Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Fiscal Year 2019”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Fuel Flexible Combustor for High-OPR Compact-Core N+3 Propulsion Engine

This document reports unlimited-rights data relating to technical work under NASA contract NNC14CA30C, performed throughout the full period of the effort. This period comprises Fiscal Years 2015 through 2019 (inclusive); this period includes the 4th Quarter of Calendar Year 2014, all of Calendar Years 2015 through 2018, and the first three Quarters of Calendar Year 2019. Limited-rights data relating to technical progress during this period are provided in a separate document, a Limited Rights version of this report having limited rights markings.

Smith, Lance L.↗

Actions to Evaluate Tritium in ATR Complex Perched Water Well 12

On April 23, 2019, elevated tritium concentrations in monitoring well PW-12 were reported to the Advanced Test Reactor (ATR) Complex environmental manager by the Fluor Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) lead. The monitoring well is one of a series of wells located in and around the ATR Complex that are sampled on an annual basis as part of the CERCLA monitoring program. The Fluor Idaho CERCLA lead indicated the elevated concentrations had been trending upward from Fiscal Year (FY) 2017 through FY 2019. The tritium levels went from 1,880 pCi/L in October 2016 to 7,890 pCi/L in October 2017 and increased to 13,000 pCi/L in October 2018. In order to identify a baseline, the safe drinking water level (e.g. 20,000 pCi/L) can be used as a reference point for comparison only, as PW-12 is a perched water well and does not penetrate the aquifer. Although well below safe drinking water levels, an investigation was initiated to identify the source of tritium.

99 GENERAL AND MISCELLANEOUS↗

Climate Change Observation Accuracy: Requirements and Economic Value

This presentation will summarize a new quantitative approach to determining the required accuracy for climate change observations. Using this metric, most current global satellite observations struggle to meet this accuracy level. CLARREO (Climate Absolute Radiance and Refractivity Observatory) is a new satellite mission designed to resolve this challenge is by achieving advances of a factor of 10 for reflected solar spectra and a factor of 3 to 5 for thermal infrared spectra. The CLARREO spectrometers can serve as SI traceable benchmarks for the Global Satellite Intercalibration System (GSICS) and greatly improve the utility of a wide range of LEO and GEO infrared and reflected solar satellite sensors for climate change observations (e.g. CERES, MODIS, VIIIRS, CrIS, IASI, Landsat, etc). A CLARREO Pathfinder mission for flight on the International Space Station is included in the U.S. Presidentâ€"TM"s fiscal year 2016 budget, with launch in 2019 or 2020. Providing more accurate decadal change trends can in turn lead to more rapid narrowing of key climate science uncertainties such as cloud feedback and climate sensitivity. A new study has been carried out to quantify the economic benefits of such an advance and concludes that the economic value is ~ $9 Trillion U.S. dollars. The new value includes the cost of carbon emissions reductions.

Wielicki, Bruce↗

Annual Status Report (FY 2020): Performance Assessment for the Environmental Restoration Disposal Facility

DOE O 435.1 and DOE M 435.1-1 require that a determination of continued adequacy of the performance assessment (PA) (CP-60089), composite analysis, and disposal authorization statement (DAS) be made annually, and these guidelines must be used to consider the results of data collection and analysis from research, field studies, and monitoring as well as provide the need to update any radioactive waste management basis documents. Beginning in 1996, the Environmental Restoration Disposal Facility (ERDF) started accepting low-level radioactive, hazardous, and mixed wastes generated during cleanup activities at the Hanford Site. ERDF is composed of a series of cells or disposal areas and can accommodate future design expansions as needed. Currently, there are 10 cells. During this reporting period (fiscal year 2020, which extended from October 1, 2019, through September 30, 2020), approximately 3.39E+04 U.S. tons (3.07E+04 metric tons) of waste was disposed at ERDF. From ERDF inception through September 30, 2020, approximately 18.5 million U.S. tons of waste has been disposed at ERDF, which equates to the consumption of approximately 88% of the disposal volume. As a condition of the DAS, disposal operations within ERDF must be in accordance with the waste acceptance criteria (ERDF-00011) that provide specific radionuclide disposal limits, waste form restrictions, and descriptions of acceptable waste packages in compliance with DOE M 435.1-1 requirements. The ERDF waste acceptance criteria stipulate that waste destined for disposal at ERDF be controlled based on source, physical form, and contaminant concentration and activity levels. There have been no changes to the physical configuration of ERDF or to the waste forms (source, physical form, etc.). No new Unreviewed Disposal Question Screenings or Evaluations have been generated during this reporting period. Therefore, there are no noted impacts to the PA, composite analysis, DAS, or radioactive waste management basis documents resulting from the evaluations and screenings. Sum of fraction analysis shows that the disposed inventory meets both the concentration and inventory threshold requirements. A sum of fractions value is computed for ERDF sensitive radionuclides contributing to the all pathways and air pathway inventory limits. Computed values were 8.85E-02 and 1.78E-01, respectively. The disposed waste inventory remained well under the PA imposed limits. Required monitoring was satisfactorily completed during the fiscal year reporting period (fiscal year 2020). Compliance with performance objectives were met as each of the reported values were well below the established limit. Overall, there are no substantive changes to primary PA assumptions nor changes to the PA analysis conclusion; therefore, compliance with DOE O 435.1 and the DAS is maintained.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WPTO Peer Review 2019 Report

