Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DRILLING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Fluoroscopy-Guided Percutaneous Vertebral Body Biopsy Using a Novel Drill-Powered Device: Technical Case Series

BackgroundA novel coaxial biopsy system powered by a handheld drill has recently been introduced for percutaneous bone biopsy. This technical note describes our initial experience performing fluoroscopy-guided vertebral body biopsies with this system, compares the yield of drill-assisted biopsy specimens with those obtained using a manual technique, and assesses the histologic adequacy of specimens obtained with drill assistance.MethodsMedical records of all single-level, fluoroscopy-guided vertebral body biopsies were reviewed. Procedural complications were documented according to the Society of Interventional Radiology classification. The total length of bone core obtained from drill-assisted biopsies was compared with that of matched manual biopsies. Pathology reports were reviewed to determine the histologic adequacy of specimens obtained with drill assistance.ResultsTwenty eight drill-assisted percutaneous vertebral body biopsies met study inclusion criteria. No acute complications were reported. Of the 86 % (24/28) of patients with clinical follow-up, no delayed complications were reported (median follow-up, 28 weeks; range 5–115 weeks). The median total length of bone core obtained from drill-assisted biopsies was 28 mm (range 8–120 mm). This was longer than that obtained from manual biopsies (median, 20 mm; range 5–45 mm; P = 0.03). Crush artifact was present in 11 % (3/28) of drill-assisted biopsy specimens, which in one case (3.6 %; 1/28) precluded definitive diagnosis.ConclusionsA drill-assisted, coaxial biopsy system can be used to safely obtain vertebral body core specimens under fluoroscopic guidance. The higher bone core yield obtained with drill assistance may be offset by the presence of crush artifact.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Utah FORGE: Well 16B(78)-32 Drilling Data

This drilling data for Utah FORGE well 16B(78)-32 include a well survey, core summary, mud and mud temperature logs, daily reports of the drilling process, and additional data from the Pason oil and gas company. Well 16B(78)-32 serves as the production well for reservoir creation, fluid circulation, and demonstration of heat extraction for the FORGE project. It has been drilled as a doublet approximately 300 feet parallel to and above the injection well 16A(78)-32. The proposed total depth was 10,658 feet, which was exceeded. Spudding began on April 26th, 2023. As of June 20th, 2023, the total depth measured 10,947 feet and the vertical depth measured 8,357 feet. Drilling included the trial use of insulated drill pipe (IDP) from Eavor Technologies, which was considered a success. IDP restricts counter-current heat transfer between drilling fluid inside the drill string and hotter returning fluid in the annulus, thereby ensuring the bottomhole assembly (BHA) remains submerged in cool fluid. Eavor rented 350 joints of IDP to FORGE which were run in two consecutive BHAs at the well. The results of this trial are included here.

15 GEOTHERMAL ENERGY↗

Techniques Employed to Conduct Postshot Drilling at the former Nevada Test Site

Postshot drilling provided essential data on the results of the underground nuclear tests conducted at the Nevada Test Site (NTS), now identified as the Nevada National Security Site (NNSS). It was the means by which samples from the zone of interest were obtained for radiochemical analysis. This handbook describes how Lawrence Livermore National Laboratory (LLNL) conducted postshot drilling operations at the NTS, and it provides a general understanding of the process. Postshot drilling is a specialized application of rotary drilling. Accordingly, this handbook gives a brief description of rotary drilling in Section 2 to acquaint the reader with the general subject before proceeding to the specialized techniques used in postshot drilling. In Section 3, the handbook describes the typical postshot drilling situation at the former NTS and the drilling methods used. Section 4 describes the typical sequence of operations in postshot drilling at the former NTS. Detailed information on special equipment and techniques is given in a series of appendices (A through F) at the end of the handbook.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of Physics-Based Limiter Redesign Drilling and Alternative Bit Design at The Geysers

As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC, an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration with increased time on bottom for each bit. The project will leverage advances in oil and gas drilling technologies including PDC bits, along with the physics-based limiter redesign techniques championed in drilling demonstrations conducted at the Utah FORGE geothermal site. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. The wells are typically drilled to the top of the reservoir with mud and then air-drilled to total depth (TD) through fractured zones at temperatures ≥ 450°F. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate bit technologies. The first demonstration well has been completed, with a total of 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three hole sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges.

