Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ELECTROMAGNETIC COMPATIBILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Electromagnetic interference assessment of an ion drive electric propulsion system

The electromagnetic interference (EMI) form elements of an ion drive electric propulsion system was analyzed, and the effects of EMI interaction with a typical interplanetary spacecraft engineering and scientific subsystems were predicted. SEMCAP, a computerized electromagnetic compatibility assessment code, was used to analyze the impact of EMI noise sources on 65 engineering/telemetry circuits and 48 plasma wave and planetary radio astronomy channels measuring over the range of 100 Hz to 40 MHz in a spacecraft of the Voyager type; manual methods were used to evaluate electrostatics, magnetics, and communications effects. Results indicate that some conducted and radiated spectra are in excess of electromagnetic compatibility specification limits; direct design changes may be required for filtering and shielding of thrust system elements. The worst source of broadband radiated noise appears to be the power processor. The magnetic field necessary to thruster operation is equivalent to about 18 amp-sq m per amp of beam current at right angles to the axis caused by the neutralizer/plume loop.

Whittlesey, A. C.↗

EMC Test Challenges for NASAs James Webb Space Telescope

This presentation describes the electromagnetic compatibility (EMC) tests performed on the Integrated Science Instrument Module (ISIM), the science payload of the James Webb Space Telescope (JWST), at NASAs Goddard Space Flight Center (GSFC) in August 2015. By its very nature of being an integrated payload, it could be treated as neither a unit level test nor an integrated spacecraft observatory test. Non-standard test criteria are described along with non-standard test methods that had to be developed in order to evaluate them. Results are presented to demonstrate that all test criteria were met in less than the time allocated.

Electromagnetics↗

EMC Lessons on the Path to Flight

This slide presentation summarizes Electromagnetic Compatibility lessons learned over a sampling of space and aerospace hardware development projects.

Electromagnetic Interference↗

Antenna Measurements: Test & Analysis of the Radiated Emissions/Immunity of the NASA/Orion Spacecraft Dart Parachute Simulator & Prototype Capsule - The Crew Exploration Vehicle

For future NASA Manned Space Exploration of the Moon and Mars, a blunt body capsule, called the Orion Crew Exploration Vehicle (CEV), composed of a Crew Module (CM) and a Service Module (SM), with a parachute decent assembly is planned for reentry back to Earth. A Capsule Parachute Assembly System (CPAS) is being developed for preliminary prototype parachute drop tests at the Yuma Proving Ground (YPG) to simulate high-speed reentry to Earth from beyond Low-Earth-Orbit (LEO) and to provide measurements of position, velocity, acceleration, attitude, temperature, pressure, humidity, and parachute loads. The primary and secondary (backup) avionics systems on CPAS also provide mission critical firing events to deploy, reef, and release the parachutes in three stages (extraction, drogues, mains) using mortars and pressure cartridge assemblies. In addition, a Mid-Air Delivery System (MDS) is used to separate the capsule from the sled that is used to eject the capsule from the back of the drop plane. Also, high-speed and high-definition cameras in a Video Camera System (VCS) are used to film the drop plane extraction and parachute landing events. Intentional and unintentional radiation emitted from and received by antennas and electronic devices on/in the CEV capsule, the MDS sled, and the VCS system are being tested for radiated emissions/immunity (susceptibility) ~ (RE/RS). To verify Electromagnetic Compatibility (EMC) of the Orion capsule, Electromagnetic Interference (EMI) measurements are being made inside a semi-anechoic chamber at NASA/JSC on the components of the CPAS system. Measurements are made at 1m from the components-under-test (CUT). In addition, EMI measurements of the integrated CEV system are being made inside a hanger at YPG. These measurements are made in a complete circle, at 30◦ angles or less, around the Orion Capsule, the spacecraft system under-test (SUT). Near-field B-Dot probe measurements on the surface of the Orion capsule are being extrapolated outward to the 1m standard distance for comparison to the MIL-STD radiated emissions limit, and far-field hybrid antenna measurements at 3m are being extrapolated inward to the 1m distance for similar comparisons.

Norgard, John D.↗

Emc in apollo's ace-s/c system.

