Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Design Reference Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Lessons Learned from Annual Inspection Process - 12329

The U.S. Department of Energy (DOE) Office of Legacy Management's (LM) mission is to manage DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. As defined by the DOE guidance document Long-Term Stewardship Planning Guidance for Closure Sites, long-term stewardship refers to all activities necessary to ensure protection of human health and the environment. These activities include, but are not limited to, 'all engineered and institutional controls (ICs) designed to contain or to prevent exposure to residual contamination and waste, such as surveillance activities, record-keeping activities, inspections, groundwater monitoring, maintenance of other barriers and contained structures, access control, and posting signs'. The development and management of ICs have been, and continue to be, critical to the success of LM surveillance and maintenance activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Synergistic Effect of High Charge and Energy Particle Radiation and Chronological Age on Biomarkers of Oxidative Stress and Tissue Degeneration: A Ground-Based Study Using the Vertebrate Laboratory Model Organism Oryzias latipes

High charge and energy (HZE) particles are a main hazard of the space radiation environment. Uncertainty regarding their health effects is a limiting factor in the design of human exploration-class space missions, that is, missions beyond low earth orbit. Previous work has shown that HZE exposure increases cancer risk and elicits other aging-like phenomena in animal models. In this work, we investigate how a single exposure to HZE particle radiation, early in life, influences the subsequent age-dependent evolution of oxidative stress and appearance of degenerative tissue changes. Embryos of the laboratory model organism, Oryzias latipes (Japanese medaka fish), were exposed to HZE particle radiation at doses overlapping the range of anticipated human exposure. A separate cohort was exposed to reference γ-radiation. Survival was monitored for 750 days, well beyond the median lifespan. The population was also sampled at intervals and liver tissue was subjected to histological and molecular analysis. HZE particle radiation dose and aging contributed synergistically to accumulation of lipid peroxidation products, which are a marker of chronic oxidative stress. This was mirrored by a decline in PPARGC1A mRNA, which encodes a transcriptional co-activator required for expression of oxidative stress defense genes and for mitochondrial maintenance. Consistent with chronic oxidative stress, mitochondria had an elongated and enlarged ultrastructure. Livers also had distinctive, cystic lesions. Depending on the endpoint, effects of γ-rays in the same dose range were either lesser or not detected. Results provide a quantitative and qualitative framework for understanding relative contributions of HZE particle radiation exposure and aging to chronic oxidative stress and tissue degeneration.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Update on Integrity Monitoring, Prediction and Assessment, Corrosion Control, and Repair of the Hanford Storage Tanks

DOE has launched a multi-year research program with the focus of preserving and increasing available volume for waste storage at Hanford. The long-term availability and operability of the Hanford Double Shell Tanks (DST) is critical to the completion of the Hanford mission. Maintaining the integrity of the tank will involve having a technology for repair or refurbishment of a DST should the tank function be compromised by degradation, monitoring the tank for indications of accelerated degradation, developing a means for mitigating accelerated degradation, and evaluating options for increasing the storage capacity in the tank farm without constructing new tanks. The project work was started in the middle of 2024; significant progress has been made in the following four areas: (i) tank refurbishment using a high performance grout and an epoxy sealant layer system, (ii) developing a chemically and radiologically stable reference electrode, (iii) designing and implementing a cathodic protection system to mitigate underside corrosion of DST secondary shells, and (iv) exploring evaporation to increase waste storage capacity.

Shukla, Pavan [Savannah River National Laboratory ↗

Implementing a Low-Activity Waste Direct Feed Capability in the Waste Treatment and Immobilization Plant Project - 15594

