Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Power Supply Options for the Marpi Landfill, Saipan: Addendum to 2023 Feasibility Study

The Marpi Landfill (Marpi or the landfill), located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by an on-site diesel generator that only operates when the landfill is open and staffed. The CNMI Office of Planning and Development (OPD) aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location and to increase sustainable energy consumption within the CNMI. Pacific Northwest National Laboratory (PNNL) authored a feasibility study in 2023 that explores alternative power supply options for the landfill. This feasibility study (hereafter referred to as Phase I of this study) culminated in a report named “Power Supply Options for the Marpi Landfill, Saipan.” In Phase I, the project team investigated and prioritized seven different power supply scenarios (Table ES-1) for the landfill according to Solid Waste (SW) Taskforce priorities. The project team found that Scenario 4 (100 kW of solar photovoltaic [PV] generation, a 75 kW/300 kWh battery energy storage system [BESS], and 160 kW of diesel generation) ranked highest. Following the Phase I feasibility study, the SW Taskforce secured additional funding for PNNL to assess additional considerations regarding power supply options for Marpi. The purpose of Phase II of this study is to investigate these additional considerations, as compiled in this addendum. Some of the findings compiled here replace findings from the original report. The project team evaluated additional considerations regarding power supply options for the landfill, including modified operations to account for 24/7 power supply, electrified landfill equipment, new and replacement distribution line costs, and the social cost of carbon.

14 SOLAR ENERGY↗

Space station tracking requirements feasibility study, volume 2

The objective of this feasibility study is to determine analytically the accuracies of various sensors being considered as candidates for Space Station use. Specifically, the studies were performed whether or not the candidate sensors are capable of providing the required accuracy, or if alternate sensor approaches should be investigated. Other topics related to operation in the Space Station environment were considered as directed by NASA-JSC. The following topics are addressed: (1) Space Station GPS; (2) Space Station Radar; (3) Docking Sensors; (4) Space Station Link Analysis; (5) Antenna Switching, Power Control, and AGC Functions for Multiple Access; (6) Multichannel Modems; (7) FTS/EVA Emergency Shutdown; (8) Space Station Information Systems Coding; (9) Wanderer Study; and (10) Optical Communications System Analysis. Brief overviews of the abovementioned topics are given. Wherever applicable, the appropriate appendices provide detailed technical analysis. The report is presented in two volumes. This is Volume 2, containing Appendices K through U.

Udalov, Sergei↗

Space station tracking requirements feasibility study, volume 1

The objective of this feasibility study is to determine analytically the accuracies of various sensors being considered as candidates for Space Station use. Specifically, the studies were performed whether or not the candidate sensors are capable of providing the required accuracy, or if alternate sensor approaches be investigated. Other topics related to operation in the Space Station environment were considered as directed by NASA-JCS. The following topics are addressed: (1) Space Station GPS; (2) Space Station Radar; (3) Docking Sensors; (4) Space Station Link Analysis; (5) Antenna Switching, Power Control, and AGC Functions for Multiple Access; (6) Multichannel Modems; (7) FTS/EVA Emergency Shutdown; (8) Space Station Information Systems Coding; (9) Wanderer Study; and (10) Optical Communications System Analysis. Brief overviews of the abovementioned topics are given. Wherever applicable, the appropriate appendices provide detailed technical analysis. The report is presented in two volumes. This is Volume 1, containing the main body and Appendices A through J.

Udalov, Sergei↗

DE-FE0029488 - North Dakota Integrated Carbon Capture and Storage Complex Feasibility Study Public Data

Data from award DE-FE0029488 - North Dakota Integrated Carbon Capture and Storage Complex Feasibility Study performed by the Energy & Environmental Research Center including the following: - 2D Seismic {Input data, sgy files, maps, logs, and descriptors} - Core Petrophysics {Core analysis of plugs from the two stratigraphic test wells (Flemmer-1 [API 33-057-00039] and BNI-1 [API 33-065-00018])} - North Dakota Oil and Gas File No 37380 Files - North Dakota Oil and Gas File No 37672 Files - Well Testing Data {Summary of well testing methods and results from the stratigraphic test wells (Flemmer-1 and BNI-1)} Additional References: https://www.netl.doe.gov/sites/default/files/2017-12/Wesley-Peck-_Mastering-the-Subsurface_CarbonSAFE-Phase-II_August-2017-final.pdf Peck, W.D., Ayash, S.C., Klapperich, R.J., Gorecki, C.D. (2019) The North Dakota integrated carbon storage complex feasibility study, International Journal of Greenhouse Gas Control, Volume 84, 2019, Pages 47-53, https://doi.org/10.1016/j.ijggc.2019.03.001

