Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Distribution network planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Storm DEPART(Damage Estimate Prediction And Recovery Tool)

Damage prediction, materials needed, and resource allocation modeling capability in order to support pre-incident planning and preparation by predicting damage to the power generation capacity, transmission grids, distribution networks, and communications assets. The capabilities will be developed by multiple factors to include wind bands, storm surge, and flooding forecasts to participant’s assets which will result in a report of predicted damages. Additional factors to include available participants infrastructure data to include class, age, construction, location, wind rating, and additional information not in the public domain. Based on predicted damages, the output will be a bill of materials (BOM) to support short-term recovery operations. The extensiveness and level of detail for this BOM will depend on the replacement configuration specifications provided for each individual participant asset. Any limiting factors for the model will be applied related supply chain and resource constraints.

Klett, Mary↗

Evolutionary Telemetry and Command Processor (TCP) architecture

A low cost, modular, high performance, and compact Telemetry and Command Processor (TCP) is being built as the foundation of command and data handling subsystems for the next generation of satellites. The TCP product line will support command and telemetry requirements for small to large spacecraft and from low to high rate data transmission. It is compatible with the latest TDRSS, STDN and SGLS transponders and provides CCSDS protocol communications in addition to standard TDM formats. Its high performance computer provides computing resources for hosted flight software. Layered and modular software provides common services using standardized interfaces to applications thereby enhancing software re-use, transportability, and interoperability. The TCP architecture is based on existing standards, distributed networking, distributed and open system computing, and packet technology. The first TCP application is planned for the 94 SDIO SPAS 3 mission. The architecture enhances rapid tailoring of functions thereby reducing costs and schedules developed for individual spacecraft missions.

Schneider, John R.↗

How Distributed Energy Resources Can Support Resilience in Utility Distribution Networks

The goal of this webinar is to engage with electric utilities in the Midwest, particularly small public utilities, to understand the industry's needs for science tools to plan for winter resilience in the future, designing tools that will benefit electric power resilience in all communities. Michigan Tech leads this project with partners from multiple academic, government, and industry groups and asked NLR to present on DERs and laboratory tools and resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution System Congestion Management - A Survey of Reliable Integration for Aggregated Resources and Microgrids

Rising penetration of consumer-owned Distribution Grid Resources (DGRs), increasingly managed by third party aggregators and enrolled in grid services and wholesale market programs, can create localized congestion in distribution networks. Managing these constraints is challenging due to a persistent coordination and information gap: utilities are accountable for reliability and have network topology and state visibility, while aggregators control the DGR capability needed to relieve congestion. This survey synthesizes congestion management solutions for distribution systems with high DGR penetration, covering both market-based mechanisms (distribution level markets, locational pricing, flexibility auctions) and non-market-based solutions (network reconfiguration, direct DGR control, demand response, curtailment, etc.). The literature is organized across three decision horizons: long term planning, operational planning, and real-time operation. Special attention is devoted to emerging distribution system operator architectures and coordination frameworks spanning transmission system operators, aggregators, and microgrids. Drawing on recent case studies and implementations, we distill best practices, identify key technical and economic barriers, and outline research directions. The evidence points to a shift toward integrated congestion management that combines market signals with technical controls, enabled by improved monitoring, forecasting, and closed loop control capabilities.

