Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Guidelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Guidelines for Making, Interpreting, and Quantifying Activity Measurements of Molten Salts Containing Mixed Cations and Anions Using Cation-Based Electrodes by Electromotive Force

Measurements of thermochemical properties in molten salt electrolytes with mixtures of cations and anions are difficult to interpret. Electromotive force measurements of salts containing common anions were driven by the least stable anion compound (e.g., LiCl in LiCl-KCl), while measurements in common cation salts were driven by the most noble anion half-cell reaction (e.g., F − /F 2 in LiCl-LiF). Measurements in mixed cation and anion salts were driven by the least stable anion compound for the most noble anion half-cell reaction (e.g., KF in KCl-LiF). These guidelines enable quantification of the activity of electroactive species in salts containing multiple cations or anions.

Lichtenstein, Timothy [Argonne National Laboratory↗

Guideline 36 Savings Calculator v0.1

This software package contains a simple calculator that can be used to estimate savings from implementing a retrofit of HVAC controls to ASHRAE Guideline 36 in a multi-zone office building. Implemented in Excel, the calculator has a user-interface front-end to configure parameters of the case study, such as location, building size, and existing control strategies, and a back-end containing results from a large number of pre-run annual energy simulations. The software package also contains the simulation models and associated pre- and post-processing scripts to generate these results.

Blum, David↗

Field Demonstration of the Brick Ontology to Scale up the Deployment of ASHRAE Guideline 36 Control Sequences

Many commercial buildings have a vast network of sensors as part of their building automation systems (BAS) that allows opportunities for energy consumption and cost savings by deploying advanced control sequences. However, this resource is often underutilized since BAS are typically programmed with simple control sequences with limited potential to deliver on these opportunities. The recent availability of ASHRAE Guideline 36 (G36) with advanced HVAC control sequences supports control retrofits in existing buildings to unlock much of the savings potential. However, barriers such as the lack of standard naming convention of building assets and data points, proprietary equipment and BAS, and the inherent uniqueness of buildings and their systems prevent building stakeholders from adopting any “plug-and-play” implementation of G36. Instead, control vendors must often undertake the manual and labor-intensive point mapping process to identify a data stream’s functional and spatial relationship within the HVAC system along with other relevant contexts and map it to the new control sequences. The vendor must carry out the point mapping process in each individual building since the mapping is unlikely to port over to another building. Even for the same building, the point mapping process can occur multiple times if various control vendors implement different control retrofits and/or multiple control retrofits happen over the lifecycle of the building. Then, there is the likelihood that G36 control sequences are programmed uniquely to the building, preventing the same implementation from being reused in another. Therefore, this paper presents a field demonstration of how we leveraged the Brick ontology with BACnet, OpenBuildingControl’s Control Description Language (CDL), and open-source support tools to implement scalable and portable advanced building controls. These tools provide standardized semantic descriptions and relationships of the building’s assets and data points (Brick), standardized communication protocol to read from and write to the building’s BAS (BACnet), and standardized code implementations (CDL) of standardized advanced control strategies (G36). We implemented G36’s hot water supply temperature setpoint reset in a Berkeley, CA building for this field demonstration. This field demonstration aims to show how integrating these tools may streamline the deployment of advanced control sequences such as G36 in a consistent manner regardless of differences found across buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Campaign Guidelines

This document establishes a common set of guidelines for the Atmospheric Radiation Measurement (ARM) Climate Research Facility for planning, executing, and closing out field campaigns. The steps that guide individual field campaigns are described in the Field Campaign Tracking System and are specifically tailored to meet the scope of each field campaign.

54 ENVIRONMENTAL SCIENCES↗

Quality Guidelines for Energy Systems Studies: Cost Estimation Methodology for NETL Assessments of Power Plant Performance

This paper summarizes the methodology employed by the National Energy Technology Laboratory (NETL) in calculating power plant costs in its techno-economic studies, such as the Cost and Performance Baseline for Fossil Energy Systems series of reports. It also outlines the approach used to calculate the cost of electricity by which NETL evaluates electric power plants. These metrics and a clear understanding of the methodology used are essential in allowing different power plant technologies to be compared on a similar basis. These guidelines are tailored for power producing plants, although they can be applied to a variety of different revenue generating plants (e.g., coal to liquids, syngas generation, hydrogen).

