Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Delta II launch vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

64 records · Page 4

Optimal Fragmentation and Dispersion of Hazardous Near-Earth Objects

The complex problem of protecting the Earth from the possibility of a catastrophic impact by a hazardous near-Earth object (NEO) has been recently reassessed in [1]. In a letter on NEOs from the White House Office of Science and Technology Policy (OSTP) to the U.S. Senate and Congress in 2010, the White House OSTP strongly recommended that NASA take the lead in conducting research activities for NEO detection, characterization, and deflection technologies. Furthermore, President Obama's new National Space Policy specifically directs NASA to "pursue capabilities, in cooperation with other departments, agencies, and commercial partners, to detect, track, catalog, and characterize NEOs to reduce the risk of harm to humans from an unexpected impact on our planet." The Planetary Defense Task Force of the NASA Advisory Council also recommended that the NASA Office of the Chief Technologist (OCT) begin efforts to investigate asteroid deflection techniques. With national interest growing in the United States, the NEO threat detection and mitigation problem was recently identified as one of NASA's Space Technology Grand Challenges. An innovative solution to NASA's NEO Impact Threat Mitigation Grand Challenge problem was developed through a NIAC Phase I study (9/16/11 - 9/15/12), and it will be further investigated for a NIAC Phase II study (9/10/12 - 9/9/14). Various NEO deflection technologies, including nuclear explosions, kinetic impactors, and slow-pull gravity tractors, have been proposed and examined during the past two decades. Still, there is no consensus on how to reliably deflect or disrupt hazardous NEOs in a timely manner. It is expected that the most probable mission scenarios will have a mission lead time much shorter than 10 years, so the use of nuclear explosives becomes the most feasible method for planetary defense. Direct intercept missions with a short warning time will result in arrival closing velocities of 10-30 kilometers per second with respect to the target asteroid. Given such a large arrival delta V requirement, a rendezvous mission to the target asteroid is infeasible with existing launch vehicles. Furthermore, state-of-the-art penetrating subsurface nuclear explosion technology limits the penetrator's impact velocity to less than approximately 300 meters per second because higher impact velocities prematurely destroy the nuclear fuzing mechanisms. Therefore, significant advances in hypervelocity nuclear interceptor/ penetrator technology must be achieved to enable a last-minute nuclear disruption mission with intercept velocities as high as 30 kilometers per second. Consequently, a HAIV (Hypervelocity Asteroid Intercept Vehicle) mission architecture (Figure 1.1), which blends a hypervelocity kinetic impactor with a subsurface nuclear explosion for optimal fragmentation and dispersion of hazardous NEOs, has been developed through a Phase I study, and it will be further developed and validated through a Phase II study.

Asteroid↗

Pluto flyby mission design concepts for very small and moderate spacecraft

This paper discusses the trade-offs involved in the design of a Pluto flyby mission using a low-mass spacecraft, the objective of which is the first-ever reconnaissance of the Pluto/Charon system. The analyses include launch opportunity/trajectory identification/launch vehicle trades, flight time vs net spacecraft mass trades, and flyby targeting considerations. Two mission concepts currently under development are discussed. One concept involves an 83 kg dry spacecraft which uses a direct trajectory and a Titan IV/Centaur (with two solid rocket motor upper stages) to reach Pluto in 7 years. The other design is a 316 kg dry spacecraft which uses a 3+Delta VEJGA trajectory and a Delta II (7925) to arrive at Pluto in 13.6 years.

Weinstein, S. S.↗

The Plans for Getting OCO-2 into Orbit

The method and terms used to design the target parameters that will be used to insert the Orbiting Carbon Observatory 2 (OCO-2) into the A-train are defined. Comparisons are made to the plan that would have been used had OCO-1 successfully achieved its Injection Orbit. Major differences arise from the fact that OCO-1 was launched on a Taurus XL with a target 65 km below the A-Train while OCO-2 will be launched on a Delta II with a target only 15 km below the A-Train. The new plan is similar to the one used for the CloudSat/CALIPSO missions, but reformulated into a one-step iteration process that is easier to understand.

