Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DRILL BITS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

The Sensitivity of PBX 9502 to Drilling Operations

Polymer-bonded explosive (PBX) 9502 (95% TATB, 5% Kel-F 800 by weight) is dry-drilled on a CNC milling machine and its thermomechanical response to varying feed rates, drilling speeds, and peck depths with 4 mm and 5 mm diameter drill bits is investigated. The tested samples are affixed to a force sensor that enables recording temporally resolved cutting forces and torques, and a drill-embedded thermocouple yields local temperature data. From the data, an empirical relationship between temperature changes and feed per revolution is developed, which reveals reduced temperatures in higher feed per revolution regimes for PBX 9502. The observed relationship allows extrapolating to temperatures for other hole diameters, indicating increased temperature for smaller diameter drilling across the board. Additional testing was performed with PBX 9501 (95% HMX, 2.5% Estane®, 2.5% BDNPA/BDNPF by weight), albeit over a reduced parameter space, which revealed the opposite behavior for the feed per revolution temperature dependence. It is concluded that both PBX 9502 and PBX 9501 can be dry-drilled efficiently beyond the limits of presently applicable US-DOE standards, where cutting interface temperatures remain far below material critical temperatures. Finally, data reveals that coolant usage in the drilling process for these materials provides a wide safety margin.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Rock melting technology and geothermal drilling

National awareness of the potential future shortages in energy resources has heightened interest in exploration and utilization of a variety of geothermal energy (GTE) reservoirs. The status of conventional drilling of GTE wells is reviewed briefly and problem areas which lead to higher drilling costs are identified and R and D directions toward solution are suggested. In the immediate future, an expanded program of drilling in GTE formations can benefit from improvements in drilling equipment and technology normally associated with oil or gas wells. Over a longer time period, the new rock-melting drill bits being developed as a part of the Los Alamos Scientific Laboratory's Subterrene Program offer new solutions to a number of problems which frequently hamper GTE drilling, including the most basic problem - high temperature. Two of the most favorable characteristics of rock-melting penetrators are their ability to operate effectively in hot rock and produce glass linings around the hole as an integral part of the drilling process. The technical advantages to be gained by use of rock-melting penetrators are discussed in relation to the basic needs for GTE wells.

Rowley, J. C.↗

Creation of an Enhanced Geothermal System through Hydraulic and Thermal Stimulation

This report describes a 10-year DOE-funded project to design, characterize and create an Engineered Geothermal System (EGS) through a combination of hydraulic, thermal and chemical stimulation techniques. Volume 1 describes a four-year Phase 1 campaign, which focused on the east compartment of the Coso geothermal field. It includes a description of the geomechanical, geophysical, hydraulic, and geochemical studies that were conducted to characterize the reservoir in anticipation of the hydraulic stimulation experiment. Phase 1 ended prematurely when the drill bit intersected a very permeable fault zone during the redrilling of target stimulation well 34-9RD2. A hydraulic stimulation was inadvertently achieved, however, since the flow of drill mud from the well into the formation created an earthquake swarm near the wellbore that was recorded, located, analyzed and interpreted by project seismologists. Upon completion of Phase 1, the project shifted focus to a new target well, which was located within the southwest compartment of the Coso geothermal field. Volume 2 describes the Phase 2 studies on the geomechanical, geophysical, hydraulic, and geochemical aspects of the reservoir in and around target-stimulation well 46A-19RD, which is the deepest and hottest well ever drilled at Coso. Its total measured depth exceeding 12,000 ft. It spite of its great depth, this well is largely impermeable below a depth of about 9,000 ft, thus providing an excellent target for stimulation. In order to prepare 46A-19RD for stimulation, however, it was necessary to pull the slotted liner. This proved to be unachievable under the budget allocated by the Coso Operating Company partners, and this aspect of the project was abandoned, ending the program at Coso. The program then shifted to the EGS project at Desert Peak, which had a goal similar to the one at Coso of creating an EGS on the periphery of an existing geothermal reservoir. Volume 3 describes the activities that the Coso team contributed to the Desert Peak project, focusing largely on a geomechanical investigation of the Desert Peak reservoir, tracer testing between injectors 21-2 and 22-22 and the field's main producers, and the chemical stimulation of target well 27-15.