Electromagnetic compatibility of ACE-S/C, ACCEPTANCE Checkout Equipment-Spacecraft, checkout and display system for Apollo spacecraft

GROUND SUPPORT SYSTEM↗

Environmental Assurance Program for the Phoenix Mars Mission

The Phoenix Mars mission involves delivering a stationary science lander on to the surface of Mars in the polar region within the latitude band 65 deg N to 72 deg N. Its primary objective is to perform in-situ and remote sensing investigations that will characterize the chemistry of the materials at the local surface, subsurface, and atmosphere. The Phoenix spacecraft was launched on August 4, 2007 and will arrive at Mars in May 2008. The lander includes a suite of seven (7) science instruments. This mission is baselined for up to 90 sols (Martian days) of digging, sampling, and analysis. Operating at the Mars polar region creates a challenging environment for the Phoenix landed subsystems and instruments with Mars surface temperature extremes between -120 deg C to 25 deg C and diurnal thermal cycling in excess of 145 deg C. Some engineering and science hardware inside the lander were qualification tested up to 80 deg C to account for self heating. Furthermore, many of the hardware for this mission were inherited from earlier missions: the lander from the Mars Surveyor Program 2001 (MSP'01) and instruments from the MSP'01 and the Mars Polar Lander. Ensuring all the hardware was properly qualified and flight acceptance tested to meet the environments for this mission required defining and implementing an environmental assurance program that included a detailed heritage review coupled with tailored flight acceptance testing. A heritage review process with defined acceptance success criteria was developed and is presented in this paper together with the lessons learned in its implementation. This paper also provides a detailed description of the environmental assurance program of the Phoenix Mars mission. This program includes assembly/subsystem and system level testing in the areas of dynamics, thermal, and electromagnetic compatibility, as well as venting/pressure, dust, radiation, and meteoroid analyses to meet the challenging environment of this mission.

thermal testing↗

EMC Testing on the Integrated Science Instrument Module (ISIM) - A Summary of the EMC Test Campaign for the Science Payload of the James Webb Space Telescope (JWST)

This paper describes the electromagnetic compatibility (EMC) tests performed on the Integrated Science Instrument Module (ISIM), the science payload of the James Webb Space Telescope (JWST), at NASAs Goddard Space Flight Center (GSFC) in August 2015. By its very nature of being an integrated payload, it could be treated as neither a unit level test nor an integrated spacecraft/observatory test. Non-standard test criteria are described along with non-standard test methods that had to be developed in order to evaluate them. Results are presented to demonstrate that all test criteria were met in less than the time allocated.

Electromagnetic Interference (EMI)↗

EMC Test Challenges for NASA's James Webb Space Telescope

This presentation describes the electromagnetic compatibility (EMC) tests performed on the Integrated Science Instrument Module (ISIM), the science payload of the James Webb Space Telescope (JWST), at NASAs Goddard Space Flight Center (GSFC) in August 2015. By its very nature of being an integrated payload, it could be treated as neither a unit level test nor an integrated spacecraft observatory test. Non-standard test criteria are described along with non-standard test methods that had to be developed in order to evaluate them. Results are presented to demonstrate that all test criteria were met in less than the time allocated.

Electromagnetic Interference (EMI)↗

A Compact, Single Stage, >1 kV Medium-Voltage Line Impedance Stabilization Network

This paper presents the design of a single-phase, single-stage line impedance stabilization network (LISN) for medium-voltage (MV) applications. More than 1 kV rated widebandgap (WBG) power semiconductor switches are increasingly utilized in new, emerging power electronics energy systems to improve power density and efficiency. However, due to inherently fast-switching speeds, WBG switch modules emit considerable electromagnetic interference (EMI) (e.g., common mode (CM) or differential mode (DM)). State-of-the-art offers standardized LISN solutions to validate and certify the new energy system for electromagnetic compatibility (EMC). However, most are for low voltage applications (i.e., < 1 kV). MV LISNs (i.e., > 1 kV) are rare until recently and literature does not provide sufficient guidelines for designing and characterizing such devices. It has been a critical challenge for many scientists and engineers to reliably certify the emerging MV energy systems (e.g., electric ships and aircraft). This paper addresses such a technology gap. Specifically, a CISPR 16-1-2 compliant 50Ω/50μH LISN with 1.5kV, 75A and 30MHz measurement capability has been proposed. Detailed performance study versus non-linear parasitic parameters variations in MV inductors and capacitors have been done. Based on new understandings, novel techniques to intuitively mitigate unwanted parasitic have been proposed to develop the proposed LISN successfully. Thorough characterization of important LISN parameters are presented and factors influencing them are analyzed. A rigorous analysis, experimental tests, and in-depth comparisons over state-of-the-art have been made to validate the effectiveness. This is done through the state-of-the-art 300kVA MV EMI testbed.

