Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DOLLARS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Tech House

The members of the Swain family- Dr. Charles "Bill" Swain, wife Elaine, daughter Carol, 17, son "Chuck", 12, and dog Susie have an interesting assignment. They are active participants in an important NASA research program involving the application of space-age technology to home construction. b' Transplanted Floridians, the Swains now reside in NASA's Tech House, lo~atedat Langley Research Center, Hampton, Virginia. Their job is to use and help evaluate the variety of advanced technology systems in Tech House. A contemporary three-bedroom home, Tech House incorporates NASA technology, the latest commercial building techniques and other innovations, all designed to reduce energy and water consumption and to provide new levels of comfort, convenience, security and fire safety. Tech House equipment performed well in initial tests, but a house is not a home until it has people. That's where the Swains come in. NASA wants to see how the various systems work under actual living conditions, to confirm the effectiveness of the innovations or to determine necessary modifications for improvement. The Swains are occupying the house for a year, during which NASA engineers are computer monitoring the equipment and assembling a record of day-to-day performance. . Tech House is a laboratory rather than a mass production prototype, but its many benefits may influence home design and construction. In a period of sharply rising utility costs, widespread adoption of Tech House features could provide large-scale savings to homeowners and potentially enormous national benefit in resources conservation. Most innovations are aerospace spinoffs: Some of the equipment is now commercially available; other systems are expected to be in production within a few years. Around 1980, a Tech House-type of home could be built for $45-50,000 (1 976 dollars). It is estimated that the homeowner would save well over $20,000 (again 1976 dollars) in utility costs over the average mortgage span of 20 years.

Source record↗

Launching Science: Science Opportunities Provided by NASA's Constellation System

In 2004 NASA began implementation of the first phases of a new space exploration policy. This implementation effort included the development of a new human-carrying spacecraft, known as Orion; the Altair lunar lander; and two new launch vehicles, the Ares I and Ares V rockets.collectively called the Constellation System (described in Chapter 5 of this report). The Altair lunar lander, which is in the very preliminary concept stage, is not discussed in detail in the report. In 2007 NASA asked the National Research Council (NRC) to evaluate the science opportunities enabled by the Constellation System. To do so, the NRC established the Committee on Science Opportunities Enabled by NASA's Constellation System. In general, the committee interpreted "Constellation-enabled" broadly, to include not only mission concepts that required Constellation, but also those that could be significantly enhanced by Constellation. The committee intends this report to be a general overview of the topic of science missions that might be enabled by Constellation, a sort of textbook introduction to the subject. The mission concepts that are reviewed in this report should serve as general examples of kinds of missions, and the committee s evaluation should not be construed as an endorsement of the specific teams that developed the mission concepts or of their proposals. Additionally, NASA has a well-developed process for establishing scientific priorities by asking the NRC to conduct a "decadal survey" for a particular discipline. Any scientific mission that eventually uses the Constellation System will have to be properly evaluated by means of this decadal survey process. The committee was impressed with the scientific potential of many of the proposals that it evaluated. However, the committee notes that the Constellation System has been justified by NASA and selected in order to enable human exploration beyond low Earth orbit.not to enable science missions. Virtually all of the science mission concepts that could take advantage of Constellation s unique capabilities are likely to be prohibitively expensive. Several times in the past NASA has begun ambitious space science missions that ultimately proved too expensive for the agency to pursue. Examples include the Voyager-Mars mission and the Prometheus program and its Jupiter Icy Moons Orbiter spacecraft (both examples are discussed in Chapter 1). Finding: The scientific missions reviewed by the committee as appropriate for launch on an Ares V vehicle fall, with few exceptions, into the "flagship" class of missions. The preliminary cost estimates, based on mission concepts that at this time are not very detailed, indicate that the costs of many of the missions analyzed will be above $5 billion (in current dollars). The Ares V costs are not included in these estimates. All of the costs discussed in this report are presented in current-year (2008) dollars, not accounting for potential inflation that could occur between now and the decade in which these missions might be pursued. In general, preliminary cost estimates for proposed missions are, for many reasons, significantly lower than the final costs. Given the large cost estimates for many of the missions assessed in this report, the potentially large impacts on NASA's budget by many of these missions are readily apparent.

