Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FINANCIAL PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Enhancing the EVI-X National Framework to Address Emerging Questions on Charging Infrastructure Deployment

As national investments in EV charging infrastructure accelerate, this project advances the state-of-the-art in infrastructure analysis to better inform deployment strategies. It enhances NLR's EVI-X Suite, a set of tools supporting national network planning, local site design, and financial evaluation. These capabilities will position VTO to provide timely analysis to the DOT/DOE Joint Office, and to guide the strategic buildout of the national charging network. EVI-X development is closely coordinated with other VTO-funded efforts to ensure consistent, integrated use of key inputs and outputs, including EV adoption scenarios from TEMPO and infrastructure designs developed through EVs@Scale.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhancing the EVI-X National Framework to Address Emerging Energy Questions

This project advances the state-of-the-art in infrastructure analysis to better inform deployment strategies. It enhances NLR's EVI-X Suite, a set of tools supporting national network planning, local site design, and financial evaluation. These capabilities will position DOE to provide timely analysis and inform the strategic buildout of the national charging network. EVI-X development is closely coordinated with other DOE-funded efforts to ensure consistent, integrated use of key inputs and outputs, including EV adoption scenarios from NLR's TEMPO model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development and Deployment of NASA's Budget Execution Dashboard

This paper discusses the successful implementation of a highly visible company-wide management system and its potential to change managerial and accounting policies, processes and practices in support of organizational goals. Applying the conceptual framework of innovation in organizations, this paper describes the development and deployment process of the NASA Budget Execution Dashboard and the first two fiscal years of its use. It discusses the positive organizational changes triggered by the dashboard, like higher visibility of financial goals and variances between plans and actuals, increased involvement of all management levels in tracking and correcting of plan deviations, establishing comparable data standards across a strongly diversified organization, and enhanced communication between line organizations (NASA Centers) and product organizations (Mission Directorates). The paper also discusses the critical success factors experienced in this project: Strong leadership and division of management roles, rapid and responsive technology development, and frequent communication among stakeholders.

Putz, Peter↗

2010 Annual Report

This annual report includes: an overview of Western; approaches for future hydropower and transmission service; major achievements in FY 2010; FY 2010 customer Integrated Resource Planning, or IRP, survey; and financial data.

13 HYDRO ENERGY↗

2009 Annual Report

This annual report includes: a brief overview of Western; some of our major achievements in FY 2009; FY 2009 customer Integrated Resource Planning, or IRP, survey; and financial data.

13 HYDRO ENERGY↗

Indirect impacts in Illinois from a renewable portfolio standard

Indirect impacts associated with Illinois' RPS include a change in the laws concerning the planning and zoning for wind development, a market for renewable energy credits, and awareness of problems with the transmission grid. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Flat H Frangible Joint Evolution

Space vehicle staging and separation events require pyrotechnic devices. They are single-use mechanisms that cannot be tested, nor can failure-tolerant performance be demonstrated in actual flight articles prior to flight use. This necessitates the implementation of a robust design and test approach coupled with a fully redundant, failure-tolerant explosive mechanism to ensure that the system functions even in the event of a single failure. Historically, NASA has followed the single failure-tolerant (SFT) design philosophy for all human-rated spacecraft, including the Space Shuttle Program. Following the end of this program, aerospace companies proposed building the next generation human-rated vehicles with off-the-shelf, non-redundant, zero-failure-tolerant (ZFT) separation systems. Currently, spacecraft and launch vehicle providers for both the Orion and Commercial Crew Programs (CCPs) plan to deviate from the heritage safety approach and NASA's SFT human rating requirements. Both programs' partners have base-lined ZFT frangible joints for vehicle staging and fairing separation. These joints are commercially available from pyrotechnic vendors. Non-human-rated missions have flown them numerous times. The joints are relatively easy to integrate structurally within the spacecraft. In addition, the separation event is debris free, and the resultant pyro shock is lower than that of other design solutions. It is, however, a serious deficiency to lack failure tolerance. When used for critical applications on human-rated vehicles, a single failure could potentially lead to loss of crew (LOC) or loss of mission (LOM)). The Engineering and Safety & Mission Assurance directorates within the NASA Johnson Space Center took action to address this safety issue by initiating a project to develop a fully redundant, SFT frangible joint design, known as the Flat H. Critical to the ability to retrofit on launch vehicles being developed, the SFT mechanisms must fit within the same three-dimensional envelope as current designs as well as meet structural loads requirements. There is increased mass associated with the redundant design, and the goal is to minimize the weight impact as much as possible. These requirements presented significant challenges, both technically and financially; these challenges will be explored in this paper. Perhaps greater than the technical issues confronted during this design process, were the financial considerations. These were a significant part of the story of this design and development plan. Insufficient financial and labor resources were formidable barriers to completing this project. Nevertheless, JSC personnel successfully conducted several test series at JSC with very useful results. The many lessons learned drove design improvements, performance efficiency, and increased functional reliability. This paper examines the significant technical and financial challenges that these requirements posed to the project team. It discusses the evolution of the SFT frangible joint design, including optimization, testing, and successful partnering of the Johnson Space Center (JSC) engineering and JSC safety organizations, to enhance the flight safety margin for America's next generation of human-rated space vehicles.

