Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

The use of parametric cost estimating relationships for transport aircraft systems in establishing initial Design to Cost Targets

This paper provides a brief overview of Design to Cost (DTC). Problems inherent in attempting to estimate costs are discussed, along with techniques and types of models that have been developed to estimate aircraft costs. A set of cost estimating relationships that estimate the total production cost of commercial and military transport aircraft at the systems level is presented and the manner in which these equations might be used effectively in developing initial DTC targets is indicated. The principal point made in this paper is that, by using a disagregated set of equations to estimate transport aircraft costs at the systems level, reasonably accurate preliminary cost estimates may be achieved. These estimates may serve directly as initial DTC targets, or adjustments may be made to the estimates obtained for some of the systems to estimate the production cost impact of alternative designs or manufacturing technologies. The relative ease by which estimates may be made with this model, the flexibility it provides by being disaggregated, and the accuracy of the estimates it provides make it a unique and useful tool in establishing initial DTC targets.

Beltramo, M. N.↗

Estimating the Deep Space Network modification costs to prepare for future space missions by using major cost drivers

This paper develops a cost model to do long range planning cost estimates for Deep Space Network (DSN) support of future space missions. The paper focuses on the costs required to modify and/or enhance the DSN to prepare for future space missions. The model is a function of eight major mission cost drivers and estimates both the total cost and the annual costs of a similar future space mission. The model is derived from actual cost data from three space missions: Voyager (Uranus), Voyager (Neptune), and Magellan. Estimates derived from the model are tested against actual cost data for two independent missions, Viking and Mariner Jupiter/Saturn (MJS).

Remer, Donald S.↗

Life Cycle Costing in Radioactive Waste Packaging: Reducing Costs Whilst Accelerating Clean-Up - 16131

In recognition of the high up-front costs and potentially long timescales to implement the more traditional methods of encapsulating wastes, in the UK alternative approaches to help accelerate hazard reduction and reduce such costs are being deployed. When considering such the cost of alternative approaches to waste packaging strategies, it is important that the complete waste life cycle is taken into account. This paper will demonstrate that when evaluating waste packaging options, whilst individual elements (e.g. container costs) within an overall waste management programme may appear to offer a cost benefit by comparison with alternatives, the programme as a whole may not necessarily be the most cost effective solution when life cycle costs are taken into account, or when other technical issues are considered. To illustrate this point this paper will present a view of the application of LCC, utilising a number of waste packaging scenarios, to promote discussion and consideration of the benefits of undertaking a holistic assessment of the investment decision as part of an overall waste management strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A cost-benefit analysis to select the most effective method for positional cloning: genotyping by sequencing versus allele-specific PCR

Next-generation sequencing technologies have enabled the rapid generation of high-resolution genetic maps to enable the identification of genomic regions associated with traits of interest. In certain cases these regions of interest need to be narrowed down via fine mapping to increase resolution to the level of the individual gene. In those cases, there is a choice of genotyping options, whereby cost, time, and information content need to be considered. We developed detailed, customizable models to compare the cost of genotyping by sequencing and allele-specific PCR for fine-mapping genomic regions of interest. The models were validated experimentally with data from a fine-mapping experiment designed to identify candidate genes within a 3.2-Mb disease resistance locus in the cereal crop sorghum (Sorghum bicolor (L.). Moench), which has a sequenced genome. The size of the mapping population, genetic diversity of the parental lines, choice of reagents, and labor cost were shown to influence the overall cost of the two methods, and, consequently, which method would be most cost-effective for a given experiment. Here, the model can be easily customized to reflect experiments with different species, genetic populations, experimental and personnel costs to determine the most cost-effective procedure for a new positional cloning project.