Source record↗

Going South: Analysis of an Historic Project Engineering Failure

NASA's successful conduct of the Apollo Program greatly enhanced the prestige of the United States and remains broadly accepted as America's gift to all Mankind. NASA's accomplishments continue to amaze the world. With the Vision for Space Exploration (VSE) Americans once again tasked NASA to carry out a project that is expected to provide inspiration and economic stimulus to the United States and to the world. In preparation NASA has thoroughly examined space program precedents. There is, however, another precedent which has not been examined in this context but whose scope and environment in many ways parallel the VSE. This project was initiated by a team that had, ten years before, successfully completed an effort that, at a cost of $173 billion (in 2008 dollars), had pushed the envelope of technology, brought economic growth, established their country as the world leader in engineering, and been broadly accepted as that country's gift to all Mankind. The new project was again inspired by popular desire to enhance national prestige and make yet another major contribution to Humanity. This effort was predicted to require eight years and $156 billion (2008 dollars). However, after nine years and expenditures of 96% beyond the baseline, the project collapsed amid bankruptcy, political scandal, and criminal prosecution. This paper applies current project management metrics, such as earned value analysis, to review the strategic decisions in this historic failure and describe its ultimate collapse. Key mistakes are identified, and lessons are drawn which may prove useful in guiding the VSE.

Scott, John H.↗

Alabama Disasters: Leveraging NASA EOS to Explore the Environmental and Economic Impact of the April 27 Tornado Outbreak

The disastrous tornado outbreak in Alabama on April 27, 2011 greatly impacted the economy of the state. On record, the tornado outbreak was the second deadliest tornado outbreak in U.S. When considering the agricultural and value-added activities such as food and timber processing, farm inputs, manufacturing, transportation, and retail sales, the dollar value of Alabama agribusiness annually exceeds $40 billion (NASS, 2011). This research aims to examine how the timber and agriculture damage affected the state economy of Alabama and will be used to aid in long-term economic recovery. ASTER imagery was used along with ground-truthed NASS (National Agriculture Statistics Service) crop location records to verify the economic impact tornadoes had on the agricultural economy of the state. This swath damage can be calculated by correlating tornado path with NASS statistics on crop yield, precisely showing the fields affected and dollars lost to this disaster. Not only can this be executed manually using ENVI and ArcGIS, but also through the use of Python, a programming language that has the ability to automate the process, creating a product for initial damage assessment.

Herdy, Claire↗

Alabama Disasters: Leveraging NASA EOS to Explore the Environmental and Economic Impact of the April 27 Tornado Outbreak

The disastrous tornado outbreak in Alabama on April 27, 2011 greatly impacted the economy of the state. On record, the tornado outbreak was the second deadliest tornado outbreak in U.S. When considering the agricultural and value-added activities such as food and timber processing, farm inputs, manufacturing, transportation, and retail sales, the dollar value of Alabama agribusiness annually exceeds $40 billion (NASS, 2011). This research aims to examine how the timber and agriculture damage affected the state economy of Alabama and will be used to aid in long-term economic recovery. ASTER imagery was used along with ground-truthed NASS (National Agriculture Statistics Service) crop location records to verify the economic impact tornadoes had on the agricultural economy of the state. This swath damage can be calculated by correlating tornado path with NASS statistics on crop yield, precisely showing the fields affected and dollars lost to this disaster. Not only can this be executed manually using ENVI and ArcGIS, but also through the use of Python, a programming language that has the ability to automate the process, creating a product for initial damage assessment.

