Suggested MBSE Implementation Plan Approaches
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
This Implementation Work Plan (IWP) presents detailed design elements and coordination specifics to implement an air sparging (AS) Interim Measure (IM) to remediate groundwater at the Components Cleaning Facility (CCF), Eastern High Concentration Plume (HCP) Area located at Kennedy Space Center (KSC), Florida. The objective of the CCF East IM is to remediate groundwater where trichloroethene, cis-1,2-dichloroethene, and vinyl chloride concentrations exceed Florida Department of Environmental Protection Natural Attenuation Default Criteria (NADC) (identified as the HCP) via AS and to transition to monitored natural attenuation. CCF has been designated Solid Waste Management Unit 030 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.
This Implementation Work Plan (IWP) presents detailed design elements for the air sparging (AS) Interim Measure (IM) design provided in the IM Work Plan (IMWP) within the High Concentration Plume (HCP) at the Former Central Heat Plan (CHP) located at Kennedy Space Center (KSC), Florida. The IMWP presented an approach to implement an AS IM to reduce chlorinated volatile organic compound concentrations to concentrations that facilitate a transition to long-term monitoring. CHP has been designated Solid Waste Management Unit 045 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.
This Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) Contract 80KSC019D0011/80KSC019F0070, for the implementation of a bioremediation Interim Measure (IM) at the Converter Compressor Building (CCB) site located at Kennedy Space Center (KSC), Florida. The location of CCB within KSC is shown on Figure A-1. CCB has been designated as Solid Waste Management Unit (SWMU) 089 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. The overall Corrective Action Objective (CAO) for CCB is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), and vinyl chloride (VC) to less than State of Florida Groundwater Cleanup Target Levels (GCTLs). The objective for the IM associated with this IM is to reduce groundwater concentrations for the contaminants of concern (COCs) to less than their Natural Default Attenuation Concentrations (NADCs) within the Monitoring Well 21 Area (herein referred to as MW21 Area) via bioremediation injections to support transition to long term monitoring (LTM). This IWP describes the activities that will be performed for the treatment of the MW21 Area. The Revision 1 CCB MW21 Area Interim Measure Work Plan (IMWP; NASA, 2024), which was approved by the Florida Department of Environmental Protection (FDEP) on December 26, 2024, was used as the design basis for this IWP.
This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.
This Hot Spot (HS) Area 6 Air Sparge Expansion – Phase Three Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under the Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0067, for the implementation of an Air Sparging (AS) Interim Measure (IM) at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. LC34 has been designated as Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) operating permit. Expansion of the HS 6 IM will include installation of an additional 192 AS wells to depths of approximately 40 feet below land surface (bls) to remediate contaminated groundwater within two areas located west and northeast of the existing HS 6 AS treatment area. These areas were delineated via direct push technology investigations in September and October 2023. The expansion will target “hot spot” concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC), which are the contaminants of concern in these areas with concentrations greater than 10-times Florida Department of Environmental Protection Natural Attenuation Default Concentrations. The highest cDCE and VC concentrations detected in the proposed phase three expansion area were 58,000 micrograms per liter (μg/L) (32 to 36 feet bls) and 12,000 μg/L (23 to 27 feet bls), respectively. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to support transition to long-term monitoring. This phase three expansion will add an additional 9.4 acres of treatment area to the HS 6 IM, which currently covers approximately 26.9 acres.
Integrated test plan and implementation plan highlights for Voyager capsule - preliminary design phase B
NASA Langley Research Center (LaRC) has developed and tested two facilities dedicated to increasing efficiency in key mission design processes, including payload design, mission planning, and implementation plan development, among others. The Integrated Design Center (IDC) is a state-of-the-art concurrent design facility which allows scientists and spaceflight engineers to produce project designs and mission plans in a real-time collaborative environment, using industry-standard physics-based development tools and the latest communication technology. The Mission Simulation Lab (MiSL), a virtual reality (VR) facility focused on payload and project design, permits engineers to quickly translate their design and modeling output into enhanced three-dimensional models and then examine them in a realistic full-scale virtual environment. The authors were responsible for envisioning both facilities and turning those visions into fully operational mission design resources at LaRC with multiple advanced capabilities and applications. In addition, the authors have created a synergistic interface between these two facilities. This combined functionality is the Interactive Design and Simulation Center (IDSC), a meta-facility which offers project teams a powerful array of highly advanced tools, permitting them to rapidly produce project designs while maintaining the integrity of the input from every discipline expert on the project. The concept-to-flight mission support provided by IDSC has shown improved inter- and intra-team communication and a reduction in the resources required for proposal development, requirements definition, and design effort.
