Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Fermilab”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

P-986 Letter of Intent: Medium-Energy Antiproton Physics at Fermilab

Fermilab has long had the world's most intense antiproton source. Despite this, the opportunities for medium-energy antiproton physics at Fermilab have been limited in the past and - with the antiproton source now exclusively dedicated to serving the needs of the Tevatron Collider - are currently nonexistent. The anticipated shutdown of the Tevatron in 2010 presents the opportunity for a world-leading medium-energy antiproton program. We summarize the current status of the Fermilab antiproton facility and review some physics topics for which the experiment we propose could make the world's best measurements. Among these, the ones with the clearest potential for high impact and visibility are in the area of charm mixing and CP violation. Continued running of the Antiproton Source following the shutdown of the Tevatron is thus one of the simplest ways that Fermilab can restore a degree of breadth to its future research program. The impact on the rest of the program will be minor. We request a small amount of effort over the coming months in order to assess these issues in more detail.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

TCLK Must Stay! CAMAC Must Go! How Does Fermilab Move Forward

The current Timing System at Fermilab has been around for 40 years and currently relies on 7 CAMAC crates and over 100 CAMAC cards to produce the Tevatron Clock (TCLK). Thanks to the ingenuity of those before us, this has allowed Fermilab the flexibility to change the timing and Events for its accelerator as beamlines and projects have changed over the years. With the advent of the Proton Improvement Plan-II (PIP-II), the Timing System at Fermilab is being reimagined into a single chassis with even greater flexibility and functionality for decades to come while tackling the ever-challenging task of maintaining backwards compatibility.

Austin, M. R. [Fermilab]↗

The Short-Baseline Near Detector at Fermilab: Input to the European Strategy for Particle Physics 2026 Update

SBND is a 112 ton liquid argon time projection chamber (LArTPC) neutrino detector located 110 meters from the Booster Neutrino Beam (BNB) target at Fermilab. Its main goals include searches for eV-scale sterile neutrinos as part of the Short-Baseline Neutrino (SBN) program, other searches for physics beyond the Standard Model, and precision studies of neutrino-argon interactions. In addition, SBND is providing a platform for LArTPC neutrino detector technology development and is an excellent training ground for the international group of scientists and engineers working towards the upcoming flagship Deep Underground Neutrino Experiment (DUNE). SBND began operation in July 2024, and started collecting stable neutrino beam data in December 2024 with an unprecedented rate of ~7,000 neutrino events per day. During its currently approved operation plans (2024-2027), SBND is expected to accumulate nearly 10 million neutrino interactions. The near detector dataset will be instrumental in testing the sterile neutrino hypothesis with unprecedented sensitivity in SBN and in probing signals of beyond the Standard Model physics. It will also be used to significantly advance our understanding of the physics of neutrino-argon interactions ahead of DUNE. After the planned accelerator restart at Fermilab (2029+), opportunities are being explored to operate SBND in antineutrino mode in order to address the scarcity of antineutrino-argon scattering data, or in a dedicated beam-dump mode to significantly enhance sensitivity to searches for new physics. SBND is an international effort, with approximately 40% of institutions from Europe, contributing to detector construction, commissioning, software development, and data analysis. Continued European involvement and leadership are essential during SBND's operations and analysis phase for both the success of SBND, SBN and its role leading up to DUNE.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The Italian Summer Students Program at Fermilab and other US Laboratories: 40 years of education in particle physics and technology

Since 1983 the Italian groups collaborating with Fermilab (US) have been running a 2-month summer training program for Master students. While in the first year the program involved only 4 physics students, in the following years it was extended to engineering students. Many students have extended their collaboration with Fermilab with their Master Thesis and PhD. The program has involved more than 600 Italian students from more than 20 Italian universities. Each intern is supervised by a Fermilab Mentor responsible for the training program. Training programs spanned from Tevatron, CMS, Muon (g-2), Mu2e and SBN (MicroBooNE, Icarus, and SBND) and DUNE design and data analysis, development of particle detectors, design of electronic and accelerator components, development of infrastructures and software for tera-data handling, quantum computing and research on superconductive elements and accelerating cavities. In 2015 the University of Pisa included the program within its own educational programs. Summer Students are enrolled at the University of Pisa for the duration of the internship and at the end of the internship they write summary reports on their achievements. After positive evaluation by a University of Pisa Examining Board, interns are acknowledged 6 ECTS credits for their Diploma Supplement. The program was paused in 2020 and 2021 due to the COVID-19 pandemic, but it resumed in 2022. From 2022 to 2024, a total of 60 students participated in the nine-week training at Fermilab. We are currently organizing the 2025 program. This paper provides an overview of the program, which can serve as a model for other interested laboratories.