42 ENGINEERING↗

Modeling and analyzing parasitic parameters in high frequency converters

This research focuses on electromagnetic interference (EMI) / electromagnetic compatibility (EMC) design and analysis in power electronics systems. To limit the EMI under the standards, different methods and strategies are investigated. Parasitic parameters of high frequency (HF) transformer are analyzed using a novel analytical method, finite element method (FEM), and experimental measurements for different structures and windings arrangements. Also, the magnetic field, electric field, electric displacement, and electric potential distribution are simulated and analyzed. Moreover, a high voltage system is considered and analyzed to improve the EMC. The EMI propagation paths are analyzed. The EMI noise level of the system is obtained and compared to the IEC61800-3 standard. To improve the EMC, the parasitic parameters of the transformer, as the main path of EMI circulation, are analyzed and optimized to block the propagation. Furthermore, the geometry structure of the HF transformer is optimized to lower the parasitics in the system. Three pareto-optimal techniques are investigated for the optimization. The models and results are verified by 3D-FEM and experimental results for several given scenarios. Furthermore, the EMC modeling and conducted EMI analysis are developed for a system including an AC-DC-DC power supply (rectifier and dual active bridge (DAB) converter). Moreover, the common mode (CM) EMI noise propagation through the system is discussed and the noise sources and effect of components on the noise are analyzed. Additionally, the CM impedance of different parts of the system and the noise levels are discussed. Finally, EMI attenuation techniques were applied to the system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Antenna Measurements: Test & Analysis of the Radiated Emissions from the NASA/Orion Spacecraft - Parachute System Simulator

For future NASA Manned Space Exploration of the Moon and Mars, a blunt body capsule, called the Orion Crew Exploration Vehicle (CEV), composed of a Crew Module (CM) and a Service Module (SM), with a parachute decent assembly is planned for reentry back to Earth. A Capsule Parachute Assembly System (CPAS) is being developed for preliminary parachute drop tests at the Yuma Proving Ground (YPG) to simulate high-speed reentry to Earth from beyond Low-Earth-Orbit (LEO) and to provide measurements of landing parameters and parachute loads. The avionics systems on CPAS also provide mission critical firing events to deploy, reef, and release the parachutes in three stages (extraction, drogues, mains) using mortars and pressure cartridge assemblies. In addition, a Mid-Air Delivery System (MDS) is used to separate the capsule from the sled that is used to eject the capsule from the back of the drop plane. Also, high-speed and high-definition cameras in a Video Camera System (VCS) are used to film the drop plane extraction and parachute landing events. To verify Electromagnetic Compatibility (EMC) of the CPAS system from unintentional radiation, Electromagnetic Interference (EMI) measurements are being made inside a semi-anechoic chamber at NASA/JSC at 1m from the electronic components of the CPAS system. In addition, EMI measurements of the integrated CPAS system are being made inside a hanger at YPG. These near-field B-Dot probe measurements on the surface of a parachute simulator (DART) are being extrapolated outward to the 1m standard distance for comparison to the MIL-STD radiated emissions limit.

Norgard, John D.↗

Application of Fault Containment Principles to EMC

A hardware fault in aerospace is an undesired response to a designed engineering function in hardware. Therefore, in aerospace systems fault management is of prime importance. An important aspect of hardware faults is fault propagation. Fault propagation (also known as failure propagation) is a condition where a fault will not only produce an undesired hardware response, at its location of origin, but the fault will also propagate to other interfaced hardware and cause additional faults, or failures. Fault containment is necessary to avoid fault propagation. A fault containment region is an electronic or electromechanical region within a given hardware assembly where a fault in that region will not physically propagate to other regions of the assembly, and beyond. Rather, the fault will cause a functional failure of the hardware, where the fault occurred, without causing any additional propagated failures. Electromagnetic Compatibility (EMC) is a desired state in aerospace hardware. Electromagnetic Interference (EMI) in aerospace hardware is a fault condition of EMC. Like other faults EMI can also propagate to other aerospace hardware unless it occurs inside an EMI containment region. The paper addresses the concepts of fault containment region and introduces the concept of EMI containment region with examples of both.