Active Distribution Networks (ADN)↗

A Framework for Dimensioning VDL-2 Air-Ground Networks

This paper describes a framework developed at MITRE for dimensioning a Very High Frequency (VHF) Digital Link Mode 2 (VDL-2) Air-to-Ground network. This framework was developed to support the FAA's Data Communications (Data Comm) program by providing estimates of expected capacity required for the air-ground network services that will support Controller-Pilot-Data-Link Communications (CPDLC), as well as the spectrum needed to operate the system at required levels of performance. The Data Comm program is part of the FAA's NextGen initiative to implement advanced communication capabilities in the National Airspace System (NAS). The first component of the framework is the radio-frequency (RF) coverage design for the network ground stations. Then we proceed to describe the approach used to assess the aircraft geographical distribution and the data traffic demand expected in the network. The next step is the resource allocation utilizing optimization algorithms developed in MITRE's Spectrum ProspectorTM tool to propose frequency assignment solutions, and a NASA-developed VDL-2 tool to perform simulations and determine whether a proposed plan meets the desired performance requirements. The framework presented is capable of providing quantitative estimates of multiple variables related to the air-ground network, in order to satisfy established coverage, capacity and latency performance requirements. Outputs include: coverage provided at different altitudes; data capacity required in the network, aggregated or on a per ground station basis; spectrum (pool of frequencies) needed for the system to meet a target performance; optimized frequency plan for a given scenario; expected performance given spectrum available; and, estimates of throughput distributions for a given scenario. We conclude with a discussion aimed at providing insight into the tradeoffs and challenges identified with respect to radio resource management for VDL-2 air-ground networks.

Aviation↗

NASA's Contribution to Global Space Geodesy Networks

The NASA Space Geodesy program continues to be a major provider of space geodetic data for the international earth science community. NASA operates high performance Satellite Laser Ranging (SLR), Very Long Baseline Interferometry (VLBI) and Global Positioning System (GPS) ground receivers at well over 30 locations around the world and works in close cooperation with space geodetic observatories around the world. NASA has also always been at the forefront in the quest for technical improvement and innovation in the space geodesy technologies to make them even more productive, accurate and economical. This presentation will highlight the current status of NASA's networks; the plans for partnerships with international groups in the southern hemisphere to improve the geographic distribution of space geodesy sites and the status of the technological improvements in SLR and VLBI that will support the new scientific thrusts proposed by interdisciplinary earth scientists. In addition, the expanding role of the NASA Space geodesy data archive, the CDDIS will be described.

Bosworth, John M.↗

Designing and Implementing a Distributed System Architecture for the Mars Rover Mission Planning Software (Maestro)

Distributed systems allow scientists from around the world to plan missions concurrently, while being updated on the revisions of their colleagues in real time. However, permitting multiple clients to simultaneously modify a single data repository can quickly lead to data corruption or inconsistent states between users. Since our message broker, the Java Message Service, does not ensure that messages will be received in the order they were published, we must implement our own numbering scheme to guarantee that changes to mission plans are performed in the correct sequence. Furthermore, distributed architectures must ensure that as new users connect to the system, they synchronize with the database without missing any messages or falling into an inconsistent state. Robust systems must also guarantee that all clients will remain synchronized with the database even in the case of multiple client failure, which can occur at any time due to lost network connections or a user's own system instability. The final design for the distributed system behind the Mars rover mission planning software fulfills all of these requirements and upon completion will be deployed to MER at the end of 2005 as well as Phoenix (2007) and MSL (2009).

Goldgof, Gregory M.↗

Dynamic Validation of CNN-Based Surrogate Models for Inverter-Based Resources in Open-Source Solvers

Traditionally, distribution system planning has focused on steady-state analyses, with limited consideration of dynamic behavior. However, as large or medium-scale inverter-based resources (IBRs), particularly grid-following (GFL) inverters in commercial or industry buildings, become more prevalent, understanding their dynamic impact is essential for grid planning and operation. This article presents an innovative deep-learning (DL)-approach using convolutional neural networks technique to model the GFL inverters. Developed from real grid-tied commercial IBR transient data, these dynamic DL models overcome proprietary constraints by requiring minimal knowledge of internal converter physics while maintaining high accuracy and flexibility. To demonstrate their applicability, the models were incorporated into GridLAB-D, an open-source, three-phase distribution analysis tool. This integration enables dynamic simulations of large-scale distribution networks with high IBR penetration stability analysis. Rigorous testing and validation, aligned with industry standards, confirmed the reliability and efficiency of this approach, paving the way for enhanced planning and operational assessments of modern power systems.

