The Influence of Rolling Schedule on the Dynamic Properties of Accumulatively Roll Bonded Nano-layered Cu-Nb
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
The ongoing changes in the generation resource mix, driven by the rapid adoption of inverter-based resources (IBR) as well as the early retirement of synchronous generators, are bringing new challenges to the planning and operation of bulk electric power systems. Consequently, there is an increasing need to understand, design, and quantify the reliability service provision from IBRs by performing integrated scheduling and dynamic simulations. However, test systems that have consistent scheduling and dynamic models rarely exist largely because of the decoupled nature of the two simulations on a synchronous generator-dominated system. This paper develops the dynamic model of a reduced Western Electricity Coordinating Council (WECC) system. In conjunction with the existing scheduling model, it is suitable for integrating scheduling and dynamic simulations. The reduced 240-bus WECC model reflects the generation resource mix of the Western Interconnection as of 2018. Moreover, the developed dynamic model is validated against field frequency events measured by FNET/GridEye and preserves the dominant inter-area oscillation mode in WECC.
This paper presents a Dynamic Internal Predictive Power Scheduling (DIPPS) approach for optimizing power management in microgrids, particularly focusing on external power exchanges among diverse prosumers. DIPPS utilizes a dynamic objective function with a time-varying binary parameter to control the timing of power transfers to the external grid, facilitated by efficient usage of energy storage for surplus renewable power. The microgrid power scheduling problem is modeled as a mixed-integer nonlinear programming (MINLP-PS) and subsequently transformed into a mixed-integer linear programming (MILPPS) optimization through McCormick's relaxation to reduce computational complexity. A predictive window window with 6 data points is solved at an average of 0.92s, a 97.6% improvement over the 38.27s required for the MINLP-PS formulation, implying the numerical feasibility of the DIPPS approach for real-time implementation. Finally, the approach is validated against a static objective using real-world load data across three case studies with different time-varying parameters, demonstrating the ability of DIPPS to optimize power exchanges and efficiently utilize distributed resources while shifting the external power transfers to specified time durations.
Not provided.
The Dynamic Planner (DP) has been designed, implemented, and integrated into the Center-TRACON Automation System (CTAS) to assist Traffic Management Coordinators (TMCs), in real time, with the task of planning and scheduling arrival traffic approximately 35 to 200 nautical miles from the destination airport. The TMC may input to the DP a series of current and future scheduling constraints that reflect the operation and environmental conditions of the airspace. Under these constraints, the DP uses flight plans, track updates, and Estimated Time of Arrival (ETA) predictions to calculate optimal runway assignments and arrival schedules that help ensure an orderly, efficient, and conflict-free flow of traffic into the terminal area. These runway assignments and schedules can be shown directly to controllers or they can be used by other CTAS tools to generate advisories to the controllers. Additionally, the TMC and controllers may override the decisions made by the DP for tactical considerations. The DP will adapt to computations to accommodate these manual inputs.
Methods for dynamically executing computer code across multiple disparate processing unit architectures are disclosed. During execution of a first portion of computer code on a first processing unit, it is determined that a first dynamic hardware behavior of a plurality of dynamic hardware behaviors will occur at a subsequent point in time, based on a second dynamic hardware behavior that is occurring. The methods include determining to execute code corresponding to the first dynamic hardware behavior on a second processing unit, rather than the first processing unit, and scheduling computer program code corresponding to the first dynamic hardware behavior to execute on the second processing unit rather than the first processing unit. Upon completion of execution of the computer code corresponding to the first dynamic hardware behavior, a remaining portion of the computer code is scheduled to execute on the first processing unit.
A program that defines and assesses the dynamic risk of software vulnerabilities and considers the dynamic risks into patch scheduling to reduce security risks posed by vulnerabilities and provide formal guidance to security operations at various organizations.