20 FOSSIL-FUELED POWER PLANTS↗

Guidelines for Broadband Seismometer Testing

The Comprehensive Nuclear-Test-Ban Treaty mandates the four verification technologies to be used by the International Monitoring System (IMS) to monitor compliance to the Treaty. These technologies are seismic, hydroacoustic, infrasound, and radionuclide. Operational manuals for each of these technologies specify the requirements that equipment installed at IMS stations must meet for data from said stations to be accepted by the International Data Center. Following a model in which a revised set of infrasound sensor specifications and accompanying test procedures were developed in an international collaboration overseen by the Comprehensive Nuclear-Test-Ban Treaty Organization, the same process was recently followed for seismometers potentially of use by the IMS. This document, a product of that collaboration, defines key concepts and recommends test procedures to be followed to characterize broadband seismometers in a consistent and standardized way. Results from these test procedures can be used to verify that a seismometer meets the manufacturers stated specifications and IMS requirements. ACKNOWLEDGEMENTS The writers of this document would like to acknowledge Charles R. Hutt, John R. Evans, Fred Followill, Robert L. Nigbor, and Erhard Wielandt, the authors of the 2009 Guidelines for Standardized Testing of Broadband Seismometers and Accelerometers funded by the U.S. Department of Interior, on which this document is based. Although this document is limited in scope to seismometers and much of the document has been updated, the structure remains essentially the same.

58 GEOSCIENCES↗

Environmental Brand Guidelines

The Environmental Brand Guidelines have been prepared by the CEA-CAS Visual Design team for use primarily by IFPROG, but they apply to all LANL employees ordering signage for new and existing buildings. By adhering to this guidance, you will be a responsible steward of the “One Lab, one voice” mentality and successfully implement the Lab’s brand on all of your communications.

54 ENVIRONMENTAL SCIENCES↗

Campaign Guidelines: Security Starts With You [Slides]

The Security Starts With You Campaign Guidelines have been prepared by the CEA-CAS Visual Design team for use primarily by DSOs, FODs, and/or any LANL employee who wishes to extend the messaging to new and existing buildings. By adhering to this guidance, you will be a responsible steward of the “One Lab, one voice” mentality and successfully implement the Lab’s brand and security messaging on all of your communications.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Quality Guidelines for Energy System Studies - Capital Cost Scaling Methodology: Revision 4a Report

Costs are frequently required as part of systems analysis work at NETL. Many of the cost results provided as part of systems analysis work were created with the use of scaling, since obtaining new vendor-supplied cost quotes for each category developed by NETL would be prohibitively time consuming and costly. Additionally, many of the technologies being investigated by NETL have not progressed far enough to have quotable costs. The costs are scaled from a quote for a similar plant configuration by use of various equations that typically employ at least one process parameter (e.g., coal-feed rate, oxidant-feed rate) and often an exponent. The primary purpose of the exponent is to account for economies of scale (i.e., as equipment size gets larger, it gets progressively cheaper to add additional capacity). The purpose of this section of the QGESS report is to provide a standard basis for scaling costs, with specific emphasis on scaling exponents. The intention of having a standardized document is to provide guidelines for proper procedures to reduce the potential of errors and increase credibility through consistency.

99 GENERAL AND MISCELLANEOUS↗

Additive Manufacturing Design Guidelines for Wind Industry

The purpose of this report is to equip wind industry professionals with the fundamental information needed to best leverage additive manufacturing techniques in their design and manufacturing decisions. Herein an overview of each of the seven families of additive manufacturing is provided, along with typical materials used in each process, current ranges on process speeds, materials and system costs, and examples of systems on the market today. Using the lens of large-scale additive to suit the needs of the wind industry, the processes that are well-suited to large-scale production are down selected from the seven families and additional information with design guidelines specific to each process are detailed. A companion document titled “Relevant Additive Manufacturing Materials for Wind Industry” elaborates on the specifics of relevant material properties and test methods for additive manufacturing materials.