Cost analysis↗

Optimization and life-cycle cost of health clinic PV system for a rural area in southern Iraq using HOMER software

This paper addresses the need for electricity of rural areas in southern Iraq and proposes a photovoltaic (PV) solar system to power a health clinic in that region. The total daily health clinic load is 31.6 kW h and detailed loads are listed. The National Renewable Energy Laboratory (NREL) optimization computer model for distributed power, ''HOMER,'' is used to estimate the system size and its life-cycle cost. The analysis shows that the optimal system's initial cost, net present cost, and electricity cost is US$ 50,700, US$ 60,375, and US$ 0.238/kW h, respectively. These values for the PV system are compared with those of a generator alone used to supply the load. We found that the initial cost, net present cost of the generator system, and electricity cost are US$ 4500, US$ 352,303, and US$ 1.332/kW h, respectively. We conclude that using the PV system is justified on humanitarian, technical, and economic grounds. (author)

14 SOLAR ENERGY↗

Marginal Cost Pricing in a World without Perfect Competition: Implications for Electricity Markets with High Shares of Low Marginal Cost Resources

A common approach to regulating electricity is through auction-based competitive wholesale markets. The goal of this approach is to provide a reliable supply of power at the lowest reasonable cost to the consumer. This necessitates market structures and operating rules that ensure revenue sufficiency for all generators needed for resource adequacy purposes. Wholesale electricity markets employ marginal-cost pricing to provide cost-effective dispatch such that resources are compensated for their operational costs. However, marginal-cost pricing alone cannot guarantee cost recovery outside of perfect competition, and electricity markets have at least six attributes that preclude them from functioning as perfectly competitive markets. These attributes include market power, externalities, public good attributes, lack of storage, wholesale price caps, and ineffective demand curve. Until (and unless) these failures are ameliorated, some form of corrective action(s) will be necessary to improve market efficiency so that prices can correctly reflect the needed level of system reliability. Many of these options necessarily involve some form of administrative or out-of-market actions, such as scarcity pricing, capacity payments, bilateral or other out-of-market contracts, or some hybrid combination. A key focus with these options is to create a connection between the electricity market and long-term reliability/loss-of-load expectation targets, which are inherently disconnected in the native markets because of the aforementioned market failures. The addition of variable generation resources can exacerbate revenue sufficiency and resource adequacy concerns caused by these underlying market failures. Because variable generation resources have near-zero marginal costs, they effectively suppress energy prices and reduce the capacity factors of conventional generators through the merit-order effect in the simplest case of a convex market; non-convexities can also suppress prices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solid Sorbent Cost Sensitivity Analysis: A Framework for UNF Reprocessing Sorbent Cost Comparison

Solid sorbents have been the subject of research and development across the U.S. Department of Energy national laboratory complex for many years. They are generally accepted as a safer alternative to cryogenic distillation for noble gas capture, and they present an easier pathway in development of long-term waste forms after iodine capture. As more types of sorbents have been proposed for capture of volatile radionuclides, it has become necessary to compare them based on performance and cost criteria. This report details cost and performance information for three promising sorbents and provides a cost sensitivity analysis. The goal of this analysis is to establish a framework which can be utilized to directly compare future sorbents, with differing properties, to the sorbents discussed in this report. Direct comparison is instrumental to making informed decisions to efficiently guide research and minimize laborious detours. In all cases, sorbent capacity is a major cost driver as it influences the mass of sorbent, operational footprint, and disposal cost requirements., However, sorbent price can greatly increase the cost of a capture technology. For sorbents used in krypton capture, the purity of krypton released to storage is the highest cost driver.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Life Cost Based FMEA Manual: A Step by Step Guide to Carrying Out a Cost-based Failure Modes and Effects Analysis