An increasing penetration level of inverter-based renewable energy resources changes the inertia of power systems, posing challenges for maintaining the desired system frequency stability. An accurate frequency nadir estimation is crucial for power system operators to prepare preventive actions against large frequency excursions. In this paper, five machine learning methods - linear regression, gradient boosting, support vector regression, an artificial neural network, and XGBoost - are applied to two different datasets, i.e., 1) the unit generation dataset and 2) the system total inertia and headroom dataset, for the prediction of the frequency nadir. The training and testing datasets are generated through extensive generation scheduling simulations using Multi-timescale Integrated Dynamic and Scheduling (MI-DAS) toolbox on the Western Electricity Coordinating Council 240-bus system with high renewable penetration levels. Numerical results show that all five machine learning methods perform well in predicting the nadir frequency of the system. Among them, the gradient boosting and the XGBoost are clear winners yielding the best prediction accuracy in terms of four evaluation metrics.
An increasing penetration level of inverter-based renewable energy resources changes the inertia of power systems, posing challenges for maintaining the desired system frequency stability. An accurate frequency nadir estimation is crucial for power system operators to prepare preventive actions against large frequency excursions. In this paper, five machine learning methods - linear regression, gradient boosting, support vector regression, an artificial neural network, and XGBoost - are applied to two different sets of preprocess data for the prediction of the frequency nadir in the Western Electricity Coordinating Council 240-bus system with high renewable penetration levels. The training and testing data sets are collected by extensive generation scheduling simulations on the Multi-timescale Integrated Dynamic and Scheduling (MIDAS) toolbox. Numerical results show that all five machine learning methods can achieve high performance accuracy for power system nadir frequency estimation. Among them, the gradient boosting and the XGBoost are clear winners by providing the best prediction accuracy.
Low Earth Orbit (LEO) satellites play a crucial role in enhancing global connectivity, serving a complementary solution to existing terrestrial systems. In wireless networks, scheduling is a vital process that allocates time-frequency resources to users for interference management. However, LEO satellite networks face significant challenges in scheduling their links towards ground users due to the satellites’ mobility and overlapping coverage. This paper addresses the dynamic link scheduling problem in LEO satellite networks by considering spatio-temporal correlations introduced by the satellites’ movements. The first step in the proposed solution involves modeling the network over Riemannian manifolds, thanks to their representation as symmetric positive definite matrices. We introduce two machine learning (ML)-based link scheduling techniques that model the dynamic evolution of satellite positions and link conditions over time and space. To accurately predict satellite link states, we present a recurrent neural network (RNN) over Riemannian manifolds, which captures spatio-temporal characteristics over time. Furthermore, we introduce a separate model, the convolutional neural network (CNN) over Riemannian manifolds, which captures geometric relationships between satellites and users by extracting spatial features from the network topology across all links. Simulation results demonstrate that both RNN and CNN over Riemannian manifolds deliver comparable performance to the fractional programming-based link scheduling (FPLinQ) benchmark. Remarkably, unlike other ML-based models that require extensive training data, both models only need 30 training samples to achieve over 99% of the sum rate while maintaining similar computational complexity relative to the benchmark.
Planning complex missions requires a number of programs to be executed in concert. The Application Navigation System (ANS), developed in the NAS Division, can execute many interdependent programs in a distributed environment. We show that the ANS simplifies user effort and reduces time in optimization of the trajectory of a martian airplane. We use a software package, Cart3D, to evaluate trajectories and a shortest path algorithm to determine the optimal trajectory. ANS employs the GridScape to represent the dynamic state of the available computer resources. Then, ANS uses a scheduler to dynamically assign ready task to machine resources and the GridScape for tracking available resources and forecasting completion time of running tasks. We demonstrate system capability to schedule and run the trajectory optimization application with efficiency exceeding 60% on 64 processors.
