Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Early design support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Simple, Robust Cryogenic Propellant Depot for Near Term Applications

The ability to refuel cryogenic propulsion stages on-orbit provides an innovative paradigm shift for space transportation supporting National Aeronautics and Space Administration s (NASA) Exploration program as well as deep space robotic, national security and commercial missions. Refueling enables large beyond low Earth orbit (LEO) missions without requiring super heavy lift vehicles that must continuously grow to support increasing mission demands as America s exploration transitions from early Lagrange point missions to near Earth objects (NEO), the lunar surface and eventually Mars. Earth-to-orbit launch can be optimized to provide competitive, cost-effective solutions that allow sustained exploration. This paper describes an experimental platform developed to demonstrate the major technologies required for fuel depot technology. This test bed is capable of transferring residual liquid hydrogen (LH2) or liquid oxygen (LO2) from a Centaur upper stage, and storage in a secondary tank for up to one year on-orbit. A dedicated, flight heritage spacecraft bus is attached to an Evolved Expendable Launch Vehicle (EELV) Secondary Payload Adapter (ESPA) ring supporting experiments and data collection. This platform can be deployed as early as Q1 2013. The propellant depot design described in this paper can be deployed affordably this decade supporting missions to Earth-Moon Lagrange points and lunar fly by. The same depot concept can be scaled up to support more demanding missions and launch capabilities. The enabling depot design features, technologies and concept of operations are described.

McLean, Christopher↗

Space Launch System, Core Stage, Structural Test Design and Implementation

As part of the National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, engineers at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama are working to design, develop and implement the SLS Core Stage structural testing. The SLS will have the capability to return humans to the Moon and beyond and its first launch is scheduled for December of 2017. The SLS Core Stage consist of five major elements; Forward Skirt, Liquid Oxygen (LOX) tank, Intertank (IT), Liquid Hydrogen (LH2) tank and the Engine Section (ES). Structural Test Articles (STA) for each of these elements are being designed and produced by Boeing at Michoud Assembly Facility located in New Orleans, La. The structural test for the Core Stage STAs (LH2, LOX, IT and ES) are to be conducted by the MSFC Test Laboratory. Additionally, the MSFC Test Laboratory manages the Structural Test Equipment (STE) design and development to support the STAs. It was decided early (April 2012) in the project life that the LH2 and LOX tank STAs would require new test stands and the Engine Section and Intertank would be tested in existing facilities. This decision impacted schedules immediately because the new facilities would require Construction of Facilities (C of F) funds that require congressional approval and long lead times. The Engine Section and Intertank structural test are to be conducted in existing facilities which will limit lead times required to support the first launch of SLS. With a SLS launch date of December, 2017 Boeing had a need date for testing to be complete by September of 2017 to support flight certification requirements. The test facilities were required to be ready by October of 2016 to support test article delivery. The race was on to get the stands ready before Test Article delivery and meet the test complete date of September 2017. This paper documents the past and current design and development phases and the supporting processes, tools, and methodology for supporting the SLS Core Stage STA test stands and related STE. The paper will address key requirements, system development activities and project challenges. Additionally, the interrelationships as well as interdependencies within the SLS project will be discussed.

Shaughnessy, Ray↗

Experiences with a prevalidation methodology for designing integrated/propulsion control system architectures

The work described in this paper is supported under NASA contract NAS1-18099, Analysis and Detailed Design of an Integrated Airfame/Propulsion Control System Architecture (IAPSA II). This contract address methodology, analysis and detailed design of integrated control system architectures suitable for high performance aircraft of the 1990's. We have developed methodology, with supporting analytical tools, to provide system designers with the capability to specify candidate architectures and accurately predict their reliability and performance in the early stages of design development. This paper describes experience gained using the prevalidation methodology, including supporting tools.