Failure occurs when one or more of the intended functions of a product are no longer fulfilled to the customer's satisfaction. The most critical product failures are those that escape design reviews and in-house quality inspection and are found by the customer. The product may work for a while until its performance degrades to an unacceptable level or it may have not worked even before customer took possession of the product. The end results of failures which may lead to unsafe conditions or major losses of the main function are rated high in severity. Failure Modes and Effects Analysis (FMEA) is a tool widely used in the automotive, aerospace, and electronics industries to identify, prioritize, and eliminate known potential failures, problems, and errors from systems under design, before the product is released (Stamatis, 1997). Several industrial FMEA standards such as those published by the Society of Automotive Engineers, US Department of Defense, and the Automotive Industry Action Group employ the Risk Priority Number (RPN) to measure risk and severity of failures. The Risk Priority Number (RPN) is a product of 3 indices: Occurrence (O), Severity (S), and Detection (D). In a traditional FMEA process design engineers typically analyze the 'root cause' and 'end-effects' of potential failures in a sub-system or component and assign penalty points through the O, S, D values to each failure. The analysis is organized around categories called failure modes, which link the causes and effects of failures. A few actions are taken upon completing the FMEA worksheet. The RPN column generally will identify the high-risk areas. The idea of performing FMEA is to eliminate or reduce known and potential failures before they reach the customers. Thus, a plan of action must be in place for the next task. Not all failures can be resolved during the product development cycle, thus prioritization of actions must be made within the design group. One definition of detection difficulty (D) is how well the organization controls the development process. Another definition relates to the detectability of a particular failure in the product when it is in the hands of the customer. The former asks 'What is the chance of catching the problem before we give it to the customer'? The latter asks 'What is the chance of the customer catching the problem before the problem results in a catastrophic failure?' (Palady, 1995) These differing definitions confuse the FMEA users when one tries to determine detection difficulty. Are we trying to measure how easy it is to detect where a failure has occurred or when it has occurred? Or are we trying to measure how easy or difficult it is to prevent failures? Ordinal scale variables are used to rank-order industries such as, hotels, restaurants, and movies (Note that a 4 star hotel is not necessarily twice as good as a 2 star hotel). Ordinal values preserve rank in a group of items, but the distance between the values cannot be measured since a distance function does not exist. Thus, the product or sum of ordinal variables loses its rank since each parameter has different scales. The RPN is a product of 3 independent ordinal variables, it can indicate that some failure types are 'worse' than others, but give no quantitative indication of their relative effects. To resolve the ambiguity of measuring detection difficulty and the irrational logic of multiplying 3 ordinal indices, a new methodology was created to overcome these shortcomings, Life Cost-Based FMEA. Life Cost-Based FMEA measures failure/risk in terms of monetary cost. Cost is a universal parameter that can be easily related to severity by engineers and others. Thus, failure cost can be estimated using the following simplest form: Expected Failure Cost = {sup n}{Sigma}{sub i=1}p{sub i}c{sub i}, p: Probability of a particular failure occurring; c: Monetary cost associated with that particular failure; and n: Total number of failure scenarios. FMEA is most effective when there are inputs into it from all concerned disciplines of the product development team. However, FMEA is a long process and can become tedious and won't be effective if too many people participate. An ideal team should have 3 to 4 people from: design, manufacturing, and service departments if possible. Depending on how complex the system is, the entire process can take anywhere from one to four weeks working full time. Thus, it is important to agree to the time commitment before starting the analysis else, anxious managers might stop the procedure before it is completed.

97 MATHEMATICS AND COMPUTING↗

Technology Improvement Pathways to Cost-Effective Vehicle Electrification

Electrifying transportation can reduce or eliminate dependence on foreign fuels, emission of green house gases, and emission of pollutants. One challenge is finding a pathway for vehicles that gains wide market acceptance to achieve a meaningful benefit. This paper evaluates several approaches aimed at making plug-in electric vehicles (EV) and plug-in hybrid electric vehicles (PHEVs) cost-effective including opportunity charging, replacing the battery over the vehicle life, improving battery life, reducing battery cost, and providing electric power directly to the vehicle during a portion of its travel. Many combinations of PHEV electric range and battery power are included. For each case, the model accounts for battery cycle life and the national distribution of driving distances to size the battery optimally. Using the current estimates of battery life and cost, only the dynamically plugged-in pathway was cost-effective to the consumer. Significant improvements in battery life and battery cost also made PHEVs more cost-effective than today's hybrid electric vehicles (HEVs) and conventional internal combustion engine vehicles (CVs).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cost Modeling for low-cost planetary missions

This presentation will provide an overview of the JPL parametric cost models used to estimate flight science spacecrafts and instruments. This material will emphasize the cost model approaches to estimate low-cost flight hardware, sensors, and instrumentation, and to perform cost-risk assessments. This presentation will also discuss JPL approaches to perform cost modeling and the methodologies and analyses used to capture low-cost vs. key cost drivers.

cost model↗

Validation and Comparison of Carbon Sequestration Project Cost Models with Project Cost Data Obtained from the Southwest Partnership