The Reliable Optical Bus (ROBUS) is the core communication system of the Scalable Processor-Independent Design for Enhanced Reliability (SPIDER), a general-purpose fault-tolerant integrated modular architecture currently under development at NASA Langley Research Center. The ROBUS is a time-division multiple access (TDMA) broadcast communication system with medium access control by means of time-indexed communication schedule. ROBUS-2 is a developmental version of the ROBUS providing guaranteed fault-tolerant services to the attached processing elements (PEs), in the presence of a bounded number of faults. These services include message broadcast (Byzantine Agreement), dynamic communication schedule update, clock synchronization, and distributed diagnosis (group membership). The ROBUS also features fault-tolerant startup and restart capabilities. ROBUS-2 is tolerant to internal as well as PE faults, and incorporates a dynamic self-reconfiguration capability driven by the internal diagnostic system. This version of the ROBUS is intended for laboratory experimentation and demonstrations of the capability to reintegrate failed nodes, dynamically update the communication schedule, and tolerate and recover from correlated transient faults.
The emphasis currently placed on enterprise-wide decision making and optimization has led to an increased need for methods of integrating nonlinear process dynamics and control information in scheduling calculations. The inevitable high dimensionality and nonlinearity of first-principles dynamic process models makes incorporating them in scheduling calculations challenging. In this work, we describe a general framework for deriving data-driven surrogate models of the closed-loop process dynamics. Focusing on Hammerstein–Wiener and finite step response (FSR) model forms, we show that these models can be (exactly) linearized and embedded in production scheduling calculations. The resulting scheduling problems are mixed-integer linear programs with a special structure, which we exploit in a novel and efficient solution strategy. A polymerization reactor case study is utilized to demonstrate the merits of this method. Finally, our framework compares favorably to existing approaches that embed dynamics in scheduling calculations, showing considerable reductions in computational effort.
This case study presents a characterization and optimization of an application code for extracting parton distribution functions from high energy electron-proton scattering data. Profiling this application code reveals that the phase-space density computation accounts for 93% of the overall execution time for a single iteration on a single core. When executing multiple iterations in parallel on a multicore system, the application spends 78% of its overall execution time idling due to load imbalance. We address these issues by first transforming the application code from Python to C++ and then tackling the application load imbalance via a hybrid scheduling strategy that combines dynamic and static scheduling. These techniques result in a 62% reduction in CPU idle time and a 2.46x speedup in overall execution time per node. In addition, the typically enabled power-management mechanisms in supercomputers (e.g., AMD Turbo Core, Intel Turbo Boost, and RAPL) can significantly impact intra-node scalability when more than 50% of the CPU cores are used. This finding underscores the importance of understanding system interactions with power management, as they can adversely impact application performance, and highlights the necessity of intra-node scaling tests to identify performance degradation that inter-node scaling tests might otherwise overlook.
Parallel processing of real-time dynamic systems simulation on a multiprocessor system named OSCAR is presented. In the simulation of dynamic systems, generally, the same calculation are repeated every time step. However, we cannot apply to Do-all or the Do-across techniques for parallel processing of the simulation since there exist data dependencies from the end of an iteration to the beginning of the next iteration and furthermore data-input and data-output are required every sampling time period. Therefore, parallelism inside the calculation required for a single time step, or a large basic block which consists of arithmetic assignment statements, must be used. In the proposed method, near fine grain tasks, each of which consists of one or more floating point operations, are generated to extract the parallelism from the calculation and assigned to processors by using optimal static scheduling at compile time in order to reduce large run time overhead caused by the use of near fine grain tasks. The practicality of the scheme is demonstrated on OSCAR (Optimally SCheduled Advanced multiprocessoR) which has been developed to extract advantageous features of static scheduling algorithms to the maximum extent.
