Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “HOSES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

BENCH SCALE SALTSTONE PROCESS DEVELOPMENT MIXING STUDY

The Savannah River National Laboratory (SRNL) was requested to develop a bench scale test facility, using a mixer, transfer pump, and transfer line to determine the impact of conveying the grout through the transfer lines to the vault on grout properties. Bench scale testing focused on the effect the transfer line has on the rheological property of the grout as it was processed through the transfer line. Rheological and other physical properties of grout samples were obtained prior to and after pumping through a transfer line. The Bench Scale Mixing Rig (BSMR) consisted of two mixing tanks, grout feed tank, transfer pump and transfer hose. The mixing tanks were used to batch the grout which was then transferred into the grout feed tank. The contents of the feed tank were then pumped through the transfer line (hose) using a progressive cavity pump. The grout flow rate and pump discharge pressure were monitored. Four sampling stations were located along the length of the transfer line at the 5, 105 and 205 feet past the transfer pump and at 305 feet, the discharge of the hose. Scaling between the full scale piping at Saltstone to bench scale testing at SRNL was performed by maintaining the same shear rate and total shear at the wall of the transfer line. The results of scaling down resulted in a shorter transfer line, a lower average velocity, the same transfer time and similar pressure drops. The condition of flow in the bench scale transfer line is laminar. The flow in the full scale pipe is in the transition region, but is more laminar than turbulent. The resulting plug in laminar flow in the bench scale results in a region of no-mixing. Hence mixing, or shearing, at the bench scale should be less than that observed in the full scale, where this plug is non existent due to the turbulent flow. The bench scale tests should be considered to be conservative due to the highly laminar condition of flow that exists. Two BSMR runs were performed. In both cases, wall shearing was shown to reduce the rheological properties of the grout as it was processed through the transfer line. Samples taken at the static feed tank showed that gelling impacted the rheological properties of the grout before it was fed into the pump and transfer line. A comparison of the rheological properties of samples taken at the feed tank and transfer line discharge indicated shearing of the grout was occurring in the transfer line. Bench scale testing of different mixing methods with three different salt solutions showed that method of mixing influences the rheological properties of the grouts. The paddle blade mixing method of the salt solution used for the BMSR testing provided comparable rheological properties of the grout prepared in the BMSR after 14 minutes of processing, B3. The paddle blade mixing method can be used to represent BMSR results and mixing time can be adjusted to represent larger scale mixing.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Transverse self-modulation of ultra-relativistic lepton beams in the plasma wakefield accelerator

The transverse self-modulation of ultra-relativistic, long lepton bunches in high-density plasmas is explored through full-scale particle-in-cell simulations. We demonstrate that long SLAC-type electron and positron bunches can become strongly radially self-modulated over centimeter distances, leading to wake excitation in the blowout regime with accelerating fields in excess of 20 GV/m. We show that particles energy variations exceeding 10 GeV can occur in meter-long plasmas. We find that the self-modulation of positively and negatively charged bunches differs when the blowout is reached. Seeding the self-modulation instability mitigates the effect of the competing hosing instability. This work reveals that a proof-of-principle experiment to test the physics of bunch self-modulation can be performed with available lepton bunches and with existing experimental apparatus and diagnostics.

43 PARTICLE ACCELERATORS↗

S-102 Transfer Pump Restriction Modeling Results

It was determined that a radioactive waste leak in the Hanford S Farm in the vicinity of the S-102 retrieval pump discharge occurred because of over-pressurization and failure of the S-102 dilution water supply hose while operating the retrieval pump in reverse with an obstructed suction cavity and an unobstructed flow path to the dilution water supply hose. This report describes efforts to identify plausible scenarios for the waste leak to occur.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robot-Powered Reliability Testing at NREL's ESIF

With auto manufacturers expected to roll out fuel cell electric vehicles in the 2015 to 2017 timeframe, the need for a reliable hydrogen fueling infrastructure is greater than ever. That's why the National Renewable Energy Laboratory (NREL) is using a robot in its Energy Systems Integration Facility (ESIF) to assess the durability of hydrogen fueling hoses, a largely untested-and currently costly-component of hydrogen fueling stations. The automated machine mimics the repetitive stress of a human bending and twisting the hose to refuel a vehicle-all under the high pressure and low temperature required to deliver hydrogen to a fuel cell vehicle's onboard storage tank.