The current design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility. The U.S. Department of Energy (DOE) has developed a strategic, phased approach to completing the WTP Project, beginning with feeding some liquid waste from the tank farms to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. To accomplish this, the DOE Office of River Protection (ORP) will construct a new capability outside WTP to remove cesium and solids from the liquid portion of the tank waste before transferring that waste to the LAW Facility. This new capability, referred to as the Low-Activity Waste Pretreatment System, is outside WTP and not included in the project's scope. The primary driver for the Direct-Feed LAW (DFLAW) approach is to enable commissioning of the LAW Facility for low-activity waste processing before the PT and High-Level Waste Facilities are complete and operational. As such, the functions intended to be provided to the LAW Facility by the PT Facility and the common functionality with the High-Level Waste Facility must be refined and modified. The DFLAW approach will provide necessary systems and facilities to replace these enabling PT Facility functions until the PT Facility is completed and commissioned. In February 2014, ORP requested the WTP contractor to develop separate contract modification proposals for completing: (1) the LAW Facility, Balance of Facilities, and Analytical Laboratory work scope in the current contract through hot commissioning in a manner to accommodate a phased start of the WTP mission; and (2) initial planning and design for incorporating a permanent capability to accommodate DFLAW in the WTP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The time-dependent simulation of CFETR baseline steady-state scenarios

One of the key issues to achieve the phase I mission of China fusion engineering test reactor (CFETR) is steady-state operation with a modest fusion power up to 200 MW. To examine this feasibility, time-dependent modeling of CFETR baseline scenario is performed. The time-dependent scenario design examines actual discharge features, including auxiliary heating and current drive scheme, equilibrium, transport, PF coil systems and plasma control system during the plasma evolution. During plasma current ramp-up, 10 MW of EC or LH heating is used to effectively save volt–second consumption to a reasonable level within magnet coil capability and to reduce li for better plasma control. Three reference scenarios are designed to target full non-inductive operation with different external heating and current drive (H&CD), which are NB + EC, NB + LH, and LH + EC, respectively. Two scenarios with neutral beams reach the required fusion power of CFETR phase I target, while for LH + EC scenario the fusion power and confinement is somewhat lower. A reversed magnetic shear with q min > 2 is sustained with off-axis current drive and bootstrap current for all cases examined. Ideal MHD analysis shows that both large toroidal mode number n ballooning mode and low n kink mode are stable in the three reference cases independent of whether the current is totally relaxed or not. The L mode and H–L back transition ramp-down are designed to successfully reduce the plasma current to 2 MA and keep li below 2 with ramp-down rate of 80 kA s -1 . The H–L back transition ramp-down yields improvements in the power transfer and coil current evolution as well as the li evolution. The heating and current drive characteristics of three auxiliary heating sources are indicated by scanning studies. A 2D scan of NB energy and tangency radius indicates the features of NB power deposition, current drive, torque and shine through issue. Both ramp-up and flattop are considered in the scanning of radio frequency parameters. For EC waves, the ramp-up phase constrains the parameter space more. The 2D scan of EC launch angle shows that EC waves launched above the midplane yield a better CD efficiency than using a midplane launcher. Specifically, 10 MW of EC waves launched from LFS above the midplane yield a maximum on axis driven current of about 0.55 MA, while waves launched from top yield a maximum near edge driven current of about 0.45 MA in the region of ρ > 0.5. Scanning of n $\parallel$ in LH spectrum shows that n $\parallel$ should be set around 1.7 to get enough penetration (inside ρ = 0.7) for current drive and avoid strong accessibility problem. It is found that LH waves launched from HFS drives more current than that launched from LFS when n $\parallel$ is small. The maximum LH driven current reaches 1.1 MA with 10 MW of LH power launched from HFS.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Seismic Soil-Structure Interaction Analyses of a Deeply Embedded Model Reactor – SASSI Analyses

This report summarizes the SASSI analyses of a deeply embedded reactor model performed by BNL and CJC and Associates, as part of the seismic soil-structure interaction (SSI) simulation capability project for the NEAMS (Nuclear Energy Advanced Modeling and Simulation) Program of the Department of Energy. The SASSI analyses included three cases: 0.2 g, 0.5 g, and 0.9g, all of which refer to nominal peak accelerations at the top of the bedrock. The analyses utilized the modified subtraction method (MSM) for performing the seismic SSI evaluations. Each case consisted of two analyses: input motion in one horizontal direction (X) and input motion in the vertical direction (Z), both of which utilized the same in-column input motion. Besides providing SASSI results for use in comparison with the time domain SSI results obtained using the DIABLO computer code, this study also leads to the recognition that the frequency-domain method should be modernized so that it can better serve its mission-critical role for analysis and design of nuclear power plants.

