Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Development assurance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Space Station - An integrated approach to operational logistics support

Development of an efficient and cost effective operational logistics system for the Space Station will require logistics planning early in the program's design and development phase. This paper will focus on Integrated Logistics Support (ILS) Program techniques and their application to the Space Station program design, production and deployment phases to assure the development of an effective and cost efficient operational logistics system. The paper will provide the methodology and time-phased programmatic steps required to establish a Space Station ILS Program that will provide an operational logistics system based on planned Space Station program logistics support.

Hosmer, G. J.↗

First Phase Consensus Roadmap for Development of Condition-Based Cable Reliability Assurance

The objective of this work was to develop a first phase consensus roadmap for condition-based qualification (CBQ) of electrical cables. With CBQ, qualification of Class 1E electrical cables moves from a time-based approach to a condition-based approach, which is anticipated to be safer in terms of reliability and conservatism, and more cost effective in the long run. However, due to barriers, the CBQ approach has not yet been adopted by U.S. nuclear power plants (NPPs). Based upon a review of current work evaluating CBQ, the limitation of available condition monitoring technology seems to be the largest barrier. The importance of condition monitoring, or more specifically selecting appropriate condition indicators, during CBQ cannot be understated. However, selecting appropriate condition indicators is challenged by techniques that are destructive and only evaluate cable degradation locally. Further, arguably, no one identified condition indicator fully establishes cable condition. Thus, additional work is necessary to evaluate potential condition indicators towards CBQ. In addition to the requirements of IEC/IEEE Std. 60780-323, ideal condition indicators should include a) both destructive and non-destructive approaches, b) both local and global measurements, c) real-time (i.e., online) monitoring that trends with degradation, d) enable correlation with qualified levels of degradation, and e) be established within a repository of condition indicators with applicable materials and/or components and their acceptance criteria. Additional work is needed in development of technology and methodology prior to adoption of CBQ, especially for extending qualified life of installed components. Education and early experience by the industry and regulators will be required for this change in approach as an alternative to re-analysis. A series of workshops that bring together stakeholders to identify and address gaps will be needed. The longstanding cooperative working group of cable researchers from the U.S. Department of Energy, the Electric Power Research Institute, and the Nuclear Regulatory Commission forms a valuable starting point for development of a consensus roadmap to condition-based qualification approach as a viable options for qualification of cable systems in U.S. light water reactors.

42 ENGINEERING↗

Space station common module power system network topology and hardware development

Candidate power system newtork topologies for the space station common module are defined and developed and the necessary hardware for test and evaluation is provided. Martin Marietta's approach to performing the proposed program is presented. Performance of the tasks described will assure systematic development and evaluation of program results, and will provide the necessary management tools, visibility, and control techniques for performance assessment. The plan is submitted in accordance with the data requirements given and includes a comprehensive task logic flow diagram, time phased manpower requirements, a program milestone schedule, and detailed descriptions of each program task.

Landis, D. M.↗

An Assurance Case with a Model at its Core

We describe our pilot study development of an Assurance Case arguing the robustness of a spacecraft demonstration of optical communication. Our Assurance Case addresses the concern that optical communication may be interrupted by the presence of cloud cover, threatening the success of the demonstration. Central to our Assurance Case is its use of a model of atmospheric attenuation to support a key portion of the robustness argument. The conclusion for the demonstration is that its schedule slack plus ability to store data for transmission later accommodates occasional weather-caused atmospheric attenuation.We indicate how the overall structure of the Assurance Case derives from the Objectives Hierarchy set forth in the NASA Reliability and Maintainability standard. We then present the portions of the Assurance Case that argue (1) the atmospheric attenuation model is sufficiently accurate, (2) application of the model shows the desired robustness of the demonstration, and (3) all the model assumptions are satisfied in its application. Lastly, we suggest how an engineering model of the demonstration system and its use could inform the development of the Assurance Case encompassing additional plausible hazards.

