High-power magnetron transmitter as an RF source for superconducting linear accelerators
Abstract Not Provided
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract Not Provided
A second X-ray free electron laser facility, LCLS-II, will be constructed at SLAC. LCLS-II is based on a 1.3 GHz, 4 GeV, continuous-wave (CW) superconducting linear accelerator, to be installed in the first kilometer of the SLAC tunnel. Multiple types of high power RF (HPRF) sources will be used to power different systems on LCLS-II. The main 1.3 GHz linac will be powered by 280 1.3 GHz, 3.8 kW solid state amplifier (SSA) sources. The normal conducting buncher in the injector will use four more SSAs identical to the linac SSAs but run at 2 kW. Two 185.7 MHz, 60 kW sources will power the photocathode dual-feed RF gun. A third harmonic linac section, included for linearizing the bunch energy spread before the first bunch compressor, will require sixteen 3.9 GHz sources at about 1 kW CW. A description and an update on all the HPRF sources of LCLS-II and their implementation is the subject of this paper.
Explore the source record for details and available documents.
Utilization of the high-power CW magnetrons as RF sources in SRF accelerators was proposed in a number of works, e.g., [1, 2]. But typically, the CW high-power magnetrons are designed as RF sources for industrial heating, and the lifetime of the tubes is not the first priority as it is required for high-energy accelerators. The high-power CW magnetrons use cathodes made of pure tungsten. The emission properties of the tungsten cathodes are not deteriorated much by electron and ion bombardment, but the latter causes sputtering of the cathode in the magnetron crossed fields. The sputtered cathode material covers the magnetron interior. That leads to sparks and discharges in a magnetron limiting its lifetime. Thus, the life expectancy estimates are highly important for application of CW magnetrons in SRF accelerator projects.
A high power, high particle flux rf-based helicon plasma source has been constructed at ORNL and operated at power levels up to 30 kW. High-density hydrogen and helium plasmas have been produced. The source has been designed as the basis for a linear plasma materials interaction (PMI) test facility that will generate particle fluxes Gamma(p) > 10(23) M-3 s(-1), and utilize additional ion and electron cyclotron heating to produce high parallel (to the magnetic field) heat fluxes of similar to 10 MW/m(2). An rf-based source for PMI research is of interest because high plasma densities are generated with no internal electrodes, allowing true steady state operation with minimal impurity generation. The ORNL helicon source has a diameter of 15 cm and to-date has operated at a frequency f = 13.56 MHz, with magnetic field strength vertical bar B vertical bar in the antenna region up to similar to 0.15 T. Maximum densities of 3 x 10(19) M-3 in He and 2.5 x 10(19) m(-3) in H have been achieved. Radial density profiles have been seen to be dependent on the axial vertical bar B vertical bar profile.
A high power, high particle flux rf-based helicon plasma source has been constructed at ORNL and operated at power levels up to 30 kW. High-density hydrogen and helium plasmas have been produced. The source has been designed as the basis for a linear plasma materials interaction (PMI) test facility that will generate particle fluxes {Gamma}{sub p}10{sup 23} m{sup -3} s{sup -1}, and utilize additional ion and electron cyclotron heating to produce high parallel (to the magnetic field) heat fluxes of {approx}10 MW/m{sup 2}. An rf-based source for PMI research is of interest because high plasma densities are generated with no internal electrodes, allowing true steady state operation with minimal impurity generation. The ORNL helicon source has a diameter of 15 cm and to-date has operated at a frequency f = 13.56 MHz, with magnetic field strength |B| in the antenna region up to {approx}0.15 T. Maximum densities of 3x10{sup 19} m{sup -3} in He and 2.5x10{sup 19} m{sup -3} in H have been achieved. Radial density profiles have been seen to be dependent on the axial |B| profile.
Radio-frequency (RF) driven helicon plasma sources can produce relatively high-density plasmas (n > 1019 m -3 ) at relatively moderate powers (<2 kW) in argon. However, to produce similar high-density plasmas for fusion relevant gases such as hydrogen (H), deuterium (D) and helium (He), much higher RF powers are needed. For very high RF powers, thermal issues of the RF-transparent dielectric window, used in the RF source design, limit the plasma operation timescales. To mitigate this constraint, we have designed, built and tested a novel helicon plasma source assembly with a fully liquid-cooled RF-transparent window which allows steady state operations at high power (up to 20 kW) and successfully produces high-density plasma with both argon and H. Deionized (DI) water, flowing between two concentric dielectric RF windows, is used as the coolant. We show that a full azimuthal blanket of DI water does not prevent high-density plasma production. From calorimetry on the DI water, we measure the net heat removed by the coolant at steady state conditions. Using infra-red imaging, we calculate the constant plasma heat deposition and measure the final steady state temperature distribution patterns on the inner surface of the ceramic layer. The heat deposition pattern follows the helical shape of the antenna. We also show the consistency between the heat absorbed by the DI water, as measured by calorimetry, and the total heat due to the combined effect of the plasma heating and the absorbed RF. These results are being used to answer critical engineering questions for the 200 kW RF device materials plasma exposure experiment being designed at the Oak Ridge National Laboratory as a next generation plasma material interaction device.