Barzi, Emanuela [Ohio State U.]↗

Vertically Integrated Circuits at Fermilab

The exploration of vertically integrated circuits, also commonly known as 3D-IC technology, for applications in radiation detection started at Fermilab in 2006. This paper examines the opportunities that vertical integration offers by looking at various 3D designs that have been completed by Fermilab. The emphasis is on opportunities that are presented by through silicon vias (TSV), wafer and circuit thinning, and finally fusion bonding techniques to replace conventional bump bonding. Early work by Fermilab has led to an international consortium for the development of 3D-IC circuits for High Energy Physics. For the first time, Fermilab has organized a 3D MPW run, to which more than 25 different designs have been submitted by the consortium.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Cooperative Support of Fermilab’s Science Education Programs

The purpose of this CRADA is to sustain and expand Fermilab’s highly successful science education programs through continued cooperation between Fermilab and Fermilab Friends for Science Education (FFSE). FFSE is a not-for-profit institution that provides support for Fermilab’s science education programming, including public events, instructional resources and program development, scholarships and educational equipment.

43 PARTICLE ACCELERATORS↗

Accelerators for the Future: R&D at the Fermilab FAST Facility

High energy physics in the U.S. has ambitious plans requiring new and improved accelerator technologies, including an upgraded complex at Fermilab for DUNE, next-generation light sources, and the potential of a future collider to be built on U.S. soil. To address these requirements, Fermilab operates the Fermilab Accelerator Science and Technology (FAST) facility, dedicated to accelerator R&D. FAST includes an electron gun and superconducting RF linac (up to 300 MeV), a storage ring, and an upcoming proton source and injector line (up to 2.5 MeV). In addition to the future of Fermilab accelerators, the broad physics program includes general R&D with potential impact across the DOE science program. This colloquium will provide a basic introduction to accelerator technologies and describe the principles of proton and electron accelerators, including the challenges associated with next-generation operations. We will discuss the exciting R&D ongoing at FAST to address the required technological advancements, focusing on Non-Linear Integrable Optics (NIO) for improved beam intensity and Optical Stochastic Cooling (OSC) for improved beam quality, and touching on a wide range of additional ongoing research. I intend to make the content interesting and accessible to those who have never taken any formal courses in accelerator physics.

43 PARTICLE ACCELERATORS↗

Vertically Integrated Circuits at Fermilab

The exploration of the vertically integrated circuits, also commonly known as 3D-IC technology, for applications in radiation detection started at Fermilab in 2006. This paper examines the opportunities that vertical integration offers by looking at various 3D designs that have been completed by Fermilab. The emphasis is on opportunities that are presented by through silicon vias (TSV), wafer and circuit thinning and finally fusion bonding techniques to replace conventional bump bonding. Early work by Fermilab has led to an international consortium for the development of 3D-IC circuits for High Energy Physics. The consortium has submitted over 25 different designs for the Fermilab organized MPW run organized for the first time.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Project X and a muon facility at Fermilab

An integrated program is described, starting with muon experiments in the Booster era, continuing with a 2 MW target station, a 4 GeV Neutrino Factory and a 3 TeV Muon Collider, all driven by Project X. This idea provides an integrated approach to the Intensity and Energy Frontiers at Fermilab. Project X is a proposed high intensity proton facility intended to support a world-leading program in neutrino and flavor physics over the next two decades at Fermilab while also providing an upgrade path to drive a neutrino factory and/or a muon collider. Project X is an integral part of the Fermilab Roadmap as described in the Fermilab Steering Group Report of August 2007 and of the Intensity Frontier science program described in the P5 report of May 2008. The primary elements of that research program to be supported by Project X include: (1) A neutrino beam for long baseline neutrino oscillation experiments. A new 2 megawatt proton source with proton energies between 50 and 120 GeV would produce intense neutrino beams, directed toward a large detector located in a distant underground laboratory. (2) Kaon and muon based precision experiments running simultaneously with the neutrino program. These could include a world leading muon-to-electron conversion experiment and world leading rare kaon decay experiments. (3) A path toward a muon source for a possible future neutrino factory and, potentially, a muon collider at the Energy Frontier. This path requires that the new proton source have significant upgrade potential beyond the initial uses. This paper suggests that an implementation of Project X based on a CW linac can be part of a continuous synergistic transition from a muon physics program in the 'Booster era' to the Neutrino Factory and Muon Collider. It then describes a possible staging of the planned muon experiments and of Project X to provide a graceful transition from the Intensity Frontier to the Energy Frontier.