15 GEOTHERMAL ENERGY↗

Creation of an Enhanced Geothermal System through Hydraulic and Thermal Stimulation

This report describes a 10-year DOE-funded project to design, characterize and create an Engineered Geothermal System (EGS) through a combination of hydraulic, thermal and chemical stimulation techniques. Volume 1 describes a four-year Phase 1 campaign, which focused on the east compartment of the Coso geothermal field. It includes a description of the geomechanical, geophysical, hydraulic, and geochemical studies that were conducted to characterize the reservoir in anticipation of the hydraulic stimulation experiment. Phase 1 ended prematurely when the drill bit intersected a very permeable fault zone during the redrilling of target stimulation well 34-9RD2. A hydraulic stimulation was inadvertently achieved, however, since the flow of drill mud from the well into the formation created an earthquake swarm near the wellbore that was recorded, located, analyzed and interpreted by project seismologists. Upon completion of Phase 1, the project shifted focus to a new target well, which was located within the southwest compartment of the Coso geothermal field. Volume 2 describes the Phase 2 studies on the geomechanical, geophysical, hydraulic, and geochemical aspects of the reservoir in and around target-stimulation well 46A-19RD, which is the deepest and hottest well ever drilled at Coso. Its total measured depth exceeding 12,000 ft. It spite of its great depth, this well is largely impermeable below a depth of about 9,000 ft, thus providing an excellent target for stimulation. In order to prepare 46A-19RD for stimulation, however, it was necessary to pull the slotted liner. This proved to be unachievable under the budget allocated by the Coso Operating Company partners, and this aspect of the project was abandoned, ending the program at Coso. The program then shifted to the EGS project at Desert Peak, which had a goal similar to the one at Coso of creating an EGS on the periphery of an existing geothermal reservoir. Volume 3 describes the activities that the Coso team contributed to the Desert Peak project, focusing largely on a geomechanical investigation of the Desert Peak reservoir, tracer testing between injectors 21-2 and 22-22 and the field's main producers, and the chemical stimulation of target well 27-15.

15 GEOTHERMAL ENERGY↗

The Effect of Hole Quality on the Bearing Strength of Carbon Fiber Laminates

On programs involving flight hardware for launch vehicles that the author has been involved in over the years, the question always arises as to how to best machine and inspect holes drilled for fasteners. While common sense dictates that ‘well-drilled’ holes are desired over ‘poorly drilled’ holes for bolt bearing applications, the effect of hole quality on the bearing strength of carbon fiber laminates has not been extensively studied in the open literature. If this effect is not quantitatively known, the question of what hole quality needs to be required for the flight hardware cannot be answered. In addition, the function of the part with respect to the holes needs to be taken into account. There is no such thing as a defect-free hole since some chip-out of fibers within the hole will occur regardless of drill bit and backing plate pressure. For most holes machined in a carbon fiber laminate, some extent of delamination and fiber breakout on the entrance and exit of the hole is going to occur. Much time and money can be spent on trying to perfect the drilling technique and subsequent inspection of holes in carbon fiber laminates, including adding extra plies of cloth to the surfaces to help prevent fiber breakout; but is this effort really justified if little-to-no increase in bearing strength is realized by good-quality holes over those of lesser quality?

Nettles, A. T.↗

Removal of the Plutonium Recycle Test Reactor - 13031

The 309 Facility housed the Plutonium Recycle Test Reactor (PRTR), an operating test reactor in the 300 Area at Hanford, Washington. The reactor first went critical in 1960 and was originally used for experiments under the Hanford Site Plutonium Fuels Utilization Program. The facility was decontaminated and decommissioned in 1988-1989, and the facility was deactivated in 1994. The 309 facility was added to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response actions as established in an Interim Record of Decision (IROD) and Action Memorandum (AM). The IROD directs a remedial action for the 309 facility, associated waste sites, associated underground piping and contaminated soils resulting from past unplanned releases. The AM directs a removal action through physical demolition of the facility, including removal of the reactor. Both CERCLA actions are implemented in accordance with U.S. EPA approved Remedial Action Work Plan, and the Remedial Design Report / Remedial Action Report associated with the Hanford 300-FF-2 Operable Unit. The selected method for remedy was to conventionally demolish above grade structures including the easily distinguished containment vessel dome, remove the PRTR and a minimum of 300 mm (12 in) of shielding as a single 560 Ton unit, and conventionally demolish the below grade structure. Initial sample core drilling in the Bio-Shield for radiological surveys showed evidence that the Bio-Shield was of sound structure. Core drills for the separation process of the PRTR from the 309 structure began at the deck level and revealed substantial thermal degradation of at least the top 1.2 m (4LF) of Bio-Shield structure. The degraded structure combined with the original materials used in the Bio-Shield would not allow for a stable structure to be extracted. The water used in the core drilling process proved to erode the sand mixture of the Bio-Shield leaving the steel aggregate to act as ball bearings against the core drill bit. A redesign is being completed to extract the 309 PRTR and entire Bio-Shield structure together as one monolith weighing 1100 Ton by cutting structural concrete supports. In addition, the PRTR has hundreds of contaminated process tubes and pipes that have to be severed to allow for a uniformly flush fit with a lower lifting frame. Thirty-two 50 mm (2 in) core drills must be connected with thirty-two wire saw cuts to allow for lifting columns to be inserted. Then eight primary saw cuts must be completed to severe the PRTR from the 309 Facility. Once the weight of the PRTR is transferred to the lifting frame, then the PRTR may be lifted out of the facility. The critical lift will be executed using four 450 Ton strand jacks mounted on a 9 m (30 LF) tall mobile lifting frame that will allow the PRTR to be transported by eight 600 mm (24 in) Slide Shoes. The PRTR will then be placed on a twenty-four line, double wide, self powered Goldhofer for transfer to the onsite CERCLA Disposal Cell (ERDF Facility), approximately 33 km (20 miles) away. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computerized tomography-based quality assurance tool for proton range compensators