42 ENGINEERING↗

Progress on Resolution of Technical Issues at the Hanford Waste Treatment And Immobilization Plant Project - 16285

The U.S. Department of Energy's (DOE) Waste Treatment and Immobilization Plant (WTP) Pretreatment (PT) Facility has a number of first-of-a-kind technical challenges that have required additional expert analysis and testing activities to resolve. In 2006 an External Flowsheet Review Team identified 28 technical vulnerabilities with the plant design or future operability. Over a period of three months starting in September 2012, a number of top scientists and engineers conducted a review of the major technical issues associated with the design and operability of the WTP. These experts also provided independent advice on some of the broader challenges associated with completing the Hanford tank waste mission - highlighting the linkage between the physical and chemical properties of the tank waste and the PT Facility technical issues. In 2012 and early 2013 DOE's Office of River Protection (ORP) directed the WTP contractor to suspend production work on the Pretreatment Facility until the outstanding technical issues could be resolved and the nuclear safety basis could be updated and brought into alignment with any updates to the facility design and/or process flowsheet. Specific plans for resolving each the technical issues have been developed and significant progress has been made over the past year in identifying solution sets for each of the issues. The eight remaining technical issues (referred to as T1 to T8) are as follows: (T1) Hydrogen Gas Release from Vessel Solids; (T2) Potential Criticality in Pretreatment Facility Vessels; (T3) Hydrogen in Piping and Ancillary Vessels; (T4) Pulse-Jet Mixing and Control; (T5) Erosion and Localized Corrosion in WTP Vessels and Piping; (T6) Design Redundancy in Black Cells/In-Service Inspection; (T7) Black Cell Vessel Structural Integrity; (T8) Facility Ventilation. This paper provides a synopsis of the progress that has been made on resolving the Pretreatment technical issues over the past year, and how resolution of the issues will enable DOE to make an informed decision to resume design and production engineering for the Pretreatment Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Graphical User Interface for a Biasing Board for the PSEC6

The PSEC6 is an application-specific integrated circuit (ASIC) designed for a readout system for a large area picosecond photodetector (LAPPD). The PSEC6 is currently in fabrication and pending testing. The testing system for the PSEC5, the previous iteration of the ASIC, required expensive and non-portable equipment, because the ASIC needs twelve adjustable reference voltages. The new testing system consists of an low-cost, open-source, cross-platform graphical user interface (GUI), a digital system, and a biasing board. The digital system is the interface between the GUI and biasing board, and can be implemented on a microcontroller or field-programmable gate array (FPGA). The biasing board contains twelve digital-to-analog converters (DACs) that are configurable via the GUI, which gives users the ability to write voltage values to all or specific DACs. The GUI was developed in C on Linux using the widget library GTK4 and cross-compiled for Windows compatibility. I2C and SPI protocols were implemented on an Adafruit Feather ESP32-S3 microcontroller to write commands to the DACs and PSEC6. A hardware implementation of the I2C protocol is in development on an FPGA. Since LAPPDs will be used by the Accelerator Neutrino Neutron Interaction Experiment (ANNIE) at Fermilab, the PSEC6 testing system in this internship project can potentially benefit future neutrino research. The project is relevant to the Department of Energy’s microelectronics mission, because the PSEC6 is an ASIC that will handle fast time signals arriving from the detector for readout. It also provided experience with building a cross-platform user interface, practicing digital design and implementation in hardware description language (HDL), and using simulations to inform new design iterations.

