Lessons Learned from the Development of the DGR Konrad - 19619

The Federal Republic Germany builds the deep geological repository Konrad. The repository is suitable for low- and intermediate-level radioactive waste (LAW and MAW) and it is the first German repository site, which is not located in a salt geological formation. Konrad is a former iron ore mine in Salzgitter (in southeast Lower Saxony) with an active production time between 1961 and 1976. In 2007, the BGE started with the conversion of the mine infrastructure above and underground to build the repository while using the shafts and some roadways of the former mine. The experiences gained from ten years project progress with its complexities and difficulties can be used for similar repository projects in the future. The Konrad repository is designed for 303,000 m{sup 3} of LAW and MAW, which will be emplaced in chambers. The emplacement chambers are located outside of the existing mine, so an impairment by the old mine workings can be excluded. So far, the first area with emplacement chambers has been excavated. In order to be able to start repository operations in 2027, a wide range of work in building construction, civil engineering, shaft sinking and infrastructure development above and below ground has been necessary and will be completed in the next years. The main activities are focused on the Konrad 1 and 2 sites and the part of the infrastructure located in the future control area, which is used for repository operations. There are still many challenges to overcome in the Konrad repository project, although many processes have been put on the right track in recent years. Looking back on past activities and in the cautious preview, this paper gives some indications from which lessons can be drawn and should be applied to similar projects in the future. - Prefer small dimensions for the infrastructure, such as insets and roadway cross-section, and the appropriate machinery and handling equipment; - Detailed process planning for construction in existing infrastructure in the run-up to implementation; - Intensive communication with contracted partners on the preparation of planning documents for nuclear examination procedures and ensuring an excellent contract management; - Early start of the implementation planning for projects under nuclear law, taking into account the relevant boundary conditions; - Ensuring the support of the project by the local community and other stakeholders. Overall, the use of parts of the existing above and underground infrastructure for the construction of a new repository is more difficult than for a complete new construction. But using the shafts of an existing mine delivers the advantage of very good knowledge about the underground environment. In addition, the areas necessary for the construction and operation of the buildings and facilities are already available and secured and do not compete with other projects.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Design Application of Rigidized Surface Insulation Thermal Protection Systems, Volume 1

Materials and design technology of the all-silica LI-900 rigid surface insulation (RSI) thermal protection system (TPS) concept for the shuttle spacecraft is presented. All results of contract development efforts are documented. Engineering design and analysis of RSI strain arrestor plate material selections, sizing, and weight studies are reported. A shuttle prototype test panel was designed, analyzed, fabricated, and delivered. Thermophysical and mechanical properties of LI-900 were experimentally established and reported. Environmental tests, including simulations of shuttle loads represented by thermal response, turbulent duct, convective cycling, and chemical tolerance tests are described and results reported. Descriptions of material test samples and panels fabricated for testing are included. Descriptions of analytical sizing and design procedures are presented in a manner formulated to allow competent engineering organizations to perform rational design studies. Results of parametric studies involving material and system variables are reported. Material performance and design data are also delineated.

Source record↗

Summary document of tasks performed on the Shuttle-C/NLS contract

During FY92, USBI performed many programmatic related tasks. These programmatic tasks have been categorized as follows: (1) acquisition; (2) project engineering/program planning; and (3) cost. The reports associated with these tasks follow in paragraphs 1.1.1 through 1.3.3. Proceeding each task report is a brief description of the contents contained within.

Source record↗

Rocketdyne Safety Algorithm: Space Shuttle Main Engine Fault Detection

The Rocketdyne Safety Algorithm (RSA) has been developed to the point of use on the TTBE at MSFC on Task 4 of LeRC contract NAS3-25884. This document contains a description of the work performed, the results of the nominal test of the major anomaly test cases and a table of the resulting cutoff times, a plot of the RSA value vs. time for each anomaly case, a logic flow description of the algorithm, the algorithm code, and a development plan for future efforts.

