Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EERE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

68 records · Page 4

A Report on Actions for Medium- and Heavy-Duty Vehicle Energy and Emissions Innovation

A Report on Actions for Medium- and Heavy-Duty Vehicle Energy and Emissions Innovation (the MHDV Plan) summarizes strategies and actions to substantially reduce emissions in the U.S. commercial on-road medium- and heavy-duty vehicle (MHDV) sector. This includes all on-road vehicles over 8,500 pounds used for commercial purposes. The intended audience of this report are industry and stakeholders who will take on the suite of actions needed to drive forward MHDV emissions reduction and decarbonization in a sustainable and economic way.

33 ADVANCED PROPULSION SYSTEMS↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗

An Extension Industrial Assessment Center in Eastern Great Lakes Region

The extension IAC at CWRU is funded for 3 years to conduct 10 assessments of small and medium-sized manufacturing facilities each year in Eastern Great Lakes region. Total 30 assessments was proposed in the SOPO but due to the Covid-19 pandemic, the IAC program was suspended for 1.5 years. A total of 20 assessments was contracted to the extension IAC at CWRU which have been successfully accomplished. In the proposal, we proposed to train 18 students in the extension IAC program, and actually we selected and trained 19 students even though the IAC project was suspended during half of its project period.

42 ENGINEERING↗

Spring 2025 Solar Industry Update [Slides]

Each quarter, the National Renewable Energy Laboratory conducts the Quarterly Solar Industry Update, a presentation of technical trends within the solar industry. Each presentation focuses on global and U.S. supply and demand, module and system price, investment trends and business models, and updates on U.S. government programs supporting the solar industry.

14 SOLAR ENERGY↗

Industrial Electrification Technologies Booklet

Electrification refers to transitioning from fuel-powered systems to electrically-powered alternatives. In an industrial context, this primarily refers to the electrification of process heat, but there are also widespread opportunities to electrify space heating and cooling as well as onsite transportation (e.g., forklifts). Electrification does not refer to one particular technology, but a wide range of technologies that use different methods to transfer electrical energy into a usable form – usually heat.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Industrial Electrification Assessment Framework

Electrification refers to the process of transitioning from fuel-powered systems to electric-powered systems, or electrotechnologies. This document first provides an overview of industrial electrification, including possible advantages and common applications. Next, it provides a comprehensive, step-by-step framework for assessing the potential for electrification at an individual industrial facility. The steps in this framework include inventorying current fuel-powered systems, evaluating a manufacturing facility’s electrification readiness, and identifying, evaluating, and prioritizing strategies and technologies. This document also contains information about project implementation, and the appendices provide tools and resources to support organizations pursuing electrification.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Vehicle Technologies Program: Energy Storage R&D (2008 Annual Progress Report)

One of the primary objectives of the Energy Storage effort is the development of durable and affordable advanced batteries (and ultracapacitors) for use in a full range of vehicle applications, from start/stop to full-power HEVs, EVs, and PHEVs. The battery technology development activity spans three areas: system development of full battery systems; benchmark testing of emerging technologies in order to remain abreast of the latest industry developments; and Small Business Innovative Research (SBIR) to fund early-stage R&D for small businesses/entrepreneurs.

25 ENERGY STORAGE↗

Processing Municipal Solid Waste for Conversion to Jet Fuel (Final Technical Report)

This final report describes the successful demonstration of AI‑assisted waste sorting and a novel pressurized solids feed system to enable conversion of non‑recyclable municipal solid waste to jet fuel under DOE Award DE‑EE0009265. Results include improved feedstock purity and variability reduction, lab‑scale testing, and technoeconomic and life‑cycle assessments.

09 BIOMASS FUELS↗

Updating the Building Science Advisor (BSA): A Tool to Assist in the Design of Durable Building Envelopes

Predicting the moisture durability of building envelope components remains challenging due to multiple influencing factors, including material selection, assembly positioning, local climate conditions, air tightness, interior environment, and construction quality. Building codes increasingly emphasize energy efficiency through enhanced insulation and tighter envelopes but offer limited guidance on moisture durability considerations. Consequently, builders face uncertainty, particularly as new materials and assemblies enter the market.The Building Science Advisor (BSA) is a free, web-based expert system developed to address these challenges by providing actionable insights into the moisture durability and energy efficiency of both new and retrofit wall designs. Recently updated, we are now providing version 3.0 of the tool. BSA features significant user interface improvements, enhancing navigation and user interaction through a refreshed, intuitive design. Additionally, the tool incorporates a newly developed database containing pre-simulated wall assembly cases, significantly reducing response times and improving the accuracy of moisture durability assessments. Furthermore, the updated BSA includes moisture content as a performance criterion, providing users with a more comprehensive understanding of moisture-related durability risks. These enhancements enable rapid, reliable assessments tailored to specific climate zones and local building practices. BSA continues to offer targeted guidance on wall retrofit scenarios and delivers access to an expanded library of location-specific building science resources.This paper describes these key updates, highlighting the enhanced features, expanded capabilities, and overall improvements to user experience and educational content. The paper includes a demonstration that illustrates how the revised BSA effectively supports practitioners in designing durable, energy-efficient building envelope assemblies.