Propulsion control system↗

EVA-Compatible Microbial Swab Tool

When we send humans to search for life on Mars, we'll need to know what we brought with us versus what may already be there. To ensure our crewed spacecraft meet planetary protection requirements—and to protect our science from human contamination—we'll need to know whether micro-organisms are leaking/venting from our ships and spacesuits. This is easily done by swabbing external vents and suit surfaces for analysis, but requires a specialized tool for the job. Engineers at the National Aeronautics and Space Administration (NASA) recently developed an Extravehicular Activity (EVA)-compatible swab tool that can be used to sample current space suits and life support systems. Data collected now will influence Mars life support and EVA hardware early in the planning process, before design changes become difficult and expensive.NASA’s EVA swab tool pairs a Space Shuttle-era tool handle with a commercially available swab tip mounted into a custom-designed end effector. A glove-compatible release mechanism allows the handle to quickly switch between swab tips, much like a shaving razor handle can snap onto a disposable blade cartridge. Swab tips are stowed inside individual sterile containers, each fitted with a microbial filter that allows the container to equalize atmospheric pressure, but prevents cabin contaminants from rushing into the container when passing from the EVA environment into a pressurized cabin. A bank of containers arrayed inside a tool caddy allows up to six individual samples to be collected during a given spacewalk.NASA plans to use the tool in 2016 to collect samples from various spacesuits during ground testing to determine what (if any) human-borne microbial contamination leaks from the suit under simulated thermal vacuum conditions. Next, the tool will be used on board the International Space Station to assess the types of microbial contaminants found on external environmental control and life support system vents. Data will support advanced EVA and life support system maturation studies, helping to answer questions such as “how close can an EVA-suited crew member approach an area of scientific interest without compromising the science?”

Rucker, Michelle A.↗

CO2 Handling & Electrolyzer Efficiency Scaling Evaluator

CHEESE is an interactive dashboard tool for estimating the performance and material requirements of carbon dioxide electrolysis systems. It helps users evaluate how electrode area, current density, product selectivity, gas flow, cell voltage, and the number of cells in a stack affect system operation. The dashboard provides simple and advanced modes so it can be used for both quick estimates and more detailed engineering analysis. Users can estimate product output, carbon dioxide use, electrical power, electrode area, gas and liquid flow rates, energy efficiency, material cost per test, and the effect of scaling from a single cell to a multi cell stack. It also includes tools for examining carbon balance, equipment durability, component replacement, and changes in performance over time. This is intended to help both academia and industry researchers who are either getting into CO2 electrolysis on lab-scale or are trying to establish a larger footprint. CHEESE presents results through tables, charts, and simplified cell and stack diagrams. It is intended to support research planning, experimental design, comparison of operating conditions, and early stage scale up studies.

Prajapati, Aditya [Lawrence Livermore National Lab↗

Integrated Design Results for the MSR SRC Mars Ascent Vehicle

The primary mission of the NASA Mars Sample Return (MSR) Campaign is to return samples of the Martian surface to Earth for scientific study. As part of this campaign, NASA is developing a Mars Ascent Vehicle (MAV). This vehicle must survive an approximate two year journey to the Martian surface as a payload aboard a separate lander spacecraft. After residing on the surface for another year, the MAV will carry a payload of samples into orbit. From there, following ejection from the MAV, the samples will rendezvous with an Earth return spacecraft for capture, and ultimately, return to Earth.The design of the MAV represents a number of unique challenges, as no launch vehicle has ever left the surface of a planet other than Earth. Although conceptual designs for a MAV have been in various levels of development since the 1970s, none have achieved the level of fidelity and support that exists in the current MSR-MAV design. Early MSR-MAV concept studies examined multiple methods of propulsion, ultimately deciding that a Two Stage to Orbit (TSTO) solid propulsion vehicle would provide the most capable performance in a Martian environment. Following this key architecture decision, the vehicle design was further matured to a Solid-Solid Guided-Guided (SSGG) architecture for NASA Key Decision Point A (KDP-A). Although the SSGG design was able to meet all mission constraints, concerns were raised regarding limited mass margin on other elements of the MSR campaign at such an early phase. A design challenge was issued to reduce MAV total mass by as much as possible. It was ultimately determined that by moving a number of components of the vehicle second stage to the first stage, the overall vehicle mass could be reduced significantly. The new design featured a much smaller and completely unguided second stage. This paper describes the resultant Solid-Solid Guided-Unguided (SSGU) MAV design concept developed as part of the Systems Requirement Cycle (SRC). This design was developed primarily by NASA Marshall Space Flight Center (MSFC), in association with NASA Jet Propulsion Laboratory (JPL) and NASA Langley Research Center (LaRC). The TSTO vehicle includes one solid rocket motor per stage. As the vehicle second stage is unguided, it features spin-stabilization to maintain vehicle stability during flight. An electromechanically actuated Thrust Vector Control (TVC) and a monopropellant Reaction Control System (RCS) is employed for active guidance on the first stage. The vehicle is designed to deliver up to 0.47kg of Martian samples to a Mars circular orbit of 380km at 27° inclination. Due to the extremely unique design constraints of this mission, and a recent transition to a Risk Class A posture, the MAV team was compelled to devise unconventional solutions to the vehicle design. The detailed design and analysis of these subsystems and the vehicle as a whole are discussed in this paper relative to all of the engineering disciplines involved.