Diegelman, Thomas E.↗

Thermal area effectiveness for future aircraft

Problem areas in airport planning, design, and operations identified by a decision matrix developed to display various airport functions interfaced with facilities and an extensive literature survey were investigated. Areas considered include: site selection and growth potential; emissions and noise control/containment for airports; financial and legal aspects of airport planning, contruction, and operation; intra-airport transportation and other passenger flow facilitators; simulation and modeling for airports; guidelines for airport multimodal access planning. Results are summarized and a bibliography is included.

Happ, W. W.↗

Staffing Analyses Tool

The Staffing Analyses Tool is an interactive resource planning tool used for visualizing programmatic staffing financial information. This dashboard provides historical and current staff charging data under organizations’ and/or programs’ views. This tool is used to manage staffing cost and inform outyear planning. It was developed in collaboration with Associate Laboratory Directorate for Infrastructure and Capital Projects (ALDICP) Planning Office.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

INFORMATION: Audit Report on "Accounting and Reporting for the American Recovery and Reinvestment Act by the Department of Energy's Funding Recipients"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was established to jumpstart the U.S. economy, create or save millions of jobs, and invest in the Nation's energy future. The Department of Energy received approximately $37 billion through the Recovery Act to support a variety of science, energy and environmental initiatives. The Office of Management and Budget (OMB) issued guidance for carrying out stimulus-related activities which requires, among other things, that recipients ensure funds provided by the Recovery Act are clearly distinguishable from non-Recovery Act funds in all reporting systems and that recipients' actions are transparent to the public. To meet these requirements, the Department's recipients must clearly and accurately track and report on 18 separate data elements. In addition, the Department was to develop and implement a process to ensure that recipient information reported to the public was free from material omissions and significant reporting errors. Our recent report (OAS-RA-10-01, October 2009) noted that the Department had developed a quality assurance process to facilitate the quarterly reviews of recipient data and planned to test it during the first quarterly reporting cycle. To determine whether the Department's quality assurance process was effective, we examined information reported by recipients of Departmental funding as of September 30, 2009. We also sought to determine whether the Department's prime contractors were prepared to track and report on Recovery Act activities. The Department had taken a number of actions designed to ensure the accuracy and transparency of reported Recovery Act results. This process identified potential anomalies with information reported by 1,113 of 2,038, or 55 percent of recipients. We view the Department's data quality assurance efforts as both timely and significant. As noted by our audit testing, however, opportunities exist to strengthen the process. In particular: (1) Site officials did not always ensure that anomalies, once identified during the quality assurance process, were actually resolved. For example, the Department's process identified that about 740 of the approximately 10,000 jobs reported in the first quarter of Fiscal Year 2010 as created/retained were for projects reported as having no funds spent. Although these problems were referred to site officials for follow-up and/or correction, the information was never actually changed; (2) The Department did not always utilize the correct basis when evaluating the accuracy of 'funds provided' data submitted by grant recipients. For example, in its analysis process, the Department used data reflecting 'funds obligated' rather than the correct amount of 'total grant awards'. This generated a number of potential false positives; and, (3) Duplicate reports by certain recipients, resulting in overstatements of as much as $137 million of the more than $18 billion obligated, were not corrected. We observed that the Department had taken prompt action to ensure that its prime facility management contractors could properly report Recovery Act information. Notably, the seven contractors in this category included in our review had modified their accounting systems, as necessary, to ensure that they could accurately track and report on Recovery Act activities. The systems at each of these entities had been restructured so that they: (i) could separate Recovery Act and non-Recovery Act funds; and, (ii) had adequate processing capacity to handle the projected increase in transactions. We found the Department's decision to limit its reviews to the four elements that it considered to be critical (award amount, invoiced amount, jobs created/retained, and project status) to be reasonable. We concluded, however, other elements or dependent relationships should not be completely excluded from review. Beyond its initial development and implementation of its quality assurance process, the Department had taken steps to improve its ability to ensure that Recovery Act information was both accurate and transparent to the public. Specifically, officials changed the quality assurance plan based on initial data reviews. Department officials also informed us that they are in the process of updating their quality assurance process to meet new OMB requirements. For example, recent guidance directed agencies to focus on certain data elements, such as award number and recipient name, during their quality assurance reviews. In addition, subsequent to our review, the Department added two more data elements and comparisons to its quarterly assurance process, including an analysis of costs/expenditures and a comparison of the recipient reported project status to the Department's data contained in its financial system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Energy Retrofit Guide (AERG): Practical Ways to Improve Energy Performance; Healthcare Facilities (Book)