Carbon Storage↗

A Summary of Two Recent UAS Command and Control (C2) Communications Feasibility Studies

In Spring of 2015, the NextGen Institute conducted two UAS C2 Communications Feasibility Studies on behalf of the FAA UAS Integration Office to develop two limited UAS C2 operational examples, each involving low-altitude BLOS (Beyond Line of Sight) Line of Communication (LOC) UAS applications, as part of assessing the myriad practical UAS C2 deployment challenges associated with these approaches. The studies investigated the feasibility of "Point-to-Point" (PTP) and "Network" approaches to UAS C2 to better understand potential user needs and to explore evolutionary paths to establishing a nation-wide system for delivering UAS C2 communications. This paper will summarize the solicitation, approach and results of the two studies teams led by Aviation Management Associates, Inc. and Exelis Inc.

Navigation↗

Feasibility Study of a Satellite Solar Power Station

A feasibility study of a satellite solar power station (SSPS) was conducted to: (1) explore how an SSPS could be flown and controlled in orbit; (2) determine the techniques needed to avoid radio frequency interference (RFI); and (3) determine the key environmental, technological, and economic issues involved. Structural and dynamic analyses of the SSPS structure were performed, and deflections and internal member loads were determined. Desirable material characteristics were assessed and technology developments identified. Flight control performance of the SSPS baseline design was evaluated and parametric sizing studies were performed. The study of RFI avoidance techniques covered (1) optimization of the microwave transmission system; (2) device design and expected RFI; and (3) SSPS RFI effects. The identification of key issues involved (1) microwave generation, transmissions, and rectification and solar energy conversion; (2) environmental-ecological impact and biological effects; and (3) economic issues, i.e., costs and benefits associated with the SSPS. The feasibility of the SSPS based on the parameters of the study was established.

Glaser, P. E.↗

Future Circular Collider Feasibility Study Report

In response to the 2020 Update of the European Strategy for Particle Physics , the Future Circular Collider (FCC) Feasibility Study was launched as an international collaboration hosted by CERN. This report describes the FCC integrated programme , which consists of two stages: an electron-positron collider (FCC-ee) in the first phase, serving as a high-luminosity Higgs, top, and electroweak factory; followed by a proton-proton collider (FCC-hh) at the energy frontier in the second phase. The FCC-ee is designed to operate at four key centre-of-mass energies: the Z pole, the WW pair production threshold, the ZH production peak, and the top/anti-top production threshold—each delivering the highest possible luminosities to four experiments. Over 15 years of operation, FCC-ee will produce more than 6 trillion Z bosons, 200 million WW pairs, nearly 3 million Higgs bosons, and 2 million top anti-top pairs. Precise energy calibration at the Z pole and WW threshold will be achieved through frequent resonant depolarisation of pilot bunches. The sequence of operation modes between the Z, WW, and ZH substages remains flexible. The FCC-hh will operate at a centre-of-mass energy of approximately 85 TeV—nearly an order of magnitude higher than the LHC—and is designed to deliver 5 to 10 times the integrated luminosity of the upcoming High-Luminosity LHC. Its mass reach for direct discovery extends to several tens of TeV. In addition to proton-proton collisions, the FCC-hh is capable of supporting ion-ion, ion-proton, and lepton-hadron collision modes. This second volume of the Feasibility Study Report presents the complete design of the FCC-ee collider, its operation and staging strategy, the full-energy booster and injector complex, required accelerator technologies, safety concepts, and technical infrastructure. It also includes the design of the FCC-hh hadron collider, development of high-field magnets, hadron injector options, and key technical systems for FCC-hh.

Benedikt, M. [European Organization for Nuclear Re↗

Crew emergency return vehicle autoland feasibility study

The crew emergency return vehicle (CERV) autoland feasibility study focused on determining the controllability of the NASA Langley high lift over drag CERV for performing an automatic landing at a prescribed runway. An autoland system was developed using integral linear quadratic Gaussian (LQG) design techniques. The design was verified using a nonlinear 6 DOF simulation. Simulation results demonstrate that the CERV configuration is a very flyable configuration for performing an autoland mission. Adequate stability and control was demonstrated for wind turbulence and wind shear. Control surface actuator requirements were developed.

