Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Container Ship”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Internship at NASA Kennedy Space Center's Cryogenic Test laboratory

NASA's Kennedy Space Center (KSC) is known for hosting all of the United States manned rocket launches as well as many unmanned launches at low inclinations. Even though the Space Shuttle recently retired, they are continuing to support unmanned launches and modifying manned launch facilities. Before a rocket can be launched, it has to go through months of preparation, called processing. Pieces of a rocket and its payload may come in from anywhere in the nation or even the world. The facilities all around the center help integrate the rocket and prepare it for launch. As NASA prepares for the Space Launch System, a rocket designed to take astronauts beyond Low Earth Orbit throughout the solar system, technology development is crucial for enhancing launch capabilities at the KSC. The Cryogenics Test Laboratory at Kennedy Space Center greatly contributes to cryogenic research and technology development. The engineers and technicians that work there come up with new ways to efficiently store and transfer liquid cryogens. NASA has a great need for this research and technology development as it deals with cryogenic liquid hydrogen and liquid oxygen for rocket fuel, as well as long term space flight applications. Additionally, in this new era of space exploration, the Cryogenics Test Laboratory works with the commercial sector. One technology development project is the Liquid Hydrogen (LH2) Ground Operations Demonstration Unit (GODU). LH2 GODU intends to demonstrate increased efficiency in storing and transferring liquid hydrogen during processing, loading, launch and spaceflight of a spacecraft. During the Shuttle Program, only 55% of hydrogen purchased was used by the Space Shuttle Main Engines. GODU's goal is to demonstrate that this percentage can be increased to 75%. Figure 2 shows the GODU layout when I concluded my internship. The site will include a 33,000 gallon hydrogen tank (shown in cyan) with a heat exchanger inside the hydrogen tank attached to a refrigerator capable of removing 850 Watts at 20 Kelvin (shown in green). The refrigerator and most of its supporting equipment will be kept in a standard shipping container (shown in pink). Currently, GODU is in the fabrication process and some of the large components have already been purchased.

Holland, Katherine↗

Layered Thermal Insulation Systems for Industrial and Commercial Applications

From the high performance arena of cryogenic equipment, several different layered thermal insulation systems have been developed for industrial and commercial applications. In addition to the proven areas in cold-work applications for piping and tanks, the new Layered Composite Insulation for Extreme Environments (LCX) has potential for broader industrial use as well as for commercial applications. The LCX technology provides a unique combination of thermal, mechanical, and weathering performance capability that is both cost-effective and enabling. Industry applications may include, for example, liquid nitrogen (LN2) systems for food processing, liquefied natural gas (LNG) systems for transportation or power, and chilled water cooling facilities. Example commercial applications may include commercial residential building construction, hot water piping, HVAC systems, refrigerated trucks, cold chain shipping containers, and a various consumer products. The LCX system is highly tailorable to the end-use application and can be pre-fabricated or field assembled as needed. Product forms of LCX include rigid sheets, semi-flexible sheets, cylindrical clam-shells, removable covers, or flexible strips for wrapping. With increasing system control and reliability requirements as well as demands for higher energy efficiencies, thermal insulation in harsh environments is a growing challenge. The LCX technology grew out of solving problems in the insulation of mechanically complex cryogenic systems that must operate in outdoor, humid conditions. Insulation for cold work includes equipment for everything from liquid helium to chilled water. And in the middle are systems for LNG, LN2, liquid oxygen (LO2), liquid hydrogen (LH2) that must operate in the ambient environment. Different LCX systems have been demonstrated for sub-ambient conditions but are capable of moderately high temperature applications as well.

thermal conductivity↗

Operating and Maintaining the JWST Cleanroom attached to JSC's Chamber A during preparations for the OTIS Cryogenic Thermal Vacuum Test