The Advanced Energy Retrofit Guide for Healthcare Facilities is part of a series of retrofit guides commissioned by the U.S. Department of Energy. By presenting general project planning guidance as well as detailed descriptions and financial payback metrics for the most important and relevant energy efficiency measures (EEMs), the guides provide a practical roadmap for effectively planning and implementing performance improvements in existing buildings. The Advanced Energy Retrofit Guides (AERGs) are intended to address key segments of the U.S. commercial building stock: retail stores, office buildings, K-12 schools, grocery stores, and healthcare facilities. The guides' general project planning considerations are applicable nationwide; the energy and cost savings estimates for recommended EEMs were developed based on energy simulations and cost estimates for an example hospital tailored to five distinct climate regions. These results can be extrapolated to other U.S. climate zones. Analysis is presented for individual EEMs, and for packages of recommended EEMs for two project types: existing building commissioning projects that apply low-cost and no-cost measures, and whole-building retrofits involving more capital-intensive measures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Proposed Framework For Planning Deactivation And Decommissioning Engineering And Design Activities To Meet The Requirements Of DOE Order 413.3A, Program And Project Management For The Acquisition Of Capital Assets

This paper applies the DOE O 413.3A Design/Engineering requirements to Deactivation and Decommissioning (D and D) projects. A list of 41 activities for which Design/Engineering is generally required and which are relevant and common to many D and D projects was generated. For several activities in this list, examples of the level of development and/or types of deliverables that might be expected at the completion of the conceptual, preliminary and final project design phases described in the Order are provided. This paper also discusses tailoring the application of the Order to a facility based on the complexity of the facility's engineered systems and the hazards existing in the facility. DOE D and D projects are expected to meet the requirements of DOE O 413.3A. For D and D engineering and design activities only, this paper provides guidance for applying these requirements to the Order. A list of 41 typical D and D engineering and design activities has been provided. The Order divides projects into conceptual, preliminary and final design phases. Development of each of the 41 activities can also be organized in conceptual, preliminary and final levels. In general, at the conceptual level project engineers should be determining the what (i.e., the scope) for each activity. At the preliminary level they should be resolving how the activity will be accomplished. At the final level, all the engineering and design details for the activity should be completed so that the activity is ready to implement in the field. It may not be appropriate that development of each individual activity correspond to the current phase of the project. For example, at CD-2 (end of the preliminary design phase) not all activities need be developed to the same level of detail. Only those that are truly significant to the project baseline must be developed to the level of detail necessary to create a reliable project baseline. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Challenges to institutionalizing strategic environmental assessment: The case of Vietnam