MSR↗

Integrated Design Results for the MSR SRC Mars Ascent Vehicle

The primary mission of the NASA Mars Sample Return (MSR) Campaign is to return samples of the Martian surface to Earth for scientific study. As part of this campaign, NASA is developing a Mars Ascent Vehicle (MAV). This vehicle must survive an approximate two-year journey to the Martian surface as a payload aboard a separate lander spacecraft. After residing on the surface for another year, the MAV will carry a payload of samples into orbit. From there, following ejection from the MAV, the samples will rendezvous with an Earth return spacecraft for capture, and ultimately, return to Earth. The design of the MAV represents a number of unique challenges, as no launch vehicle has ever left the surface of a planet other than Earth. Although conceptual designs for a MAV have been in various levels of development since the 1970s, none have achieved the level of fidelity and support that exists in the current MSR-MAV design. Early MSR-MAV concept studies examined multiple methods of propulsion, ultimately deciding that a Two-Stage-to-Orbit (TSTO) solid propulsion vehicle would provide the most capable performance in a Martian environment. Following this key architecture decision, the vehicle design was further matured to a Solid-Solid Guided-Guided (SSGG) architecture for NASA Key Decision Point A (KDP-A). Although the SSGG design was able to meet all mission constraints, concerns were raised regarding limited mass margin on other elements of the MSR campaign at such an early phase. A design challenge was issued to reduce MAV total mass by as much as possible. It was ultimately determined that by moving a number of components of the vehicle second stage to the first stage, the overall vehicle mass could be reduced significantly. The new design features a much smaller and completely unguided second stage. This paper describes the resultant Solid-Solid Guided-Unguided (SSGU) MAV design concept developed as part of the Systems Requirement Cycle (SRC). This design was developed primarily by NASA Marshall Space Flight Center (MSFC), in association with NASA Jet Propulsion Laboratory (JPL) and NASA Langley Research Center (LaRC). The TSTO vehicle includes one solid rocket motor per stage. As the vehicle second stage is unguided, it features spin-stabilization to maintain vehicle stability during flight. An electromechanically actuated Thrust Vector Control (TVC) system and a monopropellant Reaction Control System (RCS) are employed for active guidance on the first stage. The vehicle is designed to deliver up to 0.47kg of Martian samples to a Mars circular orbit of 380km at 27° inclination. Due to the extremely unique design constraints of this mission, and a recent transition to a Risk Class A posture, the MAV team was compelled to devise unconventional solutions to the vehicle design. The detailed design and analysis of these subsystems and the vehicle as a whole are discussed in this paper relative to all of the engineering disciplines involved.

MAV↗

Completion of the first NGNP Advanced Gas Reactor Fuel Irradiation Experiment, AGR-1, in the Advanced Test Reactor