43 PARTICLE ACCELERATORS↗

Current Progress on the High-Field Cable Testing Facility at Fermilab

Fermi National Accelerator Laboratory (Fermilab) is constructing a new High Field Vertical Magnet Test Facility (HFVMTF) with capabilities comparable to the European facilities EDIPO and FRESCA2. The facility, located at Fermilab, will feature a background magnetic field of 15 T, generated by a magnet provided by Lawrence Berkeley National Laboratory (LBNL). The HFVMTF will support two U.S. national programs under the DOE Office of Science: the U.S. Fusion Energy Science (FES) program and the Magnet Development Program (MDP). It will enable the testing of HTS samples in high magnetic fields across a wide range of temperatures and facilitate the development of hybrid magnets combining LTS and HTS superconductors. This paper presents an overview of the current progress in constructing the facility, including updates on the test cryostat, power supplies, and systems for quench protection and monitoring.

Velev, G. [Fermilab]↗

Data preservation at the Fermilab Tevatron

The Fermilab Tevatron collider's data-taking run ended in September 2011, yielding a dataset with rich scientific potential. The CDF and D0 experiments each have approximately 9 PB of collider and simulated data stored on tape. A large computing infrastructure consisting of tape storage, disk cache, and distributed grid computing for physics analysis with the Tevatron data is present at Fermilab. The Fermilab Run II data preservation project intends to keep this analysis capability sustained through the year 2020 and beyond. To achieve this goal, we have implemented a system that utilizes virtualization, automated validation, and migration to new standards in both software and data storage technology and leverages resources available from currently-running experiments at Fermilab. Lastly, these efforts have also provided useful lessons in ensuring long-term data access for numerous experiments, and enable high-quality scientific output for years to come.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Data preservation at the Fermilab Tevatron

The Fermilab Tevatron collider's data-taking run ended in September 2011, yielding a dataset with rich scientific potential. The CDF and DO experiments each have nearly 9 PB of collider and simulated data stored on tape. A large computing infrastructure consisting of tape storage, disk cache, and distributed grid computing for physics analysis with the Tevatron data is present at Fermilab. The Fermilab Run II data preservation project intends to keep this analysis capability sustained through the year 2020 or beyond. To achieve this, we are implementing a system that utilizes virtualization, automated validation, and migration to new standards in both software and data storage technology as well as leveraging resources available from currently-running experiments at Fermilab. Furthermore, these efforts will provide useful lessons in ensuring long-term data access for numerous experiments throughout high-energy physics, and provide a roadmap for high-quality scientific output for years to come.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Progress on the FabrIc for Frontier Experiments project at Fermilab

The FabrIc for Frontier Experiments (FIFE) project is an ambitious, major-impact initiative within the Fermilab Scientific Computing Division designed to lead the computing model for Fermilab experiments. FIFE is a collaborative effort between experimenters and computing professionals to design and develop integrated computing models for experiments of varying needs and infrastructure. The major focus of the FIFE project is the development, deployment, and integration of Open Science Grid solutions for high throughput computing, data management, database access and collaboration within experiment. To accomplish this goal, FIFE has developed workflows that utilize Open Science Grid sites along with dedicated and commercial cloud resources. The FIFE project has made significant progress integrating into experiment computing operations several services including new job submission services, software and reference data distribution through CVMFS repositories, flexible data transfer client, and access to opportunistic resources on the Open Science Grid. Hence, the progress with current experiments and plans for expansion with additional projects will be discussed. FIFE has taken a leading role in the definition of the computing model for Fermilab experiments, aided in the design of computing for experiments beyond Fermilab, and will continue to define the future direction of high throughput computing for future physics experiments worldwide

97 MATHEMATICS AND COMPUTING↗

Improvement Plans of Fermilab’s Proton Accelerator Complex

The flagship of Fermilab's long term research program is the Deep Underground Neutrino Experiment (DUNE), located Sanford Underground Research Facility (SURF) in Lead, South Dakota, which will study neutrino oscillations with a baseline of 1300 km. The neutrinos will be produced in the Long Baseline Neutrino Facility (LBNF), a proposed new beam line from Fermilab's Main Injector. The physics goals of the DUNE require a proton beam with a power of some 2.4 MW at 120 GeV, which is roughly four times the current maximum power. Here I discuss current performance of the Fermilab proton accelerator complex, our plans for construction of the SRF proton linac as key part of the Proton Improvement Plan-II (PIP-II), outline the main challenges toward multi-MW beam power operation of the Fermilab accelerator complex and the staged plan to achieve the required performance over the next 15 years.