Building on new institutional theory, this paper develops an analytical framework for analyzing constraints to the institutionalization of strategic environmental assessment (SEA) at four different institutional levels. The framework is tested in an empirical analysis of the environmental assessment system in Vietnam, which is a frontrunner among developing countries regarding the introduction and use of SEA. Building on interviews with Vietnamese and international experts, as well as an extensive literature review, we identify institutional constraints which challenge the effective use of SEA in Vietnam. We conclude that commonly identified constraints, such as inadequate training, technical guidelines, baseline data and financial resources, are strongly linked to constraints at higher institutional levels, such as incentives to not share information between ministries and severe restrictions on access to information and public participation. Without a thorough understanding of these institutional constraints, there is a risk that attempts to improve the use of SEA are misdirected. Thus, a careful institutional analysis should guide efforts to introduce and improve the use of SEA in Vietnam and other developing countries. The analytical framework for analyzing constraints to institutionalization of SEA presented in this paper represents a systematic effort in this direction. - Highlights: • A framework for analyzing constraints to institutionalizing SEA is developed • Empirical analysis of the strategic environmental assessment system in Vietnam • Constraints in the action arena linked to deeper institutional constraints • Institutional analysis needed prior to introducing SEA in developing countries.

54 ENVIRONMENTAL SCIENCES↗

A Comprehensive Economic Coal Transition in South Asia

Many countries are considering accelerating their coal transition. A coal transition refers to an energy sector’s shift from a reliance on coal toward an energy mix largely based on cleaner fuels and renewable energy sources. Such a transition is not just related to greenhouse gas emissions, but also encompasses a range of benefits, recognizing that global energy costs and options are changing. Since 2015, proposed new coal power capacity has dropped by three-quarters globally, leaving only a few countries that develop coal-fired power plants at scale (Littlecott et al., 2021). Historic steps were taken at the United Nations Climate Change 26th Conference of Parties (COP26) in Glasgow, as countries pledged to stop new coal builds, end international coal financing, phase down and phase out unabated coal use, and transition to clean energy. In South Asia, there have been several indicators suggesting that countries may be open to moving toward a coal transition. For example, the number of coal power plants under development across South Asia has decreased by 87% since 2015 (Littlecott et al., 2021). However, the challenges of assuring a just transition are substantial. Because coal plays a critical role in the energy and economic systems in South Asia, especially India, moving away from coal means realizing a broader country-wide economic and social transition. A comprehensive, integrated transition strategy for each state is thus needed urgently. This report briefly reviews the current trends and policies on coal in South Asian countries, develops a framework for a comprehensive economic coal transition, and assesses the opportunities and challenges of the transition in key countries. Several important findings emerge from the analysis. First, a coal transition can support overall economic growth and stability. Financial advantages to a well-planned coal transition include mitigating the risk of stranded assets and taking advantage of low-cost renewables. As a global coal transition proceeds, funds are being diverted from new unabated coal power plants, and utilization rates are declining. The likelihood that coal assets will become stranded is increasing, and the potential for future losses therefore increases as well. Second, coal imports in South Asia are rising. Of the coal consumed in Bangladesh, India, Nepal, and Sri Lanka, 32% is imported; this number increases to 94% when excluding India (International Energy Agency [IEA], 2021d). This illustrates a serious energy security risk. One example is the recent increase in coal prices in South Asia, to be discussed in Section 2.2.1. A diverse energy portfolio that incorporates local renewable energy can provide resilience in the face of changing commodity prices and availability. Third, the social benefits of a coal transition include positive health impacts and broader economic improvements in job creation, although assuring a just transition may be a challenge. Phasing out or phasing down coal can significantly reduce air pollutant emissions and therefore minimize associated premature mortality and improve life expectancy. Additional societal benefits of a coal transition include the high economy-wide potential for job creation, although it creates challenges in terms of reintegration and resettlement for coal miners and their communities.