08 HYDROGEN↗

Improving chiller performance and energy efficiency in hydrogen station operation by tuning the auxiliary cooling

In a hydrogen station that operates with direct fueling through the use of a 700 bar boost compressor, the outlet hydrogen temperature can significantly increase, stressing the chiller system. Here, this paper evaluates improvements that can be made to the auxiliary cooling system integrated with the compressor. Both theoretical modeling and experiments were performed at Cal State LA Hydrogen Research and Fueling Facility. The findings suggest that adjusting the auxiliary closed-loop cooling system from 15 °C to 10 °C reduced the station energy consumption and decreased the demand on the station chiller that needed to provide –20 °C hydrogen at the hose. The overall energy consumption for a single fueling reduced by between 2.86 and 9.43% for the set of experiments conducted. After the temperature of the closed-loop cooling system was reduced by 5 °C, the boost compressor outlet temperature dropped from 46-50 °C–40 °C and consequently at the hose the hydrogen temperature declined by 3 °C. Results were scaled up with a forecast on the number of daily refueling events. With a low number of daily fuelings, the proposed set-up showed a minor influence on the overall station energy consumption. However, the benefits were more pronounced for a connector station with sales at 180 kg/day, where the energy efficiency improved by between 1.4 and 5.5%, and even more so for a higher capacity station at 360 kg/day, where the improvement was between 2.9 and 8%.

08 HYDROGEN↗

Proper orthogonal decomposition-based spectral higher-order stochastic estimation

A unique routine, capable of identifying both linear and higher-order coherence in multiple-input/output systems, is presented. The technique combines two well-established methods: Proper Orthogonal Decomposition (POD) and Higher-Order Spectra Analysis. The latter of these is based on known methods for characterizing nonlinear systems by way of Volterra series. In that, both linear and higher-order kernels are formed to quantify the spectral (nonlinear) transfer of energy between the system's input and output. This reduces essentially to spectral Linear Stochastic Estimation when only first-order terms are considered, and is therefore presented in the context of stochastic estimation as spectral Higher-Order Stochastic Estimation (HOSE). The trade-off to seeking higher-order transfer kernels is that the increased complexity restricts the analysis to single-input/output systems. Low-dimensional (POD-based) analysis techniques are inserted to alleviate this void as POD coefficients represent the dynamics of the spatial structures (modes) of a multi-degree-of-freedom system. The mathematical framework behind this POD-based HOSE method is first described. The method is then tested in the context of jet aeroacoustics by modeling acoustically efficient large-scale instabilities as combinations of wave packets. The growth, saturation, and decay of these spatially convecting wave packets are shown to couple both linearly and nonlinearly in the near-field to produce waveforms that propagate acoustically to the far-field for different frequency combinations.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Adiabatic matching of particle bunches in a plasma-based accelerator in the presence of ion motion

Witness beam stability and preservation of its ultra-low emittance have been identified as critical challenges toward realizing a TeV-class, plasma-based linear collider. In fact, the witness bunch parameters required by a future TeV-class collider have been expected to trigger hosing instability and background ion motion, leading to emittance degradation and, potentially, to bunch loss. Recently, it has been shown that ion motion suppresses the hosing instability, and proper longitudinal bunch shaping can eliminate the ion-motion-induced emittance growth. Here, we propose and analyze a plasma-based method to generate the shaped bunches that enable emittance preservation in the presence of ion motion. The method is based on an adiabatic matching procedure, where a bunch with an initially untapered profile is injected in the plasma accelerator stage with an energy low enough that ion motion effects are initially small. As the bunch accelerates, it is adiabatically compressed, ion motion is gradually triggered, and the bunch slowly but continuously readjusts itself in the ion motion-perturbed wakefield acquiring the desired taper. The production of tapered witness bunch profiles that minimize energy spread and preserve emittance for collider-relevant parameters could enable the use of plasma-based accelerators for high-energy physics applications.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

PROTON TEMPERATURE ANISOTROPY AND MAGNETIC RECONNECTION IN THE SOLAR WIND: EFFECTS OF KINETIC INSTABILITIES ON CURRENT SHEET STABILITY