High frequency, high output power, and high efficiency RF sources have compelling applications in accelerators for high energy physics. The 26 GHz RF power extractor proposed in this paper provides a practical approach for generating high power RF in this particular frequency range. The extractor is designed to couple out RF power generated from the high charge electron bunch train at the Argonne Wakefield Accelerator (AWA) facility traversing a dielectric loaded waveguide. Designs are presented including parameter optimization, electromagnetic modeling of structures and RF couplers, and analysis of beam dynamics.
NASA s Vision for Space Exploration outlines a very ambitious program for the next several decades of the Space Agency endeavors. Ahead is the completion of the International Space Station (ISS); safely flight the shuttle (STS) until 2010; develop and fly the Crew Exploration Vehicle (Orion) by no later than 2014; return to the moon by no later than 2020; extend human presence across the solar system and beyond; implement a sustainable and affordable human and robotic program; develop supporting innovative technologies, knowledge and infrastructure; and promote international and commercial participation in exploration. To achieve these goals, a series of enabling technologies must be developed or matured in a timely manner. Some of these technologies are: spacecraft RF technology (e.g., high power sources and large antennas which using surface receive arrays can get up to 1 Gbps from Mars), uplink arraying (reduce reliance on large ground-based antennas and high operation costs; single point of failure; enable greater data-rates or greater effective distance; scalable, evolvable, flexible scheduling), software define radio (i.e., reconfigurable, flexible interoperability allows for in flight updates open architecture; reduces mass, power, volume), and optical communications (high capacity communications with low mass/power required; significantly increases data rates for deep space). This presentation will discuss some of the work being performed at the NASA Glenn Research Center, Cleveland, Ohio, in antenna technology as well as other on-going RF communications efforts.
In this paper, we summarize the current state of a concept for muon acceleration aimed at a future Neutrino Factory. The main thrust of these studies was to reduce the overall cost while maintaining performance by exploring the interplay between the complexity of the cooling systems and the acceptance of the accelerator complex. To ensure adequate survival for the short-lived muons, acceleration must occur at high average gradient. The need for large transverse and longitudinal acceptances drives the design of the acceleration system to an initially low RF frequency, e.g., 325 MHz, which is then increased to 650 MHz as the transverse size shrinks with increasing energy. High-gradient normal conducting RF cavities at these frequencies require extremely high peak-power RF sources. Hence superconducting RF (SRF) cavities are chosen. Finally, we consider two cost effective schemes for accelerating muon beams for a stageable Neutrino Factory: exploration of the so-called "dual-use" linac concept, where the same linac structure is used for acceleration of both H - and muons and, alternatively, an SRF-efficient design based on a multi-pass (4.5) "dogbone" RLA, extendable to multi-pass FFAG-like arcs.
Power extraction from charged particle beams is a prospective way to develop future high power radio frequency (RF) sources. We have designed and tested a 7.8 GHz power extractor based on a dielectric-loaded waveguide. Building upon earlier work on single electron bunch tests, 10 ns and 22 ns megawatt-level RF pulses have been generated with trains consisting of 16 electron bunches each, by using a laser splitting-recombination scheme. In addition, 44 MW of peak power has been generated with a train consisting 4 electron bunches. Behaviors of higher-order-modes are also explored.
Here, we summarize current state of concept for muon acceleration aimed at future Neutrino Factory. The main thrust of these studies was to reduce the overall cost while maintaining performance through exploring interplay between complexity of the cooling systems and the acceptance of the accelerator complex. To ensure adequate survival of the short-lived muons, acceleration must occur at high average gradient. The need for large transverse and longitudinal acceptances drives the design of the acceleration system to initially low RF frequency, e.g. 325 MHz, and then increased to 650 MHz, as the transverse size shrinks with increasing energy. High-gradient normal conducting RF cavities at these frequencies require extremely high peak-power RF sources. Hence superconducting RF (SRF) cavities are chosen. Here, we considered two cost effective schemes for accelerating muon beams for a stagable Neutrino Factory: Exploration of the so-called 'dual-use' linac concept, where the same linac structure is used for acceleration of both H- and muons and alternatively, the SRF efficient design based on multi-pass (4.5) 'dogbone' RLA, extendable to multi-pass FFAG-like arcs.
A single drift gallium arsenide (GaAs) Schottky barrier IMPATT diode and related components were developed. The IMPATT diode reliability was assessed. A proof of concept solid state transmitter design and a technology assessment study were performed. The transmitter design utilizes technology which, upon implementation, will demonstrate readiness for development of a POC model within the 1982 time frame and will provide an information base for flight hardware capable of deployment in a 1985 to 1990 demonstrational 30/20 GHz satellite communication system. Life test data for Schottky barrier GaAs diodes and grown junction GaAs diodes are described. The results demonstrate the viability of GaAs IMPATTs as high performance, reliable RF power sources which, based on the recommendation made herein, will surpass device reliability requirements consistent with a ten year spaceborne solid state power amplifier mission.