Guerrero, Sasha Camila [North Central Coll.]↗

Graphical User Interface for a Biasing Board for the PSEC6

The PSEC6 is an application-specific integrated circuit (ASIC) designed for a readout system for a large area picosecond photodetector (LAPPD). The PSEC6 is currently in fabrication and pending testing. The testing system for the PSEC5, the previous iteration of the ASIC, required expensive and non-portable equipment, because the ASIC needs twelve adjustable reference voltages. The new testing system consists of an low-cost, open-source, cross-platform graphical user interface (GUI), a digital system, and a biasing board. The digital system is the interface between the GUI and biasing board, and can be implemented on a microcontroller or field-programmable gate array (FPGA). The biasing board contains twelve digital-to-analog converters (DACs) that are configurable via the GUI, which gives users the ability to write voltage values to all or specific DACs. The GUI was developed in C on Linux using the widget library GTK4 and cross-compiled for Windows compatibility. I2C and SPI protocols were implemented on an Adafruit Feather ESP32-S3 microcontroller to write commands to the DACs and PSEC6. A hardware implementation of the I2C protocol is in development on an FPGA. Since LAPPDs will be used by the Accelerator Neutrino Neutron Interaction Experiment (ANNIE) at Fermilab, the PSEC6 testing system in this internship project can potentially benefit future neutrino research. The project is relevant to the Department of Energy’s microelectronics mission, because the PSEC6 is an ASIC that will handle fast time signals arriving from the detector for readout. It also provided experience with building a cross-platform user interface, practicing digital design and implementation in hardware description language (HDL), and using simulations to inform new design iterations.

Guerrero, Sasha Camila [North Central Coll.]↗

Geotechnical Analysis Report for July 2007-June 2008

This Geotechnical Analysis Report (GAR) presents and interprets geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2007, to June 30, 2008. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and hole observations. Chapter 8 summarizes the results of geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists references.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geotechnical Analysis Report for July 2008-June 2009

This Geotechnical Analysis Report (GAR) presents and interprets geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2008, to June 30, 2009. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and hole observations. Chapter 8 summarizes the results of geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists references.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

One System Overview - 16579

The U.S. Department of Energy (DOE), Office of River Protection (ORP) is responsible for managing and completing the River Protection Project mission, which is to 'safeguard the nuclear waste stored in Hanford's 177 underground tanks, and to manage the waste safely and responsibly until it can be treated in the Waste Treatment and Immobilization Plant for final disposition'. The Office of River Protection's work scope is currently performed through two primary contracts: - The Tank Operations Contract, held by Washington River Protection Solutions LLC, (WRPS) includes the construction, operation, and maintenance activities necessary to safely store, retrieve, and transfer tank wastes; provide supplemental tank waste treatment; provide storage and/or disposal of primary and secondary waste streams; design, construction and commissioning of the Low-Activity Waste Pretreatment System; and support ORP to integrate Hanford Tank Waste Treatment and Immobilization Plant (WTP) completion and startup with Tank Farms operations. - The WTP Contract, held by Bechtel National, Inc. (BNI), includes the design, construction, and commissioning of a Pretreatment Facility, two vitrification facilities (one for high-level waste and one for low-activity waste), a dedicated analytical laboratory, and supporting facilities to treat radioactive tank wastes by immobilizing them into a stable glass waste form. One System was established as a means to improve the integration between the tank farms and the WTP project to support its safe and successful startup. One System's scope and purpose focus on mission integration consistent with DOE's plans to treat tank waste in phases, starting with direct feed of the low-activity waste stream to the WTP's Low-Activity Waste (LAW) Vitrification Facility (referred to as DFLAW). The One System organization now has four major focus areas: - Flowsheet Integration? Integrated River Protection Project (RPP) flowsheet development and management; developing a gaps, risks, and opportunities management plan and technical roadmap; and waste feed qualification. - Mission Analysis and Planning? Strategic planning, system planning, and modeling integration. - WTP Startup, Commissioning, and Operations Integration? Interface Control Document (ICD) management, coordinating facilities startup-to-commissioning-to-operations, contract directives and standards identification, and DFLAW program integration. - Project Integration and Controls? Integrated schedule, metrics/dashboards monitoring, and One System risk register. ORP established the DFLAW Program Office in February 2015 as one of its key performance goals. ORP staff, along with contractor managers, have identified roles and responsibilities for the each of the four major focus areas. One System has established an Executive Council and Governance Board to drive program progress and make decisions on DFLAW. This approach allows appropriate government and contractor senior management involvement in the DFLAW Program. Monthly critical path analysis on the integrated DFLAW schedule is being performed. Interface control documents specific to DFLAW have been developed, and system planning and modeling tools are being used to help define the DFLAW flowsheet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 18327