The authors have developed an automatic quality assurance method based on computerized tomography (CT) data for physically manufactured proton range compensators. Eight range compensators used for proton therapy at their institution were scanned using CT and their depth distributions were compared with data provided by a proton treatment planning system (TPS). The depth difference (DD), distance to agreement (DTA), and a composite analysis (CA) indicating regions that passed either of the tests were used for depth verification. When the tolerance limits were set at 3 mm for DD and 1 mm for DTA, the average percentages of points exceeding the acceptance criteria for DD, DTA, and CA for the eight compensators were 9.0%, 5.3% and 3.2%, respectively. In general, the percentages of points exceeding the acceptance criteria were much higher in DD than in DTA analysis and mismatch of depth was greater in regions with high depth gradients. This is considered to arise mainly because of systematic errors such as the physical size of the drill, slight bending or slipping of the drill bit near high gradient regions, the limit of CT resolution, and the uncertainty in CT number. When the tolerance limit of DTA was increased from 1 to 2 mm, the average percentage of points exceeding the acceptance criteria for DTA was reduced from 5.3% to 0.9%. Their results show that depth comparison of proton range compensators based on CT images can provide more systematic data than does the current method, in which a representative group of drill points is measured manually.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Voice Coil Percussive Mechanism Concept for Hammer Drill

A hammer drill design of a voice coil linear actuator, spring, linear bearings, and a hammer head was proposed. The voice coil actuator moves the hammer head to produce impact to the end of the drill bit. The spring is used to store energy on the retraction and to capture the rebound energy after each impact for use in the next impact. The maximum actuator stroke is 20 mm with the hammer mass being 200 grams. This unit can create impact energy of 0.4 J with 0.8 J being the maximum. This mechanism is less complex than previous devices meant for the same task, so it has less mass and less volume. Its impact rate and energy are easily tunable without changing major hardware components. The drill can be driven by two half-bridges. Heat is removed from the voice coil via CO2 conduction.

Okon, Avi↗

TU-F-CAMPUS-J-04: Evaluation of Metal Artifact Reduction Technique for the Radiation Therapy Planning

Purpose: To evaluate the feasibility of using a metal artifact reduction technique in depleting metal artifact and its application in improving dose calculation in External Radiation Therapy Planning. Methods: CIRS electron density phantom was scanned with and without steel drill bits placed in some plug holes. Meta artifact reduction software with Metal Deletion Technique (MDT) was used to remove metal artifacts for scanned image with metal. Hounsfield units of electron density plugs from artifact free reference image and MDT processed images were compared. To test the dose calculation improvement after the MDT processed images, clinically approved head and neck plan with manual dental artifact correction was tested. Patient images were exported and processed with MDT and plan was recalculated with new MDT image without manual correction. Dose profiles near the metal artifacts were compared. Results: The MDT used in this study effectively reduced the metal artifact caused by beam hardening and scatter. The windmill around the metal drill was greatly improved with smooth rounded view. Difference of the mean HU in each density plug between reference and MDT images were less than 10 HU in most of the plugs. Dose difference between original plan and MDT images were minimal. Conclusion: Most metal artifact reduction methods were developed for diagnostic improvement purpose. Hence Hounsfield unit accuracy was not rigorously tested before. In our test, MDT effectively eliminated metal artifacts with good HU reproduciblity. However, it can introduce new mild artifacts so the MDT images should be checked with original images.