DiVenti, Anthony↗

Use of Preliminary PRA to Inform Decisions During Initial NASA Gateway Development

How do you use Probabilistic Risk Assessment (PRA) to support a program in development before designs are even known? Traditional PRAs require detailed design information and early in a program life cycle such information is not available. National Aeronautics and Space Administration (NASA) Safety and Mission Assurance (SMA) developed a preliminary PRA for the Gateway Program based upon NASA reference designs utilizing data and models from pervious PRA studies as surrogates for the Gateway systems. Gateway will be a lunar outpost that supports missions to the moon and includes several elements/modules developed by NASA and International Partners. NASA SMA began supporting Gateway in fall 2017 during initial formulation and continues to support the Gateway Program today. This paper will explore how the NASA SMA developed preliminary PRA was used to inform Gateway Program decisions with specific examples provided.

PRA↗

Use of Preliminary PRA to Inform Decisions During Initial NASA Gateway Development

How do you use Probabilistic Risk Assessment (PRA) to support a program in development before designs are even known? Traditional PRAs require detailed design information and early in a program life cycle such information is not available. National Aeronautics and Space Administration (NASA) Safety and Mission Assurance (SMA) developed a preliminary PRA for the Gateway Program based upon NASA reference designs utilizing data and models from previous PRA studies as surrogates for the Gateway systems. Gateway will be a lunar outpost that supports missions to the moon and includes several elements/modules developed by NASA and International Partners. NASA SMA began supporting Gateway in fall 2017 during initial formulation and continues to support the Gateway Program today. This paper will explore how the NASA SMA developed preliminary PRA was used to inform Gateway Program decisions with specific examples provided.

PRA↗

Annual LDRD Report (FY2019)

The performance of Nuclear Deterrence (ND) systems could be improved by adopting advanced commercial CMOS technologies. However, the radiation hardness of these ND systems must be assured. This project quantified dose rate upset thresholds, allowing us to evaluate whether advanced commercial technologies can be used in rad hard applications. This project also evaluated the susceptibility of advanced commercial technologies to neutron displacement damage and single event effects, and developed hardness assurance methods. As a result of this work, Sandia is now collaborating more closely with DoD agencies and their contractors to understand and improve the radiation hardness of advanced commercial technologies. Sandia Capabilities (SPHINX, lon Beam Lab, FPGA test capabilities) were developed and are being utilized by other programs. Staff were trained to do radiation survivability testing and developed proposals that were funded. Internal and external collaborations and partnerships were developed, including with Georgia Tech. This project received the Best Paper award at the 2019 Hardened Electronics And Radiation Technology (HEART) Conference.

36 MATERIALS SCIENCE↗

Report of the Interagency Optical Network Testbeds Workshop 2, NASA Ames Research Center, September 12-14, 2005

The Optical Network Testbeds Workshop 2 (ONT2), held on September 12-14, 2005, was cosponsored by the Department of Energy Office of Science (DOE/SC) and the National Aeronautics and Space Administration (NASA), in cooperation with the Joint Engineering Team (JET) of the Federal Networking and Information Technology Research and Development (NITRD) Program's Large Scale Networking (LSN) Coordinating Group. The ONT2 workshop was a follow-on to an August 2004 Workshop on Optical Network Testbeds (ONT1). ONT1 recommended actions by the Federal agencies to assure timely development and implementation of optical networking technologies and infrastructure. Hosted by the NASA Ames Research Center in Mountain View, California, the ONT2 workshop brought together representatives of the U.S. advanced research and education (R&E) networks, regional optical networks (RONs), service providers, international networking organizations, and senior engineering and R&D managers from Federal agencies and national research laboratories. Its purpose was to develop a common vision of the optical network technologies, services, infrastructure, and organizations needed to enable widespread use of optical networks; recommend activities for transitioning the optical networking research community and its current infrastructure to leading-edge optical networks over the next three to five years; and present information enabling commercial network infrastructure providers to plan for and use leading-edge optical network services in that time frame.