Herdy, Claire↗

A Proposed Approach for Prioritizing Maintenance at NASA Centers

The National Aeronautics and Space Administration (NASA) manages a vast array of infrastructure assets across ten National Centers with a worth of at least 30 billion dollars. Eighty percent of this infrastructure is greater than 40 years old and is in degraded condition. Maintenance budgets are typically less than one percent of current replacement value (CRV), much less than the 2-4% recommended by the National Research Council. The maintenance backlog was 2.55 billion dollars in FY10 and growing. NASA s annual budgets have flattened and are at risk of being reduced, so the problem is becoming even more difficult. NASA Centers utilize various means to prioritize and accomplish maintenance within available budgets, though data is suspect and processes are variable. This paper offers a structured means to prioritize maintenance based on mission criticality and facility performance (ability of the facility to deliver on its purpose). Mission alignment is assessed using the current timeframe Mission Dependence Index and a measure of facility alignment with the 2011 NASA Strategic Plan for the long-term perspective. Facility performance is assessed by combining specific findings from a structured facility condition assessment and an assessment of actual functional output. These are then combined in a matrix to identify the facilities most critical to mission and able to deliver services. The purpose of this approach is to provide the best benefits for the available funding. Additionally, this rationale can also be applied to the prioritization of investment (recapitalization) projects so that the ultimate customers of this paper, the senior infrastructure managers at each NASA Center, are better able to strategically manage their capabilities.

Dunn, Steven C.↗

Phonesat In-flight Experience Results

Consumer technology, over the last decade, has begun to encompass devices that enable us to figure out where we are, which way we are pointing, observe the world around us, and store and transmit this information to wherever we want. Once separate consumer products such as GPS units, digital cameras and mobile phones are now combined into the modern day Smartphone. Since these capabilities are remarkably similar to those required for the multi-million dollar satellites - so why not use a multihundred dollar Smartphone instead? The PhoneSat project of NASA Ames Research Center is developing technology demonstrations utilizing these extraordinary advances to show just how simple and cheap Space can be. The style of development revolves around the "release early, release often" Silicon Valley mentality. PhoneSat is a series of 1U CubeSat size spacecrafts that use an off-the-shelf Smartphone as their onboard computer. By doing so, PhoneSat takes advantage of the high computational capability, large memory as well as ultra-tiny sensors like high-resolution cameras and navigation devices that Smartphones offer. Along with a Smartphone, PhoneSat is equipped with other commercially available technology products, such as medical brushless motors that are used as reaction wheels. Over the four years that NASA Ames Research Center has been developing the PhoneSat project, different suborbital and orbital flight activities have proven the validity of this revolutionary approach. In early 2013, the PhoneSat project launched the first triage of PhoneSats into LEO. In the five day orbital life time, the nano-satellites flew the first functioning Smartphone based satellites (using the Nexus One and Nexus S phones), the cheapest satellite (a total parts cost below $3,500) and one of the fastest on-board processors (CPU speed of 1GHz). In late 2013, the PhoneSat project launched an improved version of its bus to a higher altitude orbit which provided data about the overall system's tolerance to the space environment. In this paper, an overview of the PhoneSat project as well as a summary of the in-flight experimental results is presented. NASA Ames Research Center is carrying on its effort to bring a paradigm shift in the way we conceive Space exploration, this new approach is certainly incarnated by PhoneSat. A set of eight PhoneSat-based CubeSats is manifested to launch in 2014 with the purpose of demonstrating new technical capabilities and being a pathfinder for future Spacecraft technology missions.