Norman, Arnold M., Jr.↗

Lessons Learned from the Construction of Upgrades to the NASA Glenn Icing Research Tunnel and Re-activation Testing

Major upgrades were made in 1999 to the 6- by 9-Foot (1.8- by 2.7-m) Icing Research Tunnel (IRT) at the NASA Glenn Research Center. These included replacement of the electronic controls for the variable-speed drive motor, replacement of the heat exchanger, complete replacement and enlargement of the leg of the tunnel containing the new heat-exchanger, the addition of flow-expanding and flow-contracting turning vanes upstream and downstream of the heat exchanger, respectively, and the addition of fan outlet guide vanes (OGV's). This paper presents an overview of the construction and reactivation testing phases of the project. Important lessons learned during the technical and contract management work are documented.

Sheldon, David W.↗

Binding Procurement

This viewgraph presentation reviews the use of the binding procurement process in purchasing Aerospace Flight Battery Systems. NASA Engineering and Safety Center (NESC) requested NASA Aerospace Flight Battery Systems Working Group to develop a set of guideline requirements document for Binding Procurement Contracts.

Rao, Gopalakrishna M.↗

Army Reserve Comprehensive Water Efficiency Assessments

The Army Reserve has partnered with the Pacific Northwest National Laboratory (PNNL) to develop comprehensive water assessments for numerous Army Reserve Centers in all five regions including the Pacific islands and Puerto Rico, and at Fort Buchanan and Fort Hunter Liggett. The objective of these assessments is to quantify water use at the site, and identify innovative water efficiency projects that can be implemented to help reduce water demand and increase efficiency. Several of these assessments have focused on a strategic plan for achieving net zero water to help meet the Army’s Net Zero Directive . The Army Reserve has also leveraged this approach as part of the energy conservation investment program (ECIP), energy savings performance contracts (ESPCs), and utility energy service contracts (UESCs). This article documents the process involved.

McMordie Stoughton, Kate↗

THE POSITIVE IMPACTS OF AMERICAN REINVESTMENT AND RECOVERY ACT (ARRA) FUNDING TO THE WASTE MANAGEMENT PROGRAM ON HANFORD'S PLATEAU REMEDIATION PROJECT

In April 2009, the Department of Energy (DOE) Richland Operations Office (RL) was allocated $1.6 billion (B) in ARRA funding to be applied to cleanup projects at the Hanford Site. DOE-RL selected projects to receive ARRA funding based on 3-criteria: creating/saving jobs, reducing the footprint of the Hanford Site, and reducing life-cycle costs for cleanup. They further selected projects that were currently covered under regulatory documents and existing prime contracts, which allowed work to proceed quickly. CH2M HILL Plateau Remediation Company (CHPRC) is a prime contractor to the DOE focused on the environmental cleanup of the DOE Hanford Site Central Plateau. CHPRC was slated to receive $1.36B in ARRA funding. As of January, 2010, CHPRC has awarded over $200 million (M) in subcontracts (64% to small businesses), created more that 1,100 jobs, and touched more than 2,300 lives - all in support of long-term objectives for remediation of the Central Plateau, on or ahead of schedule. ARRA funding is being used to accelerate and augment cleanup activities already underway under the baseline Plateau Remediation Contract (PRC). This paper details challenges and accomplishments using ARRA funding to meet DOE-RL objectives of creating/saving jobs, expediting cleanup, and reducing lifecycle costs for cleanup during the first months of implementation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Range Flight Safety Requirements

The purpose of this NASA Technical Standard is to provide the technical requirements for the NPR 8715.5, Range Flight Safety Program, in regards to protection of the public, the NASA workforce, and property as it pertains to risk analysis, Flight Safety Systems (FSS), and range flight operations. This standard is approved for use by NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers, and may be cited in contract, program, and other Agency documents as a technical requirement. This standard may also apply to the Jet Propulsion Laboratory or to other contractors, grant recipients, or parties to agreements to the extent specified or referenced in their contracts, grants, or agreements, when these organizations conduct or participate in missions that involve range flight operations as defined by NPR 8715.5.1.2.2 In this standard, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall.”1.3 TailoringTailoring of this standard for application to a specific program or project shall be formally documented as part of program or project requirements and approved by the responsible Technical Authority in accordance with NPR 8715.3, NASA General Safety Program Requirements.