The U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO) hosted the 2019 Project Peer Review on October 8-10, 2019 in Alexandria, Virginia. The majority of projects in WPTO's Fiscal Year 2017‒2018 research and development (R&D) portfolio were presented to the public and systematically reviewed by external subject-matter experts from industry, academia, and federal agencies.

16 TIDAL AND WAVE POWER↗

Nuclear Science User Facilities FY 2019 Program Performance Summary

The Nuclear Science User Facilities (NSUF) first gathered and reported metric data for Fiscal Year (FY) 2014. The goal of the FY 2014 NSUF Metric Report was to establish metric measures and to provide baseline data to evaluate future performance of the NSUF. Each metric goal and objective were established through NSUF discussions with Department of Energy (DOE) Idaho Operations Office and Office of Nuclear Energy staff. This report provides the data, analysis, and conclusions for the FY 2019 metrics.

99 GENERAL AND MISCELLANEOUS↗

Status Update: Deposition Modeling For SNF Canister CISCC

This report fulfills the M3 milestones M3SF-21PN010207025 & M3SF-20PN0102070412. During fiscal year (FY) 2020, Pacific Northwest National Laboratory (PNNL) worked to further develop the FY 2019 deposition and particle tracking models. This status report outlines these efforts and presents the progress made so far. Model development work is ongoing and is planned to continue in FY 2021. The FY 2020 model development included work on: Wind Effects. Model development and sensitivity studies, investigated how wind direction and speed affect deposition; Brownian Motion. Implementing Brownian Motion into existing models; Particle Size Variability. Depending on the particle composition, the diameter of the particle may vary with changes in relative humidity. Models were developed to analyze this; Multiphase and Fluid Film Modeling. Investigating canister surface wetting and drying, and how this effects overall deposition. Models were developed to analyze this; Difusophoresis. Performing initial work to implement diffusiophoresis into the existing models; Turbophoresis. Performing initial work to implement turbophoresis into the existing models. Much of this work will continue into FY21. The authors present initial results and discus current and future work.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASA’s Space Launch System: First Mission Hardware Nears Completion

The Space Launch System (SLS) Program (Fig. 1) completed several significant production milestones in 2018 for its first mission and is poised for greater accomplishments in 2019. With manufacturing and hardware installation complete, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success and scientific discovery. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

Honeycutt, John↗

United States Nuclear Data Program Annual Report for FY2021

The US Nuclear Data Program (USNDP) Annual Report for Fiscal Year 2021 (FY21) summarizes the work of USNDP for the period of October 1, 2020 through September 30, 2021, with respect to the Work Plan for FY21 that was prepared in 2019. The Work Plan and Final Report for USNDP are prepared for the DOE Office of Science, Office of Nuclear Physics. The support for the nuclear data activity from sources outside the nuclear data program is described in the staffing table and in Appendix A. This leverage amounts to about 3.24 FTE scientific, to be compared with 25.095 FTEs at USNDP units funded by the DOE Office of Science, Office of Nuclear Physics. Since it is often difficult to separate accomplishments funded by various sources, some of the work reported in the present report was accomplished with nuclear data program support leveraged by other funding.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

NASA’s Space Launch System: Exploration Mission-1 Hardware Nears Completion

The Space Launch System (SLS) Program completed several significant production milestones in 2018 for the launch vehicle’s first mission (Fig. 1) and is poised for greater accomplishments in 2019. With manufacturing and hardware installation finished, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The upper stage, the Interim Cryogenic Propulsion Stage (ICPS), and the Orion Stage Adapter (OSA), where 13 6U CubeSats will ride to deep space on EM-1, were completed and delivered to Exploration Ground Systems at KSC in 2017 and 2018, respectively. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

Honeycutt, John↗

An Integrated Framework for Risk Assessment of High Safety Significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology and Demonstration