43 PARTICLE ACCELERATORS↗

Cryogenics and purification systems of the ICARUS T600 detector installation at Fermilab

This paper describes the cryogenic and purification systems of the ICARUS T600 detector in its present implementation at the Fermi National Laboratory, Illinois, U.S.A. The ICARUS T600 detector is made of four large Time Projection Chambers, installed in two separate containers of about 275 m 3 each. The detector uses liquid argon both as target and as active medium. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions and the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector was previously operated in Italy, at the INFN Gran Sasso Underground Laboratory (LNGS), in a three-year run on the CERN to LNGS Long Baseline Neutrino Beam. For its operation on the Booster and NuMI neutrino beams at Fermilab, for the search of sterile neutrinos and measurements of neutrino-argon cross sections, the detector was moved from Gran Sasso to CERN for the upgrades required for operation at shallow depth with high intensity neutrino beams. The liquid argon containers, the thermal insulation and all the cryogenic equipment have been completely re-designed and rebuilt, following the schemes of the previous installation in Gran Sasso. The detector and all the equipment have been transported to Fermilab, where they have been installed, tested and recently put into operation. The work described in this paper has been conducted as a joint responsibility of CERN and Fermilab with the supervision provided by the ICARUS Collaboration. Design, installation, testing, commissioning and operation are the result of a common effort of CERN, Fermilab and INFN groups.

Cryogenic detectors↗

Fermilab Cryogenic Test Facilities

Fermi National Accelerator Laboratory (Fermilab) has multiple cryogenic test facilities, undertaking testing of superconducting magnets, Superconducting Radio Frequency (SRF) cavities, SRF cryomodules and other helium cryogenic components. The test areas within Fermilab include: Meson Cryogenic Test facility (Meson), Industrial Building 1 (IB-1), Heavy Assembly Building/Illinois Accelerator Research Center (HAB/IARC), New Muon Lab, (NML) and the Cryomodule Test Facility (CMTF). Meson and HAB/IARC utilize repurposed Tevatron era reciprocating engine based cryogenic refrigerator systems, whereas CMTF and IB-1 utilize gas bearing turbine based coldboxes. Each of these test areas support the various Fermilab projects and collaborations including the Linear Coherent Light Source II (LCLS-II), Proton Improvement Plan II (PIP-II), High Luminosity Large Hadron Collider (HL-LHC), and Mu2e. This paper outlines the diverse and extensive cryogenic test capabilities within Fermilab.

43 PARTICLE ACCELERATORS↗

Fermilab's Horizontal Test Stand Upgrade Overview and Commissioning

Cryo-assemblies with the Nb 3 Sn MQXFA low-beta quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab's magnet test facility. A total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational for more than a decade. In order to restore the test stand functions and meet the design and test requirements for the HL-LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded horizontal test stand was completed during the first cryo-assembly test in 2023. These tests verified the major cryo-mechanical installations, as well as the basic test stand operations, including controlled cooldown and operation at 1.9 K, magnet protection and process controls. Here, in this paper, overview of the Fermilab's horizontal test facility upgrade and commissioning of these upgrades are presented.

43 PARTICLE ACCELERATORS↗

Overview of LCLS-II Project Status at Fermilab

The superconducting RF Continuous-Wave (CW) Linac for the LCLS-II consists of thirty-five 1.3 GHz and two 3.9 GHz cryomodules that Fermilab and Jefferson Lab are jointly producing in collaboration with SLAC. Fermilab’s scope of work is to build, test, and deliver half the 1.3 GHz and all the 3.9 GHz cryomodules and to design and procure components for the cryogenic distribution system. Fermilab has primary responsibility for delivering a working design. The cryomodule design basis was the European XFEL but several elements evolved to meet CW operation requirements and specifics of the SLAC tunnel. There have been several challenges faced during the design, assembly, testing and transportation of the cryomodules which have required design updates. Success in overcoming these challenges is attributable to the strength of the LCLS-II SRF Collaboration (Fermilab, Jefferson Lab and SLAC with extensive help from DESY and CEA/Saclay). The cryogenic distribution system has progressed relatively well and there are valuable Lessons Learned. An overview of the status, accomplishments, problems encountered, solutions developed, and a summary of Lessons Learned will be presented.

43 PARTICLE ACCELERATORS↗