60 APPLIED LIFE SCIENCES↗

Sub-Degree-Per-Hour MEMS Gyroscope for Measurement While Drilling at 300°C

The orientation module of MWD tool offers the critical drill bit orientation information, including azimuth, inclination and toolface in order to control the path of wellbore. Although high end navigation grade gyroscope can meet the accuracy requirement for azimuth finding, the requirements of cost, size and reliability under harsh environment have largely limited the deployment of gyroscopes in MWD tools. To overcome these constraints, GE Research has developed a low cost, MEMS based Multi-Ring Gyroscope (MRG) capable of azimuth-seeking in MWD applications at 300°C. The MRG prototype has been demonstrated to achieve angular random walk (ARW) better than 0.003 deg/rt(hr) and bias instability of 0.01 deg/hr, capable of meeting azimuth finding accuracy better than 0.25 deg. It has further been tested to remain fully operational at 300 °C.

15 GEOTHERMAL ENERGY↗

ROP model for PDC bits in Geothermal drilling

Geothermal energy is a renewable source of energy, where heat extraction is preferentially balanced with the reservoir's natural heat recharge rate. The objective of this paper is to present and validate a novel rate of penetration (ROP) model for drilling hard and abrasive formations including granite formations for polycrystalline diamond compact (PDC) bits. The ROP model was developed based on a derived relationship of a threshold weight on cutter (WOC) and its corresponding depth of cut (DOC) for a single cutter. Laboratory data was used to scale the derived single cutter relationship to a full-hole ROP model for PDC bits. The ROP model includes a non-linear correlation for Phase I (inefficient drilling due to low WOB values) and a linear Phase II (efficient drilling) ROP response to WOB. The ROP model was verified using measured drilling parameter data from Utah FORGE well# 58-32 and data from Chocolate Mountains well # 17-8 in Southern California. When compared to oil and gas well drilling, geothermal drilling in granitic formations can be more difficult and complicated due to rock hardness and high temperatures. PDC bits can increase ROP and optimize drilling for these types of hard formations. This paper provides novel insight into the ROP response of PDC bits to drilling operational parameters.

15 GEOTHERMAL ENERGY↗

Development and Manufacture of Cost-Effective Composite Drill Pipe

Advanced Composite Products and Technology, Inc. (ACPT) has developed composite drill pipe (CDP) that matches the structural and strength properties of steel drill pipe, but weighs less than 50 percent of its steel counterpart. Funding for the multiyear research and development of CDP was provided by the U.S. Department of Energy Office of Fossil Energy through the Natural Gas and Oil Projects Management Division at the National Energy Technology Laboratory (NETL).

03 NATURAL GAS↗

Metal Scrap Upcycling with Shear Assisted Processing and Extrusion (ShAPE)

The overarching objective of this project is to convert metal scraps, such as aluminum, titanium, and other alloys provided by the industry, into extruded tubing, wires, and rods. Upcycling of scrap will be accomplished using Shear Assisted Processing and Extrusion (ShAPE). This approach is a new solution for recycling. The specific aims of this project are as follows: 1. Receive metal scrap under a Material Transfer Agreement (MTA), in the form of billets, from select industry partners that meet the following requirements: outer diameter of 1.245 inches (+/-0.003 inches), inner diameter drilled with a 0.404-inch drill bit, and a length of 4.0 inches (+/-0.01 inches). The billet must be cast or compacted to greater than 98% density. If the industry partner does not have the capabilities to prepare the billets, PNNL can make introductions to third-party entities as needed. Industry partners will also provide a composition analysis as weight percent. 2. Extrude metal scrap via the ShAPE process at PNNL. 3. Evaluate and benchmark the extrudate material properties per the ASTM B557-15 – Testing Tubulars Standard or similar wire and rod standards. 4. Characterize the extrudate microstructure for any of the following: grain size, second phase composition, and texture. Additional testing may include corrosion per the ASTM B117 standard and electro-potential. 5. Deliver specimens to industry partners under an MTA for additional third-party evaluations. Industry partners will, in return, provide a non-proprietary report on any testing, including testing per the ASTM B557-15, ASTM B117, and other industry standards. 6. PNNL will develop data and insights to support intellectual property capture, a published non-proprietary technical report, research collaborations, and commercialization opportunities.

36 MATERIALS SCIENCE↗

Limiting State of High-Speed Drills

Drill failure is due to the predominant wear of the rear surface or ribbon, depending on the range of cutting speed. Such wear is accompanied by increase in the cutting torque to critical values. Formulas are derived for the limiting permissible wear.

42 ENGINEERING↗

Dual-Action Drilling and Milling Tool

Abstract—Analysis of drilling methods and drilling tools used in the oil and gas industry gives rise to a new dual-action drilling and milling tool, which ensures constant contact of the tool’s cutting edge with the face. That reduces the frictional forces in drilling and improves the tool’s wear resistance.

36 MATERIALS SCIENCE↗

Method of removing drilling chips

Special chuck directs mixture of pressurized air and water through drill bit, thus removing chips during boring of long, large diameter holes.

Ransom, F. E.↗