Salonvaara, Mikael [ORNL] (ORCID:0000000318991554)↗

Modeled Electricity Demand Profiles for Federal, State, and Municipal Electric Vehicle Fleets in the United States

Federal, state, and municipal electric vehicle fleet hourly load datasets at the Uber H3 hex, county, and city resolutions, as described in Singer et al. (2025). Please cite as: Singer, Mark, Cabell Hodge, Kara Podkaminer, and Brennan Borlaug. 2025. Hourly Load Profile Dataset for Federal, State, and Municipal Electric Vehicle Fleets in the United States. Golden, CO: National Renewable Energy Laboratory. NREL/TP-5400-92142. https://www.nlr.gov/docs/fy25osti/92142.pdf

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeled Electricity Demand Profiles for Electric Airport Ground Support Equipment in the United States

Electric airport ground support equipment (eGSE) hourly annual (8760) load datasets for the top 50 U.S. airports (by enplanements), as described in Liu et al. (2025). Please cite as: Liu, Bo, Kevin Robby, Jayaraj Rane, Adway Das, Kara Podkaminer, and Brennan Borlaug. 2025. Hourly Load Profile Dataset for Electric Airport Ground Support Equipment in the United States. Golden, CO: National Renewable Energy Laboratory. NREL/TP-5400-92139. https://www.nlr.gov/docs/fy25osti/92139.pdf

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeled Electricity Demand Profiles for Electric Port Cargo Handling Equipment in the United States

Electric port cargo handling equipment (eCHE) hourly load datasets for the top 25 U.S. cargo airports (by tonnage), as described in Polemis et al. (2025). Please cite as: Polemis, Katerina, Andrew Kotz, Kara Podkaminer, and Brennan Borlaug. 2025. Hourly Load Profile Dataset for Electric Port Cargo Handling Equipment in the United States. Golden, CO: National Renewable Energy Laboratory. NREL/TP-5400-92141. https://www.nlr.gov/docs/fy25osti/92141.pdf

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeled Electricity Demand Profiles for Electric Transit Bus Depots in the United States

Hourly one-week electricity demand profiles for electric transit bus depots in the United States, as described in Liu et al. (2025). Please cite as: Liu, Bo, Tim Jonas, Kara Podkaminer, and Brennan Borlaug. 2025. Hourly Load Profile Dataset for Electric Transit Bus Depots in the United States. Golden, CO: National Renewable Energy Laboratory. NREL/TP-5400-92140. https://www.nlr.gov/docs/fy25osti/92140.pdf

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hot Springs and Geysers: Exploring Historical and Modern Impacts of Geothermal Energy Production on Associated Natural Surface Systems and Standardizing Management Practices

Surface thermal features, most notably hot springs and geysers are increasingly being recognized for their importance to ecosystems, indigenous cultures, and in some cases agriculture, recreation, and tourism. Geothermal project development poses a potential risk to these natural features but current regulatory requirements for assessing and managing these risks during exploration, permitting and monitoring are somewhat inconsistent and unpredictable across different geothermal fields. This has resulted in uncertainty and increases in exploration risk for geothermal energy developers that have led to costly project delays, cancellations, or hesitation to commit. Varying regulatory requirements may also influence public perception, fostering confusion, distrust and ultimately opposition to geothermal projects, further contributing to project delays or cancellations. At a time when there is an increasing urgency for reliable baseload clean energy, geothermal is a net-zero, renewable solution that additionally provides access to more equitable and environmentally just clean power. Continued integration of geothermal energy into the national energy roadmap can be facilitated through consistent and predictable permitting, providing regulators the framework they need, developers a clear path forward, and transparency that the public deserves. This project, currently in its beginning phases, seeks to address this important issue by providing a technical basis from which to build a preliminary protocol for assessing and managing potential impacts from new or existing geothermal energy projects to surface thermal features and their associated ecosystems. Development of this preliminary protocol will be informed by (1) a literature review of well-documented case studies in the western U.S. and New Zealand to understand the range of conditions that exemplify geothermal-surface thermal systems; (2) development of generic illustrative conceptual-numerical models to quantify, understand, and predict the first-order controls (e.g., pressure and permeability) on surface flows; and (3) additional independent and scientifically rigorous evaluations of geothermal-surface thermal system case studies from the Basin and Range Province that incorporate publicly available data as well as data provided by industry through data-sharing agreements. Learning from the successes of the process used to develop the Induced Seismicity Management Protocol (ISMP), we ultimately aim to use these initial efforts as a springboard for establishing a surface thermal feature management working group that will work collaboratively to finalize the protocol as well as co-create recommended best practices for implementation. We envision that the working group will primarily be composed of representatives from regulatory entities, government agencies, Tribes, academia, national laboratories, and industry, and will include early and regular engagement with community organizations and environmental groups. This will help ensure broad acceptance and implementation of the protocol, which will facilitate a more consistent, predictable, and standardized regulatory process, and help to ensure that geothermal energy continues to provide a reliable source of clean energy, and a pathway to achieving greater energy equity in the U.S.

Best Practices↗