We investigate the role of kinetic instabilities driven by a proton anisotropy on the onset of magnetic reconnection by means of two-dimensional hybrid simulations. The collisionless tearing of a current sheet is studied in the presence of a proton temperature anisotropy in the surrounding plasma. Our results confirm that anisotropic protons within the current sheet region can significantly enhance/stabilize the tearing instability of the current. Moreover, fluctuations associated with linear instabilities excited by large proton temperature anisotropies can significantly influence the stability of the plasma and perturb the current sheets, triggering the tearing instability. We find that such a complex coupling leads to a faster tearing evolution in the T{sub Up-Tack} > T{sub ||} regime when an ion-cyclotron instability is generated by the anisotropic proton distribution functions. On the contrary, in the presence of the opposite anisotropy, fire-hose fluctuations excited by the unstable background protons with T{sub ||} < T{sub Up-Tack} are not able to efficiently destabilize current sheets, which remain stable for a long time after fire-hose saturation. We discuss possible influences of this novel coupling on the solar wind and heliospheric plasma dynamics.

79 ASTRONOMY AND ASTROPHYSICS↗

Electron-Beam Dynamics for an Advanced Flash-Radiography Accelerator

Beam dynamics issues were assessed for a new linear induction electron accelerator being designed for multipulse flash radiography of large explosively driven hydrodynamic experiments. Special attention was paid to equilibrium beam transport, possible emittance growth, and beam stability. Especially problematic would be high-frequency beam instabilities that could blur individual radiographic source spots, low-frequency beam motion that could cause pulse-to-pulse spot displacement, and emittance growth that could enlarge the source spots. Furthermore, beam physics issues were examined through theoretical analysis and computer simulations, including particle-in-cell codes. Beam instabilities investigated included beam breakup, image displacement, diocotron, parametric envelope, ion hose, and the resistive wall instability. The beam corkscrew motion and emittance growth from beam mismatch were also studied. It was concluded that a beam with radiographic quality equivalent to the present accelerators at Los Alamos National Laboratory will result if the same engineering standards and construction details are upheld.

43 PARTICLE ACCELERATORS↗

Comparison of Infrasound Wind Noise Reduction Systems for Use in Temporary Deployments

Infrasound, or low frequency sound 20 Hz, is produced by a variety of natural and anthropogenic sources. Wind also generates signals within this frequency band and serves as a persistent source of infrasonic noise. Infrasound sensors measure pressure fluctuations, which scale with the ambient density and velocity fluctuations of ground winds. Here we compare four different wind noise reduction systems, or "filters", and make recommendations for their use in temporary infrasound deployments. Our results show that there are two filters that are especially effective at reducing wind noise: (1) a Hyperion high frequency (HF) shroud with a 1 m diameter metal mesh dome placed on top and (2) a Hyperion Four Port Garden Hose shroud with 4 Miracle-Gro Soaker System garden hoses. We also find that placing a 5-gallon bucket over the HF wind shroud should not be done as it provides a negligible decrease in noise up to ~ 1 Hz and then an increase in noise. We conclude that it is up to the researcher to determine which of the other filters is best for their needs based on location and expense. We anticipate this study will be used as a resource for future deployments when a wind noise reduction method is necessary but only needed for a limited time period.

58 GEOSCIENCES↗

Robot-Powered Reliability Testing at NREL's ESIF

With auto manufacturers expected to roll out fuel cell electric vehicles in the 2015 to 2017 timeframe, the need for a reliable hydrogen fueling infrastructure is greater than ever. That's why the National Renewable Energy Laboratory (NREL) is using a robot in its Energy Systems Integration Facility (ESIF) to assess the durability of hydrogen fueling hoses, a largely untested—and currently costly—component of hydrogen fueling stations. The automated machine mimics the repetitive stress of a human bending and twisting the hose to refuel a vehicle—all under the high pressure and low temperature required to deliver hydrogen to a fuel cell vehicle's onboard storage tank.