Obtaining formal quotes and engineering conceptual designs for carbon dioxide (CO{sub 2}) sequestration sites and facilities is costly and time-consuming. Frequently, when looking at potential locations, managers, engineers and scientists are confronted with multiple options, but do not have the expertise or the information required to quickly obtain a general estimate of what the costs will be without employing an engineering firm. Several models for carbon compression, transport and/or injection have been published that are designed to aid in determining the cost of sequestration projects. A number of these models are used in this study, including models by J. Ogden, MIT's Carbon Capture and Sequestration Technologies Program Model, the Environmental Protection Agency and others. This report uses the information and data available from several projects either completed, in progress, or conceptualized by the Southwest Regional Carbon Sequestration Partnership on Carbon Sequestration (SWP) to determine the best approach to estimate a project's cost. The data presented highlights calculated versus actual costs. This data is compared to the results obtained by applying several models for each of the individual projects with actual cost. It also offers methods to systematically apply the models to future projects of a similar scale. Last, the cost risks associated with a project of this scope are discussed, along with ways that have been and could be used to mitigate these risks.

54 ENVIRONMENTAL SCIENCES↗

Cost Impacts of Risk-Based Methods for Defining AoR and PISC Duration of a CO 2 Storage Project Using NRAP Tools and FE/NETL CO 2 Saline Storage Cost Model

The purpose of this analysis is to assess the fiscal impact of using risk-based methods to define the area of review (AoR) and post-injection site care (PISC) duration for a geologic carbon dioxide (CO 2 ) storage project. The Office of Fossil Energy (FE)/National Energy Technology Laboratory (NETL) CO 2 Saline Storage Cost Model (“cost model”) was utilized to evaluate CO 2 storage economics in this study. The cost model is a widely used tool for evaluating CO 2 storage costs in geologic settings. It estimates costs for storage operations conducted under compliance to the United States Environmental Protection Agency (EPA) Underground Injection Control (UIC) Class VI regulations. This analysis evaluates and compares the costs of storage (on a first-year break-even dollar per tonne [2018$] basis) at the proposed FutureGen 2.0 site as a case study storage location by implementing different approaches to determine AoR and PISC given the prevailing geologic conditions and injection volume and duration considerations. The approaches include the use of 1) risk-based methods to define AoR and PISC duration, 2) an EPA-approved AoR and PISC documented in the FutureGen 2.0 UIC Class VI permit applications, and 3) cost model default settings that utilize uncertainty multipliers to estimate CO 2 plume and pressure front extent as part of AoR determination, as well as a 50-year PISC default. From all three sources, the AoR and PISC specified in the Class VI permit applications for FutureGen 2.0 were the largest and longest relative to the other two sources.

54 ENVIRONMENTAL SCIENCES↗

ActiveBAS: A Low-cost, Scalable Control Solution for Grid-Interactive Small and Medium Sized Commercial Buildings

This project aims to develop and enhance a low-cost, highly scalable control solution for Small and Medium-Sized Commercial Buildings (SMCB), assess the business potential at multiple sites, and perform commercialization efforts. The technology can be applied to any buildings served by multiple units, with the benefits being greatest for open-spaced buildings, such as banks, retail stores, restaurants, and factories. This project aims to develop an affordable control solution for: 1) SMCB grid responsiveness, 2) reduction of GHG by changing unit operations, 3) greater reduction in utility costs, and 4) rapid adoption in the marketplace. The proposed technology will be built on a previously developed and demonstrated MPC solution. The minimal sensor requirement and less need of control expertise are the unique feature of the algorithm that leads to low capital and maintenance costs, and short installation and implementation time. These attributes contribute to low capital and maintenance costs, as well as a short installation and implementation time. However, these advantages come with a trade-off: increased difficulties and unreliability when applying traditional modeling and MPC control approaches due to limited information. This final report describes the modeling approaches developed and tested to overcome these challenges. It begins by outlining the modeling challenge posed by minimal sensor requirements, then delves into the proposed modeling approaches, which primarily involve system identification. Finally, preliminary test results for a simulation case study are presented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A life cycle cost economics model for automation projects with uniformly varying operating costs

The described mathematical model calculates life-cycle costs for projects with operating costs increasing or decreasing linearly with time. The cost factors involved in the life-cycle cost are considered, and the errors resulting from the assumption of constant rather than uniformly varying operating costs are examined. Parameters in the study range from 2 to 30 years, for project life; 0 to 15% per year, for interest rate; and 5 to 90% of the initial operating cost, for the operating cost gradient. A numerical example is presented.