CubeSat↗

Is It Worth It? - the Economics of Reusable Space Transportation

Over the past several decades billions of dollars have been invested by governments and private companies in the pursuit of lower cost access to space through earth-to-orbit (ETO) space transportation systems. Much of that investment has been focused on the development and operation of various forms of reusable transportation systems. From the Space Shuttle to current efforts by private commercial companies, the overarching belief of those making such investments has been that reusing system elements will be cheaper than utilizing expendable systems that involve throwing away costly engines, avionics, and other hardware with each flight. However, the view that reusable systems are ultimately a "better" approach to providing ETO transportation is not held universally by major stakeholders within the space transportation industry. While the technical feasibility of at least some degree of reusability has been demonstrated, there continues to be a sometimes lively debate over the merits and drawbacks of reusable versus expendable systems from an economic perspective. In summary, is it worth it? Based on our many years of direct involvement with the business aspects of several expendable and reusable transportation systems, it appears to us that much of the discussion surrounding reusability is hindered by a failure to clearly define and understand the financial and other metrics by which the financial "goodness" of a reusable or expandable approach is measured. As stakeholders, the different users and suppliers of space transportation have a varied set of criteria for determining the relative economic viability of alternative strategies, including reusability. Many different metrics have been used to measure the affordability of space transportation, such as dollars per payload pound (kilogram) to orbit, cost per flight, life cycle cost, net present value/internal rate of return, and many others. This paper will examine the key considerations that influence stakeholders as they make space transportation investment decisions, including primary metrics by which various stakeholders measure financial goodness and other factors that significantly shape decisions to invest in reusable or expendable systems. It must be noted at the outset that reusable systems take many forms and perform different transportation functions including, but not limited to, ETO payload delivery. The discussion in this paper is limited to the economics of ETO transportation systems.

Webb, Richard↗

Mobile/Modular BSL-4 Facilities for Meeting Restricted Earth Return Containment Requirements

NASA robotic sample return missions designated Category V Restricted Earth Return by the NASA Planetary Protection Office require sample containment and biohazard testing in a receiving laboratory as directed by NASA Procedural Requirement (NPR) 8020.12D - ensuring the preservation and protection of Earth and the sample. Currently, NPR 8020.12D classifies Restricted Earth Return for robotic sample return missions from Mars, Europa, and Enceladus with the caveat that future proposed mission locations could be added or restrictions lifted on a case by case basis as scientific knowledge and understanding of biohazards progresses. Since the 1960s, sample containment from an unknown extraterrestrial biohazard have been related to the highest containment standards and protocols known to modern science. Today, Biosafety Level (BSL) 4 standards and protocols are used to study the most dangerous high-risk diseases and unknown biological agents on Earth. Over 30 BSL-4 facilities have been constructed worldwide with 12 residing in the United States; of theses, 8 are operational. In the last two decades, these brick and mortar facilities have cost in the hundreds of millions of dollars dependent on the facility requirements and size. Previous mission concept studies for constructing a NASA sample receiving facility with an integrated BSL-4 quarantine and biohazard testing facility have also been estimated in the hundreds of millions of dollars. As an alternative option, we have recently conducted an initial trade study for constructing a mobile and/or modular sample containment laboratory that would meet all BSL-4 and planetary protection standards and protocols at a faction of the cost. Mobile and modular BSL-2 and 3 facilities have been successfully constructed and deployed world-wide for government testing of pathogens and pharmaceutical production. Our study showed that a modular BSL-4 construction could result in approximately 90% cost reduction when compared to traditional construction methods without compromising the preservation of the sample or Earth.