42 ENGINEERING↗

DESIGN AND DEVELOPMENT OF A HELIUM PURIFIER

Director: Sebastian Bawab. The helium purification system at Jefferson Lab is approaching the end of its design life. Its capacity no longer meets the facility's capacity requirements and consequently, a new system is needed. Several improvements were incorporated into the new purifier design to include extended cycle time, minimum space usage, and convenient placement of components from both safety and maintenance aspects. The purifier design has been completed and the resulting design documentation has been signed and submitted to the Jefferson Lab cryogenic fabrication group. In general, helium purification systems use both a molsieve bed and a carbon bed for purification process. Their function is to remove the contaminants, such as air (moisture, nitrogen, and oxygen) from the helium that enter the system process helium during operations. For continuous operation, usually two sets of purifiers are required, one on-line while the other is being regenerated. Each purification system also contains a nitrogen boiler and a heat exchanger to maintain the temperature of the carbon bed at 80 K (Kelvin) and to minimize liquid nitrogen (LN2) use. The helium purification system at Spallation Neutron Source (SNS) in Oak Ridge, TN, also designed by Jefferson Lab, served as a model for the new system at Jefferson Lab due to similar requirements. However, space restrictions at Jefferson Lab necessitated design modification and re-examination of the beds' capacity. When both the carbon and molsieve beds were the same size (for economical reasons), the life of the molsieve bed was calculated to be longer than the life of the carbon bed for the given contamination level. The design was centered on the limited space and also to make the valves and components easily accessible for the purifier operation. To reduce heat leak from the surroundings and to maintain the carbon bed temperatures at 80 K and to minimize the LN2 usage, a heat exchanger, nitrogen boiler, piping, and miscellaneous items were encased in a vacuum shell. To allow for the flexibility requirements of the piping for the various operating processes, the piping is designed with additional bends and/or length of piping or flex hoses as required. In addition flex hoses were also used to simplify the fabrication process. The beds were designed, fabricated, tested, and inspected to conform to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section VIII, Rules for Construction of Pressure Vessels. The piping system requirements for design, fabrication, testing and inspection were also made to conform to the ASME Code B31.3, Process Piping. All other design choices were based on sound engineering practices.