The United States Department of Energy’s Next Generation Nuclear Plant (NGNP) Advanced Gas Reactor (AGR) Fuel Development and Qualification Program will be irradiating up to seven separate low enriched uranium (LEU) tri-isotopic (TRISO) particle fuel (in compact form) experiments in the Advanced Test Reactor (ATR) located at the Idaho National Laboratory (INL). The ATR has a long history of irradiation testing in support of reactor development and the INL has been designated as the United States Department of Energy’s lead laboratory for nuclear energy development. The ATR is one of the world’s premiere test reactors for performing long term, high flux, and/or large volume irradiation test programs. These irradiations and fuel development are being accomplished to support development of the next generation reactors in the United States, and will be irradiated over the next several years to demonstrate and qualify new TRISO coated particle fuel for use in high temperature gas reactors. The goals of the irradiation experiments are to provide irradiation performance data to support fuel process development, to qualify fuel for normal operating conditions, to support development and validation of fuel performance and fission product transport models and codes, and to provide irradiated fuel and materials for post irradiation examination (PIE) and safety testing. The experiments, which will each consist of at least six separate capsules, will be irradiated in an inert sweep gas atmosphere with individual on-line temperature monitoring and control of each capsule. The sweep gas will also have on-line fission product monitoring on its effluent to track performance of the fuel in each individual capsule during irradiation. The first experiment (designated AGR-1) started irradiation in December 2006 and completed a very successful irradiation in early November 2009. The design of AGR-1 test train and support systems used to monitor and control the experiment during irradiation will be discussed and the results of the experiment will be presented. The second experiment (AGR-2) is currently being assembled, and the status as well as the new fuel and irradiation conditions for that experiment will also be discussed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

U.S. department of energy safety design strategy review and approval beyond critical decision 3 for the high-level waste facility - 15525

The Waste Treatment and Immobilization Plant (WTP) in Hanford, Washington, is the nation's largest environmental remediation construction project. In 2012, at the WTP's High-Level Waste (HLW) Facility, the U.S. Department of Energy (DOE), Office of River Protection (ORP) restricted construction work at the Hazard Category 2 nuclear facility because of unresolved technical issues associated with the facility and of misalignment of the design and nuclear safety basis. By 2013, as additional issues were discovered, ORP limited HLW design and procurement activities. Addressing the technical issues and the misalignment of the design basis with the Preliminary Documented Safety Analysis (PDSA) is a priority for ORP. A proposal was developed to use the concept of a safety design strategy (SDS), as documented in DOE-STD-1189-2008, Integration of Safety into the Design Process, as a planning mechanism to support facility design and PDSA alignment. The standard provides the processes to develop an SDS that will ensure safety is integrated into design early in the project, by the start of preliminary design. Ultimately, as design progresses, an SDS is intended to support development of the project's PDSA. However, in this unique case, the HLW Facility design and construction phase has progressed beyond Critical Decision 3 and DOE-STD-1189-2008 was issued in 2008; 6 years after ORP approved the first WTP PDSA. In July 2013, ORP and the contractor recognized that the unresolved technical issues and design - safety basis misalignment should be addressed through a renewed look at nuclear safety requirements, and agreed that developing an SDS tailored to the criteria in DOE-STD-1189-2008 provided the best path forward to better integrate design and safety. Development of the SDS for the HLW Facility was one of many goals ORP established in a plan that describes how ORP will determine whether, and under what conditions, the contractor should be authorized to proceed with production engineering, procurement, and construction activities for the HLW Facility. Over the next several months, the contractor developed the draft SDS, identifying design basis accidents and control strategies for those accidents. ORP monitored progress and, when appropriate, provided recommendations. In April 2014, the contractor provided a draft SDS to ORP for initial review by an independent DOE Review Team. The Review Team was comprised of representatives from nuclear safety, criticality safety, engineering, fire protection, the Office of Environmental Management, the Assistant Manager WTP, and the DOE Chief of Nuclear Safety. A unique draft document review and interactive review process, facilitated through work sessions and continuous communication with the contractor, culminated in the development of 147 technical comments on topics varying from SDS implementation to hydrogen deflagration in vessels. Comment resolution sought to improve project clarity, delineation of control strategies, and, holistically, facilitate integration of safety into design in the SDS, as it will guide the restart of the HLW Facility production engineering and limited procurement and construction activities. All comments were resolved in support of a contractor submission of the final SDS to ORP at the end of June 2014. Successful resolution of these comments was achieved by continuing the real-time response and incorporation interaction with the contractor to ensure that mutual objectives were satisfied. The response times were facilitated through telephone, E-mail, and a shared file server accessible to contractor and DOE reviewers across the DOE complex. As a measure of success of this process, the Safety Basis Approval Authority (ORP Manager) and the WTP Federal Project Director approved the SDS on August 1, 2014, with no conditions of approval. DOE and the contractor recognized that it would be difficult to implement the SDS without changes to the existing contractor's engineering and nuclear safety processes. Accordingly, the contractor developed or revised a significant number of engineering and nuclear safety plans and procedures to implement the SDS into the design process. Over the coming year, the contractor will conduct a gap analysis between the SDS and the presently approved PDSA to incorporate the design basis accidents and preferred control strategies developed from the SDS into the PDSA. In addition, ORP will conduct an assessment of the contractor's implementation of the SDS into the design process at the appropriate stage of implementation, within 6 to 12 months of approval. Although the SDS was developed late in the HLW project timeline, the document will facilitate alignment of design and the safety basis, and is a key step in the return to full production engineering for the HLW Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design study of RL10 derivatives. Volume 3, part 2: Operational and flight support plan