17 WIND ENERGY↗

Guidelines for Determining the Load Resistance of Thin-Glass Triple-Pane Insulating Glass Unit Configurations

This guideline is intended to provide information relevant to the specification of triple- pane insulating glass (IG) units where the thickness of lite number 2 (center lite) is less than or equal to the thickness of lite numbers 1 and 3. Procedures and charts are presented to determine the load resistance (LR) of common soda-lime glass thicknesses from 0.7 mm (3/128 in.) to 1.8 mm (9/128 in.) exposed to a uniform lateral load of short or long duration, for a 0.008 probability of breakage. Deflection under load, horizontal self-weight deflection, and natural frequency procedures and charts are also included to aide in the selection of glass thickness to meet manufacturing and/or loading criteria determined by the user.

42 ENGINEERING↗

Guidelines for Nuclear Structure Evaluators

This document sets forth the policies and procedures for preparing mass chain evaluations for the Evaluated Nuclear Structure Data File (ENSDF). Also included are some appendices which are referred to or augment material in the guidelines. See section on Appendices for details and references to additional material.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Quality Guidelines for Energy System Studies: Carbon Dioxide Transport and Storage Costs in NETL Studies

Transport, storage, and combined T&S costs are reported in this guideline as first-year break even (FYBE) costs in real 2023 dollars per metric ton (tonne) (2023$/tonne). These FYBE costs are from the perspective of a CO 2 pipeline project owner and/or a CO 2 saline storage project owner, and represent a minimum price the owner(s) can charge a CO 2 capture project owner over 30 operating years to transport and/or store a tonne of CO 2 and remain economically viable.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electrical Energy Storage Data Submission Guidelines, Version 3

The knowledge of long-term health and reliability of energy storage systems is still unknown, yet these systems are proliferating and are expected increasingly to assist in the maintenance of grid reliability. Understanding long-term reliability and performance characteristics to the degree of knowledge similar to that of traditional utility assets requires operational data. This guideline is intended to inform numerous stakeholders on what data are needed for given functions, how to prescribe access to those data and the considerations impacting data architecture design, as well as provide these stakeholders insight into the data and data systems necessary to ensure storage can meet growing expectations in a safe and cost-efficient manner. Understanding data needs, the systems required, relevant standards, and user needs early in a project conception aids greatly in ensuring that a project ultimately performs to expectations.

25 ENERGY STORAGE↗

Digitize O&M Procedure Guidelines for Illu Workflows (CRADA Final Report)

NREL will provide technical assistance to help digitize best practice operations and maintenance (“O&M”) procedure guidelines utilizing the Illu platform for specific distributed solar-storage system configurations. NREL shall test Illu workflows in a real inspection environment for clarity of instruction and ease of documentation.

14 SOLAR ENERGY↗

As-Run Neutronic Calculations of HFIR Mini-Fuel Experiments: Guidelines for Analysts

This report provides guidelines for analysts performing radiation transport calculations for mini-fuel experiments irradiated in the High Flux Isotope Reactor (HFIR). Procedures, practical recommendations, and modeling conventions which are essential to ensuring consistency and high fidelity in as-run simulations have been compiled. The content is intended to be a portion of the official training material for new staff in this area, offering both technical references and practical guidance derived from previous experience. This report is a living document and will be periodically updated to incorporate new developments, methodological improvements, and lessons learned from ongoing and future irradiation campaigns.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Revisiting the guidelines for ending isolation for COVID-19 patients

Since the start of the COVID-19 pandemic, two mainstream guidelines for defining when to end the isolation of SARS-CoV-2-infected individuals have been in use: the one-size-fits-all approach (i.e. patients are isolated for a fixed number of days) and the personalized approach (i.e. based on repeated testing of isolated patients). We use a mathematical framework to model within-host viral dynamics and test different criteria for ending isolation. By considering a fixed time of 10 days since symptom onset as the criterion for ending isolation, we estimated that the risk of releasing an individual who is still infectious is low (0–6.6%). However, this policy entails lengthy unnecessary isolations (4.8–8.3 days). In contrast, by using a personalized strategy, similar low risks can be reached with shorter prolonged isolations. The obtained findings provide a scientific rationale for policies on ending the isolation of SARS-CoV-2-infected individuals.

Jeong, Yong Dam↗