OEP(Open Exchange Points)↗

Overview of environmental test plans for Space Station Freedom work package 4

The generation and distribution of electric power for Space Station Freedom (SSF) is critical to the station's success. Work Package 4 (WP-04) has the responsibility for the design, development, test, and delivery of the Electric Power System (EPS) for the SSF. During launch, assembly, and operation, the EPS will be subjected to various environments. A test and verification approach has been developed to assure that the EPS will function in these environments. An overview of that test program is presented with emphasis on environmental testing of hardware. Two key areas of the test program are highlighted in the overview. One area is the verification of the Solar Power Module (SPM) and associated cargo element hardware. This area includes detailing the plans for development and qualification testing of the SPM hardware. One series of tests, including modal and acoustic, has been completed on a development cargo element. Another area highlighted is the acceptance testing of high-power Orbital Replacement Units (ORU). The environmental test equipment plans are presented and reviewed in light of an aggressive production rate, which delivers ORU's to the WP-04 and other Space Station Work Packages. Through implementing the test program as outlined, the EPS hardware will be certified for flight and operation on the Space Station Freedom.

Peterson, Tom J.↗

Plasma Environments and Spacecraft Charging for Lunar Programs

Space systems interacting with the space plasma environment charge to potentials of a few tens of volts positive in interplanetary space or on the lunar surface in daylight, a few hundred volts negative in the dark lunar plasma wake and in some regions of the Earth s radiation belts, and to multiple kilovolt negative potentials for worst case conditions in the Earth s magnetosphere near geostationary orbit. Good design practices are required to assure that space systems operate successfully in these environments without detrimental effects due to transient currents and insulator failure produced by electrostatic discharges. Cold lunar environments in particular are challenging because detrimental effects of charging are often exacerbated by cold, highly resistive dielectrics which can integrate charge for long periods of time. We will describe the cold plasma and energetic particle environments relevant to lunar missions responsible for surface and bulk charging of space systems and discuss program requirements under development for assuring that systems operate successfully in these environments.

Minow, Joseph I.↗

Assured Shuttle Availability Project

This paper discusses the development of the Assured Shuttle Availability Project (ASA). The ASA project has been created to provide a structure by which the Space Shuttle Program (SSP) may allocate resources to hardware redesign efforts required to extend effective Space Shuttle operational life through the year 2020. Specific ASA Project goals and evaluation criteria have been set, and redesign efforts have been evaluated using systems engineering methods.

Scott, John H.↗

Interim Report of the Astronomy Spacelab Payloads Study: Ultraviolet and Optical Astronomy - Volume 2

The Space Shuttle will comprise NASA's primary transportation system into near-earth orbit during the 1980s. The Shuttle will provide the astronomical community with a major new capability to send a wide variety of instrumentation into orbit, to utilize it there under manned or automatic control for periods from seven to thirty days, and to return it to the ground. To this end the European Space Research Organization (ESRO) is developing Spacelab, an array of interchangeable components -pressurized manned modules, unpressurized pallets and related support systems - to be mounted in the Shuttle payload bay. Spacelab will offer important opportunities to carry out astronomical research with instruments optimized for specific objectives. With a high flight frequency and with the ability to modify or interchange telescopes and instruments between flights, one will not need to make rigid long-term commitments to specific and compromised telescope/instrument/ detector combinations as is the case for automated satellites. Observational techniques demanding the physical return of data and equipment - in particular the use of photographic film, instruments requiring tight calibration controls, cryogens, high-risk detectors and degradeable optical coatings -will open research areas not readily addressed by automated satellites. Although Shuttle flight duration will be limited to periods from seven to thirty days, substantial data can be obtained with a single instrument on short missions, if targets are carefully selected and prioritized, and a large number of instruments can be accommodated on a single flight. Important astronomical data are regularly obtained on sounding rocket flights of five minutes duration. Spacelab will provide far longer observing periods for large and small telescopes, with resources greatly exceeding those of sounding rockets, while retaining much of the sounding rocket philosophy in terms of instrument flexibility, simplicity, reliability assurance and development costs. The Ultraviolet and Optical Astronomy Program on Spacelab is being planned to provide optical astronomers with relatively simple and regular access to the extended wavelength coverage, the superior image quality and the darkness of the night sky available above the earth's atmosphere. In a rapidly evolving science one cannot predict what problems will be timely in the 1980s. Extrapolating from the current epoch, however, one can envision a continuing interest in such areas as the structure, composition and phenomenology of planetary surfaces and atmospheres; the composition and physical nature of the interstellar medium; the composition, structure and life history of stars, especially those in advanced stages of evolution; the stellar population of other galaxies; such enigmatic phenomena as X-ray binary black holes, pulsars, active galactic nuclei and quasars; large scale interactions between galaxies and the nature of the intergalactic medium; precise calibration of the Hubble law for the expansion of the universe; the average density of the universe; and the existence of extraterrestrial life.