Transportation requirements are considered during the engine design layout reviews and maintenance engineering analyses. Where designs cannot be influenced to avoid transportation problems, the transportation representative is advised of the problems permitting remedies early in the program. The transportation representative will monitor and be involved in the shipment of development engine and GSE hardware between FRDC and vehicle manufacturing plant and thereby will be provided an early evaluation of the transportation plans, methods and procedures to be used in the space tug support program. Unanticipated problems discovered in the shipment of development hardware will be known early enough to permit changes in packaging designs and transportation plans before the start of production hardware and engine shipments. All conventional transport media can be used for the movement of space tug engines. However, truck transport is recommended for ready availability, variety of routes, short transit time, and low cost.

Shubert, W. C.↗

A comparison of the Shuttle remote manipulator system and the Space Station Freedom mobile servicing center

The Shuttle Remote Manipulator System is a mature system which has successfully completed 18 flights. Its primary functional design driver was the capability to deploy and retrieve payloads from the Orbiter cargo bay. The Space Station Freedom Mobile Servicing Center is still in the requirements definition and early design stage. Its primary function design drivers are the capabilities: to support Space Station construction and assembly tasks; to provide external transportation about the Space Station; to provide handling capabilities for the Orbiter, free flyers, and payloads; to support attached payload servicing in the extravehicular environment; and to perform scheduled and un-scheduled maintenance on the Space Station. The differences between the two systems in the area of geometric configuration, mobility, sensor capabilities, control stations, control algorithms, handling performance, end effector dexterity, and fault tolerance are discussed.

Taylor, Edith C.↗

Evolutionary development of a lunar CELSS

This paper describes a method of evolving the life support technologies of an early lunar base into an advanced life support system. The initial design is a partially-closed regenerative life support system based upon Space Station Freedom physicochemical technology. The paper describes the stepwise evolution of this baseline system into a closed-loop, lunar base Controlled Ecological Life Support System, a hybrid design which incorporates both advanced physicochemical and bioregenerative technologies.

Schwartzkopf, Steven H.↗

2010 JPC Abstract: Ares I First Stage Propulsion System Status

In November 2005, NASA created the Constellation Program to develop an entirely new fleet of spacecraft to include the Ares I Crew Launch Vehicle and Ares V Cargo Launch vehicles. This mission architecture included the Orion capsule (which would be used to transport astronauts to low-Earth orbit and beyond), the Altair lunar lander, and an Earth departure stage. The Ares First Stage Team has made significant progress on the design of a propulsion system to meet the objectives of the Constellation Program. Work on a first stage element propulsion system capable of lofting a new fleet of spacecraft is well underway. To minimize technical risks and development costs, the Solid Rocket Boosters (SRBs) of Shuttle served as a starting point in the design of a new motor that would meet the requirements of those new vehicles. This new propulsive element will provide greater total impulse utilizing a fifth segment to loft a safer, more powerful fleet of space flight vehicles. Performance requirements, basic architecture, and obsolescence issues were all factors in determining the new first stage element design and configuration. Early efforts focused on creating designs that would be capable of supporting the requisite loads and environments. While the motor casings are Shuttle legacy, because of Ares I s unique in-line configuration, the first stage will require entirely new forward structures (forward skirt, forward skirt extension, aeroshell, and frustum) and a modified systems tunnel. The use of composites facilitated a change in the geometry, which in turn afforded the ability to focus strength where it was needed without additional mass. The Ares First Stage rocket motor casting tooling was designed and built to achieve a propellant grain geometry that produces the specific required ballistic profile. The new propellant formulation is a polybutadiene acrylonitrile (PBAN) copolymer, which has been modified to attain the desired burn rate and retain adequate tailoring capability.