JPL has extensive expertise fielding contamination sensitive missions-in house and with our NASA/industry/academic partners.t Development and implementation of performance-driven cleanliness requirements for a wide range missions and payloads - UV-Vis-IR: GALEX, Dawn, Juno, WFPC-II, AIRS, TES, et al - Propulsion, thermal control, robotic sample acquisition systems. Contamination control engineering across the mission life cycle: - System and payload requirements derivation, analysis, and contamination control implementation plans - Hardware Design, Risk trades, Requirements V-V - Assembly, Integration & Test planning and implementation - Launch site operations and launch vehicle/payload integration - Flight ops center dot Personnel on staff have expertise with space materials development and flight experiments. JPL has capabilities and expertise to successfully address contamination issues presented by space and habitable environments. JPL has extensive experience fielding and managing contamination sensitive missions. Excellent working relationship with the aerospace contamination control engineering community/.
The implementation plan which is presented was developed to provide the means for the successful implementation of the automated production control system. There are three factors which the implementation plan encompasses: detailed planning; phased implementation; and user involvement. The plan is detailed to the task level in terms of necessary activities as the system is developed, refined, installed, and tested. These tasks are scheduled, on a preliminary basis, over a two-and-one-half-year time frame.
The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.
The 2001 Mars Surveyor Program Mission includes an orbiter with a gamma ray spectrometer and a multispectral thermal imager, and a lander with an extensive set of instrumentation, a robotic arm, and the Marie Curie Rover. The Mars 2001 Science Operations Working Group (SOWG) is a subgroup of the Project Science Group that has been formed to provide coordinated planning and implementation of scientific observations, particularly for the landed portion of the mission. The SOWG will be responsible for delivery of a science plan and, during operations, generation and delivery of conflict-free sequences. This group will also develop an archive plan that is compliant with Planetary Data System (PDS) standards, and will oversee generation, validation, and delivery of integrated archives to the PDS. In this report we cover one element of the SOWG planning activities, the development of a plan that maximizes the scientific return from lander-based observations by treating the instrument packages as an integrated payload. Scientific objectives for the lander mission have been defined. They include observations focused on determining the bedrock geology of the site through analyses of rocks and also local materials found in the soils, and the surficial geology of the site, including windblown deposits and the nature and history of formation of indurated sediments such as duricrust. Of particular interest is the identification and quantification of processes related to early warm, wet conditions and the presence of hydrologic or hydrothermal cycles. Determining the nature and origin of duricrust and associated salts is -very important in this regard. Specifically, did these deposits form in the vadose zone as pore water evaporated from soils or did they form by other processes, such as deposition of volcanic aerosols? Basic information needed to address these questions includes the morphology, topography, and geologic context of landforms and materials exposed at the site, together with quantitative information on material mineralogy, chemistry, and physical properties (rock textures; soil grain size and shape distributions; degree and nature of soil induration; soil magnetic properties). The calibration targets provide radiometric and mineralogical control surfaces. The magnets allow observations of magnetic phases. Patch plates are imaged to determine adhesive and abrasive properties of soils. Coordinated mission planning is crucial for optimizing the measurement synergy among the packages included on the lander. This planning has already begun through generation of multi-sol detailed operations activities. One focus has been to develop a scenario to use the arm to dig a soil trench to a depth of tens of centimeters. The activity will be monitored through use of Pancam and RAC to ensure nominal operations and to acquire data to determine subsurface physical properties (e.g., angle of repose of trench walls). Pancam and Mini-TES observations would also provide constraints on mineralogy and texture for the walls and bottom of the trench during excavation. If desired, soils excavated at depth could be deposited on the surface and Mossbauer and APXS measurements could be acquired for these materials. Soil samples from various depths would be delivered to MECA for characterization of aqueous geochemistry and physical properties