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever, built for radioactive waste processing. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) (collectively referred to as LBL); - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the Pretreatment (PT) Facility; - Resolving the technical issues associated with primarily the PT Facility; - Completing the design and construction of the High-Level Waste (HLW) and PT facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree 1 completion milestones for the Hanford WTP, which generally aligns with DOE's plans for completing the WTP facilities in sequence: - Complete LAW Facility hot commissioning: December 31, 2023; - Complete HLW Facility hot commissioning: December 31, 2033; - Complete PT Facility hot commissioning: December 31, 2033; - Achieve initial plant operations for the WTP: December 31, 2036. Having established milestones for completing the WTP facilities has enabled DOE to formally implement its plans for completing the WTP facilities in sequence, starting with the LAW Facility. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. Significant progress has been made toward completing the design, construction, and planning for commissioning of the facilities needed to enable the DFLAW operations to commence as early as January 2022. In 2012, DOE partially suspended production work on the WTP's PT Facility and to a lesser degree the HLW Facility because of unresolved technical issues associated with those facilities. In September 2017, DOE acknowledged the WTP contractor had met all the criteria for full resumption of engineering, procurement, and construction (EPC) activities for the HLW Facility. By December 2017, DOE had completed the actions needed to resolve the six of the eight primary technical issues associated with the PT Facility, with the remaining two issues expected to be resolved in the first quarter of 2018. Although significant progress has been made to prepare for resuming production activities for the HLW and PT facilities, DOE has made the decision to constrain EPC work on those facilities in the near term based on DOE's higher priority of completing the WTP facilities needed to begin DFLAW operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TREAT Slide Decks for Alabama A&M

Slides to introduce TREAT and two senior design projects to a professor and senior engineering students at Alabama A&M. Slide Deck 1 is an overview of the TREAT Reactor and its mission. Use for Space Nuclear Thermal Propulsion Testing is mentioned, but no details of space reactor fuel are included. Review for unlimited release is requested. Slide deck 2 presents technical background for neutron radiography, with contrast to x-radiography, and then presents the application of TREAT for Flash Radiography. Slide Deck 3 describes the background behind the second senior design project, which is to design powered actuators for TREAT core clamps. Slide Deck 3 includes photos of different sides of the TREAT reactor and sketches of internal components associated with the core clamping system. These were presented via Teams on October 5, but we want to provide the slidedeck files to the university for student reference.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Blending Of Radioactive Salt Solutions In Million Gallon Tanks

Research was completed at Savannah River National Laboratory (SRNL) to investigate processes related to the blending of radioactive, liquid waste, salt solutions in 4920 cubic meter, 25.9 meter diameter storage tanks. One process was the blending of large salt solution batches (up to 1135 ? 3028 cubic meters), using submerged centrifugal pumps. A second process was the disturbance of a settled layer of solids, or sludge, on the tank bottom. And a third investigated process was the settling rate of sludge solids if suspended into slurries by the blending pump. To investigate these processes, experiments, CFD models (computational fluid dynamics), and theory were applied. Experiments were performed using simulated, non-radioactive, salt solutions referred to as supernates, and a layer of settled solids referred to as sludge. Blending experiments were performed in a 2.44 meter diameter pilot scale tank, and flow rate measurements and settling tests were performed at both pilot scale and full scale. A summary of the research is presented here to demonstrate the adage that, ?One good experiment fixes a lot of good theory?. Experimental testing was required to benchmark CFD models, or the models would have been incorrectly used. In fact, CFD safety factors were established by this research to predict full-scale blending performance. CFD models were used to determine pump design requirements, predict blending times, and cut costs several million dollars by reducing the number of required blending pumps. This research contributed to DOE missions to permanently close the remaining 47 of 51 SRS waste storage tanks.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Blending of Radioactive Salt Solutions in Million Gallon Tanks - 13002

