Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EuSe”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

61 records · Page 4

NASA’s Space Launch System: Progress Toward Launch

The Space Launch System (SLS), NASA’s cornerstone launch capability for a new generation of deep space exploration, has begun assembly at Kennedy Space Center (KSC) in preparation for launch in 2021. SLS will provide an unparalleled launch capability for human and robotic deep space exploration missions. Its proven propulsion system, upgrade path to more powerful vehicles, and high-volume payload fairings make it the foundation for ambitious and demanding as part of the Artemis program. Artemis is NASA’s 21st-century plan to put boots on the Moon and to perform sustainable, long-term science in deep space, with eyes toward sending explorers to Mars. The initial SLS vehicle to fly, Block 1 in the crew configuration – with the new Orion spacecraft – is scheduled to lift off from revitalized launch facilities at KSC in 2021 for an uncrewed test flight known as Artemis I. Manufacturing is complete on the vehicle and all elements have been delivered to the Exploration Ground Systems (EGS) Program, except the core stage. The program’s all-new development, the core stage is currently in the midst of a “Green Run” test campaign at Stennis Space Center (SSC). Eight progressively more challenging tests in the Green Run series will culminate in a hot-fire of four flight-proven liquid hydrogen/liquid oxygen (LH2/LOX) RS25 engines. Following the Green Run hotfiring, the core stage will ship to KSC. Already at KSC, aft sections of the fivesegment solid rocket boosters are being assembled. Previously delivered elements, including the upper stage, are undergoing final checkouts in preparation for stacking. An exciting 2021 will include such milestones as stacking SLS and Orion in KSC’s Vehicle Assembly Building (VAB), modal testing, roll out to Launch Pad 39B, Wet Dress Rehearsal (WDR), and launch. Teams across the country are preparing for launch by finalizing procedures, defining launch constraints and flight rules, training console operators, performing simulations, and more. With the SLS Block 1 vehicle for Artemis I nearing integration and launch, the second Block 1 vehicle in the crew configuration, which will carry astronauts on an Artemis II hybrid lunar flyby mission, has several elements manufactured. In fact, the solid rocket motor segments and RS-25 engines are complete. Those program elements are processing hardware for the third flight and working toward manufacturing the second SLS variant to fly, Block 1B, which will onramp a powerful new upper stage, the Exploration Upper Stage (EUS).

John Honeycutt↗

Hydrocarbon Cold-Flow Simulation of LOX/LH2 Rocket Aerodynamics

In FY19, this project developed a test method which employed heated ethane in the physical simulation of rocket plume aerodynamics. Based on this work, EUS partnered with significant leveraged funding. A portable, self-contained test bed was also fabricated to support validation of the new method. In FY20, this project focused on the formal validation of ethane’s performance as an aerodynamic simulant as well as the development of the analytical and hardware infrastructure required to carry out that task. The test bed was activated, a series of heated-ethane tests on one or more rocket/diffuser configurations were conducted, and characterizations of the performance of the ethane simulation compared to hot-fire were performed. A series of 127 tests were conducted on 13 aerodynamic configurations to evaluate ethane’s performance as a simulant. It was found that the new methodology can reproduce rocket plume flow fields with +/- 0.5% pressure error at ~3% physical scale. The result is a cost-per-test reduction of ~99% compared to the hot-fire subscale testing typically used to obtain equivalent data. Some initial efforts have taken place, and future efforts are being planned with LaRC supersonic retro propulsion and MSFC SLS aerodynamics teams, which are interested in using the ethane system to wind-tunnel test human-rated Mars lander retrorockets and SLS Booster. Details of the prototypical experiments were published as NASA TM 2020-5009122,and have been presented in JANNAF Virtual Conference paper, "New Developments in Retro propulsion Testing for Mars Entry, Descent and Landing".

Daniel Jones↗

Successful First Flight of NASA’s SLS (Space Launch System) Super Heavy-Lift Rocket Lays Groundwork for U. S.’s Most Ambitious Missions

In late 2022, NASA’s SLS (Space Launch System) super heavy-lift rocket launched for the first time. Artemis I sent an uncrewed Orion spacecraft on a 25.5-day round-trip mission to lunar orbit. The near-perfect performance laid the groundwork for the next flights and for NASA’s return of humans to the Moon. The SLS team is now preparing for the launch of Artemis II, which will be the first launch of astronauts to cislunar space since Apollo 17 in December 1972. In addition to preparations on the Artemis II launch vehicle, significant progress is being made on the hardware and software for future flights. Artemis II will include a test of a new military-grade GPS system, which will be fully utilized on Artemis III. Progress is also being made on the exploration upper stage (EUS) for the Block 1B SLS variant, which will debut on Artemis IV. New production RS-25 liquid-propellant engines will be used beginning with Artemis V. These new engines, which are in a final qualification test firing program at the time of writing, realize a cost savings of at least 30 percent and reduced production time due to streamlined manufacturing and advances in technology, including additive manufacturing. The evolved solid rocket boosters, which will debut on Artemis IX as part of the Block 2 variant, are in development now. In addition to propulsion updates, each variant of SLS maintains payload configuration flexibility and can fly crew-only, cargo-only, and crew-cargo combinations. This adaptability ensures that SLS, with its significant mass and volume capability – including the ability to launch large co-manifested payloads with Orion directly to trans-lunar injection (TLI) – can support the country’s most ambitious missions. Results from the Artemis I mission, as well as progress to the next flights and SLS variants, will be covered in the paper and presentation.