Calaway, M. J.↗

Optimal Low Thrust Orbit Transfers for Space Telescope Refueling at SEL2

The James Webb Space Telescope (JWST), a ten billion-dollar infrared telescope with a 6.5m primary mirror to be launched in 2021, is designed to operate in a Halo orbit around the second Sun-Earth Lagrange point (SEL2) for five to ten years. At that point fuel for station keeping and attitude maneuvers will run out. Refueling missions to JWST, as well as to similar space telescope missions proposed for SEL2, could greatly enhance the “science-per-dollar” value and promote a more sustainable use of space assets. In this paper, we present a novel approach to designing fuel optimal trajectories that will allow the refueling spacecraft to arrive at the SEL2 Halo orbit with maximum final mass (i.e. fuel payload). The low thrust optimal control problem is formulated using an indirect optimization method, leading to a two-point boundary value problem with a bang-bang control structure. We make use of a hyperbolic tangent smoothing technique for performing continuation on the thrust magnitude to reduce the sharpness of the control switches in early iterations and, thus, promote convergence. The problem is posed and solved in the circular restricted three-body problem. In this dynamical system, invariant manifolds exist that can be utilized to reduce fuel consumption. The here presented methodology to this challenging and important problem in astrodynamics demonstrates a significant potential for low-cost refueling mission design.

Woollands, Robyn↗

Design and Technology Maturation of the Stratospheric Projectile Experiment of Entry Dynamics

The supersonic and transonic dynamic stability of blunt-body reentry vehicles currently poses large risks in all of NASA’s ongoing entry missions (MSR SRL, MSR EES, and Dragonfly). These projects have allocated millions of dollars to testing and modeling efforts to buy down risk by using the current state-of-the-art (SoA) facilities at NASA’s disposal. While these facilities have heritage in supplying dynamics data to reentry missions, their availability is severely limited – particularly with the high number of concur-rent projects requesting simultaneous testing– and are costly when considering the science density per dollar. None of the current SoA facility methodologies allow the test model to have the dynamics fully develop through a flight relevant free-stream profile and as such require extrapolations with resultant high uncertainties in order to relate the test dynamics to flight expectations. SPEED is a NASA Ames Center Innovation Fund (CIF) project that is developing a highly tailorable and cost-effective test methodology to better assess the dynamic stability of blunt-body reentry vehicles via a stratospheric balloon flight. This is accomplished by dropping a suite of instrumented capsules from a stratospheric balloon to gain a statistically relevant dataset of scaled reentry vehicles in mission relevant free-flight conditions. This presentation will walk through how the test methodology is being implemented specifically for the Mars Sample Return (MSR) Earth Entry System (EES) geometry in an awarded Flight Opportunities Program (FOP) test flight in early CY24. SPEED Application to MSR: SPEED consists of three main mechanical systems: the Drop Platform, the Projectile, and the test Capsule. SPEED is being developed as a set of guidelines and recommendations for how to test with the proposed Concept of Operations (Conops) since the specific design parameters will vary depending on the specific project’s reference trajectory and entry vehicle design. As such, this presentation will walk through the development time-line as shown in Fig. 2. This is meant to serve as a blueprint for further missions as desired. Mechanical and Avionics Design. The SPEED test platform designed for the MSR-EES capsule geometry with nominal entry parameters has the ability to carry 10 Capsules to altitude instrumented with: 1. 3-Axis Accelerometer 2. IMU 3. Gyroscope 4. Magnetometer 5. Pressure Transducer cruciform 6. Uplook and Horizon Cameras To package the avionics/instrumentation suite, the capsule is approximately 1’ in diameter with the Outer Mold Line (OML) centroid-scaled from the full EES design. The internal volume is gutted and custom-shaped to fit the desired instrumentation suite, as well as to allow for the positioning of ballast mass such that the Center of Gravity is analogous to the flight vehicle. All structural components in the Capsule and Projectile are 3D printed, which significantly reduces the cost of each flight unit to around $1500 including all instrumentation, avionics, and structural components. Flight Conops. The test Capsule is accelerated to the desired altitude and Mach number while stowed in the Projectile, a missile-like vehicle consisting of steel ballast in the nose, a low-drag OML, and an Ejection Mechanism to reliably release the Capsule into the free-flow supersonic conditions. For the MSR-EES design, the capsule employs ~3kg of ballast mass at the nose to accelerate the 1.25kg test Capsule to ~Mach 1.7 at 23km altitude. This requires an initial release altitude of 40km, the quoted limit of a 80kg payload by the FOP-contracted balloon provider. Once the Ejection Mechanism avionics detect the proper conditions, the spring-loaded Ejection Mechanism will release and – guided by the sabot – expose the test Capsule to the desired test conditions for ~5 seconds of free-flight in the supersonic/transonic regimes. Dynamics in the subsonic regime will also be captured with the instrumentation suite with post-flight recovery operations aimed at recovering the high-G-load capable SD cards after the planned hard impact landings. Testing and Development: In the few months the SPEED project has worked the development of MSR-EES flight test, the team has performed lab and drone based testing which this presentation will overview. After the first design phase, the team fabricated Engineering Demonstration Units (EDUs) of all subsystems to perform validation testing shown in Fig. 5. After validation was completed on the subsystem level, a drone-drop test was performed at the recreational flight ceiling of 400ft altitude to assess the SPEED systems in a flight environment. Parameters such as in-flight stability, hard impact landing performance, and avionics performance were quantified and qualified. The FY23 CIF will culminate in a helicopter drop test aboard an Air National Guard Blackhawk. This will prepare the team for the CY24 FOP stratospheric balloon flight that should provide the final verification to begin offering the test platform for mission support. Focus of Presentation: This presentation will outline the technology maturation path of the SPEED implementation to the MSR-EES capsule baseline as well as the details regarding the mechanical system, avionics and instrumentation, and flight operations. Note that a complementary presentation is being submitted for a methodology overview of the SPEED test platform, introducing the testing technique and benefits as well as the full application space of the technology.