Deep-learning↗

Toward a Virtual Solar Observatory: Starting Before the Petabytes Fall

NASA is currently engaged in the study phase of a modest effort to establish a Virtual Solar Observatory (VSO). The VSO would serve ground- and space-based solar physics data sets from a distributed network of archives through a small number of interfaces to the scientific community. The basis of this approach, as of all planned virtual observatories, is the translation of metadata from the various sources via source-specific dictionaries so the user will not have to distinguish among keyword usages. A single Web interface should give access to all the distributed data. We present the current status of the VSO, its initial scope, and its relation to the European EGSO effort.

Gurman, J. B.↗

Cascaded clocks measurement and simulation findings

This paper will examine aspects related to network synchronization distribution and the cascading of timing elements. Methods of timing distribution have become a much debated topic in standards forums and among network service providers (both domestically and internationally). Essentially these concerns focus on the need to migrate their existing network synchronization plans (and capabilities) to those required for the next generation of transport technologies (namely, the Synchronous Digital Hierarchy (SDH), Synchronous Optical Networks (SONET), and Asynchronous Transfer Mode (ATM). The particular choices for synchronization distribution network architectures are now being evaluated and are demonstrating that they can indeed have a profound effect on the overall service performance levels that will be delivered to the customer. The salient aspects of these concerns reduce to the following: (1) identifying that the devil is in the details of the timing element specifications and the distribution of timing information (i.e., small design choices can have a large performance impact); (2) developing a standardized method of performance verification that will yield unambiguous results; and (3) presentation of those results. Specifically, this will be done for two general cases: an ideal input, and a noisy input to a cascaded chain of slave clocks.

Chislow, Don↗

Gateway Autonomy for Enabling Deep Space Exploration

The Gateway spacecraft is an important stepping-stone to exploration of the solar system, integrating commercial and international partners into a tightly coupled system, enabling cislunar activities, and implementing key technologies for missions to Mars. Autonomy is a capability area necessary to handle long communication outages where intervention from Earth is impossible, to prepare to operate with long communication delays that will be common in interplanetary travel, and to make spaceflight more affordable and accessible by reducing sustaining operations costs. The Gateway Concept of Operations states that one of Gateway’s goals is to “focus on infrastructure and systems that will allow autonomous operations aboard the Gateway with robotics, automated systems, advanced communications, and distributed computing.” Gateway’s Vehicle Systems Manager (VSM) and associated Autonomous Spacecraft Management Architecture (ASMA) are key products towards delivering autonomous capability. The primary functions of the control architecture are Mission Management and Timeline Execution, Resource Management, Fault Management, and Vehicle Control and Operation (VCO). In each of these areas, there is an initial level of capability to be delivered at launch, with plans to continue development and grow to greater capability. The initial deployment of VSM will focus on maintaining vehicle safety by focusing on full fault management capabilities and deploying only enough resource and timeline planning functionality to support that. The final deployment of VSM will add significant planning and control optimization functionality to support nominal operations for up to 21 days without ground support, even accommodating fault and failure conditions. While the VSM is the vehicle-level representation of autonomous reasoning, distributed automation is essential to provide the right scope and abstraction of information to process. Module and system support of automation and simplicity of interfaces are two important design paradigms that Gateway is focusing on to garner a systems approach to autonomy. Distribution of reasoning can increase complexity, so Gateway is also taking a strict hierarchical approach to information flow and decision making. VSM is not the only capability necessary to achieve an autonomous spacecraft. Robotics support for maintenance of the spacecraft will be essential to provide continued vehicle functionality even when crew is not present. Technical and programmatic challenges exist when implementing autonomous robotics operations. These challenges include sufficient network flexibility to support data transfer to the rest of the vehicle to coordinate module-to-module robotic walk-offs and finding the proper interfaces to allow sufficient dexterity. Communication system upgrades planned for Gateway include Delay Tolerant Networking to best utilize the complex network of relays that will be part of mature cislunar operations. Distributed computing and management will provide failure tolerance, robustness, and growth of capabilities while still allowing significant reuse of heritage software on heritage systems as well as reuse of common applications across a spacecraft to minimize new development, but this requires adherence to key standards and interfaces. The Gateway program has demonstrated significant progress towards these capabilities and has identified challenges other spacecraft developers should be aware of from the start.