of soil grains, particularly size, shape, and hardness. These physical properties would be determined by optical and atomic force microscopy. When completed, detailed information of soil properties as a function of depth would be obtained. These various data sets would constrain our understanding of whether or not there are systematic variations in soil characteristics as a function of depth. These variations might be related, for example, to evaporative moisture losses and formation of salt deposits, thereby indicating water transport processes occurred fairly recently. Many other value-added measurement scenarios are being developed. For example, characterizing the nature and dynamics of dust deposition will be done using MIP/DART to provide deposition rates, Pancam and RAC imaging of lander and rover surfaces to extrapolate these measurements to other areas, and a variety of measurements to determine if the bulk loose soil has the same characteristics as dust that accumulates during the mission. Bedrock geology of the site is primarily an APEX-focus setting, mineralogy, and texture, and APXS data to be we interest will be to determine the extent to which rock hydrothermal processes, given that APEX is the precursor 4 and 2005 rover missions. Additional information is contained in the original.
A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.
Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.
The National Aeronautics and Space Administration's (NASA) Advanced Space Transportation Program is a customer driven, focused technology program that supports the NASA Strategic Plan and considers future commercial space business projections. The initial cycle of the Advanced Space Transportation Program implementation planning was conducted from December 1995 through February 1996 and represented increased NASA emphasis on broad base technology development with the goal of dramatic reductions in the cost of space transportation. The second planning cycle, conducted in January and February 1997, updated the program implementation plan based on changes in the external environment, increased maturity of advanced concept studies, and current technology assessments. The program has taken a business-like approach to technology development with a balanced portfolio of near, medium, and long-term strategic targets. Strategic targets are influenced by Earth science, space science, and exploration objectives as well as commercial space markets. Commercial space markets include those that would be enhanced by lower cost transportation as well as potential markets resulting in major increases in space business induced by reductions in transportation cost. The program plan addresses earth-to-orbit space launch, earth orbit operations and deep space systems. It also addresses all critical transportation system elements; including structures, thermal protection systems, propulsion, avionics, and operations. As these technologies are matured, integrated technology flight experiments such as the X-33 and X-34 flight demonstrator programs support near-term (one to five years) development or operational decisions. The Advanced Space Transportation Program and the flight demonstrator programs combine business planning, ground-based technology demonstrations and flight demonstrations that will permit industry and NASA to commit to revolutionary new space transportation systems beginning at the turn of the century and continuing far into the future.
This paper provides an overview of what the primary contractors at Kennedy Space Center (KSC) are doing in the field of predictive engineering. The technologies employed by each of the contractors and the cost savings associated with the implementation of these predictive engineering methods are discussed. The sources include predictive engineering implementation plans, published by each of the contractors and interviews with the authors of these implementation plans.
Objectives and Goals: Maintain and operate the POIC and support integrated Space Station command and control functions. Provide software and hardware systems to support ISS payloads and Shuttle for the POIF cadre, Payload Developers and International Partners. Provide design, development, independent verification &validation, configuration, operational product/system deliveries and maintenance of those systems for telemetry, commanding, database and planning. Provide Backup Control Center for MCC-H in case of shutdown. Provide certified personnel and systems to support 24x7 facility operations per ISS Program. Payloads CoFR Implementation Plan (SSP 52054) and MSFC Payload Operations CoFR Implementation Plan (POIF-1006).
A simplified flight management descent algorithm was developed and programmed on a small programmable calculator. It was designed to aid the pilot in planning and executing a fuel conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. An explanation and examples of how the algorithm is used, as well as a detailed flow chart and listing of the algorithm are contained.