Research was completed at Savannah River National Laboratory (SRNL) to investigate processes related to the blending of radioactive, liquid waste, salt solutions in 4920 cubic meter, 25.9 meter diameter storage tanks. One process was the blending of large salt solution batches (up to 1135 - 3028 cubic meters), using submerged centrifugal pumps. A second process was the disturbance of a settled layer of solids, or sludge, on the tank bottom. And a third investigated process was the settling rate of sludge solids if suspended into slurries by the blending pump. To investigate these processes, experiments, CFD models (computational fluid dynamics), and theory were applied. Experiments were performed using simulated, non-radioactive, salt solutions referred to as supernates, and a layer of settled solids referred to as sludge. Blending experiments were performed in a 2.44 meter diameter pilot scale tank, and flow rate measurements and settling tests were performed at both pilot scale and full scale. A summary of the research is presented here to demonstrate the adage that, 'One good experiment fixes a lot of good theory'. Experimental testing was required to benchmark CFD models, or the models would have been incorrectly used. In fact, CFD safety factors were established by this research to predict full-scale blending performance. CFD models were used to determine pump design requirements, predict blending times, and cut costs several million dollars by reducing the number of required blending pumps. This research contributed to DOE missions to permanently close the remaining 47 of 51 SRS waste storage tanks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reference reactor module for NASA's lunar surface fission power system

Surface fission power systems on the Moon and Mars may provide the first US application of fission reactor technology in space since 1965. The Affordable Fission Surface Power System (AFSPS) study was completed by NASA/DOE to determine the cost of a modest performance, low-technical risk surface power system. The AFSPS concept is now being further developed within the Fission Surface Power (FSP) Project, which is a near-term technology program to demonstrate system-level TRL-6 by 2013. This paper describes the reference FSP reactor module concept, which is designed to provide a net power of 40 kWe for 8 years on the lunar surface; note, the system has been designed with technologies that are fully compatible with a Martian surface application. The reactor concept uses stainless-steel based. UO{sub 2}-fueled, pumped-NaK fission reactor coupled to free-piston Stirling converters. The reactor shielding approach utilizes both in-situ and launched shielding to keep the dose to astronauts much lower than the natural background radiation on the lunar surface. The ultimate goal of this work is to provide a 'workhorse' power system that NASA can utilize in near-term and future Lunar and Martian mission architectures, with the eventual capability to evolve to very high power, low mass systems, for either surface, deep space, and/or orbital missions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

MRT 7365: Power flow physics and key physics phenomena

The Z accelerator at Sandia National Laboratories conducts z-pinch experiments at 26 MA in support of DOE missions in stockpile stewardship, dynamic materials, fusion, and other basic sciences. Increasing the current delivered to the z-pinch would extend our reach in each of these disciplines. To achieve increases in current and accelerator efficiency, a fraction of Z’s shots are set aside for research into transmission-line power flow. These shots, with supporting simulations and theory, are incorporated into this Advanced Diagnostics milestone report. The efficiency of Z is reduced as some portion of the total current is shunted across the transmission-line gaps prior to the load. This is referred to as “current loss”. Electrode plasmas have long been implicated in this process, so the bulk of dedicated power-flow experiments are designed to measure the plasma environment. The experimental analyses are enhanced by simulations conducted using realistic hardware and Z voltage pulses. In the same way that diagnostics are continually being improved for sensitivity and resolution, the modeling capability is continually being improved to provide faster and more realistic simulations. The specifics of the experimental hardware, diagnostics, simulations, and algorithm developments are provided in this report. The combined analysis of simulation and data confirms that electrode plasmas have the most detrimental impact on current delivery. Experiments over the last three years have tested the theoretical current-loss mechanisms of enhanced ion current, plasma gap closure, and Hall-related current. These mechanisms are not mutually exclusive and may be coincident in the final feed as well as in upstream transmission lines. The final-feed geometries tested here, however, observe lower-density plasmas without dominant ion currents which is consistent with a Hall-related current. The picture of plasma formation and transport formed from experiment and simulation is informing hardware designs being fielded on Z now and being proposed for the Next-Generation Pulsed Power (NGPP) facility. In this picture, the strong magnetic fields that heat the electrodes above particle emission thresholds also confine the charged particles near the surface. Some portion of the plasmas thus formed is transported into the transmission-line gap under the force of the electric field, with aid from plasma instabilities. The gap plasmas are then transported towards the load by a cross-field drift, where they accumulate and contribute to a likely Hall-related cross-gap current. The achievements in experimental execution, model validation, and physical analysis presented in this report set the stage for continued progress in power flow and load diagnostics on Z. The planned shot schedule for Z and Mykonos will provide data for extrapolation to higher current to ensure the predicted performance and efficiency of a NGPP facility.

43 PARTICLE ACCELERATORS↗