This report documents the activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective and secure DI&C technologies for digital upgrades/designs. A framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the risk impact of plant modernization, considering the introduction of high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals, the framework provides a means to address relevant technical issues by: (1) defining a risk-informed analysis process for DI&C upgrade, that integrates hazard analysis, reliability analysis, and consequence analysis, (2) applying risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development and deployment of advanced DI&C technologies on nuclear power plant (NPPs).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Integrated Framework for Risk Assessment of Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology Refinement and Exploration

This report documents activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2023 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective, and secure DI&C technologies for digital upgrades/designs. A risk assessment-informed framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk informed capability to quantitatively estimate the safety margin obtained from plant modernization, especially for safety-related DI&C systems, (2) support and supplement existing risk informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of safety-related DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals, the LWRS-developed framework provides a means to address relevant technical issues by: (1) defining a risk informed analysis process for DI&C upgrade that integrates hazard analysis, reliability analysis, and consequence analysis, (2) applying risk informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development and deployment of advanced DI&C technologies in nuclear power plants (NPPs). Adding diversity within a system or components is the primary means to eliminate and mitigate CCFs, but diversity also increases system complexity and may not address all sources of systematic failures. Optimization of diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in safety-related DI&C systems of NPPs and supporting relevant design optimization, the proposed framework provides: (a) A best-estimate, risk informed capability to address new technical digital issues quantitatively, focusing on software CCFs in safety-related DI&C systems of NPPs; (b) A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to predict and prevent risk in the early design stage of DI&C systems; (c) Technical bases and risk informed insights to assist users address the risk informed alternatives for evaluation of CCFs in safety-related DI&C systems of NPPs; and (d) A risk informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The research and development efforts of this project in FY 2023 are focused on refining current methods on software CCF modeling and estimation and exploring additional innovative approaches to risk assessment of DI&C systems to enable a more comprehensive and complete assessment of various safety-related DI&C design architectures. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists. It should be noted that all the analyses are performed for the demonstration of the methodology, not for the evaluation of an actual digital control system. Results are obtained based on limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk Analysis of Various Design Architectures for High Safety-significant Safety-related Digital Instrumentation and Control Systems of Nuclear Power Plants during Accident Scenarios

This report documents the plus-up activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing advanced risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems to support system design decisions and diversity and redundancy applications, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the LWRS-developed framework instructs nuclear vendors and utilities on how to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). Adding diversity within system or components is the main means to eliminate and mitigate CCFs, but diversity also increases plant complexity and errors and may not address all sources of systematic failures. How to optimize the diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in HSSSR DI&C systems of NPPs and supporting relevant design optimization, the framework provides: ? An integrated best-estimate, risk-informed capability to address new technical digital issues quantitatively, accurately, and efficiently in plan modernization progress, such as software CCFs in HSSSR DI&C systems of NPPs ? A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to efficiently predict and prevent risk in the early design stage of DI&C systems ? Technical bases and risk-informed insights to assist U.S. Nuclear Regulatory Commission (NRC) and industry to address and fulfill the risk-informed alternatives for evaluation of CCFs in HSSSR DI&C systems of NPPs ? An integrated risk-informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The plus-up research and development efforts of this project in FY 2022 are focused on methodology improvement of software CCF modeling and estimation, prevention analysis, importance analysis and risk analysis of various design architectures of HSSSR DI&C systems. This work greatly enhances the capability of the LWRS-developed framework for the risk assessment and design optimization of safety-critical DI&C systems. It should be noted that all the analyses are performed for the demonstration of the LWRS-developed framework, not for the evaluation of relevant systems. Results are obtained based on very limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Wet Waste Hydrothermal Liquefaction and Biocrude Upgrading to Hydrocarbon Fuels: 2020 State of Technology

Data from Pacific Northwest National Laboratory’s conversion hydrothermal liquefaction (HTL) program for wet waste was used to update the pathway techno-economic analysis (TEA) for the fiscal year 2020 State of Technology (2020 SOT). The modeled fuel blendstock MFSP for the 2020 SOT is estimated at $4.50/GGE (with ammonia stripping of the AP), a reduction of $0.61/GGE, or 12%, relative to the 2019 SOT (Snowden-Swan et al. 2020). Progress in the HTL area includes increased reactor LHSV from 3.6 to 4.0 and a newly designed staged approach for the sludge pumping and heating, resulting in a 1 cent and 26 cent reduction in modeled MFSP, respectively. The newly designed heat exchanger configuration is less material and capital intensive than the previous SOT, and provides a system design that is more scalable with regard to practical fabrication limitations. Further improvements may be possible with the use of core inserts to enhance tube velocity and heat transfer rates. Biocrude hydrotreating research progress improved weight hourly space velocity (WHSV) from 0.67 to 0.72 hr-1 in the guard bed and from 0.39 to 1.02 hr-1 in the main hydrotreating bed, a 7% and 162% improvement, respectively. Hydrotreating performance was not sacrificed at the higher throughput rates and catalyst activity remained stable over the run. The demonstrated increase in WHSVs reduced the modeled MFSP by $0.34/GGE.