In order to maintain cleanliness during preparations for JWST’s OTIS (Optical Telescope Element-Integrated Science Instrument Module) Cryogenic Thermal Vacuum Test, a cleanroom was built that attached directly to the 60-year-old Chamber A. The cleanroom and chamber were outfitted with independent environmental control systems each providing ISO Class 71 air cleanliness. To maintain balanced, positive pressure in both the cleanroom and chamber volumes, a special control protocol was developed and successfully implemented. Dual back-up environmental control units (one each for the chamber and cleanroom) were installed just outside the building to provide environmental control redundancy due to a single source chilled water supply and weather threats. In addition, lack of a dedicated cleanroom airlock facilitating clean ingress and egress made it necessary to perform additional cleaning and packaging, as well as augment the uncontrolled truck lock space with small clean tents for pre-cleaning. Special procedures were developed to allow ingress of extra-large support equipment required for load testing of the cleanroom crane, installation of optical equipment in Chamber A and accommodation of the OTIS shipping container. A thorough bake-out and cleaning of Chamber A was also necessary to reduce volatiles from the shroud’s black thermal paint and to reduce particle fallout. Acrylic adhesive fracture discovered during early cryo-testing represented a significant challenge that was successfully mitigated prior to OTIS testing. A dedicated team of Contamination Control (CC) Technicians was specifically trained to clean support equipment and screen materials entering the cleanroom and chamber to ensure cleanliness and vacuum compatibility.

Optics↗

Operating and Maintaining the JWST Cleanroom attached to JSC's Chamber A during preparations for the OTIS Cryogenic Thermal Vacuum Test

In order to maintain cleanliness during preparations for JWST’s OTIS (Optical Telescope Element-Integrated Science Instrument Module) Cryogenic Thermal Vacuum Test, a cleanroom was built that attached directly to the 60-year-old Chamber A. The cleanroom and chamber were outfitted with independent environmental control systems each providing ISO Class 71 air cleanliness. To maintain balanced, positive pressure in both the cleanroom and chamber volumes, a special control protocol was developed and successfully implemented. Dual back-up environmental control units (one each for the chamber and cleanroom) were installed just outside the building to provide environmental control redundancy due to a single source chilled water supply and weather threats. In addition, lack of a dedicated cleanroom airlock facilitating clean ingress and egress made it necessary to perform additional cleaning and packaging, as well as augment the uncontrolled truck lock space with small clean tents for pre-cleaning. Special procedures were developed to allow ingress of extra-large support equipment required for load testing of the cleanroom crane, installation of optical equipment in Chamber A and accommodation of the OTIS shipping container. A thorough bake-out and cleaning of Chamber A was also necessary to reduce volatiles from the shroud’s black thermal paint and to reduce particle fallout. Acrylic adhesive fracture discovered during early cryo-testing represented a significant challenge that was successfully mitigated prior to OTIS testing. A dedicated team of Contamination Control (CC) Technicians was specifically trained to clean support equipment and screen materials entering the cleanroom and chamber to ensure cleanliness and vacuum compatibility.

James Webb Space Telescope↗

Evaluating and Countering the Insider Threat to the Radioactive Source Supply Chain

The modern supply chain is a global enterprise and little drove this home more than the global COVID-19 pandemic which sent economic shockwaves throughout the world. Many goods became scarce, as products were delayed, in limited supply, or simply not available. The suddenly diminished supply collided with still high demand and led to greatly increased costs. This was particularly true for the radioactive source supply chain. The pandemic introduced extensive delays for construction projects, slowed the transport of radiological materials to facilities, interrupted treatment deliveries, and impaired the mobility of contractors across the industry. All of these concerns not only adversely affected the economy, but also impacted the safety and security of radiological material, potentially raising national security concerns. The vulnerability of the supply chain, a critical element in an increasingly interconnected world, was exposed. One example that challenged the adaptive capacity of the overall supply chain is the Ever Given container ship, which became stuck in the Suez Canal in 2020. This accident immediately shut down shipments that accounted for 12% of global trade, with long-term impacts estimated to be much larger. Developing the ability to anticipate and react in real-time to sudden changes has quickly become a necessity, particularly in industries that deal with the transport of hazardous material. The reaction to these dramatic incidents was to largely focus attention and resources on protecting the supply chain from external threats. However, the threat to the radioactive material supply chain from insiders intimately involved in the process may be even greater and remains a blind spot that requires increased attention. Recent events revealed the blueprint for targeting and disrupting that supply chain, so the potential for a malicious insider—or a manipulated, unwitting insider—to take advantage of this vulnerability is elevated, creating security concerns for radiological industries. This paper examines and analyzes the potential insider threat to the radioactive source supply chain and recommends steps to take to counter this possibility.