Bossi, J. A.↗

Feasibility study of superconducting LSM rocket launcher system

A feasibility study is presented concerning an application of a superconducting linear synchronous motor (LSM) to a large-scale rocket launcher, whose acceleration guide tube of LSM armature windings is constructed 1,500 meters under the ground. The rocket is released from the linear launcher just after it gets to a peak speed of about 900 kilometers per hour, and it flies out of the guide tube to obtain the speed of 700 kilometers per hour at the height of 100 meters above ground. The linear launcher is brought to a stop at the ground surface for a very short time of 5 seconds by a quick control of deceleration. Very large current variations in the single-layer windings of the LSM armature, which are produced at the higher speed region of 600 to 900 kilometers per hour, are controlled successfully by adopting the double-layer windings. The proposed control method makes the rocket launcher ascend stably in the superconducting LSM system, controlling the Coriolis force.

Yoshida, Kinjiro↗

From Theory to Practice: Feasibility Study of a Thermal Microgrid at a DoD Installation: Preprint

Advanced district thermal energy systems, also known as thermal microgrids, can electrify and decarbonize urban districts in a highly efficient way, but adoption of such systems, especially in the US, has been slow. Thermal microgrids use a network circulating water at near-ambient (60-80 degree F) (15- 25 degree C) temperatures, and water-source heat pumps at connected buildings to boost or lower the temperature for space conditioning and domestic hot water. Addressing challenges related to retrofits of existing buildings for integration with such systems, as well as quantifying the benefits of different configurations, will be key to unlocking the full potential of thermal microgrids for energy savings, decarbonization, and resiliency. This paper will do that, by reporting on preliminary results from a feasibility study of a thermal microgrid, and illustrating the process of conceptual design to seek the best possible performance, within the many constraints of existing buildings. The feasibility study focuses on a cluster of existing buildings, including a grocery store, big box style retail store, motel, and clinic, at a US Department of Defense installation in Germany. The study will assess the performance of a pilot-scale thermal microgrid serving those buildings, in terms of energy, emissions, and life cycle cost, and assess practical considerations (such as building retrofits and scalability) for future implementation. A significant opportunity exists for waste heat recovery from refrigeration at the grocery store (more than offsetting the entire building s space heating load in terms of waste heat availability), and modeling of the proposed thermal microgrid will assess the benefits of the waste heat integration. The moderate operating temperatures of thermal microgrids facilitate the integration of waste heat from a variety of sources, and the networks allow waste heat to be shared amongst buildings in proximity. Along with results on expected energy and emissions performance, as well as waste heat integration, the paper will assess implications of load diversity on system performance. The paper will also discuss the process of evaluating existing building HVAC systems for compatibility with a thermal microgrid, including the feasibility of lower heating hot water temperatures compatible with currently-available water-to-water heat pumps. The cluster of buildings under consideration in this study has much in common with commercial buildings in the United States. The process of and results from this feasibility study can inform assessment of the potential for thermal microgrids in other locations and help unlock the benefits of such systems for decarbonization and energy savings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A feasibility study: Forest Fire Advanced System Technology (FFAST)

The National Aeronautics and Space Administration/Jet Propulsion Laboratory and the United States Department of Agriculture Forest Service completed a feasibility study that examined the potential uses of advanced technology in forest fires mapping and detection. The current and future (1990's) information needs in forest fire management were determined through interviews. Analysis shows that integrated information gathering and processing is needed. The emerging technologies that were surveyed and identified as possible candidates for use in an end to end system include ""push broom'' sensor arrays, automatic georeferencing, satellite communication links, near real or real time image processing, and data integration. Matching the user requirements and the technologies yielded a ""strawman'' system configuration. The feasibility study recommends and outlines the implementation of the next phase for this project, a two year, conceptual design phase to define a system that warrants continued development.

Mcleod, R. G.↗

Numerical aerodynamic simulation facility feasibility study

There were three major issues examined in the feasibility study. First, the ability of the proposed system architecture to support the anticipated workload was evaluated. Second, the throughput of the computational engine (the flow model processor) was studied using real application programs. Third, the availability reliability, and maintainability of the system were modeled. The evaluations were based on the baseline systems. The results show that the implementation of the Numerical Aerodynamic Simulation Facility, in the form considered, would indeed be a feasible project with an acceptable level of risk. The technology required (both hardware and software) either already exists or, in the case of a few parts, is expected to be announced this year. Facets of the work described include the hardware configuration, software, user language, and fault tolerance.

Source record↗

Nine Canyon Long-Duration Energy Storage: A Feasibility Study

The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.

25 ENERGY STORAGE↗