Sheet beam devices provide important advantages for very high power, narrow bandwidth RF sources like accelerator klystrons [1]. Reduced current density and increased surface area result in increased power capabi1ity, reduced magnetic fields for focusing and reduced cathode loading. These advantages are offset by increased complexity, beam formation and transport issues and potential for mode competition in the ovennoded cavities and drift tube. This paper will describe the design issues encountered in developing a 100 kW peak and 2 kW average power sheet beam k1ystron at W-band including beam formation, beam transport, circuit design, circuit fabrication and mode competition.
We summarize the current state of a concept for muon acceleration aimed at a future Neutrino Factory and extendable to Higgs Factory. The main thrust of these studies was to reduce the overall cost while maintaining performance by exploring the interplay between the complexity of the cooling systems and the acceptance of the accelerator complex. To ensure adequate survival for the short-lived muons, acceleration must occur at high average gradient. The need for large transverse and longitudinal acceptances drives the design of the acceleration system to an initially low RF frequency, e.g., 325 MHz, which is then increased to 650 MHz as the transverse size shrinks with increasing energy. High-gradient normal conducting RF cavities at these frequencies require extremely high peak-power RF sources. Hence superconducting RF (SRF) cavities are chosen. We consider an SRF-efficient design based on a multi-pass (4.5) ?dogbone? RLA, extendable to multi-pass FFAG-like arcs.
The ITER Ion Cyclotron Heating and Current Drive system (IC H&CD) is designed to deliver 20MW to a broad range of plasma scenarios between 40 and 55MHz, during very long pulses. It consists of two broadband equatorial port plug antennas, their pre-matching and matching systems, transmission lines, Radio Frequency (RF) Sources and High Voltage Power Supplies. The overall project schedule has been revised and agreed by ITER Council; it re-integrates the second antenna and its power supplies in construction baseline and sets the dates for progressive installation with DT phase planned in 2035. Recent progress on ICRF subsystems is reported, covering design evolution, qualification of test articles and specific R&D results in domestic agencies, suppliers, associated laboratories and IO.
Statement of problem or situation that is being addressed: microwave power sources (such as klystrons) offering an increased efficiency (80% or above) are needed for various applications. Of a particular interest is a source at 952.6 MHz delivering 50kW (continuous) CW for the RF systems for ion acceleration in the Energy Electron Ion Collider EIC being developed at Thomas Jefferson National Accelerator Facility. General statement of how this problem is being addressed: A novel tube (klystron) concept with efficiency in excess of 80%, delivering 50 kW CW at 952.6 MHz MHz is proposed. It is a combination of proven technologies put together: its uses multiple beams to have its perveance low to boost beam-power to RF efficiency. It uses a partially grounded depressed collector (as invented by Omega P R&D) with a carefully tailored beam distribution after the cavity chain to recover energy thereby increasing the overall efficiency even more. A low operating voltage makes the tube more user-friendly avoiding need for costly modulators and oil insulation. A sectioned solenoid is used to insure superb beam-matching to all components downstream of the electron gun, increasing the tube performances. What is to be done in Phase I: The overall goal of this project is to develop, design, engineer, manufacture and test a multi-beam klystron operating in CW regime, delivering 50kW CW of power at 952.6 MHz. The effort is to be coordinated with TJNAF to insure excellent compatibility with the facility. The device will have a high efficiency >80% (operating at 12kV). The main goals during Phase I are to numerically simulate and optimize the klystron main components, namely the gun, the RF cavity chain, the multi-channel-channel partially grounded depressed collector, and the magnetic system. Preliminary engineering issues will be coordinated by Omega-P R&D with its strategic alliance partner Calabazas Creek Research Inc., which expected to participate formally during Phase II in final design and fabrication. Commercial Applications and Other Benefits: The klystrons of this type can serve as the main RF-energy source of in RF-systems for accelerators which have found their applications both in science and industry, and is of high interest to Thomas Jefferson National Accelerator Facility.
A digital low-level radio frequency (LLRF) field controller has been developed for the storage ring of The National Synchrotron Light Source-II (NSLS-II). The primary performance goal for the LLRF is to support the required RF operation of the superconducting cavities with a beam current of 500mA and a 0.14 degree or better RF phase stability. The digital field controller is FPGA-based, in a standard format 19-inch/I-U chassis. It has an option of high-level control support with MATLAB running on a local host computer through a USB2.0 port. The field controller has been field tested with the high-power superconducting RF (SRF) at Canadian light Source, and successfully stored a high beam current of 250 mA. The test results show that required specifications for the cavity RF field stability are met. This digital field controller is also currently being used as a development platform for other functional modules in the NSLS-II RF systems.