Kinney, Justin↗

Process Improvement For Pu-238 Production at Idaho National Laboratory

Idaho National Laboratory (INL) has supported the production of Pu-238 for future NASA deep space missions since 2017. Over this time, INL has worked to improve the qualification process of Pu-238 production targets as well as improve processes related to the shipping, storage, irradiation, and storage of Pu-238 production targets. Qualification of Pu-238 production targets began with flux measurements and scoping analysis to provide fundamental data to confirm the impacts on the operation of the Advanced Test Reactor (ATR), Fig1. Later, initial production targets were irradiated in ATR’s I-7 position, and then the South Flux Trap (SFT). A modified target design was then implemented which would use the full length of the ATR core and increase Pu-238 production. While working to improve and streamline the qualification of the Pu-238 production targets, INL worked to improve multiple operational aspects of the Pu-238 production process. These changes include updating procedures to streamline operations, supporting modification of shipping containers to contain five rather than one production target, reviewing target receipt procedures and changing work flow to provide flexibility in target receipt, and designing and fabricating support equipment for the storage and internal transfer of production targets

07 ISOTOPE AND RADIATION SOURCES↗

Process Improvements For Pu-238 Production at Idaho National Laboratory

Idaho National Laboratory (INL) has supported the production of Pu-238 for future NASA deep space missions since 2017. Over this time, INL has worked to improve the qualification process of Pu-238 production targets as well as improve processes related to the shipping, storage, irradiation, and storage of Pu-238 production targets. Qualification of Pu-238 production targets began with flux measurements and scoping analysis to provide fundamental data to confirm the impacts on the operation of the Advanced Test Reactor (ATR), Fig1. Later, initial production targets were irradiated in ATR’s I-7 position, and then the South Flux Trap (SFT). A modified target design was then implemented which would use the full length of the ATR core and increase Pu-238 production. While working to improve and streamline the qualification of the Pu-238 production targets, INL worked to improve multiple operational aspects of the Pu-238 production process. These changes include updating procedures to streamline operations, supporting modification of shipping containers to contain five rather than one production target, reviewing target receipt procedures and changing work flow to provide flexibility in target receipt, and designing and fabricating support equipment for the storage and internal transfer of production targets.

07 ISOTOPE AND RADIATION SOURCES↗

Plutonium-238 Loadout Calorimeter Return To Service

The calorimeter in the transfer area in Building 7920 at the US Department of Energy’s Oak Ridge National Laboratory is used to measure the amount of 238 Pu in the Plutonium Heat Source Oxide. The calorimetry measurement is taken after the oxide is packaged in an ORISC (Oak Ridge Inner Shipping Capsule)/FSO (Fuel Storage Outer) assembly before loading into the Containment Vessel and shipping container. The equipment is used in three specific configurations: zero measurement (nothing in the sample cup), FSO measurement (actual measurement of 238 Pu), and reference calibration measurement (using the reference FSO as a known heat source). System checks were performed in July 2023 in preparation for scheduled material loadout. During these checks, personnel discovered that the reference FSO had experienced an electrical short in the heater cable and was no longer functional. The calorimeter was in the reference calibration measurement configuration at this time. Facility management was notified when the damage was discovered. The data from the Yokogawa recorder were pulled and analyzed for a span of time between September 2022 and July 2023. An unusual spike was found in the sample cup temperature data that started on October 19, 2022, and ended on October 20, 2022. The sample cup reached a temperature of 191.1°C. The maximum allowable temperature for the calorimeter thermopile to reach is 220°C based on the manufacturer statement provided in Appendix B of this report [1]. The calorimeter thermopile and the sample cup thermocouple are physically close to each other; therefore, the data suggest that the calorimeter itself never saw a temperature in excess of 191.1°C. Physical damage present on the cable, tape, and insulation suggests that the temperature reached a higher value in some locations within the sample cup than the data shows. Because of this discrepancy, testing of the calorimeter was required to confirm that the calorimeter is functioning the same as it was before the electrical short. The intent of this report is to assess the functionality of the calorimeter and determine if it is acceptable to use for 238 Pu loadout material measurement. Testing showed that the calorimeter is functionally equivalent to the initial calibration that was performed in the summer of 2021, and thus, the calorimeter was cleared to be used for its intended purposes.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Damage-detection system for LNG carriers

System utilizes array of acoustical transducers to detect cracks and leaks in liquefied natural gas (LNG) containers onboard ships. In addition to detecting leaks, device indicates location and leak rate.