Source record↗

Assessment of the NASA Flight Assurance Review Program

The NASA flight assurance review program to develop minimum standard guidelines for flight assurance reviews was assessed. Documents from NASA centers and NASA headquarters to determine current design review practices and procedures were evaluated. Six reviews were identified for the recommended minimum. The practices and procedures used at the different centers to incorporate the most effective ones into the minimum standard review guidelines were analyzed and guidelines for procedures, personnel and responsibilies, review items/data checklist, and feedback and closeout were defined. The six recommended reviews and the minimum standards guidelines developed for flight assurance reviews are presented. Observations and conclusions for further improving the NASA review and quality assurance process are outlined.

Holmes, J.↗

Reference document for LANL stack sampling and ANSI N13.1 (Article) Gielow RL and McNamee MR 1993. Numerical Flue Gas Flow Modeling for Continuous Emissions Monitoring Applications. EPRI CEM Users Group Meeting. Baltimore. RP1961-13

American National Standard N13.1 “sets forth guidelines and performance criteria for sampling the emissions of airborne radioactive substances in the air discharge ducts and stacks of nuclear facilities. Emphasis is on extractive sampling from a location in a stack or duct where the contaminant is well mixed. At such a location, sampling may be conducted at a single point. This standard provides performance-based criteria for the use of air sampling probes, transport lines, sample collectors, sample monitoring instruments, and gas flow measuring methods. This standard also covers sampling program objectives, quality assurance issues, developing air sampling action levels, system optimization, and system performance verification. Workplace, containment, and environmental air monitoring are not addressed. Specific sample analysis methods and the reporting or interpreting of results are also not addressed.” (HPS 2011).

61 RADIATION PROTECTION AND DOSIMETRY↗

Impact Fracture and Fragmentation of Glass via the 3D Combined Finite-Discrete Element Method

A driving technical concern for the automobile industry is their assurance that developed windshield products meet Federal safety standards. Besides conducting innumerable glass breakage experiments, product developers also have the option of utilizing numerical approaches that can provide further insight into glass impact breakage, fracture, and fragmentation. The combined finite-discrete element method (FDEM) is one such tool and was used in this study to investigate 3D impact glass fracture processes. To enable this analysis, a generalized traction-separation model, which defines the constitutive relationship between the traction and separation in FDEM cohesive zone models, was introduced. The mechanical responses of a laminated glass and a glass plate under impact were then analyzed. For laminated glass, an impact fracture process was investigated and results were compared against corresponding experiments. Correspondingly, two glass plate impact fracture patterns, i.e., concentric fractures and radial fractures, were simulated. The results show that for both cases, FDEM simulated fracture processes and fracture patterns are in good agreement with the experimental observations. The work demonstrates that FDEM is an effective tool for modeling of fracture and fragmentation in glass.

42 ENGINEERING↗

Big system: Interactive graphics for the engineer

The BCS Interactive Graphics System (BIG System) approach to graphics was presented, along with several significant engineering applications. The BIG System precompiler, the graphics support library, and the function requirements of graphics applications are discussed. It was concluded that graphics standardization and a device independent code can be developed to assure maximum graphic terminal transferability.

Quenneville, C. E.↗

Institutional arrangements

The practical application of space systems is considered in terms of institutional arrangements. The evolution of space systems is examined along with examples of institutional arrangements for space systems uses or applications. An institutional framework developed to assure the widest practicable application of space system is proposed and described. Recommendations are included.

Source record↗

Space-based solar power conversion and delivery systems (study), engineering analysis

A systems analysis of synchronous, orbit-based power generation and relay systems that could be operational in the 1990's is described along with a comparison with earth-based systems to be operational in the same time frame. Operational and economic requirements for the orbiting systems and near term research activities which will be required to assure feasibility, development, launch and operational capabilities of such systems in the post- 1990 time frame are examined.

Nathan, C. A.↗