Priskos, Alex S.↗

MONTE's Client-Based Trajectory Propagation Architecture

The Mission Analysis, Operations, and Navigation Toolkit Environment (MONTE) is JPL's (Jet Propulsion Laboratory's) signature astrodynamic computing platform. It supports all phases of space mission development, from early stage mission design and analysis through flight navigation services. MONTE employs a client-based trajectory propagation architecture where accelerations are calculated in the main MONTE library and the integrator exists on the periphery as a client. This paper outlines this approach to a trajectory propagation system and provides a concrete set of examples showing its utility.

Smith, Jonathan↗

Defining A Modelling Language to Support Functional Hazard Assessment

Functional Hazard Assessment (FHA) is a key early-stage engineering process that supports the incorporation of safety in design by identifying the high-level functional hazards the system may encounter. While many FHA-like methodologies have been proposed in the design engineering literature, many of these methodologies have had difficulty becoming accepted industry practice. Industry standards, on the other hand, either provide too little recommendation on how to represent the function of the system to perform FHA, or rely on existing design artefacts which insufficiently support the goals of the process. This paper presents some of the problems with current modeling languages (both proposed and used) for FHA which limit the scope, expressiveness, flexibility, and precision of the analysis. It then outlines desirable principles an FHA-supporting analysis language should embody, and introduces the Functional Reasoning Design Language (FRDL), a formal modeling language for describing the functional elements of a system and their interactions, which aims to satisfy these principles. To demonstrate the use of this language, the modeling and hazard analysis of a disaster response drone is presented. While this case study is limited in scope, it highlights how FRDL can represent system function while reducing the ambiguity present in typical FHA-supporting functional modeling languages

Hazard Assessment↗

Defining A Modelling Language to Support Functional Hazard Assessment

Functional Hazard Assessment (FHA) is a key early-stage engineering process that supports the incorporation of safety in design by identifying the high-level functional hazards the system may encounter. While many FHA-like methodologies have been proposed in the design engineering literature, many of these methodologies have had difficulty becoming accepted industry practice. Industry standards, on the other hand, either provide little recommendation on how to represent the function of the system to perform FHA, or rely on readily-available models with little justification in design theory. This paper presents some of the problems with current modelling languages used for FHA which limit the scope, expressiveness, flexibility, and precision of the analysis, as well as desirable principles an FHA-supporting analysis language should embody. It further introduces the Functional Reasoning Design Language (FRDL), a formal modelling language for describing the functional behaviors of a system and their interactions which satisfies these principles. To demonstrate the use of this language, the modelling and hazard analysis of a disaster response drone is presented.

safety analysis↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Automated Test Case Generation for an Autopilot Requirement Prototype

Designing safety-critical automation with robust human interaction is a difficult task that is susceptible to a number of known Human-Automation Interaction (HAI) vulnerabilities. It is therefore essential to develop automated tools that provide support both in the design and rapid evaluation of such automation. The Automation Design and Evaluation Prototyping Toolset (ADEPT) enables the rapid development of an executable specification for automation behavior and user interaction. ADEPT supports a number of analysis capabilities, thus enabling the detection of HAI vulnerabilities early in the design process, when modifications are less costly. In this paper, we advocate the introduction of a new capability to model-based prototyping tools such as ADEPT. The new capability is based on symbolic execution that allows us to automatically generate quality test suites based on the system design. Symbolic execution is used to generate both user input and test oracles user input drives the testing of the system implementation, and test oracles ensure that the system behaves as designed. We present early results in the context of a component in the Autopilot system modeled in ADEPT, and discuss the challenges of test case generation in the HAI domain.

Giannakopoulou, Dimitra↗