Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contingency planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Artificial Intelligence and Machine Learning Applications in Modern Power Systems

Machine learning (ML) and artificial intelligence (AI) algorithms offer valuable tools for the analysis and interpretation of large datasets. These tools have the capability to uncover insights that may not be readily apparent within these datasets. In recent years, the integration of ML and AI has become increasingly prevalent in various applications within the power system domain. One of the earliest instances of machine learning in power systems can be traced back to demand forecasting, where artificial neural networks were employed for short-term load forecasting. In contemporary power systems, an abundance of high-resolution geospatial and temporal data is generated at various time intervals, ranging from sub-seconds (Phasor Measurement Units or PMUs) to seconds (Supervisory Control and Data Acquisition or SCADA), minutes (Process Information or PI), and extending to days, months, and years. These datasets contain valuable information concerning system reliability and performance. This information holds the potential to offer critical insights into system operations, as well as solutions for predicting and mitigating contingencies to prevent cascading outages. Despite the immense power of machine learning tools, system operators, planners, and utilities often exhibit hesitancy in fully embracing AI-enabled system operations and planning. This cautious approach persists, even as numerous diverse applications of machine learning continue to emerge in the realm of power systems. In this chapter, our focus will delve deep into ML and AI applications tailored for power systems. These applications aim to furnish system operators with enhanced situational awareness and augment their decision-making capabilities, especially during challenging operating conditions. Specific areas of interest encompass root cause analyses of electricity market datasets and the strategic selection of representative samples from vast power system databases for training ML/AI models. Finally, the chapter will conclude with a short discussion on the future of ML/AI in power systems and possible directions that the industry is moving towards.

power system applications, machine learning (ML), ↗

Reserve and energy scarcity pricing in United States power markets: A comparative review of principles and practices

Here, errors in forecasting load and renewable-based generation in restructured power systems mean that independent system operators (ISOs) must procure sufficient operating reserves to keep the real-time operation of the system reliable and secure. But when procured reserves turn out to be insufficient in real-time due to the lack of resource capacity or ramp capability, operators often set higher prices for reserves and energy to encourage more supply, and to motivate consumers to decrease usage or shift it to other times. This procedure, which is called scarcity or shortage pricing, is a core feature of U.S. electricity markets. It is receiving increased attention from market designers and stakeholders because scarcity will become more important for spot price formation in the future with the increased penetration of zero-marginal cost renewables, and the shrinking role of fuel costs in setting prices. Scarcity pricing is implemented in various ways by different ISOs. These differences have practical implications for the level of prices and incentives for investment, operations, and demand modification. In this paper, general approaches and specific calculation procedures for reserve and energy scarcity pricing practices and calculations across the seven ISO-based U.S. power markets are reviewed and compared. A consistent terminology is used to facilitate the comparison. Current scarcity pricing practices are grouped into three approaches: (1) imposing an adder after the spot market is run; (2) including stepwise demand curves within market clearing procedures for non-contingency reserve products (e.g., the novel flexiramp product), which tends to yield longer right tails for energy scarcity premium curves; and (3) having stepwise demand curves for traditional contingency reserve products only, which results in shorter right tails in energy scarcity curves. A generic numerical example is presented to highlight the large practical differences among the reserve scarcity pricing approaches and specific implementations. To further investigate factors that contribute the most to demand curves differences among ISOs, a sensitivity analysis is performed. This analysis shows that the largest source of differences among the curves is the scarcity prices assumed in the case of severe scarcity, while the number of steps used and whether flexiramp is considered also yields important differences in scarcity prices. As renewable penetration increases, it will become increasingly crucial to employ administrative demand curves so that spot prices more effectively motivate supply and demand adjustments exactly when and where they are needed. This study shows that the different assumptions yield very different scarcity premiums for reserves and energy, and are likely to provide divergent incentives for resources to respond to shortages. It is concluded that to promote market efficiency, a reserve shortage demand curve should have at least three features: inclusion of the marginal value of reserve products at each shortage level, consideration of the magnitude and probability of supply contingencies, and avoidance of abrupt price discontinuities that can cause excessively volatile market outcomes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗

Bulk Electric System Protection Model Demonstration with 2011 Southwest Blackout in DCAT

Protection equipment modeling is critical to power systems planning and operational studies, it enables more accurate system response when control actions including protection relays and remedial action schemes (RAS) are adequately modeled and assessed. This paper incorporates a generic protection philosophy to the Dynamic Contingency Analysis Tools (DCAT), and demonstrates its effectiveness by modeling 2011 Pacific Southwest Blackout event autonomously.