15 GEOTHERMAL ENERGY↗

Use of Rig Parameter Data in Bit Constraint Models for Improved Drilling Performance at The Geysers

Surface parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. However, these measurements are of reduced value without a standard to aid in evaluation and decision making. A method is demonstrated whereby drill bit constraint models are used to interpret drilling response parameters. Drill rig parameter data for well GDC-36 at the Geysers Geothermal Field Power were acquired by Geysers Power Company and drilling contractor Kenai Drilling using Pason US DataHub and evaluated. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) along with other model constraints in computational algorithms. The method is used to evaluate overall bit performance, monitor bit integrity, and detect the presence of drillstring vibrations and other conditions contributing to bit failure; comparisons are made to observations of bit wear and damage. The method will be applied in real-time to improve decision-making on subsequent wells and has applicability to development of advanced analytics on future geothermal wells using real-time electronic drilling recorder (EDR) data for improved performance and reduced drilling costs.

15 GEOTHERMAL ENERGY↗

Impact of drilling fluid rheology and wellbore pressure on rock cuttings removal performance: numerical investigation

Drilling fluids exhibit non-Newtonian behavior which is generally described in the literature by two rheological models: Power Law and Herschel-Bulkley models. We have used Eulerian- Eulerian multiphase flow model to evaluate the drilling fluid flow patterns and filter cake formation patterns for both models for ultra-deep drilling conditions. Simulated drilling fluid flow patterns clearly show that the Herschel - Bulkley model exhibits fewer vortices around the drilling pipe, indicating better rock cuttings removal performance. In addition to mud rheology, we have analyzed the pressure drop variation with the filter cake formation on the wellbore during ultradeep drilling process. We have shown that filter cake thickness at the wall linearly increases with differential pressure between the well and formation. This implies that the differential pressure needs to be optimized. Very thin filter cake may lead to excessive fluid seepage into the permeable subterranean vertical zone resulting in a loss of fluid circulation and hence in a loss of rock cuttings removal. Yet, very thick filter cake reduces the effective diameter of the hole which may lead to a poor rock cuttings removal performance and stuck pipe. The mathematical model presented here needs to be experimentally validated when filter cake thickness data in deep drilling conditions become available. The model could be useful to provide drilling engineers insight on the filter cake formation, drilling fluid flow pattern, and give guide-line to optimize the filter cake as field experimental data are scarce.

02 PETROLEUM↗

SU-E-T-314: Dosimetric Effect of Smooth Drilling On Proton Compensators in Prostate Patients

Purpose: To evaluate the dosimetric effect of smooth drilling of proton compensators in proton prostate plans when compared to typical plunge drilling settings. Methods: Twelve prostate patients were planned in Eclipse treatment planning system using three different drill settings Smooth, Plunge drill A, and Plunge drill B. The differences between A and B were: spacing X[cm]: 0.4(A), 0.1(B), spacing Y[cm]: 0.35(A), 0.1(B), row offset [cm]: 0.2(A), 0(B). Planning parameters were kept consistent between the different plans, which utilized two opposed lateral beams arrangement. Mean differences absolute dosimetry in OAR constraints are presented. Results: The smooth drilled compensator based plans yielded equivalent target coverage to the plans generated with drill settings A and B. Overall, the smooth compensators reduced dose to the majority of organs at risk compared to settings A and B. Constraints were reduced for the following OAR: Rectal V75 by 2.12 and 2.48%, V70 by 2.45 and 2.91%, V65 by 2.85 and 3.37%, V50 by 2.3 and 5.1%, Bladder V65 by 4.49 and 3.67%, Penial Bulb mean by 3.7 and 4.2Gy, and the maximum plan dose 5.3 and 7.4Gy for option A vs smooth and option B vs smooth respectively. The femoral head constraint (V50<5%) was met by all plans, but it was not consistently lower for the smooth drilling plan. Conclusion: Smooth drilled compensators provide equivalent target coverage and overall slightly cooler plans to the majority of organs at risk; it also minimizes the potential dosimetric impacts caused by patient positioning uncertainty.