20 FOSSIL-FUELED POWER PLANTS↗

What's the big deal with TA-55's trash?

There's a beast of hazardous waste, and we're learning how to tame it. Plutonium and production activities are ongoing at TA-55, which means the beast of hazardous waste is always looming around the corner. The Laboratory must dispose of this delicate type of waste properly and swiftly. Learning from previous snags and pitfalls in an incredibly complex process, TA-55 leadership and staff have worked together to greatly improve and streamline waste processes. The result: As of the last week of fiscal year 2020, 42 shipments containing 1,275 containers of transuranic (TRU) waste were sent to the Waste Isolation Pilot Plant (WIPP) in southern New Mexico, the nation’s only repository for defense-generated TRU waste. In FY 2019, we shipped less than half that amount.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predictive Thermal Control (PTC) Technology to Enable Thermally Stable Telescopes: First Two Year Status

Predictive Thermal Control Technology (PTCT) development project is a multiyear effort initiated in Fiscal Year (FY) 2017, to mature the Technology Readiness Level (TRL) of critical technologies required to enable ultra-thermally-stable ultraviolet/optical/infrared (UVOIR) space telescope primary-mirror assemblies for ultra-high-contrast observations of exoplanets. Key accomplishments of 2017 to 2019 include: creating a high-fidelity STOP (Structural, Thermal, and Optical Performance) model of the AMTD-2 (Advance Mirror Technology Development) 1.5-meter Ultra-Low Expansion (ULE®) mirror (manufactured by Harris Corp) by merging 3D X-Ray computed tomography data of the ‘as-built’ mirror and coefficient of thermal expansion (CTE) data maps for each of the 18 core elements; partially validating this model by measuring the mirror’s response to bulk temperature changes and lateral thermal gradients; designed and built (with PTC partner Harris Corp) a 1.5-meter enclosure with 26 actively-control thermal zones; and defined specifications for a potential 4-meter primary mirror thermal enclosure for the Habitable Exoplanet (HabEx) Imager mission.

Astrophysics↗

Summary of Technical Peer Review on the Risk Assessment Framework proposed in Report INL/RPT-22-68656 for Digital Instrumentation and Control Systems

This report summarizes the peer review activities initiated by Idaho National Laboratory (INL) during fiscal year (FY) 2023 for the evaluation and improvement of the methodology developed under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective and secure DI&C technologies for digital upgrades/designs. A framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the risk impact of plant modernization, considering the introduction of high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. The R&D efforts of this project from FY 2019 through FY 2022 were focused on methodology improvement and demonstration of the proposed framework for the risk assessment and design optimization of safety-critical DI&C systems. Collaborations with the nuclear industry have been initiated to support the reliability and risk assessment of their DI&C systems by using the proposed framework. In FY 2023, the framework has reached to a point for a technical peer review and obtain stakeholder feedback. This peer review activity includes coordination of the reviews performed by a group of industry stakeholders, documentation of the peer review suggestions, providing resolutions and responses to the peer review comments. The objective of this technical peer review is to obtain representative feedback on the proposed framework to improve the technical qualities of its methodology and readiness for deployment to the industry. Feedback may identify potential areas for improvement and further development. The Subject Matter experts were invited to review the latest project report documenting the methodology developed in the project and provide evaluations of the technical qualities of the proposed framework and relevant methods. The reviewed project report is “An Integrated Framework for Risk Assessment of High Safety-significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology and Demonstration” INL/RPT-22-68656 (short as “INL/RPT-22-68656” in this report). This peer review report documents the technical questions provided for technical peer review and introduces the technical peer reviewers from the stakeholders including nuclear utilities, regulators, and universities. Comments from technical peer reviewers and the resolutions and responses to these comments are outlined. Insights and lessons learned from the technical peer review are summarized in conclusions and future work. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists.

99 GENERAL AND MISCELLANEOUS↗

NASA's Space Launch System: Progress Toward Unmatched Exploration Capability

The Space Launch System (SLS) Program delivered the first element of the exploration-class rocket and completed manufacturing of all major structural elements in 2017. The Program continues component integration and testing in 2018 in preparation for the inaugural launch of NASA's new deep space exploration system in fiscal year 2020. SLS represents a new strategic national capability designed for the most challenging human and robotic exploration and is engineered for overall mission success. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2018 and 2019.

Honeycutt, John↗