Mastandrea, J. R.↗

Nearly Seamless Vacuum-Insulated Boxes

A design concept, and a fabrication process that would implement the design concept, have been proposed for nearly seamless vacuum-insulated boxes that could be the main structural components of a variety of controlled-temperature containers, including common household refrigerators and insulating containers for shipping foods. In a typical case, a vacuum-insulated box would be shaped like a rectangular parallelepiped conventional refrigerator box having five fully closed sides and a hinged door on the sixth side. Although it is possible to construct the five-closed-side portion of the box as an assembly of five unitary vacuum-insulated panels, it is not desirable to do so because the relatively high thermal conductances of the seams between the panels would contribute significant amounts of heat leakage, relative to the leakage through the panels themselves. In contrast, the proposal would make it possible to reduce heat leakage by constructing the five-closed-side portion of the box plus the stationary portion (if any) of the sixth side as a single, seamless unit; the only remaining seam would be the edge seal around the door. The basic cross-sectional configuration of each side of a vacuum-insulated box according to the proposal would be that of a conventional vacuum-insulated panel: a low-density, porous core material filling a partially evacuated space between face sheets. However, neither the face sheets nor the core would be conventional. The face sheets would be opposite sides of a vacuum bag. The core material would be a flexible polymer-modified silica aerogel of the type described in Silica/Polymer and Silica/Polymer/Fiber Composite Aero - gels (MSC-23736) in this issue of NASA Tech Briefs. As noted in that article, the stiffness of this core material against compression is greater than that of prior aerogels. This is an important advantage because it translates to greater retention of thickness and, hence, of insulation performance when pressure is applied across the thickness, in particular, when the space between the face sheets is evacuated, causing the core material to be squeezed between the face sheets by atmospheric pressure. Fabrication of a typical vacuum-insulated box according to the proposal would begin with fabrication of a cross-shaped polymer-modified aerogel blanket. The dimensions of the cross would be chosen so that (1) the central rectangular portion of the cross would form the core for the back of the box and (2) the arms of the cross could be folded 90 from the back plane to form the cores of the adjacent four sides of the box. Optionally, the blanket could include tabs for joining the folded sides of the blanket along mating edges and tabs that could serve as hinges for the door. Vacuum bags in the form of similar five-sided boxes would be made of a suitable polymeric film, one bag to fit the outer core surface, the other to fit the inner core surface. By use of commercially available film-sealing equipment, these box-shaped bags would be seamed together to form a single vacuum bag encasing the box-shaped core. Also, a one-way valve would be sealed to the bag. Through this valve, the interior of the bag would be evacuated to a pressure between 1 and 10 torr (approximately between 0.13 and 1.3 kPa). The polymer-modified aerogel core material is known to perform well as a thermal insulator in such a partial vacuum.