60 APPLIED LIFE SCIENCES↗

High Temperature 300°C Measurement While Drilling System

Many countries around the world, including the USA, have untapped geothermal energy potential. Enhanced Geothermal Systems (EGS) technology is needed to economically utilize this resource. Temperatures in some EGS reservoirs can exceed 300°C. To effectively utilize EGS resources, an array of injection and production wells must be accurately placed in the formation fracture network. Therefore, EGS can greatly benefit from a high temperature directional drilling system. Most commercial services for directional drilling systems are rated for 175°C while geothermal wells require operation at much higher temperatures. Two U.S. Department of Energy (DOE) Geothermal Technologies Office (GTO) projects have been initiated to develop a 300°C capable directional drilling system, the first developing a drill bit, directional motor, and drilling fluid (award number DE-EE0002782), and the second adding navigation and telemetry systems. This report is for the second project, “High Temperature 300°C Measurement While Drilling System”, award number DE-EE0005505. The “High Temperature 300°C Measurement While Drilling (MWD)” system complements the already developed drilling system with real time navigation capability. It is comprised of 175°C directional measurement electronics including the required sensors for measuring inclination and azimuth in 3 axes. It is embedded in a cooling and temperature isolation system to protect the electronics and sensors from the higher temperature outside the system, which can reach 300°C. Building the cooling and isolation system from non-magnetic materials and keeping a required distance to any magnetic component, such as alternator parts, ensures a high quality measurement of the earth’s magnetic field. This is required to achieve the specified navigation accuracy. The MWD system has a turbine driven alternator that is capable of delivering the required electrical energy to the electronic system at a 300°C borehole temperature. Measured data will be communicated to the surface by mud-pulse-telemetry. For this purpose the tool has a mud-pulse-valve that is controlled by the measurement electronics to establish a serial data communication via the mud stream. The mud-pulse-valve is also built to operate under 300°C borehole conditions. Three prototypes of the 300°C MWD were built and tested. These systems are available for a joint application with the previously developed 300°C drilling system, in a geothermal well.

15 GEOTHERMAL ENERGY↗

Analysis of Rig Parameter Data Using Drilling Process Modeling Constraints, Volume 5: Utah FORGE Well 16B(78)-32

Drill rig parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. While insightful into the drilling process, these measurements are of reduced value without a standard to aid in data evaluation and decision making. In the main body of this work (Volume 1), a method is demonstrated whereby rock reduction model constraints are used to interpret drilling response parameters; the method could be applied in real-time to improve decision-making in the field and to further discern technology performance during post-drilling evaluations. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) in computational algorithms. The method presented has applicability to development of advanced analytics on future geothermal wells using real-time electronic data recording for improved performance and reduced drilling costs. A drilling cost model is also used to show the tradeoff between rate of penetration and bit life and the influence on interval drilling costs. Details of the bit specifications and performance are cataloged in an independent volume, documented under separate cover, for each of the four wells, and include Volume 2: Utah FORGE 16A(78)-32; Volume 3: Utah FORGE 56-32; Volume 4: Utah FORGE 78B-32 and Volume 5: Utah FORGE 16B(78)-32.

15 GEOTHERMAL ENERGY↗

Analysis of Rig Parameter Data Using Drilling Process Modeling Constraints, Volume 4: Utah FORGE Well 78B-32

Drill rig parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. While insightful into the drilling process, these measurements are of reduced value without a standard to aid in data evaluation and decision making. In the main body of this work (Volume 1), a method is demonstrated whereby rock reduction model constraints are used to interpret drilling response parameters; the method could be applied in real-time to improve decision-making in the field and to further discern technology performance during post-drilling evaluations. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) in computational algorithms. The method presented has applicability to development of advanced analytics on future geothermal wells using real-time electronic data recording for improved performance and reduced drilling costs. A drilling cost model is also used to show the tradeoff between rate of penetration and bit life and the influence on interval drilling costs. Details of the bit specifications and performance are cataloged in an independent volume, documented under separate cover, for each of the four wells, and include Volume 2: Utah FORGE 16A(78)-32; Volume 3: Utah FORGE 56-32; Volume 4: Utah FORGE 78B-32 and Volume 5: Utah FORGE 16B(78)-32.