Molly Anderson↗

Gateway Autonomy for Enabling Deep Space Exploration

The Gateway spacecraft is an important stepping-stone to exploration of the solar system, integrating commercial and international partners into a tightly coupled system, enabling cislunar activities, and implementing key technologies for missions to Mars. Autonomy is a capability area necessary to handle long communication outages where intervention from Earth is impossible, to prepare to operate with long communication delays that will be common in interplanetary travel, and to make spaceflight more affordable and accessible by reducing sustaining operations costs. The Gateway Concept of Operations states that one of Gateway’s goals is to “focus on infrastructure and systems that will allow autonomous operations aboard the Gateway with robotics, automated systems, advanced communications, and distributed computing.” Gateway’s Vehicle Systems Manager (VSM) and associated Autonomous Spacecraft Management Architecture (ASMA) are key products towards delivering autonomous capability. The primary functions of the control architecture are Mission Management and Timeline Execution, Resource Management, Fault Management, and Vehicle Control and Operation (VCO). In each of these areas, there is an initial level of capability to be delivered at launch, with plans to continue development and grow to greater capability. The initial deployment of VSM will focus on maintaining vehicle safety by focusing on full fault management capabilities and deploying only enough resource and timeline planning functionality to support that. The final deployment of VSM will add significant planning and control optimization functionality to support nominal operations for up to 21 days without ground support, even accommodating fault and failure conditions. While the VSM is the vehicle-level representation of autonomous reasoning, distributed automation is essential to provide the right scope and abstraction of information to process. Module and system support of automation and simplicity of interfaces are two important design paradigms that Gateway is focusing on to garner a systems approach to autonomy. Distribution of reasoning can increase complexity, so Gateway is also taking a strict hierarchical approach to information flow and decision making. VSM is not the only capability necessary to achieve an autonomous spacecraft. Robotics support for maintenance of the spacecraft will be essential to provide continued vehicle functionality even when crew is not present. Technical and programmatic challenges exist when implementing autonomous robotics operations. These challenges include sufficient network flexibility to support data transfer to the rest of the vehicle to coordinate module-to-module robotic walk-offs and finding the proper interfaces to allow sufficient dexterity. Communication system upgrades planned for Gateway include Delay Tolerant Networking to best utilize the complex network of relays that will be part of mature cislunar operations. Distributed computing and management will provide failure tolerance, robustness, and growth of capabilities while still allowing significant reuse of heritage software on heritage systems as well as reuse of common applications across a spacecraft to minimize new development, but this requires adherence to key standards and interfaces. The Gateway program has demonstrated significant progress towards these capabilities and has identified challenges other spacecraft developers should be aware of from the start.

Molly Anderson↗

To What Extent Will Decarbonization Deepen the Conversation Between Industry and the Grid?

Decarbonization - the transition away from un-mitigated fossil fuel combustion throughout the economy - requires big changes from both power and process systems. On the power system side, those changes are expected to include large increases in variable generation, e.g., from wind and solar, which has near-zero marginal costs and at large shares can produce infrequent but consequential energy droughts. On the process systems side, industries are investigating their options for direct and indirect electrification, the latter exemplified by replacing fossil fuel inputs with zero-carbon, energy-carrying chemicals like hydrogen and ammonia produced via electrochemical processes. The economic features of these changes within the larger context of power and process systems suggest that their realization could be accompanied by a paradigm shift in how industrial facilities interact with the grid. For example, the dominant type of demand participation in power markets could change from today's focus on load reductions at peak times to a new focus on shifting electricity use, enabled in part by large-scale product storage, to take advantage of renewable energy that would otherwise be curtailed and to avoid consumption during high-price energy droughts. This talk will describe these and other possible design and operational approaches from grid and industrial economic perspectives, culminating in an enumeration of open problems that lie at the interface of today and tomorrow's power and process systems.