Flight↗

Irradiation-assisted Stress Corrosion Cracking of PWRirradiated Type 347 Stainless Steel (NSUF CINR 19-16567)

This document serves as the final report for NSUF Project 19-16567 (Reference 1) and its supporting contracts (References 2 and 3). It documents completion of testing of specimens fabricated as previously described in Reference 4. At a high level, the purpose of the testing is to generate data to support continued operation of light water reactors (LWR) and provide further understanding of irradiation-assisted stress corrosion crack (IASCC) initiation in baffle-former bolt materials. Baffle-former bolts that had been extracted from commercial pressurized water reactors (PWRs) were machined into miniature 4-point bend specimens and TEM samples at the Westinghouse Churchill Site hot cell facility. These samples were then shipped to the University of Michigan to undergo IASCC initiation testing in simulated PWR primary coolant containing either LiOH or KOH additions. Overall, 15 samples were tested, 8 in water with KOH additions and 7 in water with LiOH additions, until indications of cracking were observed. Crack initiation stress was similar in both water environments at 50-60% of the irradiated yield stress. Post-test examination of the cracking sites, including scanning electron microscopy and transmission electron microscopy, demonstrated that the crack initiation mechanism and crack initiation rates were similar between the two different water chemistries. A grain boundary oxidation and oxide fracture mechanism was observed to be responsible for crack initiation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design and Development Requirements for Mechanisms

This NASA Technical Standard is published by the National Aeronautics and Space Administration (NASA) to provide uniform engineering and technical requirements for processes, procedures, practices, and methods endorsed as standard for NASA programs and projects, including requirements for selection, application, and design criteria of an item. This Standard is approved for use by NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers; applicable technical requirements may be cited in contract, program, and other Agency documents. This language applies to the Jet Propulsion Laboratory (a Federally Funded Research and Development Center), other contractors, recipients of grants, cooperative agreements, or other agreements only to the extent specified or referenced in the applicable contracts, grants, or agreements. This Standard establishes uniform design, development, and verification requirements for mechanisms and mechanism components whose correct operation is required for safety or mission success.

Mechanism↗

Advanced transportation system studies technical area 2 (TA-2): Heavy lift launch vehicle development: Program Cost estimates - volume 3

The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. The basic period of performance of the TA-2 contract was from May 1992 through May 1993. No-cost extensions were exercised on the contract from June 1993 through July 1995. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 3, provides a work breakdown structure dictionary, user's guide for the parametric life cycle cost estimation tool, and final report developed by ECON, Inc., under subcontract to Lockheed Martin on TA-2 for the analysis of heavy lift launch vehicle concepts.

McCurry, J. B.↗

Advanced High Temperature Polymer Matrix Composites for Gas Turbine Engines Program Expansion

This document, submitted by AlliedSignal Engines (AE), a division of AlliedSignal Aerospace Company, presents the program final report for the Advanced High Temperature Polymer Matrix Composites for Gas Turbine Engines Program Expansion in compliance with data requirements in the statement of work, Contract No. NAS3-97003. This document includes: 1 -Technical Summary: a) Component Design, b) Manufacturing Process Selection, c) Vendor Selection, and d) Testing Validation: 2-Program Conclusion and Perspective. Also, see the Appendix at the back of this report. This report covers the program accomplishments from December 1, 1996, to August 24, 1998. The Advanced High Temperature PMC's for Gas Turbine Engines Program Expansion was a one year long, five task technical effort aimed at designing, fabricating and testing a turbine engine component using NASA's high temperature resin system AMB-21. The fiber material chosen was graphite T650-35, 3K, 8HS with UC-309 sizing. The first four tasks included component design and manufacturing, process selection, vendor selection, component fabrication and validation testing. The final task involved monthly financial and technical reports.