lessons learned↗

Aerocapture Design Study for a Titan Polar Orbiter

In 2014 a team at NASA Goddard Space Flight Center (GSFC) studied the feasibility of using active aerocapture to reduce the chemical Delta V requirements for inserting a small scientific satellite into Titan polar orbit. The scientific goals of the mission would be multi-spectral imaging and active radar mapping of Titan's surface and subsurface. The study objectives were to: (i) identify and select from launch window opportunities and refine the trajectory to Titan; (ii) study the aerocapture flight path and refine the entry corridor; (iii) design a carrier spacecraft and systems architecture; (iv) develop a scientific and engineering plan for the orbital portion of the mission. Study results include: (i) a launch in October 2021 on an Atlas V vehicle, using gravity assists from Earth and Venus to arrive at Titan in January 2031; (ii) initial aerocapture via an 8-km wide entry corridor to reach an initial 350X6000 km orbit, followed by aerobraking to reach a 350X1500 km orbit, and a periapse raise maneuver to reach a final 1500 km circular orbit; (iii) a three-part spacecraft system consisting of a cruise stage, radiator module, and orbiter inside a heat shield; (iv) a 22-month mission including station keeping to prevent orbital decay due to Saturn perturbations, with 240 Gb of compressed data returned. High-level issues identified include: (i) downlink capability - realistic downlink rates preclude the desired multi-spectral, global coverage of Titan's surface; (ii) power - demise of the NASA ASRG (Advanced Stirling Radioisotope Generator) program, and limited availability at present of MMRTGs (Multi-Mission Radioisotope Generators) needed for competed outer planet missions; (iii) thermal - external radiators must be carried to remove 4 kW of waste heat from MMRTGs inside the aeroshell, requiring heat pipes that pass through the aeroshell lid, compromising shielding ability; (iv) optical navigation to reach the entry corridor; (v) the NASA requirement of continuous critical event coverage for the orbiter, especially during the peak heating of the aerocapture when the radio link will be broken. In conclusion, although Titan aerocapture allows for considerable savings in propellant mass, this comes at a cost of increased mission complexity. Further architecture study and refinement is required to reduce high-level mission risks and to elucidate the optimum architecture.

Nixon, Conor A.↗

Development of SEDS data system flight software

The Small Expendable-tether Deployer System (SEDS) is being built for a 1991 flight on a Delta launch vehicle. SEDS will deploy a 50 lb instrument satellite as an end mass at the end of a 20 km tether. The objective of the experiment is to test the SEDS design concept by demonstrating that the system will satisfactorily deploy the full 20 km tether without stopping prematurely, come to a smooth stop on application of the brake, and cut the tether at the proper time after it swings to the vertical. SEDS will also collect data that will be used to test the accuracy of tether dynamics models for this type of deployment. Radar tracking is planned. In addition, the SEDS on-board computer system will record, store, and continuously transmit data over the Delta II S-band telemetry channel. Initial testing of the software under simulated flight conditions was performed. These tests used both assembly language routines running on SEDS data systems and C-language routines on an IBM-PC. As the software now stands relatively few additions are needed before the entire set of flight software is complete.

Pierson, William E.↗

Gravity Probe B: Testing Einstein with Gyroscopes

Some 40 years in the making, NASA' s historic Gravity Probe B (GP-B) mission is scheduled to launch aboard a Delta II in 2003. GP-B will test two extraordinary predictions from Einstein's General Relativity: geodetic precession and the Lense-Thirring effect (frame-dragging). Employing tiny, ultra-precise gyroscopes, GP-B features a measurement accuracy of 0.5 milli-arc-seconds per year. The extraordinary measurement precision is made possible by a host of breakthrough technologies, including electro-statically suspended, super-conducting quartz gyroscopes; virtual elimination of magnetic flux; a solid quartz star tracking telescope; helium microthrusters for drag-free control of the spacecraft; and a 2400 liter superfluid helium dewar. This paper will provide an overview of the science, key technologies, flight hardware, integration and test, and flight operations of the GP-B space vehicle. It will also examine some of the technical management challenges of a large-scale, technology-driven, Principal Investigator-led mission.