The HabEx and LUVOIR mission concepts aim to directly image and spectrally characterize potentially habitable exoplanets. We use EXOSIMS to simulate design reference missions with observation scheduling to determine yield of exoplanets detected, spectrally characterized, and orbits determined. EXOSIMS performs dynamically responsive scheduling with realistic mission observing constraints on Monte Carlo universes of synthetic planets around known nearby stars. We use identical astrophysical inputs and the individual observing scenarios of each concept to evaluate a common comparison of the detection and spectral characterization yields of HabEx and LUVOIR. HabEx is evaluated for the 4m hybrid starshade and coronagraph architecture, the 4m coronagraph only architecture, and the 4 m starshade only architecture. LUVOIR is evaluated for the 8 m architecture of their final report. Yield analysis shows that both concepts can directly image and spectrally characterize earth-like planets in the habitable zone and that each concept has complementary strengths.
Deregulation and the increase of renewable electricity generation from wind and solar photovoltaics have transformed the U.S. electricity market. Economic and environmental benefits notwithstanding, the presence of renewables has increased variability and uncertainty on the supply side of the grid. Managing demand, rather than generation – a strategy referred to as “demand response (DR)” – is an attractive approach for mitigating this imbalance. DR efforts aim to reduce electricity usage during peak demand times, lessening stress on the grid. Industrial users are particularly attractive entities for DR participation since they present large, localized loads that can provide significant relief on grid demand and –unlike other large loads, such as buildings – are minimally dependent on human needs and preferences. In this project, we accomplished three main objectives. (1) We developed data-driven low-order DR scheduling-relevant dynamic models of chemical processes. Concurrently, we studied the formulation and solution of the associated optimal DR production scheduling problems. (a) A prototype air separation unit (ASU) model was used to generate simulated operating data for initial modeling efforts, which enabled the later use of industrial data for data-driven modeling. (b) We utilized Hammerstein-Wiener (HW) and Finite Step Response (FSR) models to represent nonlinear plant dynamics. (c) The HW models were linearized using exact linearization so they could potentially be embedded in power system models, which are formulated as mixed integer linear programs (MILPs). (d) We solved DR optimization problems under uncertainty and found that even naïve predictions of electricity price and product demand led to significant cost savings benefits. (2) Our DR scheduling optimization problem formulations are amenable to real-time solution. (a) We utilized Lagrangian Relaxation (LR) to efficiently solve the optimization problem by decoupling subproblems linked by complicating constraints. (b) We have achieved computation times for the 3-day DR scheduling problem of an ASU as low as 1.88 minutes. (3) Our representations of the DR behavior of chemical process as grid-level batteries were embedded in power system models. (a) For a small-scale grid, we found that incorporating the dynamics of the chemical plant in the optimal power flow calculations resulted in better resource management leading to up to 15% and 46% cost reduction for the grid and chemical plant operations, respectively, during periods of power line congestion. We have published several works dedicated to modeling and solving DR optimization problems from the user side. These were published in top peer-reviewed journals and are summarized in this report. The most recent work (and papers in preparation) considers DR scheduling from the grid side. Future efforts will consider networked plants (e.g., air separation units operating on a common pipeline) for DR participation, which is expected to amplify the capabilities of industrial DR participants to perform load-shifting. Our consideration of uncertainty in DR has inspired future directions in this area as well: we plan to develop multistage methods to fully account for the effects of uncertainty in DR scheduling.
This report documents the ASC/ATDM Kokkos deliverable "Production Portable Dy- namic Task DAG Capability." This capability enables applications to create and execute a dynamic task DAG ; a collection of heterogeneous computational tasks with a directed acyclic graph (DAG) of "execute after" dependencies where tasks and their dependencies are dynamically created and destroyed as tasks execute. The Kokkos task scheduler executes the dynamic task DAG on the target execution resource; e.g. a multicore CPU, a manycore CPU such as Intel's Knights Landing (KNL), or an NVIDIA GPU. Several major technical challenges had to be addressed during development of Kokkos' Task DAG capability: (1) portability to a GPU with it's simplified hardware and micro- runtime, (2) thread-scalable memory allocation and deallocation from a bounded pool of memory, (3) thread-scalable scheduler for dynamic task DAG, (4) usability by applications.