Bulk Electric System, Protection, Blackout, DCAT↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

Preliminary Criticality and Radiation Shielding Analysis for the Storage and Transfer of MARVEL Reactor Spent Nuclear Fuel

This report documents the results of preliminary nuclear criticality and radiation shielding assessments during transfer and dry storage of irradiated Microreactor Applications Research Validation and Evaluation (MARVEL) reactor fuel at Idaho National Laboratory (INL). The assessments focus on transfer casks and storage canisters that are currently in use at INL, which may be compatible with the irradiated MARVEL reactor fuel. The criticality assessments were performed using the radiation transport code MCNP6 with 37 MARVEL reactor fuel elements in various configurations and scenarios. All transfer and storage configurations under dry conditions were below the assumed criticality safety limit of 0.93. Some storage and transfer configurations under wet conditions exceeded the criticality safety limit. This suggests that the appropriate administrative and engineering controls, in addition to reducing the number of MARVEL reactor fuel elements per transfer cask or storage canister, can be expected to ensure criticality safety under all scenarios. The radiation shielding assessments were performed by generating conservative neutron and photon source terms using the ORIGEN module in the SCALE suite of codes. These source spectra were used to estimate the dose equivalent rates using the radiation transport code MCNP6, both on contact and 1 m away from the fuel and transfer casks. The maximum estimated dose equivalent rate of 37 unshielded MARVEL reactor fuel elements on contact is approximately 42000 R/hr. The maximum estimated dose equivalent rates on contact to the ATR transfer cask, HFEF-5 transfer cask, and high load charger were approximately 233 mR/hr, 171 mR/hr, and 201 mR/hr, respectively. This suggests that with the appropriate administrative and engineering controls, all three transfer casks analyzed can be expected to provide sufficient radiation shielding to workers during transfer of irradiated MARVEL reactor fuel. These calculations are performed to support the planning and strategy for the MARVEL project and will demonstrate the technical viability of the different configurations discussed and help identify where engineered or administrative controls may be necessary. A complete criticality safety analysis and radiation shielding analysis, including validation and contingency and accident analysis must be completed by licensed and authorized personnel before any transfer or storage of MARVEL reactor nuclear fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Smart Planning Support for Nuclear Power Plant Work Planners

Operation and Maintenance costs of a nuclear power plant account for 60% of overall plant costs due to the nuclear industry?s risk-adverse culture (World Nuclear Association, 2020). The industry relies on highly conservative estimates to avoid risk and brute force reactions to manage the unexpected and keep a plant running safely. This approach has kept plants operating safer than any other power source available over the last six decades (Ritchie, 2020). However, these conservative methods have cost the nuclear industry in market competitiveness. The solution? Transform the conservative approaches to accurate, efficient, and still safe data-driven approaches that leverage advanced technologies available in the digital age of operation. This project endeavored to identify two key aspects to successfully incorporate historical work execution data. First, where in the work management process is that information most pertinent? Next, what variables are key to informing the best strategy for organizing the upcoming work? The Smart Planner uses data collected by dynamic work instructions to provide a basis for suggesting requirements of similar, upcoming work packages. Further, it curbs inefficiencies of the work management process by analyzing the likelihood of discovery work, offering suggestions to build a contingency package. All this taking place as the work planner builds work packages that meet the predetermined scope of work to be performed.

99 GENERAL AND MISCELLANEOUS↗

Representation and Impact of Water Head on Power System Planning and Operation

Representing water head information in power system model files, can provide a more realistic model of the system and thereby inform operation and planning personnel in the decision-making process. This article describes a procedure for modifying the power system model files (steady-state and dynamic) to represent water head information. Additionally, the impact of representing the water head on power system reliability studies including contingency analysis, cascading failure analysis and dynamic frequency response analysis has been investigated, using the modified power system models. This paper considers the detailed Western Electricity Coordination Council model during summer and winter conditions as the test system for the impact analysis. Results show that under reduced water head: 1) the number of critical voltage and branch flow violations increases; 2) chances of cascading failure and island formation increases; and 3) frequency nadir decreases as compared to those of the base cases where the water head information is not represented.

13 - HYDRO ENERGY↗

Risk-Based Dynamic Contingency Analysis Applied to Puerto Rico Electric Infrastructure

The U.S. Department of Energy’s (DOE) Office of Electricity and Office of Energy Efficiency & Renewable Energy have funded DOE National Laboratories to perform modeling, analysis, and high-level design of resilience-enhancement options for the power grid of the Commonwealth of Puerto Rico. The Pacific Northwest National Laboratory (PNNL) is one of the national laboratories contributing to the DOE effort. Under this funding, PNNL completed Phase I of their analysis in 2018, which identified high-priority transmission enhancements derived from detailed dynamic cascading analysis of severe contingencies, including a hurricane scenario example. This report describes additional analysis completed under Phase II, which was performed over 2019. The PNNL team applied decades of experience making complex power systems more resilient, reliable, secure, flexible, affordable and sustainable, with partners in government and industry. In this report, PNNL presents the Phase II analysis, in which a risk-based dynamic contingency analysis approach to evaluate impact of several hurricane scenarios was developed. This approach was used to identify high-priority enhancements and test resilience mitigation actions, including the evaluation of high-solar scenarios developed as a result of the 2019 Puerto Rico Integrated Resource Plan (IRP).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data Requirements for Application of Risk-Based Dynamic Contingency Analysis to Evaluate Hurricane Impact to Electrical Infrastructure in Puerto Rico