Remer, D. S.↗

On Convergence of Development Costs and Cost Models for Complex Spaceflight Instrument Electronics

Development costs of a few recent spaceflight instrument electrical and electronics subsystems have diverged from respective heritage cost model predictions. The cost models used are Grass Roots, Price-H and Parametric Model. These cost models originated in the military and industry around 1970 and were successfully adopted and patched by NASA on a mission-by-mission basis for years. However, the complexity of new instruments recently changed rapidly by orders of magnitude. This is most obvious in the complexity of representative spaceflight instrument electronics' data system. It is now required to perform intermediate processing of digitized data apart from conventional processing of science phenomenon signals from multiple detectors. This involves on-board instrument formatting of computational operands from row data for example, images), multi-million operations per second on large volumes of data in reconfigurable hardware (in addition to processing on a general purpose imbedded or standalone instrument flight computer), as well as making decisions for on-board system adaptation and resource reconfiguration. The instrument data system is now tasked to perform more functions, such as forming packets and instrument-level data compression of more than one data stream, which are traditionally performed by the spacecraft command and data handling system. It is furthermore required that the electronics box for new complex instruments is developed for one-digit watt power consumption, small size and that it is light-weight, and delivers super-computing capabilities. The conflict between the actual development cost of newer complex instruments and its electronics components' heritage cost model predictions seems to be irreconcilable. This conflict and an approach to its resolution are addressed in this paper by determining the complexity parameters, complexity index, and their use in enhanced cost model.

Kizhner, Semion↗

Low Cost Rapid Response Spacecraft, (LCRRS): A Research Project in Low Cost Spacecraft Design and Fabrication in a Rapid Prototyping Environment

The Low Cost Rapid Response Spacecraft (LCRRS) is an ongoing research development project at NASA Ames Research Center (ARC), Moffett Field, California. The prototype spacecraft, called Cost Optimized Test for Spacecraft Avionics and Technologies (COTSAT) is the first of what could potentially be a series of rapidly produced low-cost satellites. COTSAT has a target launch date of March 2009 on a SpaceX Falcon 9 launch vehicle. The LCRRS research system design incorporates use of COTS (Commercial Off The Shelf), MOTS (Modified Off The Shelf), and GOTS (Government Off The Shelf) hardware for a remote sensing satellite. The design concept was baselined to support a 0.5 meter Ritchey-Chretien telescope payload. This telescope and camera system is expected to achieve 1.5 meter/pixel resolution. The COTSAT team is investigating the possibility of building a fully functional spacecraft for $500,000 parts and $2,000,000 labor. Cost is dramatically reduced by using a sealed container, housing the bus and payload subsystems. Some electrical and RF designs were improved/upgraded from GeneSat-1 heritage systems. The project began in January 2007 and has yielded two functional test platforms. It is expected that a flight-qualified unit will be finished in December 2008. Flight quality controls are in place on the parts and materials used in this development with the aim of using them to finish a proto-flight satellite. For LEO missions the team is targeting a mission class requiring a minimum of six months lifetime or more. The system architecture incorporates several design features required by high reliability missions. This allows for a true skunk works environment to rapidly progress toward a flight design. Engineering and fabrication is primarily done in-house at NASA Ames with flight certifications on materials. The team currently employs seven Full Time Equivalent employees. The success of COTSATs small team in this effort can be attributed to highly cross trained engineering team. The engineers on the team are capable of functioning in two to three engineering disciplines which allows highly efficient interdisciplinary engineering collaboration. NASA Ames is actively proposing mission concepts to use the COTSAT platform to accomplish science. If the COTSAT team validates this approach, it will allow the possibility for remote sensing missions to produce a high science yield for minimal cost and reduced schedule. Another aim of this approach is to yield an accelerated pathway from a Phase A study to mission launch. Leaders in the aerospace industry have shown interest in this methodology. Several visits and tours have been given in the lab. Although the concept of low-cost development is initially met with skepticism from some within the prohibitive aerospace industry, the project's efforts have been highly praised for the accomplishments met within a limited time and budget. Overall the development has progressed tremendously well and the team is answering critical questions for current and future low-cost small satellite developments. COTSAT subsystems are not limited to a specific weight class and could be adapted to produce smaller platforms and to fit various launch vehicles.

Spremo, Stevan↗