Hanley, David↗

Advanced Transportation System Studies Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development Contract: Technical Results - Volume 2

The purpose of the Advanced Transportation System Studies (ATSS) Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is Volume 2 of the final report for the contract. It provides documentation of selected technical results from various TA-2 analysis activities, including a detailed narrative description of the SSTO concept assessment results, a user's guide for the associated SSTO sizing tools, an SSTO turnaround assessment report, an executive summary of the ground operations assessments performed during the first year of the contract, a configuration-independent vehicle health management system requirements report, a copy of all major TA-2 contract presentations, a copy of the FLO launch vehicle final report, and references to Pratt & Whitney's TA-2 sponsored final reports regarding the identification of Russian main propulsion technologies.

Source record↗

Mechanical Design of High Lift Systems for High Aspect Ratio Swept Wings

The NASA Ames Research Center is working to develop a methodology for the optimization and design of the high lift system for future subsonic airliners with the involvement of two partners. Aerodynamic analysis methods for two dimensional and three dimensional wing performance with flaps and slats deployed are being developed through a grant with the aeronautical department of the University of California Davis, and a flap and slat mechanism design procedure is being developed through a contract with PKCR, Inc., of Seattle, WA. This report documents the work that has been completed in the contract with PKCR on mechanism design. Flap mechanism designs have been completed for seven (7) different mechanisms with a total of twelve (12) different layouts all for a common single slotted flap configuration. The seven mechanisms are as follows: Simple Hinge, Upside Down/Upright Four Bar Linkage (two layouts), Upside Down Four Bar Linkages (three versions), Airbus A330/340 Link/Track Mechanism, Airbus A320 Link/Track Mechanism (two layouts), Boeing Link/Track Mechanism (two layouts), and Boeing 767 Hinged Beam Four Bar Linkage. In addition, a single layout has been made to investigate the growth potential from a single slotted flap to a vane/main double slotted flap using the Boeing Link/Track Mechanism. All layouts show Fowler motion and gap progression of the flap from stowed to a fully deployed position, and evaluations based on spanwise continuity, fairing size and number, complexity, reliability and maintainability and weight as well as Fowler motion and gap progression are presented. For slat design, the options have been limited to mechanisms for a shallow leading edge slat. Three (3) different layouts are presented for maximum slat angles of 20 deg, 15 deg and 1O deg all mechanized with a rack and pinion drive similar to that on the Boeing 757 airplane. Based on the work of Ljungstroem in Sweden, this type of slat design appears to shift the lift curve so that higher lift is achieved with the deployed slat with no increase in angle of attack. The layouts demonstrate that these slat systems can be designed with no need for slave links, and an experimental test program is outlined to experimentally validate the lift characteristics of the shallow slat.

Rudolph, Peter K. C.↗

Addendum to Architectural Documentation and National Register of Historic Places Evaluations of Built-Environment Resources at Los Alamos National Laboratory, Los Alamos County, New Mexico

The Los Alamos National Laboratory contracted Statistical Research, Inc. (SRI), to document and evaluate 110 facilities for listing in the National Register of Historic Places (National Register). This effort was conducted in compliance with Section 110 of the National Historic Preservation Act of 1966, as amended; the Code of Federal Regulations (36 CFR 800); the Programmatic Agreement among the U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office, the New Mexico State Historic Preservation Office and the Advisory Council on Historic Preservation Concerning Management of the Historic Properties at Los Alamos National Laboratory, Los Alamos New Mexico; and A Plan for the Management of the Cultural Heritage at Los Alamos National Laboratory, New Mexico (LANL’s Cultural Resources Management Plan) (2017).

99 GENERAL AND MISCELLANEOUS↗

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