This paper presents a risk-based dynamic contingency analysis framework that was used to evaluate the hurricane impact to electrical infrastructure in Puerto Rico. PNNL developed a scalable risk-based framework for identifying high-voltage transmission resilience improvements by classifying and prioritizing high-risk power grid contingencies (system failures) under hurricane impact. The risk-based framework is founded on grid outage definitions with their associated probabilities of occurrence from hurricane events, in combination with an impact assessment derived from detailed dynamic cascading failure analysis. This paper focuses on a discussion around data requirements for transmission resilience planning for hurricane events, derived from the development of the risk-based framework and its application to Puerto Rico. This paper launches an important first step in encouraging the engineering community and power system industry to move towards establishing resilience planning as a routine practice. Since actual results for Puerto Rico contain sensitive information, sample simulation results will be used to illustrate the data requirements and risk-based dynamic cascading framework on the Puerto Rico power grid, as well as demonstrate the potential for such a simulation framework. The paper includes a discussion on the lessons learned, importance and need for improved datasets that are not usually considered in traditional power system planning. The paper will also elaborate on how the scalable simulation framework and datasets might be expanded to larger footprints and leveraged for modelling other types of natural disasters.

DCAT, Puerto Rico, hurricane, Power System Stabili↗

Simulation and Postmortem Analysis of Angeles Forest Disturbance Event

Multiple unexpected solar photovoltaic (PV) plant responses in the California region following contingencies in recent years warrant postmortem analysis leveraging digital fault recorder (DFR) data for a better understanding of such events and preventing similar events in the future. Most utilities in US, in general, possess transient stability (TS) phasor-domain models of the power grid. Since traditional phasor-based transient stability planning models cannot perform such analysis, this paper presents an approach to extract a region of such models and convert it to Electromagnetic transient (EMT) models. The approach is based on the determination of the minimum impedance-weighted spanning tree between the fault location and affected PV plants in a Western Electricity Coordinating Council (WECC) planning model followed by conversion of this region into an EMT model. The accuracy of the proposed approach is validated against DFR records obtained from the 2018 Angeles Forest disturbance event.

Samanta, Sayan↗

Removal of Institutional Controls at CERCLA Site ANL-01 Ditches A, B and C at the Materials and Fuels Complex

ANL-01 is a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site within Operable Unit (OU) 9-04 at the Materials and Fuels Complex (MFC). The ANL-01 site includes the Industrial Waste Pond and its associated ditches. Ditches A, B and C within ANL-01 were remediated in accordance with the Final Record of Decision for Argonne National Laboratory - West (DOE-CH 1998a). Due to the success of the selected and contingent remedies for the ditches and the determination that they are protective of human health and the environment, institutional controls (ICs) are no longer required and Idaho National Laboratory (INL) recommends termination of the ICs. In addition, the documentation requirements of the INL Site-wide Institutional Controls, and Operations and Maintenance Plan for CERCLA Response Actions (DOE-ID 2017) have been met to allow termination to occur.

54 ENVIRONMENTAL SCIENCES↗

Grid Strength Analysis for Integrating 30 GW of Offshore Wind Generation by 2030 in the U.S. Eastern Interconnection: Preprint

Offshore wind is a key player in the transition to a decarbonized electric gird, and the United States has set ambitious goals of integrating 30 GW of offshore wind capacity by 2030 and 110 GW by 2050. To facilitate this integration, the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory are conducting the Atlantic Offshore Wind Transmission Study to assess transmission solutions. To achieve the 110-GW target by 2050, meticulous planning for network expansion and resource allocation is essential; however, meeting the 2030 goals requires integrating offshore wind power with minimal system upgrades, thus necessitating a careful study of grid strength and stability. The study team developed the Grid Strength Analysis Tool (GSAT) to assess system strength under various operating conditions and contingencies, focusing on the proposed integration of 30 GW of offshore wind power by 2030. In this paper, we provide a summary of key features of the GSAT software and results of the grid strength analysis for integrating 30 GW of offshore wind generation by 2030 in the U.S. Eastern Interconnection.