Stepanian, Christopher J.↗

Magnetically Attached Multifunction Maintenance Rover

A versatile mobile telerobot, denoted the magnetically attached multifunction maintenance rover (MAGMER), has been proposed for use in the inspection and maintenance of the surfaces of ships, tanks containing petrochemicals, and other large ferromagnetic structures. As its name suggests, this robot would utilize magnetic attraction to adhere to a structure. As it moved along the surface of the structure, the MAGMER would perform tasks that could include close-up visual inspection by use of video cameras, various sensors, and/or removal of paint by water-jet blasting, laser heating, or induction heating. The water-jet nozzles would be mounted coaxially within compressed-air-powered venturi nozzles that would collect the paint debris dislodged by the jets. The MAGMER would be deployed, powered, and controlled from a truck, to which it would be connected by hoses for water, compressed air, and collection of debris and by cables for electric power and communication (see Figure 1). The operation of the MAGMER on a typical large structure would necessitate the use of long cables and hoses, which can be heavy. To reduce the load of the hoses and cables on the MAGMER and thereby ensure its ability to adhere to vertical and overhanging surfaces, the hoses and cables would be paid out through telescopic booms that would be parts of a MAGMER support system. The MAGMER would move by use of four motorized, steerable wheels, each of which would be mounted in an assembly that would include permanent magnets and four pole pieces (see Figure 2). The wheels would protrude from between the pole pieces by only about 3 mm, so that the gap between the pole pieces and the ferromagnetic surface would be just large enough to permit motion along the surface but not so large as to reduce the magnetic attraction excessively. In addition to the wheel assemblies, the MAGMER would include magnetic adherence enhancement fixtures, which would comprise arrays of permanent magnets and pole pieces that could be adjusted to maximize or minimize the overall attractive magnetic force. Even with a paint thickness of 2 mm, a preliminary design provides a safety factor of 5 in the magnetic force in the upside- down, water-jets-operating condition, in which the total load (including the weight of the MAGMER and cables and the water-jet force) would be about 260 lb (the weight of 118 kg). Optionally, the MAGMER could carry magnetic shielding and/or could be equipped with a demagnetizing module to remove residual magnetism from the structure. The MAGMER would carry four charge-coupled-device cameras for visual inspection, monitoring of operation, navigation, and avoidance of collisions with obstacles. The control system of the MAGMER would include navigation and collision-avoidance subsystems that would utilize surface features as landmarks, in addition to direct images of obstacles.

Bar-Cohen, Yoseph↗

Body of Knowledge (BOK) for Copper Wire Bonds

Copper wire bonds have replaced gold wire bonds in the majority of commercial semiconductor devices for the latest technology nodes. Although economics has been the driving mechanism to lower semiconductor packaging costs for a savings of about 20% by replacing gold wire bonds with copper, copper also has materials property advantages over gold. When compared to gold, copper has approximately: 25% lower electrical resistivity, 30% higher thermal conductivity, 75% higher tensile strength and 45% higher modulus of elasticity. Copper wire bonds on aluminum bond pads are also more mechanically robust over time and elevated temperature due to the slower intermetallic formation rate - approximately 1/100th that of the gold to aluminum intermetallic formation rate. However, there are significant tradeoffs with copper wire bonding - copper has twice the hardness of gold which results in a narrower bonding manufacturing process window and requires that the semiconductor companies design more mechanically rigid bonding pads to prevent cratering to both the bond pad and underlying chip structure. Furthermore, copper is significantly more prone to corrosion issues. The semiconductor packaging industry has responded to this corrosion concern by creating a palladium coated copper bonding wire, which is more corrosion resistant than pure copper bonding wire. Also, the selection of the device molding compound is critical because use of environmentally friendly green compounds can result in internal CTE (Coefficient of Thermal Expansion) mismatches with the copper wire bonds that can eventually lead to device failures during thermal cycling. Despite the difficult problems associated with the changeover to copper bonding wire, there are billions of copper wire bonded devices delivered annually to customers. It is noteworthy that Texas Instruments announced in October of 2014 that they are shipping microcircuits containing copper wire bonds for safety critical automotive applications. An evaluation of copper wire bond technology for applicability to spaceflight hardware may be warranted along with concurrently compiling a comprehensive understanding of the failure mechanisms involved with copper wire bonded semiconductor devices.