Bruce R. Askins↗

Successful First Flight of NASA’s SLS (Space Launch System) Super Heavy-Lift Rocket: Laying Groundwork for U. S.’s Most Ambitious Missions

In late 2022, NASA’s SLS (Space Launch System) super heavy-lift rocket launched for the first time. Artemis I sent an uncrewed Orion spacecraft on a 25.5-day round-trip mission to lunar orbit. The near-perfect performance laid the groundwork for the next flights and for NASA’s return of humans to the Moon. The SLS team is now preparing for the launch of Artemis II, which will be the first launch of astronauts to cislunar space since Apollo 17 in December 1972. In addition to preparations on the Artemis II launch vehicle, significant progress is being made on the hardware and software for future flights. Artemis II will include a test of a new military-grade GPS system, which will be fully utilized on Artemis III. Progress is also being made on the exploration upper stage (EUS) for the Block 1B SLS variant, which will debut on Artemis IV. New production RS-25 liquid-propellant engines will be used beginning with Artemis V. These new engines, which are in a final qualification test firing program at the time of writing, realize a cost savings of at least 30 percent and reduced production time due to streamlined manufacturing and advances in technology, including additive manufacturing. The evolved solid rocket boosters, which will debut on Artemis IX as part of the Block 2 variant, are in development now. In addition to propulsion updates, each variant of SLS maintains payload configuration flexibility and can fly crew-only, cargo-only, and crew-cargo combinations. This adaptability ensures that SLS, with its significant mass and volume capability – including the ability to launch large co-manifested payloads with Orion directly to trans-lunar injection (TLI) – can support the country’s most ambitious missions. Results from the Artemis I mission, as well as progress to the next flights and SLS variants, will be covered in the paper and presentation.

Bruce Askins↗

Advanced Manufacturing of the SLS Block 1B Payload Adapter: Engineering Development Unit

The Payload Adapter (PLA) for the Space Launch System Block 1B configuration (SLS B1B) is a structural frustum that interfaces with the Exploration Upper Stage (EUS) and the Universal Stage Adapter (USA) or the cargo fairing at the aft end and interfaces with the primary or co-manifested payload at the forward end. The primary structure is composed of a single piece aluminum forward ring, a segmented aluminum aft ring, eight carbon composite sandwich panels, and composite bonded longitudinal joints. The PLA is designed and fabricated in-house at MSFC. Development and flight article builds are joint efforts between the Materials & Processes Laboratory (EM), the Spacecraft & Vehicle Systems Department (EV), the Space Systems Department (ES), and the Test Laboratory (ET). The large-scale manufacturing efforts associated with this task include the fabrication of pathfinder panels; the fabrication and assembly of a full-scale Manufacturing Demonstration Article (MDA); the fabrication, assembly, and test of an Engineering Demonstration Unit (EDU); the fabrication, assembly, and test of a qualification Article; and the fabrication, assembly, and proof test of subsequent flight articles. The PLA team recently completed assembly of the EDU. The final assembly included the instillation of the co-manifested secondary payload, NEST, and the instillation and tensioning of the Payload Separation System (PSS). This poster will detail the assembly process which includes: (1) composite panel to ring assembly, (2) adhesive bonding for the longitudinal joints, and (3) instillation of the NEST and PSS. The PLA EDU is prepared to undergo modal and static load testing.

Monique Wallace↗

Space Launch System Block-1b USA Separation Analysis and Requirements Derivation From CLVTOPS Toolchain

Ensuring that rocket stage separation events provide positive clearance is critical to avoid loss of mission or crew. NASA's Marshall Space Flight Center (MSFC) has developed a cutting-edge toolchain to address this type of problem and it was used to set abstracted impulse requirements on, and to analyze the results of, the in-space separation event of the Universal Stage Adapter (USA) and the Exploration Upper Stage (EUS) of NASA's Space Launch System (SLS) Block-1B configuration. The toolchain is used as a hardware simulation to confirm positive body-to-body clearance during the separation event. It is also used to create a requirements-space simulation, which helps inform requirements as the hardware design matures.

Zachary T Muscha↗

SLS Block-1B USA Separation Analysis and Requirements Evaluation Using the CLVTOPS Toolchain

Ensuring that rocket stage separation events provide positive clearance is critical to avoid loss of mission or crew. NASA's Marshall Space Flight Center (MSFC) has developed a cutting-edge toolchain to address this type of problem and it was used to set abstracted impulse requirements on, and to analyze the results of, the in-space separation event of the Universal Stage Adapter (USA) and the Exploration Upper Stage (EUS) of NASA's Space Launch System (SLS) Block-1B configuration. The toolchain is used as a hardware simulation to confirm positive body-to-body clearance during the separation event. It is also used to create a requirements-space simulation, which helps inform requirements as the hardware design matures.

Zach Muscha↗