested 8 CPUs and the set that requested 4 CPUs. The original NAS algorithm for determining charges to the user discourages autotasking in the workload. A new charging algorithm to be applied to jobs run in the NQS multitasking queues also discourages NAS users from using auto tasking. The new algorithm favors jobs requesting 8 CPUs over those that request less, although the jobs requesting 8 CPUs experienced significantly higher over head and presumably degraded system throughput. A charging algorithm is presented that has the following desirable characteristics when applied to the data: higher overhead jobs requesting 8 CPUs are penalized when compared to moderate overhead jobs requesting 4 CPUs, thereby providing a charging incentive to NAS users to use autotasking in a manner that provides them with significantly improved turnaround while also maintaining system throughput.

Carter, R. L.↗

A multiprocessor computer simulation model employing a feedback scheduler/allocator for memory space and bandwidth matching and TMR processing

A computer simulation model for a multiprocessor computer is developed that is useful for studying the problem of matching multiprocessor's memory space, memory bandwidth and numbers and speeds of processors with aggregate job set characteristics. The model assumes an input work load of a set of recurrent jobs. The model includes a feedback scheduler/allocator which attempts to improve system performance through higher memory bandwidth utilization by matching individual job requirements for space and bandwidth with space availability and estimates of bandwidth availability at the times of memory allocation. The simulation model includes provisions for specifying precedence relations among the jobs in a job set, and provisions for specifying precedence execution of TMR (Triple Modular Redundant and SIMPLEX (non redundant) jobs.

Bradley, D. B.↗

Automated Euler and Navier-Stokes Database Generation for a Glide-Back Booster

The past two decades have seen a sustained increase in the use of high fidelity Computational Fluid Dynamics (CFD) in basic research, aircraft design, and the analysis of post-design issues. As the fidelity of a CFD method increases, the number of cases that can be readily and affordably computed greatly diminishes. However, computer speeds now exceed 2 GHz, hundreds of processors are currently available and more affordable, and advances in parallel CFD algorithms scale more readily with large numbers of processors. All of these factors make it feasible to compute thousands of high fidelity cases. However, there still remains the overwhelming task of monitoring the solution process. This paper presents an approach to automate the CFD solution process. A new software tool, AeroDB, is used to compute thousands of Euler and Navier-Stokes solutions for a 2nd generation glide-back booster in one week. The solution process exploits a common job-submission grid environment, the NASA Information Power Grid (IPG), using 13 computers located at 4 different geographical sites. Process automation and web-based access to a MySql database greatly reduces the user workload, removing much of the tedium and tendency for user input errors. The AeroDB framework is shown. The user submits/deletes jobs, monitors AeroDB's progress, and retrieves data and plots via a web portal. Once a job is in the database, a job launcher uses an IPG resource broker to decide which computers are best suited to run the job. Job/code requirements, the number of CPUs free on a remote system, and queue lengths are some of the parameters the broker takes into account. The Globus software provides secure services for user authentication, remote shell execution, and secure file transfers over an open network. AeroDB automatically decides when a job is completed. Currently, the Cart3D unstructured flow solver is used for the Euler equations, and the Overflow structured overset flow solver is used for the Navier-Stokes equations. Other codes can be readily included into the AeroDB framework.

Chaderjian, Neal M.↗

System Enhancements for Mechanical Inspection Processes

Quality inspection of parts is a major component to any project that requires hardware implementation. Keeping track of all of the inspection jobs is essential to having a smooth running process. By using HTML, the programming language ColdFusion, and the MySQL database, I created a web-based job management system for the 170 Mechanical Inspection Group that will replace the Microsoft Access based management system. This will improve the ways inspectors and the people awaiting inspection view and keep track of hardware as it is in the inspection process. In the end, the management system should be able to insert jobs into a queue, place jobs in and out of a bonded state, pre-release bonded jobs, and close out inspection jobs.

inspection processes↗

Planning and Monitoring for Swarm Search and Service Missions

To transition from control theory to real applications, it is important to study missions such as Swarm Search and Service (SSS) where vehicles are not only required to search an area, but also service all jobs that they find. In SSS missions each type of job requires a group of vehicles to break-off from the swarm for a given amount of time to successfully service it. The required number of vehicles and the service rate are unique to each job type. Once a job has been completed the vehicles are able to return to the swarm for use elsewhere. If not enough vehicles are present in the swarm at the time that the job is identified, that job is dropped without being serviced. Human operators as tasked with effectively planning and managing these complex missions. This work presents a user study that seeks to test the efficacy and ease-of-use of a prediction model known as the Hybrid Model as an aid in planning and monitoring tasks. Results show that the novel computational model aid allows operators to more effectively choose the necessary swarm size to handle expected mission workload, as well as, maintain sufficient situation awareness to evaluate the performance of the swarm during missions.

swarm search and service↗

Prediction of physical workload in reduced gravity environments

The background, development, and application of a methodology to predict human energy expenditure and physical workload in low gravity environments, such as a Lunar or Martian base, is described. Based on a validated model to predict energy expenditures in Earth-based industrial jobs, the model relies on an elemental analysis of the proposed job. Because the job itself need not physically exist, many alternative job designs may be compared in their physical workload. The feasibility of using the model for prediction of low gravity work was evaluated by lowering body and load weights, while maintaining basal energy expenditure. Comparison of model results was made both with simulated low gravity energy expenditure studies and with reported Apollo 14 Lunar EVA expenditure. Prediction accuracy was very good for walking and for cart pulling on slopes less than 15 deg, but the model underpredicted the most difficult work conditions. This model was applied to example core sampling and facility construction jobs, as presently conceptualized for a Lunar or Martian base. Resultant energy expenditures and suggested work-rest cycles were well within the range of moderate work difficulty. Future model development requirements were also discussed.

Goldberg, Joseph H.↗

Prediction of physical workload in reduced gravity

The background, development, and application of a methodology to predict human energy expenditure and physical workload in low gravity environments, such as a Lunar or Martian base, is described. Based on a validated model to predict energy expenditures in earth-based industrial jobs, the model relies on an elemental analysis of the proposed job. Because the job itself need not physically exist, many alternative job designs may be compared in their physical workload. The feasibility of using the model for prediction of low gravity work was evaluated by lowering body and load weights, while maintaining basal energy expenditure. Comparison of model results was made both with simulated low gravity energy expendiure studies and with reported Apollo 14 Lunar EVA expenditure. Prediction accuracy was very good for walking and for cart pulling on slopes less than 15 deg, but the model underpredicted the most difficult work conditions. This model was applied to example core sampling and facility construction jobs, as presently conceptualized for a Lunar or Martian base. Resultant energy expenditures and suggested work-rest cycles were well within the range of moderate work difficulty. Future model development requirements were also discussed.

Goldberg, Joseph H.↗