Wright, Mathew↗

The feasibility study of hot cell decontamination by the PFC spray method

The characteristics of per-fluorocarbon compounds (PFC) are colorless, non-toxic, easily vaporized and nonflammable. Also, some of them are liquids of a high density, low surface tension, low latent heat and low specific heat. These particular chemical and physical properties of fluoro-organic compounds permit their use in very different fields such as electronics, medicine, tribology, nuclear and material science. The Sonatol process was developed under a contract with the DOE. The Sonatol process uses an ultrasonic agitation in a PFC solution that contains a fluorinated surfactant to remove radioactive particles from surfaces. Filtering the suspended particles allows the solutions to be reused indefinitely. They applied the Sonatol process to the decontamination of a heterogeneous legacy Pu-238 waste that exhibited an excessive hydrogen gas generation, which prevents a transportation of such a waste to a Waste Isolation Pilot Plant. Korea Atomic Energy Research Institute (KAERI) is developing dry decontamination technologies applicable to a decontamination of a highly radioactive area loosely contaminated with radioactive particles. This contamination has occurred as a result of an examination of a post-irradiated material or the development of the DUPIC process. The dry decontamination technologies developed are the carbon dioxide pellet spray method and the PFC spray method. As a part of the project, PFC ultrasonic decontamination technology was developed in 2004. The PFC spray decontamination method which is based on the test results of the PFC ultrasonic method has been under development since 2005. The developed PFC spray decontamination equipment consists of four modules (spray, collection, filtration and distillation). Vacuum cup of the collection module gathers the contaminated PFC solution, then the solution is moved to the filtration module and it is recycled. After a multiple recycling of the spent PFC solution, it is purified in the distillation module. A performance test on each module was executed and the results have been reported. A combined test of the four modules, however, has not been performed as yet. The main objective of the present study is to demonstrate the feasibility of the full PFC spray decontamination process. Decontamination of the inside of the IMEF hot cell by the PFC spray method was also performed. PFC spray decontamination process was demonstrated by using a surrogate wall contaminated with Eu{sub 2}O{sub 3} powder. The spray pressure was 41 kgf/cm{sup 2}, the orifice diameter was 0.2 mm and the spray velocity was 0.2 L/min. And, the decontaminated area was 100 cm{sup 2}. From previous test results, we found that the decontamination factor of the PFC spray method was in the range from 9.6 to 62.4. When the decontamination efficiency of Co-60 was high, then the decontamination efficiency of Cs-137 was also high. As the surface roughness of the specimen increased, the PFC spray decontamination efficiency decreased. Inferring from the previous results, the surface of the surrogate wall was cleaned by the PFC spray method. The vacuum cup of the collection module operated well and gathered more than 99 % of the PFC solution. Also, filtration and distillation modules operated well. All the filtered PFC solution flowed to the storage chamber where some of the PFC solution was distilled. The coolant of the distillation module was a dry ice. And, the recycled solution was transferred to the spray module by a high pressure pump. To evaluate the PFC spray decontamination efficiency, a smear device was fabricated and operated by a manipulator. Before and after decontamination, a smear test was performed. The tested area was 100 cm{sup 2} and the radioactivity was estimated indirectly by measuring the radioactivity of the filter paper. The average decontamination factor was in the range between 10 and 15. One application time was 2 minutes. The sprayed PFC solution was collected by the vacuum cup and it was stored in the collection equipment. After the termination of the decontamination test, the flexible hose was cut near a toboggan. The collection equipment that contained the spent PFC solution, vacuum cup, spray nozzle and the flexible hose was stored in a radioactive waste storage tank. A feasibility study for the PFC spray decontamination method for an application to a hot cell surface was performed. The decontamination equipment that consisted of four modules operated well in the hot cell. The collection module gathered the sprayed PFC solution. The solution was purified in the filtration or distillation modules. The main characteristic of the distillation module is the use of dry ice as a coolant. The decontamination factor of IMEF hot cell was in the range from 10 to 15. It was difficult to measure the radioactivity accurately at a given time. We, however, concluded that the PFC spray decontamination method is a promising technology. It generated a small amount of secondary waste and used a non-toxic and non-conducting material. Decontamination work was performed with a little loss of the main decontamination agent. Based on the test results, we are developing an improved PFC spray decontamination process.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Use of Transportable Processing Systems for the Treatment of Radioactive Nuclear Wastes

EnergySolutions has developed two major types of radioactive processing plants based on its experience in the USA and UK, and its exclusive North American access to the intellectual property and know-how developed over 50 years at the Sellafield nuclear site in the UK. Passive Secure Cells are a type of hot cell used in place of the Canyons typically used in US-designed radioactive facilities. They are used in permanent, large scale plants suitable for long term processing of large amounts of radioactive material. The more recently developed Transportable Processing Systems, which are the subject of this paper, are used for nuclear waste processing and clean-up when processing is expected to be complete within shorter timescales and when it is advantageous to be able to move the processing equipment amongst a series of geographically spread-out waste treatment sites. Such transportable systems avoid the construction of a monolithic waste processing plant which itself would require extensive decommissioning and clean-up when its mission is complete. This paper describes a range of transportable radioactive waste processing equipment that EnergySolutions and its partners have developed including: the portable MOSS drum-based waste grouting system, the skid mounted MILWPP large container waste grouting system, the IPAN skid-mounted waste fissile content non-destructive assay system, the Wiped Film Evaporator low liquid hold-up transportable evaporator system, the CCPU transportable solvent extraction cesium separation system, and the SEP mobile shielded cells for emptying radioactive debris from water-filled silos. Maximum use is made of proven, robust, and compact processing equipment such as centrifugal contactors, remote sampling systems, and cement grout feed and metering devices. Flexible, elastomer-based Hose-in-Hose assemblies and container-based transportable pump booster stations are used in conjunction with these transportable waste processing units for transferring radioactive waste from its source to the processing equipment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Grout Isolation and Stabilization of Structures and Materials within Nuclear Facilities at the U.S. Department of Energy, Hanford Site, Summary - 12309