01 COAL, LIGNITE, AND PEAT↗

Assessing Photovoltaic Capacity Factor Variability Using Long-Term Satellite Derived Solar Resource Data Under Brazilian Climate

Accurate estimation of photovoltaic (PV) energy yield and its variability is essential for reducing financial risk and supporting reliable system planning for rapidly expanding PV markets. In Brazil, high solar adoption and increasing levels of distributed energy resources are beginning to introduce operational challenges such as curtailment and evolving grid requirements. Understanding how natural variability in solar resource propagates into PV system performance is therefore increasingly important for both project design and grid integration. Modern PV yield assessments commonly rely on multi-year meteorological datasets and probabilistic exceedance metrics (e.g., P50/P90) to quantify energy yield uncertainty for project financing. However, the implications of long-term solar resource variability for PV system design choices and high-adoption grid conditions remain less well characterized for rapidly expanding markets such as Brazil. In particular, understanding how weather-driven variability propagates into PV production distributions and capacity factor expectations is important for evaluating curtailment exposure, deployment strategies, and storage requirements in regions experiencing rapid growth of distributed and utility-scale PV. Seasonal and interannual variability in atmospheric conditions can produce substantial fluctuations in monthly PV energy production, which propagate into uncertainty in annual energy yield and capacity factor expectations. Characterizing this variability using long-term meteorological datasets allows probabilistic estimation of PV system performance and provides improved insight into the range of expected PV energy outcomes. This study explores the use of long-term satellite-derived meteorological data from the National Solar Radiation Database (NSRDB) to evaluate the variability of photovoltaic system performance across multiple locations in Brazil. Using a 27-year dataset (1998-2024), PV system simulations are performed to characterize the distribution of annual and seasonal capacity factors and energy yield outcomes, while propagating key sources of meteorological variability and model uncertainty through the PV modeling chain. The analysis also investigates the sensitivity of PV performance outcomes to key system design assumptions within the PV modeling chain, including tracking configuration and system sizing parameters. The resulting probabilistic performance characterization provides insight into how weather-driven variability influences PV production expectations and capacity factor distributions. These results provide a foundation for evaluating how weather-driven variability interacts with high PV adoption and potential storage or curtailment mitigation strategies.

14 SOLAR ENERGY↗

Lessons in Nuclear Safety, Panel on Integration of People and Programs

Four slides present a historical perspective on the evolution of nuclear safety, a description of systemic misalignment (available resources do not match expectations, demographic cliff developing, promulgation of increased expectations and new requirements proceeds unabated), and needs facing nuclear safety (financial stability, operational stability, and succession planning). The following conclusions are stated under the heading "Nuclear Safety - 'The System'": the current universe of requirements is too large for the resource pool available; the current universe of requirements has too many different sources of interpretation; there are so many indicators that it’s hard to know what is leading (or important); and the net result can come to defy integrated comprehension at the worker level.

99 GENERAL AND MISCELLANEOUS↗

Hydrodynamic Test Requirements Process Improvements

Hydrodynamic testing at Los Alamos National Laboratory would benefit from a process improvement for the requirements process. Cameo was used as a digital solution for requirements management to allow Lead Engineers to track requirements more effectively. This was identified as a process improvement throughout this Capstone project. This report includes a project proposal, business case, literature review, methodology, project plan, data analysis, decision-making report, financial analysis report, discussion, and conclusion. Initially, this project focused on figuring out a solution for the hydrotest requirement process improvements. The scope narrowed to focus on the use of Cameo for requirement capture and management. During this Capstone, four tests had digital models produced for requirements management in Cameo. The initial model was the baseline, with core requirements used across the tests. Commonalities in tests were used and the core requirements allowed for process efficiencies. In the data analysis, it was seen that overall, the implementation of using Cameo for requirements resulted in a decreasing trend for both schedule and normalized cost. Tests have different complexity levels which is also a factor in how long the requirements process will take. Additional data is needed to continue analyzing process improvements. Through decisionmaking and financial analysis, the recommendation was to use Cameo for requirements process improvement. Multiple experts provided feedback for requirements that were then captured within models. Numerous tangible and intangible benefits were identified with this process improvement. For return on investment, the metric of success was schedule reduction, which was overall seen. Four tests were analyzed, so future analysis will be needed. There is also not a great financial risk because the main cost would be purchasing more licenses. Individuals must generate requirements whether using this software or not. Overall, training is needed to help improve the skillsets of Lead Engineers but is already being supported on a regular frequency. A desktop guide was started associated with explaining the process, however, it is a work in progress. The team plans on adding additional information in the digital models to help status when requirements are met using verification methods and artifacts. From working on this project an improved understanding of Cameo and requirements was the result. There are future opportunities to extend the usage for requirements management and progress will continue after this project.

99 GENERAL AND MISCELLANEOUS↗