Perez, Reinaldo↗

Fault Propagation, EMI Propagation, and Fault Containment in Aerospace Systems

The occurrence of faults in aerospace system hardware and software have consequences ranging from minor effects to catastrophic effects, and such faults can directly affect the safety of hardware and personnel. There are many origins to fault conditions, and the hardware that is capable of still meeting its performance requirements after experiencing itself a fault is said to be fault tolerant. A fault tolerant hardware is capable of detecting, isolating, and recovering from a fault condition; and this is a subfield of control engineering. An aerospace system that has been shown to have electromagnetic compatibility (EMC) in all its subsystems and systems cannot induced faults caused by electromagnetic interference (EMI). It can be proposed that the presence of EMI (or lack of EMC) is analogous to a potential fault initiator and the effects can likewise range from minor to severe. This paper starts by addressing the consequences of hardware failure in aerospace systems from a fault perspective, because the design of fault tolerant system is a major endeavor in aerospace. To arrive to this goal the paper starts with the concepts of fault, fault propagation, and a new concept called fault containment region. The paper then proceeds to provide two very recent examples in the aircraft industry of fault propagation with catastrophic effects. The paper proceeds to introduce the concept of EMI fault containment and a brief introduction to another new concept called the EMI containment region. The paper proceeds with an example of EMI fault containment region. The paper ends with a lesson learned conclusions.

Perez, Reinaldo↗

Criteria for Determining the Safety of Wireless Technologies at Nuclear Power Plants

This report provides an initial discussion of the potential impact to safety-related/important-to-safety (SR/ITS) systems by the possible expanded use of wireless technologies. One aspect of this discussion is focused on a review of Regulatory Guide (RG) 1.180 Rev. 2 to determine whether any revisions are necessary to reflect the current state of practice in evaluating and protecting instrumentation and control (I&C) systems and components from electromagnetic interference (EMI) or radiofrequency interference (RFI) on safety and nonsafety I&C. Electromagnetic compatibility (EMC) is the ability of a device or system to function satisfactorily in its electromagnetic (EM) environment, which is achieved by limiting the unintentional generation, propagation, and reception of EM energy that may cause unwanted effects such as EMI. The goal of EMC is to ensure the correct operation of different types of equipment in a common EM environment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of Numerical Codes for Modeling Electromagnetic Behavior at High Frequencies Near Large Objects

A study into the problem of determining electromagnetic solutions at high frequencies for problems involving complex geometries, large sizes and multiple sources (e.g. antennas) has been initiated. Typical applications include the behavior of antennas (and radiators) installed on complex conducting structures (e.g. ships, aircrafts, etc..) with strong interactions between antennas, the radiation patterns, and electromagnetic signals is of great interest for electromagnetic compatibility control. This includes the overall performance evaluation and control of all on-board radiating systems, electromagnetic interference, and personnel radiation hazards. Electromagnetic computational capability exists at NASA LaRC, and many of the codes developed are based on the Moment Method (MM). However, the MM is computationally intensive, and this places a limit on the size of objects and structures that can be modeled. Here, two approaches are proposed: (i) a current-based hybrid scheme that combines the MM with Physical optics, and (ii) an Alternating Direction Implicit-Finite Difference Time Domain (ADI-FDTD) method. The essence of a hybrid technique is to split the overall scattering surface(s) into two regions: (a) a MM zone (MMZ) which can be used over any part of the given geometry, but is most essential over irregular and "non-smooth" geometries, and (b) a PO sub-region (POSR). Currents induced on the scattering and reflecting surfaces can then be computed in two ways depending on whether the region belonged to the MMZ or was part of the POSR. For the MMZ, the current calculations proceed in terms of basis functions with undetermined coefficients (as in the usual MM method), and the answer obtained by solving a system of linear equations. Over the POSR, conduction is obtained as a superposition of two contributions: (i) currents due to the incident magnetic field, and (ii) currents produced by the mutual induction from conduction within the MMZ. This effectively leads to a reduction in the size of linear equations from N to N - Npo with N being the total number of segments for the entire surface and Npo the number of segments over the POSR. The scheme would be appropriate for relatively large, flat surfaces, and at high frequencies. The ADI-FDTD scheme provides for both transient and steady state analyses. The restrictive Courant-Friedrich-Levy (CFL) condition on the time-step is removed, and so large time steps can be chosen even though the spatial grids are small. This report includes the problem definition, a detailed discussion of both the numerical techniques, and numerical implementations for simple surface geometries. Numerical solutions have been derived for a few simple situations.

Joshi, R. P.↗

The EMC of satellite power systems and DoD C-E systems

The solar power satellite (SPS) technical parameters that are needed to accurately assess the electromagnetic compatibility (EMC) between SPS systems and DoD communications-electronics (C-E) systems are identified and assessed. The type of electromagnetic interactions that could degrade the performance of C-E systems are described and the major military installations in the southwestern portions of CONUS where specially sensitive C-E systems are being used for combat training and evaluation are identified. Classes of C-E systems that are generally in the vicinity of these military installations are considered. The Technical parameters that govern the degree of compatibility of the SPS with these C-E systems, and some technical requirements that are necessary to ensure short-term and long-term EMC are identified.

Atkinson, J. H.↗