Per regulatory agreement and facility closure design, U.S. Department of Energy Hanford Site nuclear fuel cycle structures and materials require in situ isolation in perpetuity and/or interim physicochemical stabilization as a part of final disposal or interim waste removal, respectively. To this end, grout materials are being used to encase facilities structures or are being incorporated within structures containing hazardous and radioactive contaminants. Facilities where grout materials have been recently used for isolation and stabilization include: (1) spent fuel separations, (2) uranium trioxide calcining, (3) reactor fuel storage basin, (4) reactor fuel cooling basin transport rail tanker cars and casks, (5) cold vacuum drying and reactor fuel load-out, and (6) plutonium fuel metal finishing. Grout components primarily include: (1) portland cement, (2) fly ash, (3) aggregate, and (4) chemical admixtures. Mix designs for these typically include aggregate and non aggregate slurries and bulk powders. Placement equipment includes: (1) concrete piston line pump or boom pump truck for grout slurry, (2) progressive cavity and shearing vortex pump systems, and (3) extendable boom fork lift for bulk powder dry grout mix. Grout slurries placed within the interior of facilities were typically conveyed utilizing large diameter slick line and the equivalent diameter flexible high pressure concrete conveyance hose. Other facilities requirements dictated use of much smaller diameter flexible grout conveyance hose. Placement required direct operator location within facilities structures in most cases, whereas due to radiological dose concerns, placement has also been completed remotely with significant standoff distances. Grout performance during placement and subsequent to placement often required unique design. For example, grout placed in fuel basin structures to serve as interim stabilization materials required sufficient bearing i.e., unconfined compressive strength, to sustain heavy equipment yet, low breakout force to permit efficient removal by track hoe bucket or equivalent construction equipment. Further, flow of slurries through small orifice geometries of moderate head pressures was another typical design requirement. Phase separation of less than 1 percent was a typical design requirement for slurries. On the order of 30,000 cubic meters of cementitious grout have recently been placed in the above noted U.S. Department of Energy Hanford Site facilities or structures. Each has presented a unique challenge in mix design, equipment, grout injection or placement, and ultimate facility or structure performance. Unconfined compressive and shear strength, flow, density, mass attenuation coefficient, phase separation, air content, wash-out, parameters and others, unique to each facility or structure, dictate the grout mix design for each. Each mix design was tested under laboratory and scaled field conditions as a precursor to field deployment. Further, after injection or placement of each grout formulation, the material was field inspected either by standard laboratory testing protocols, direct physical evaluation, or both. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pile Fuel Cladding Silo Deflector Plate Removal Project Using Long Reach Tooling and Suspended Abrasive Water Jet Cutting System - 17541

The Pile Fuel Cladding Silo (PFCS) at the Sellafield decommissioning, reprocessing and nuclear waste management facility in the UK was constructed in the late 1940-s and used for the storage of Intermediate Level Waste (ILW) arising from the Windscale Piles, Calderhall and Chapelcross Reactors until the 1960's. The PFCS is 21 metres high and comprises 6 identical tall compartments with the waste added to the silo via a charge-hole at the top of each compartment; each compartment is split by a central dividing wall that runs from the base of the silo to a few metres below the underside of the silo roof. A deflector plate assembly (DPA) supported on two horizontal beams is located between the top of the dividing wall and the roof and allowed the waste to spread as it fell into the silo and prevent excessive mounding. Sellafield Ltd is currently engaged in an overall programme of works to remove the waste for storage within modern ILW containers. Prior to the commencement of these works the Deflector Plate Assemblies (DPA) and beam structures within the silos are required to be removed to allow access for the waste retrievals equipment through the side of the silo at the point where the DPAs are situated. James Fisher Nuclear (JFN) and Sellafield Ltd have developed a system using suspended water jet cutting equipment combined with custom long reach tooling, installed through penetrations made in the side of the silo, to enable the remote size reduction of the DPA and beams within each compartment. The use of a low pressure suspended water jet cutting system has enabled a single water/abrasive hose to be routed down a tool deployment pole and allowed long hose lengths up to 80 m from pump to nozzle enabling siting of equipment on a congested and difficult access site. The use of lightweight, yet high strength, carbon fibre poles within the tools has enabled the deployment of tool end effectors at distances of up to 6.5 m from the compartment walls using a relatively small 60 mm diameter pole. This maximised articulation of the pole within the 300 mm wall penetrations to reach all areas of the DPA. Capability of the operators to install the tooling and size reduce DPA and beam assemblies have been demonstrated through the training on a Full Scale Test Rig (FSTR). The FSTR was integral to the development of the equipment and techniques and to providing assurance to the client that the project was technically achievable given the tight building restraints and safety issues. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Multiple Remote Systems for Calcine Retrieval Operations at Idaho - 16592