Geveden, Rex D.↗

Aerocapture Trajectory Design for Uranus Orbiter

Introduction: The recently released National Academies Planetary Science and Astrobiology Decadal Survey 2023-2032 [1] identified the Ice Giants as the top priority science destination. While the survey acknowledged the potential for either a Uranus Orbiter and Probe (UOP) mission or a Neptune-Triton Odyssey mission, it ultimately identified the former as the highest priority new flagship mission. UOP missions calls for a launch window of opportunity between 2031-2038 with 12-15 year interplanetary cruise time along with a fully-propulsive Uranus Orbit Insertion burn on the order of a few km/s. However, a mission to Uranus with the same science payload could utilize aerocapture for orbit insertion to achieve both a significant reduction in the interplanetary cruise time and reduction in propulsive burn costs. Why Aerocapture: Aerocapture is a promising propellant and time-saving orbital insertion technique for planetary destinations with an atmosphere. Although not flight-proven, previous aerocapture systems studies in the literature have demonstrated both the validity and robustness of the technique at various planetary destinations. With respect to the Ice Giant planets, Neptune has seen more of the analysis in the literature. For science missions at Neptune, aerocapture can enable 1.4 times more delivered mass to orbit than an all-propulsive mission for the same launch vehicle while reducing interplanetary cruise times by more than 3 years [2] Additionally with modern guidance and control, Neptune aerocapture with blunt-body aeroshells is realizable [3][4]. There are limited papers in the literature investigating Uranus aerocapture with those available providing a preliminary feasibility assessment [5]. Consequently, the two-year funded NASA Space Technology Mission Directorate (STMD)-funded project, titled Aerocapture System as an Enabling Technology for Ice Giants Missions, aims to mature the analysis and technology state of Uranus aerocapture. Trajectory Design: This paper presents the current state of the trajectory design in support of the new aerocapture project. The project design philosophy is inspired from recent Neptune aerocapture studies, which employed modern guidance and control, in the sense that blunt-body aeroshells are analyzed. An assessment of the theoretical flight path angle corridor width is conducted for a range of ballistic coefficients and lift-to-drag ratios for both Space Launch System and Falcon Heavy Launch Vehicle interplanetary trajectory solutions. The results from the corridor width assessment provide an assessment of the aerocapture design-space and qualitative metrics on trajectory design considerations. The Program to Optimize Simulated Trajectories II (POST2) is utilized to run Monte Carlo simulations of Uranus aerocapture three-degree-of-freedom bank angle modulated trajectories using a closed-loop numerical-predictor corrector guidance algorithm. UranusGRAM 2021 is utilized as the atmospheric model [6]. A Uranus-developed aerodatabase, originally derived from Mars Science Laboratory (MSL), is utilized to provide vehicle aerodynamics over a wide range of hypersonic flow regimes. A MSL-derived 70 deg 4.5m diameter sphere-cone aeroshell that houses the UOP payload mass is assumed. Robustness testing and performance analysis is conducted, including the assessment of entry state errors, atmosphere density variations, and aerodynamic dispersions. Post-aerocapture Delta-V and aerothermal statistics are formulated into propellant mass and TPS requirements. The results presented in the paper will demonstrate the trajectory viability of Uranus aerocapture. Preliminary Results: Preliminary trajectory design results indicates successful Uranus aerocapture with a blunt-body aeroshell housing the same payload mass as the UOP mission from an Earth-to-Uranus interplanetary trajectory arriving in less than 7 years. From this interplanetary trajectory, aerocapture provides an orbit insertion Delta-V capability of 6.9 km/s requiring less than 300 m/s for post-aerocapture correction burns (15% of wet mass allocated to propellant). To put this into perspective, the UOP study utilized an Earth-to-Uranus trajectory that arrives in 13 years and requires more than 1000 m/s for fully-propulsive orbit insertion (40% of wet mass allocated to propellant). Achieving the same 6.9 km/s Delta-V capability fully-propulsively is mass prohibitive (97% of wet mass allocated to propellant). Nevertheless, aerocapture has the potential to reduce interplanetary transit times to Uranus by half while delivering the same payload mass to orbit in a reduced propellant mass footprint.

Rohan Deshmukh↗

Implementation Options for the PROPEL Electrodynamic Tether Demonstration Mission

The PROPEL ("Propulsion using Electrodynamics") flight demonstration mission concept will demonstrate the use of an electrodynamic tether (EDT) for generating thrust, which will allow the propulsion system to overcome the limitations of the rocket equation. The mission concept has been developed by a team of government, industry, and academia partners led by NASA Marshall Space Flight Center (MSFC). PROPEL is being designed for versatility of the EDT system with multiple end users in mind and to be flexible with respect to platform. Previously, we reported on a comprehensive mission design for PROPEL with a mission duration of six months or longer with multiple mission goals including demonstration of significant boost, deboost, inclination change, and drag make-up activities. To explore a range of possible configurations, primarily driven by cost considerations, other mission concept designs have been pursued. In partnership with the NASA's Office of Chief Technologist (OCT) Game Changing Program, NASA MSFC Leadership, and the MSFC Advanced Concepts Office, a mission concept design was developed for a near-term EDT propulsion flight validation mission. The Electrodynamic Tether Propulsion Study (ETPS) defined an EDT propulsion system capable of very large delta-V for use on future missions developed by NASA, DoD, and commercial customers. To demonstrate the feasibility of an ETPS, the study focused on a space demonstration mission concept design with configuration of a pair of tethered satellite busses, one of which is the Japanese H-II Transfer Vehicle (HTV). The HTV would fly its standard ISS resupply mission. When resupply mission is complete, the ISS reconfigures and releases the HTV to perform the EDT experiment at safe orbital altitudes below the ISS. Though the focus of this particular mission concept design addresses a scenario involving the HTV or a similar vehicle, the propulsion system's capability is relevant to a number of applications, as noted above. The ETPS builds on prior work on long-life, failure-resistant, conducting tethers and includes an instrument suite with demonstrated heritage capable of performing necessary diagnostics to measure performance against predictions for a given system size (to be determined) and boost rate. Mission designs in other configurations and launch vehicle options are being developed such that the system can be demonstration should a flight opportunity be identified. We will report on past and ongoing implementation options for PROPEL.