Body of Knowledge (BOK)↗

A Draft Protocol for Detecting Possible Biohazards in Martian Samples Returned to Earth

In preparation for missions to Mars that will involve the return of samples, it is necessary to prepare for the safe receiving, handling, testing, distributing, and archiving of martian materials here on Earth. Previous groups and committees have studied selected aspects of sample return activities, but a specific protocol for handling and testing of returned -=1 samples from Mars remained to be developed. To refine the requirements for Mars sample hazard testing and to develop criteria for the subsequent release of sample materials from precautionary containment, NASA Planetary Protection Officer, working in collaboration with CNES, convened a series of workshops to produce a Protocol by which returned martian sample materials could be assessed for biological hazards and examined for evidence of life (extant or extinct), while safeguarding the samples from possible terrestrial contamination. The Draft Protocol was then reviewed by an Oversight and Review Committee formed specifically for that purpose and composed of senior scientists. In order to preserve the scientific value of returned martian samples under safe conditions, while avoiding false indications of life within the samples, the Sample Receiving Facility (SRF) is required to allow handling and processing of the Mars samples to prevent their terrestrial contamination while maintaining strict biological containment. It is anticipated that samples will be able to be shipped among appropriate containment facilities wherever necessary, under procedures developed in cooperation with international appropriate institutions. The SRF will need to provide different types of laboratory environments for carrying out, beyond sample description and curation, the various aspects of the protocol: Physical/Chemical analysis, Life Detection testing, and Biohazard testing. The main principle of these tests will be described and the criteria for release will be discussed, as well as the requirements for the SRF and its personnel.

Viso, M.↗

Improbability of Post-Closure Criticality in Compacted Criticality Control Overpacks after Room Closure at Waste Isolation Pilot Plant

As part of its periodic re-certification of the Waste Isolation Pilot Plant (WIPP), an operating repository in bedded salt for the disposal of transuranic (TRU) waste from atomic energy defense activities, the United States Environmental Protection Agency expects a re-evaluation of features, events, and processes, such as post-closure nuclear criticality. Although salt creep beneficially encapsulates the TRU waste in the closed WIPP repository, the spacing between an array of waste packages is disrupted as the salt creep closes disposal rooms and containers lose structural integrity. For most TRU waste, the possibility of post-closure criticality is exceedingly small either because the salt neutronically isolates TRU waste canisters or because closure of a disposal room from salt creep does not sufficiently compact the low mass of fissile material. The criticality evaluation was updated, however, because of the introduction of criticality control overpack (CCO) containers, which may dispose up to 380 fissile gram equivalent plutonium-239 in each container. The criticality potential is evaluated through high-fidelity geomechanical modeling of a disposal room filled with CCO containers during two representative conditions: (1) large salt block fall, and (2) gradual disposal room closure from salt creep. Geomechanical models of roof fall demonstrate three tiers of CCO containers are not greatly disrupted. Geomechanical models of gradual room closure from salt creep (without brine seepage and subsequent gas generation to permit maximum room closure) were used to predict irregular arrays of closely packed CCOs after 1000 years, when room closure has asymptotically approached maximum compaction. Models of spheres or cylinders with 380 fissile gram equivalent of plutonium (as oxide) at the predicted irregular compacted spacing demonstrate that an array of CCO containers is not critical when surrounded by salt and magnesium oxide, provided the mass of hydrogenous material shipped in CCO containers (usually plastics) is controlled or boron carbide (a neutron poison) is mixed with the fissile contents.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Traffic Management System and Method

A data management system and method that enables acquisition, integration, and management of real-time data generated at different rates, by multiple heterogeneous incompatible data sources. The system achieves this functionality by using an expert system to fuse data from a variety of airline, airport operations, ramp control, and air traffic control tower sources, to establish and update reference data values for every aircraft surface operation. The system may be configured as a real-time airport surface traffic management system (TMS) that electronically interconnects air traffic control, airline data, and airport operations data to facilitate information sharing and improve taxi queuing. In the TMS operational mode, empirical data shows substantial benefits in ramp operations for airlines, reducing departure taxi times by about one minute per aircraft in operational use, translating as $12 to $15 million per year savings to airlines at the Atlanta, Georgia airport. The data management system and method may also be used for scheduling the movement of multiple vehicles in other applications, such as marine vessels in harbors and ports, trucks or railroad cars in ports or shipping yards, and railroad cars in switching yards. Finally, the data management system and method may be used for managing containers at a shipping dock, stock on a factory floor or in a warehouse, or as a training tool for improving situational awareness of FAA tower controllers, ramp and airport operators, or commercial airline personnel in airfield surface operations.

Glass, Brian J.↗