There are approximately 5000 m{sup 3} of radioactive calcine material stored in six Calcine Solids Storage Facilities (CSSFs) at the DOE Idaho site. Each CSSF contains from three to twelve stainless steel tanks surrounded by a concrete vault. In accordance with the Idaho Settlement Agreement (ISA), this waste has to be retrieved and immobilized by December 31 2035 although no final decision has yet been made on how the calcine wastes are going to be retrieved from the CSSF's. One of the primary issues with the retrieval is that, in accordance with the ISA, any existing risers into the tanks have to be used 'to the maximum extent possible' in the retrieval process. Since these risers are only 6-8'' in diameter, this limits the types of systems that can be used for the retrieval. In addition, each bin containing the calcine has a series of obstructions which need to be navigated around and so inflexible systems such as conventional hose-based vacuum type systems are not feasible. In addition, the retrieval system selected has to be able to manage multiple forms of calcine (powder, granular, agglomerated, chunks etc) and operate in a very highly radioactive environment. This paper describes the progress made to date in developing an approach based on the use of multiple remote system platforms to gain entry into the bin-sets and to safely and cost-effectively retrieve the calcine wastes. Much of the work has focused on the application of the OC Robotic snake-arm robot system although significant effort has also been allocated to understanding the deployment mechanism of the snake-arm and to the ancillary supporting systems such as those for contamination control, cutting and welding new risers into the bin-sets and vacuum hose management within the bin-set. Future work will include the construction of a scaled mock up to demonstrate the field implementation of the system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Retrieval and Management of TRU Sludge at Hanford K-Basin - 19641

At the US Department of Energy Hanford site, the K-East and K-West reactor fuel storage basins (KE or KW Basin) were used in the 1970's and 1980's to store more than 100,000 uranium fuel rods and rod fragments that had been irradiated in the Hanford N Reactor. Approximately 2,100 metric tons of spent nuclear fuel that had been stored in the KW Basin were removed in 2004. Over time a mixture of small fuel corrosion particles, fuel rod metal fragments, and other debris accumulated in the KW Basin from the degradation of the spent nuclear fuel during storage. This is the source of the TRU sludge stored in the KW Basin. The corrosion products mixed with windblown sand, concrete dust, and other debris in the basin to form what is known as sludge. In 2006/2007 KE Basin sludge of similar origin as the KW Basin was transferred to KW Basin. Approximately 27 m{sup 3} of highly radioactive sludge was collected and consolidated underwater in six specially designed engineered containers. The mission of the Hanford Sludge Treatment Project (STP) is to develop and deploy technologies to safely retrieve, transport, and interim store the approximately 27 m{sup 3} of remote-handled transuranic (RH-TRU) sludge that is stored in the KW Basin. After extensive technology development, testing (with a bounding range of simulants), design, and procurement a sludge removal and storage system called the Engineered Container Retrieval and Transfer System (ECRTS) completed acceptance testing in 2018. The ECRTS system is designed to remotely retrieve and transport high density, highly erosive, uranium metal pieces as well as small low-density particles. The ECRTS system includes a retrieval tool based on the XAGO{sup tm} design from the United Kingdom, a heavily modified positive displacement pump, a hose-in-hose transfer system, a Sludge Transport and Storage Container (STSC), a settling and decant system, and a shielded transport system. The first sludge transfer was successfully completed on June 12, 2018 proving that the ECRTS process equipment worked as intended on the actual sludge. Three batches (i.e. transfer and decant) were required to obtain a ∼ 100% fill of the first STSC. The STSC was then transported to the on-site storage facility. Over 20 STSCs will be filled with RH-TRU sludge over approximately 16 months. This paper will discuss the issues and successes associated with this project including the operational aspects of this new system. Experience gained from this successful project should assist anyone with the need to retrieve and manage remote handled sludge from fuel storage basins. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