Bilen, Sven G.↗

Surface Hardness Testing of Mobile Launcher 1 (ML-1) Vehicle Support Posts (VSP) Following Artemis I Launch Exposure

Following the successful launch of Artemis I on November 16th, 2022 (Fig 1), a surface hardness assessment was performed on the eight primary VSPs (Figs. 2, 3) located on the Zero Deck of the ML. This assessment was performed as part of an instrument investigation for strain gauges installed on VSP interior surfaces that had a “strange reaction”. This report does not address the VSP strain gauge investigation, but rather VSP structural integrity for future service (Artemis II, III, …). Surface hardness measurements were taken to assess the strength of the ASTM A148 steel castings to confirm thermal exposure from launch had not reannealed the VSPs. However unlikely, it is possible high temperature may have heated and tempered (reannealed) the VSPs, resulting in a change of built-in stresses. This loss in built-in stress may explain the change in off-set measured by the strain gauges. Initial hardness measurements were made at two interior surfaces of VSPs near the strain gauges and the corresponding exterior surfaces (engine hole-facing). Field hardness measurements on the exterior, engine hole surface-facing surfaces for all eight VSPs ranged from 175 to 226 HB/P, well below the minimum hardness of 302 Brinell (HB). Opposing interior surface hardness measurements near strain gauges ranged from 264 to 358 HB/P. In all cases for flight VSPs, a drop in interior-to-exterior hardness ranging from 70 to 132 HB/P was measured. Surface hardness measurements were then made on the two spare VSPs not exposed to launch temperatures for baseline comparison. These two spare VSPs had a drop in Brinell hardness from interior to exterior surfaces ranging from 3 to 17 HB/P. The large interior-to-exterior delta hardness for eight flight VSPs but not for the two spare VSPs suggests launch exposure temperatures softened the exterior surfaces, raising two questions: 1) Are the VSPs compromised for future use, and 2) How deep is the exterior surface softening effect? To address concerns of low surface hardness values at non-critical exterior surfaces, additional field surface hardness measurements were taken at high-stress locations on VSP3: Both door jams, back radius, and internal left and right radius near the base. These values came in well above the required minimum hardness (317 to 365 HB/P). For a more representative pre-launch versus post-launch surface hardness comparison, VSP Acceptance Data Packages (ADPs) were reviewed, and hardness measurements were made at the same eight original locations on VSP3 where hardness measurements were made at the foundry. To determine the degree of softening, 1/8” of material was machined away at three exterior surfaces of engine hole-facing side (Fig. 4). A significant increase in surface hardness was measured ranging from 50 to 86 HB/P. Values at these three locations were still slightly below the required minimum hardness, so an additional 1/8” material was machined away, and hardness values were retaken. At the ¼” depth, hardness values increased to 321 to 324 HB/P. These values fall above the required minimum, concluding surface hardness testing. Rationale for VSP continued use was reached with no restrictions during a Chief Engineering Review based on hardness values exceeding minimum at critical locations and subsurface locations for VSP #3.

Artemis I↗

Ion Propulsion: An Enabling Technology for the Dawn Mission

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, 4 Vesta, and the dwarf planet 1 Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 rocket that placed the 1218-kg spacecraft into an Earth-escape (heliocentic) trajectory with an escape velocity of 11 km/s. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide an additional delta-V of approximately 11 km/s for the heliocentric transfers to each body and for all orbit transfers including orbit capture/escape and transition to the various science orbits. Deterministic thrusting to Vesta began in December 2007 and concluded with orbit capture at Vesta in July 2011. The transfer to Vesta included a Mars gravity assist flyby in February 2009 that provided an additional delta-V of 2.6 km/s and was the only post-launch mission delta-V not provided by IPS. The IPS was used during the 14 months at Vesta for all science orbit transfers and then for Vesta escape. Deterministic thrusting for Ceres began in late August 2012 with a planned arrival date at Ceres in early 2015, whereupon IPS will be used for all science orbit transfers. As of January 2013 the IPS has been operated for approximately 28,000 hours, consumed approximately 280 kg of xenon, and provided a delta-V of approximately 7.5 km/s, the most post-launch delta-V of any spacecraft yet flown. IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. Use of the IPS together with a medium-priced launch vehicle enabled this high delta-V mission to be performed within the Discovery Program cost cap. This paper provides an overview of the Dawn IPS and its mission operations through departure for Ceres.

Dawn mission overview↗