15 GEOTHERMAL ENERGY↗

Analysis of Rig Parameter Data Using Drilling Process Modeling Constraints, Volume 3: Utah FORGE Well 56-32

Drill rig parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. While insightful into the drilling process, these measurements are of reduced value without a standard to aid in data evaluation and decision making. In the main body of this work (Volume 1), a method is demonstrated whereby rock reduction model constraints are used to interpret drilling response parameters; the method could be applied in real-time to improve decision-making in the field and to further discern technology performance during post-drilling evaluations. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) in computational algorithms. The method presented has applicability to development of advanced analytics on future geothermal wells using real-time electronic data recording for improved performance and reduced drilling costs. A drilling cost model is also used to show the tradeoff between rate of penetration and bit life and the influence on interval drilling costs. Details of the bit specifications and performance are cataloged in an independent volume, documented under separate cover, for each of the four wells, and include Volume 2: Utah FORGE 16A(78)-32; Volume 3: Utah FORGE 56-32; Volume 4: Utah FORGE 78B-32 and Volume 5: Utah FORGE 16B(78)-32.

15 GEOTHERMAL ENERGY↗

Analysis of Rig Parameter Data Using Drilling Process Modeling Constraints, Volume 1: Summary of Utah FORGE Wells 16A(78)-32, 56-32, 78B-32 and 16B(78)-32

Drill rig parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. While insightful into the drilling process, these measurements are of reduced value without a standard to aid in data evaluation and decision making. In the main body of this work (Volume 1), a method is demonstrated whereby rock reduction model constraints are used to interpret drilling response parameters; the method could be applied in real-time to improve decision-making in the field and to further discern technology performance during post-drilling evaluations. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) in computational algorithms. The method presented has applicability to development of advanced analytics on future geothermal wells using real-time electronic data recording for improved performance and reduced drilling costs. A drilling cost model is also used to show the tradeoff between rate of penetration and bit life and the influence on interval drilling costs. Details of the bit specifications and performance are cataloged in an independent volume, documented under separate cover, for each of the four wells, and include Volume 2: Utah FORGE 16A(78)-32; Volume 3: Utah FORGE 56-32; Volume 4: Utah FORGE 78B-32 and Volume 5: Utah FORGE 16B(78)-32.

15 GEOTHERMAL ENERGY↗

lllinois Storage Corridor CarbonSAFE Phase III: Pre-drilling Site Assessment: Prairie State Generating Company

The Illinois Storage Corridor project will drill a stratigraphic test well as part of the Illinois Storage Corridor CarbonSAFE Phase 3 project near the Prairie State Generating Company coal-fired power plant near Marissa, Illinois. The pre-drilling site evaluation has considered the primary target reservoirs, the Potosi Dolomite and St. Peter Sandstone, and primary seal, the Maquoketa Group. Data to be collected from the well include core, fluid samples, in situ well tests, geophysical logs intended to provide information on lithologic, geomechanical, and geophysical characteristics to determine the feasibility for the geologic sequestration of 50 million metric tons or more of injected carbon dioxide. The planned drilling site has been evaluated using available subsurface geologic data and analyses from the Illinois Basin. These data provide lithologic and structural information, shallow groundwater resource distribution, location of known nearby wellbores, and regional drilling characteristics. The data were used to generate geologic structure and isopach maps for the target reservoir and caprock strata and for prognosing the tops of major lithologic units to aid drilling and coring procedures. The regional analyses indicate that no known structural features are expected to negatively impact the target storage reservoir or caprock. No protected and sensitive areas, groundwater resources, or existing resource development are expected to be impacted by the proposed well drilling activities. The well is planned to be drilled to a total depth of approximately 5,600 feet (1,707 m) and terminate in the Precambrian. Cores (up to 5 intervals) will be collected from the Maquoketa Group, confining units above the St. Peter Sandstone, St. Peter Sandstone, confining units of the Potosi Dolomite and the Potosi Dolomite. Water samples will be attempted to be collected from the St. Peter Sandstone and Potosi Dolomite. Potential impact on drilling progress is a lost circulation zone in the Potosi Dolomite, which has been demonstrated to have intermittent cavernous porosity from karstification elsewhere in the Illinois Basin. This document also presents a preliminary coring and sampling program, proposed logging suite, and well testing program, all of which will be reviewed during drilling.