pitch damping coefficient↗

Space station ventilation study

A ventilation system design and selection method which is applicable to any manned vehicle were developed. The method was used to generate design options for the NASA 33-foot diameter space station, all of which meet the ventilation system design requirements. System characteristics such as weight, volume, and power were normalized to dollar costs for each option. Total system costs for the various options ranged from a worst case $8 million to a group of four which were all approximately $2 million. A system design was then chosen from the $2 million group and is presented in detail. A ventilation system layout was designed for the MSFC space station mockup which provided comfortable, efficient ventilation of the mockup. A conditioned air distribution system design for the 14-foot diameter modular space station, using the same techniques, is also presented. The tradeoff study resulted in the selection of a system which costs $1.9 million, as compared to the alternate configuration which would have cost $2.6 million.

Colombo, G. V.↗

Cost study of solar cell space power systems

Historical costs for solar cell space power systems were evaluated. The study covered thirteen missions that represented a broad cross section of flight projects over the past decade. Fully burdened costs in terms of 1971 dollars are presented for the system and the solar array. The costs correlate reasonably well with array area and do not increase in proportion to array area. The trends for array costs support the contention that solar cell and module standardization reduce costs.

Bernatowicz, D. T.↗

Cost study of solar cell space power systems.

A study of historical costs for solar cell space power systems was made by a NASA ad hoc study group. The study covered thirteen missions that represented a broad cross-section of flight projects over the past decade. Fully burdened costs in terms of 1971 dollars are presented for the system and the solar array. The costs correlate reasonably well with array area and do not increase in proportion to array area. The trends for array costs support the contention that solar cell and module standardization would reduce costs.

Bernatowicz, D. T.↗

Potential benefits of remote sensing: Theoretical framework and empirical estimate

A theoretical framwork is outlined for estimating social returns from research and application of remote sensing. The approximate dollar magnitude is given of a particular application of remote sensing, namely estimates of corn production, soybeans, and wheat. Finally, some comments are made on the limitations of this procedure and on the implications of results.

Eisgruber, L. M.↗

The Management of NASA Employee Health Problem; Status 1971

A system for assessing employee health problems is introduced. The automated billing system is based on an input format including cost of medical services by user and measures in dollars, that portion of resources spent on preventive techniques versus therapeutic techniques. The system is capable of printing long term medical histories of any employee.

Louis B. Arnoldi↗