co-design↗

DIMPLES: Distributed Influence Maximization for Pandemic pLanning on Exascale Systems

We study exascale parallel algorithms for the selection of intervention or monitoring strategies in massive realistic socio-technical networks through scalable Influence Maximization (InfMax) algorithms. We employ novel techniques to enable efficient scaling on up to 8k nodes of OLCF Frontier, with 65k AMD GPUs and 458k AMD CPU cores. Current state-of-the-art InfMax tools are limited to networks with only a few million actors (vertices) and a few hundred million interactions (edges). By overcoming these limitations, we show that our approach is capable of processing a realistic social contact network of the United States with 285 million nodes and about 8 billion edges. This two orders-of-magnitude improvement over the previous state-of-the-art is obtained by leveraging algorithmic advancements for the InfMax problem and designing several problem-specific approaches to overlap communication with computation, improve GPU efficiency, and lower the application’s memory requirements. We evaluate strong scaling for computing 10k most influential seeds using up to 8k nodes of an exascale system, and weak scaling from 128 to 8k system nodes for seed sets ranging from 625 to 40k seeds. We achieve the fastest-known runtime of 25 minutes while performing 48 million diffusion simulations totaling 2.31 petabytes to identify 40k influential seeds using 8k nodes, and take 5.75 minutes to identify 10k seeds while using 4k nodes.

Minutoli, Marco [Pacific Northwest National Labora↗

Scaling Innovative Approaches Within U.S. Department of Energy's Weatherization Assistance Program

In this interactive workshop, attendees will hear from Grantees and Subgrantees of the U.S. Department of Energy's Weatherization Assistance Program (WAP), that have implemented innovative methods, materials and approaches in their weatherization program. Attendees will have the opportunity to exchange ideas and share their own stories and perspectives in breakout groups. Attendees will also learn how their state and agency may be able to work with the National Renewable Energy Lab and Oak Ridge National Lab on WAP-funded pilot projects to scale innovative methods throughout the WAP network.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Framework for optimization of long-term, multi-period investment planning of integrated urban energy systems

In order to achieve stringent greenhouse gas emission reductions, a transition of our entire energy system from fossil to renewable resources needs to be designed. Such an energy transition brings two main challenges: most renewables generate variable electric energy, yet most demand is currently not electric (carrier mismatch) and does not always manifest at the same time as supply (temporal mismatch). Integrating multiple energy infrastructures can address both challenges by using the synergy between different energy carriers; building on existing infrastructure, while allowing a robust and flexible integration of the new. This paper proposes an optimization framework for long-term, multi-period investment planning of urban energy systems in an integrated manner. We formulate it as a mixed-integer linear program, combining a capacitated facility location with a multi-dimensional, capacitated network design problem. It includes generation and network expansion planning as well as interconnections between networks and storage infrastructure for each energy system. It can incorporate pathway effects like techno-economic developments, policy measures, and weather variations. The intended use is to support urban decision makers with long-term investment planning, though it can be tailored to fit other geographical or temporal scales. We demonstrate the model using two cases based on an average city in The Netherlands, which wants to reduce its CO 2 -emissions with 95% by 2050. In the first case, we include explicit carbon-emission constraints to study the effects of the carrier mismatch. In the second case, we implement interannual weather variations to analyze the temporal mismatch. The results give valuable insights into the energy transition design strategy for urban decision makers. They also show the future potential, as well as the computational challenges of the optimization framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Unified Universal Control and Coordination of Inverter-Based Resources, and Validation for a PV + Battery Hybrid Plant