01 COAL, LIGNITE, AND PEAT↗

Super Hot EGS and the Newberry Deep Drilling Project

A productive geothermal well drilled into super-hot rock (SHR) with a temperature above 400°C will produce super-critical fluid. At a flow rate of 60 kg/s, a SHR well could produce 50 MWe compared to 5-7 MWe for the same flow at 200°C. Even though these deeper, super-hot wells will cost more, the high energy density means power produced by engineered geothermal systems (EGS) can meet the market ($46 MW-hr) by directly tapping the heat source. We propose a proof of concept where hot rock is close to the surface (~5 km), and the cost of drilling and EGS stimulation will be lowest. A suitable, ready-to-go SHR site is on Newberry Volcano, Oregon, one of the largest geothermal heat reservoirs in the USA, extensively studied for the last 40 years. Millions of dollars have already been invested in the site by private geothermal developers and the US Department of Energy (DOE), resulting in a ready-to-use facility with the necessary infrastructure, environmental permits, land commitments, and monitoring plans. The Newberry Deep Drilling Project (NDDP) will be located at an idle geothermal exploration well, NWG 46-16, drilled in 2008, 3500 m deep and 320°C at bottom, which will be deepened another 1000 to 1300 m to reach 500 °C. The original well was drilled with few lost circulation zones and the temperature profile indicates conductive heat flow. Compared to other SHR projects world-wide, this well would return more materials (cuttings, core and fluids) with more predictable drilling conditions, thus providing a suite of data near and across the brittle-ductile transition in silicarich rocks. After drilling, a hydraulic well stimulation will both change the pore pressure in fractures and cool the fracture walls resulting in permeability enhancement through both thermal fracturing, and hydro-shearing. The first step for the NDDP was an International Continental Drilling Program (ICDP) sponsored workshop held at the OSU-Cascades campus in Bend from Sept. 10-14, 2017. The workshop concluded by setting ambitious goals for NDDP: 1) test EGS above the critical point of water, 2) collect samples of rocks within the brittle-ductile transition, 3) investigate volcanic hazards, 4) study magmatic geomechanics, 5) calibrate geophysical imaging techniques, and 6) test technology for drilling, well completion, and geophysical monitoring in a very high temperature environment. The second step, completed January 15, 2018, was submitting a proposal to ICDP for 46-16 deepening. The next steps will be to continue building a team with project, technology, and investment partners to make NDDP a reality.

EGS, Geothermal, Newberry↗

Wabash CarbonSAFE Subtask 7.1 – Pre-drilling Site Assessment Topical Report: DOE-FE0031626-1

The Wabash CarbonSAFE project will drill a stratigraphic test well at the Wabash Valley Resources facility near Terre Haute, Indiana. Lithologic, geomechanical, and geophysical data collected from samples testing and an extensive geophysical logging suite will be used to determine the feasibility for the geologic sequestration of 50 million metric tons or more of injected carbon dioxide. The primary target reservoir and caprock to be investigated for the Wabash CarbonSAFE project are the Mt. Simon Sandstone and Eau Claire Shale, respectively. The project team has assessed the planned Wabash #1 drilling site using subsurface geologic data and analyses from both Illinois and Indiana. These data were used to generate geologic structure and isopach thickness maps for target reservoir and caprock layers which were incorporated into a detailed discussion of the nature of the Illinois Basin’s Cambro-Ordovician carbon dioxide storage complex at the drilling site. Formation tops were prognosed for 19 lithologic units to aid drilling and coring procedures. Additional GIS analysis indicates that no known structural features will negatively impact the target storage reservoir or caprock, nor will protected and sensitive areas, groundwater resources, or existing resource development be negatively affected by Wabash #1 drilling activities. The Wabash #1 Geologic/Structure Test well drilling permit was awarded by Indiana Department of Natural Resources (IN-DNR) – Division of Oil and Gas on November 12th, 2019, and the well is expected to be drilled to a total depth of approximately 8,350 feet. Potential impacts on drilling progress include abandoned underground coal mines which mined the Springfield and Survant coals until 1964 and 1954, respectively, and a lost circulation zone in the Potosi Dolomite, which has been demonstrated to have intermittent cavernous porosity from karstification. This document also details the coring and sampling program, proposed logging suite, and well testing program, all of which will be dynamically reviewed as drilling progresses.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Directional Drilling Technology for HLW Disposal - Outline of System and its Application - 16078