Automated System-wide Strength Evaluation Tool (AS↗

Grid Strength Analysis for Integrating 30 GW of Offshore Wind Generation by 2030 in the U.S. Eastern Interconnection

Offshore wind is a key player in the transition to a decarbonized electric gird, and the United States has set ambitious goals of integrating 30 GW of offshore wind capacity by 2030 and 110 GW by 2050. To facilitate this integration, the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory are conducting the Atlantic Offshore Wind Transmission Study to assess transmission solutions. To achieve the 110-GW target by 2050, meticulous planning for network expansion and resource allocation is essential; however, meeting the 2030 goals requires integrating offshore wind power with minimal system upgrades, thus necessitating a careful study of grid strength and stability. The study team developed the Automated System-wide Strength Evaluation Tool (ASSET) to assess system strength under various operating conditions and contingencies, focusing on the proposed integration of 30 GW of offshore wind power by 2030. In this paper, we provide a summary of key features of the ASSET software and results of the grid strength analysis for integrating 30 GW of offshore wind generation by 2030 in the U.S. Eastern Interconnection.

Automated System-wide Strength Evaluation Tool (AS↗

Can section 45Q tax credit foster decarbonization? A case study of geologic carbon storage at Acid Gas Injection wells in the Permian Basin

Carbon capture, utilization, and storage (CCUS) is an important pathway for meeting climate mitigation goals. While the economic viability of CCUS is well understood, previous studies do not evaluate the economic feasibility of carbon capture and storage (CCS) in the Permian Basin specifically regarding the new Section 45Q tax credits. We developed a technoeconomic analysis method, evaluated the economic feasibility of CCS at the acid gas injection (AGI) wells, and assessed the implication of Section 45Q tax credits for CCS at the AGIs. We find that the compressors, well depth, and the permit and monitoring costs drive the facility costs. Compressors are the predominant contributors to capital and operating expenditure driving the levelized cost of CO 2 storage. Strategic cost reduction measures identified include 1) sourcing of low-cost electricity and 2) optimizing operational efficiency in well operations. In evaluating the impact of the tax credits on CCS projects, facility scale proved decisive. We found that facilities with an annual injection rate exceeding 10,000 MT storage capacity demonstrate economic viability contingent upon the procurement of inputs at the least cost. The new construction of AGI wells were found to be economically viable at a storage capacity of 100,000 MT. The basin is heavily focused on CCUS (tax credit – $\$$65/MT CO 2 ), which overshadows CCS ($\$$85/MT CO 2 ) opportunities. Balancing the dual objectives of CCS and CCUS requires planning and coordination for optimal resource and pore space utilization to attain the basin's decarbonization potential. We also found that CCS on AGI is a lower cost CCS option as compared to CCS on other industries.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Co-Simulation Framework for Steady-State Analyses of Multiple Droop-based MTdc Grids in Continental-Scale Systems

The growing scale and complexity of planning continental hybrid ac and multi-terminal dc (MTdc) systems require scalable steady-state modeling and analysis approaches not currently available in commercial tools. This paper presents a comprehensive multi-fidelity model-conversion framework that enables the efficient transition of MTdc grid models from production cost modeling (PCM) and approximated ac power flow to detailed ac–MTdc power flow for large-scale planning studies. The core of this framework is a scalable co-simulation approach that, for the first time, enables power flow analysis in continental-scale ac–MTdc systems. It seamlessly couples commercial ac solvers with a detailed MTdc grid model that incorporates droop-based control and current-limiting strategies of multiple meshed MTdc grids. Leveraging this capability, an evaluation framework to systematically assess and compare different MTdc power redispatch strategies under ac and dc contingencies is introduced. The proposed framework and algorithm are evaluated using a combined Western and Eastern Interconnection system with 11 MTdc grids of various sizes, showing a coherent transition from PCM to detailed ac–MTdc power flow and improved system performance in voltage regulation and line overload mitigation following typical contingencies.

Nguyen, Quan H.↗

Impact of Open Communication Networks on Load Frequency Control with Plug-In Electric Vehicles by Cyber-Physical Dynamic Co-Simulation

With the increasing electrification of the transportation sector to achieve the carbon neutrality objective, despite the challenges of charging electric vehicles (EV), there are also opportunities through smart charging EVs to improve system frequency stability; however, EV control technologies might require nontraditional communication support. This paper investigates the impacts of communication variations of EV on power system load frequency control through a cyber-physical dynamic system (CPDS) co-simulation. Here, the CPDS is built upon our previously developed transmission-and-distribution dynamic co-simulation model with the added communication variation functions (i.e., delay and packet loss). The case studies consider multiple communication variation scenarios when the system experiences an N-1 generation trip contingency. The scenarios include communication delays and packet loss using both homogeneous and heterogeneous assumptions. The outcomes of this work can help improve EV frequency regulation services and provide robust and effective tests for different load frequency control algorithms of the future power systems.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