As renewable energy deployment grows, hybrid power plants (HPPs) combining photovoltaic (PV) and battery systems must evolve to offer both energy and grid stability services. These systems typically include a mix of grid-following (GFL) and grid-forming (GFM) inverters, presenting unique coordination and control challenges. This Department of Energy–funded project developed and validated a Unified Universal Control and Coordination (UUCC) framework for such PV + battery hybrid plants, enabling seamless and stable operation, including ultrafast black start, autonomous synchronization, and robust frequency and voltage regulation, under different grid conditions. The project significantly advanced the understanding of inverter-based resource (IBR) control by developing and validating three complementary system-level approaches for hybrid GFL/GFM operation: 1. A combined Virtual Resistance (VR)-based GFL and Virtual Oscillator Control (VOC)-based GFM method, where each inverter type is governed by a specialized control strategy. Together, these achieve stable, fast-response coordination, eliminating inrush current and enabling smooth black start and grid synchronization across a wide range of grid strengths. 2. A Deadbeat-based UUCC strategy, which uses discrete-time, switching-cycle-level control for both GFL and GFM inverters. This approach replaces traditional PI/PLL control with a control parameter-free, high-bandwidth framework that supports stable LVRT and instantaneous synchronization under all conditions. 3. A benchmark comparison with Siemens’ commercial GFM microgrid controller, which provided a fast baseline platform. The commercial approach decoupled v & f control was implemented on a commercial microgrid controller.The baseline commercial benchmark helped highlight superior transient response and black start performance offered by the deadbeat and VOC approaches. These technical contributions offer substantial improvements over conventional inverter control schemes, which often rely on slow phase-locked loop (PLL)-based synchronization, require careful control parameters tuning, and prone to unstable in weak grids with GFL inverters and in stiff grid with GFM inverters therefore challenging for hybrid GFL+GFM under all grid conditions. The deadbeat-based UUCC framework enables simpler, faster, and more robust operation of hybrid IBR systems using wide-bandgap (WBG) devices such as SiC power semiconductors. The rapid expansion of hybrid distributed energy resources (DERs), including residential and commercial PV-BESS installations such as Tesla Powerwall, PV with vehicle-to-grid (V2G) capability, and other integrated configurations, presents complex operational challenges for medium-voltage radial distribution feeders. These networks are subject to frequent disturbances such as faults, switching operations, rapid reclosing sequences, and feeder reconfigurations, all of which introduce dynamic stress on IBRs. In addition, planned feeder segmentation and deliberate islanding for resilience will require DERs that can autonomously perform blackstart, establish voltage and frequency references, and resynchronize with the main grid. The advanced deadbeat-based UUCC control and blackstart functionalities developed in this project directly address these requirements, enabling decentralized and autonomous operation of inverter-dominated DERs in distribution systems under a wide range of fault and reconfiguration scenarios. From a public benefit perspective, these innovations enable more reliable and cost-effective integration of renewable energy into distribution networks. The ability to autonomously black start and stabilize grids under varying grid conditions support accelerates recovery from outages and support decentralized resilient energy systems. By reducing system complexity and improving performance, this project lays critical groundwork for future inverter-dominated power grids that are clean, reliable, and accessible to all.

14 SOLAR ENERGY↗

High-Resolution Synthetic Solar Irradiance Sequence Generation: An LSTM-Based Generative Adversarial Network

The rapid growth of renewable energy resources penetration is bringing more challenges to power system planning and operation. Relevant renewable energy integration studies, such as the capability and dynamic performance of inverter-based resources' primary frequency response and fast frequency response, require high-resolution renewable generation output data that are representative of renewable energy resources. This paper focuses on creating synthetic but realistic solar irradiance data and proposes a long short-term memory-based generative adversarial network to generate high-resolution (second-level) solar irradiance sequences from low-resolution (minute-level) measurements. Combined with a classifier to recognize the solar irradiance patterns, the proposed model is trained using multi-loss functions to accurately capture the temporal correlations among both high-resolution and low-resolution sequences. Verification of the proposed approach is performed on the data set of the Oahu Solar Measurement Grid collected through the National Renewable Energy Laboratory. The results of the case studies demonstrate the proposed approach's capability to capture the statistical characteristics of different solar irradiance patterns and to generate high-quality synthetic solar irradiance sequences in high resolution.

dynamic scheduling↗