During high-level waste (HLW) disposal site selection, borehole measurement and logging to investigate the hydro-geological and geo-mechanical conditions of the host rocks is a very important way to examine the potential of the disposal candidates. In Japan, attention is being given to Neogene soft sedimentary rock as the host rock for HLW disposal. In particular, the soft sedimentary rock in coastal areas is thought to be one of the best candidates, because there is little driving force from underground water. Directional drilling is supposed to be efficient under limited topographic and geological conditions, and the Central Research Institute of Electric Power Industry (CRIEPI) has been conducting a project on directional drilling and logging/measurement technologies since 2000. Basic directional drilling system was developed and the system was applied to the Neogene normal sedimentary rock at the Hokushin area of the Horonobe town in Hokkaido. The borehole was drilled to the 700 m long and the applicability of the system was confirmed until 2004. A basic directional drilling system was developed, and the system was applied to the Neogene normal sedimentary rock in the Hokushin area, in the town of Horonobe in Hokkaido. A 700-m borehole was drilled, and the applicability of the system was confirmed in 2004. After conducting a seismic reflection survey for the Omagari fault distribution at the Kami-Horonobe area in the town of Horonobe, a drilling site was selected, and a borehole trace was planned to perpendicularly intersect the fault zone in 2005. Considering the planned trace, a 1000-m-long borehole was drilled to a depth of 450 m. From 750 m to the bottom (1000 m), the borehole was horizontal. The total core recovery was 99.8%, even though it was drilled in the fault zone. The geological, hydrological, geo-mechanical, geophysical, and geochemical data were collected using borehole logging/measurement/survey and core logging/measurement/analysis, and the Omagari fault was characterized. After conducting all the work in the borehole, a steel pipe was inserted into the borehole to case the wall. Open hole sections for monitoring were constructed considering the hydro-geological conditions throughout the hole. Then, the monitoring system was inserted and set up to obtain the initial conditions of the groundwater pressure and chemistry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Crosswell Imaging Technology & Advanced DSR Navigation for Horizontal Directional Drilling

The objective of Phase II is to develop and demonstrate real-time measurement-while-drilling (MWD) for guidance and navigation of drill strings during horizontal drilling operations applicable to both short and long holes. The end product of Phase II is a functional drill-string assembly outfitted with a commercial version of Drill String Radar (DSR). Project Objectives Develop and demonstrate a dual-phase methodology of in-seam drilling, imaging, and structure confirmation. This methodology, illustrated in Figure 1, includes: (1) Using RIM to image between drill holes for seam thickness estimates and in-seam structures detection. Completed, February 2005; and (2) Using DSR for real-time MWD guidance and navigation of drillstrings during horizontal drilling operations. Completed, November 2008. As of November 2008, the Phase II portion of Contract DE-FC26-04NT42085 is about 99% complete, including milestones and tasks original outlined as Phase II work. The one percent deficiency results from MSHA-related approvals which have yet to be granted (at the time of reporting). These approvals are pending and are do not negatively impact the scope of work or project objectives.

47 OTHER INSTRUMENTATION↗

Sulfide Stress Corrosion Cracking Behavior of G105 and S135 High-Strength Drill Pipe Steels in H{sub 2}S Environment

Slow strain rate testing was employed to investigate the sulfide stress corrosion cracking (SSCC) behavior of low-carbon high-strength drill pipe steels (G105 and S135) in the simulated drilling environment containing H{sub 2}S. Results reveal that both G105 and S135 steels have a high SSCC susceptibility in the simulated drilling environment containing H{sub 2}S. In the range of experimental slow strain rate, the SSCC sensitivity of drill pipe steel increases with the decrease in slow strain rate, and the ductility and fracture properties of drill pipe steels also decrease obviously. With the increase in the steel strength, the SSCC sensitivity of the drill pipe steel increases, and the S135 drill pipe steel has higher SSCC sensitivity than G105. There is no obvious plastic deformation on the fracture surface of G105 and S135 steels in H{sub 2}S solution. The cracks of fracture sprout on the surface of the specimen, the instantaneous fracture zone is in the middle, and the fracture can be divided into the cracking and the final fracture zone. The SSCC mechanisms of two drill pipe steels are hydrogen embrittlement. The hydrogen enters the steel and reduces the binding force of the iron atom, resulting in cleavage fracture.

36 MATERIALS SCIENCE↗