Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Construction robotics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

The Challenge of Space Infrastructure Construction

This paper reviews the range of technologies that will contribute to the construction of space infrastructure that will both enable and, in some cases, provide the motivation for space exploration. Five parts are addressed: Managing complexity, robotics based construction, materials acquisition, manufacturing, and self-sustaining systems.

Howe, A. Scott↗

Androids: application of EAP as artificial muscles to entertainment industry

The classic movie Metropolis (1926), which is nowadays considered a cinema milestone, has shown the possibility to build robots called androids that are science and fiction run together to realize a dream: the human-like robot. In that movie, Dr. Rotwang transforms a simple and cold calculating robot into the body of a beautiful woman. Robots have often been depicted as metal creatures with cold steel bodies, but there is no reason why metals should be the only kind of material for construction of robots. The authors examined the issues related to applying electroactive polymers materials (EAP) to the entertainment industry. EAP are offering attractive characteristics with the potential to produce more realistic models of living creatures at significantly lower cost. This paper seeks to elucidate how EAP might infiltrate and ultimately revolutionize entertainment, showing some applicative examples.

Animatronics↗

Intelligent control and adaptive systems; Proceedings of the Meeting, Philadelphia, PA, Nov. 7, 8, 1989

Various papers on intelligent control and adaptive systems are presented. Individual topics addressed include: control architecture for a Mars walking vehicle, representation for error detection and recovery in robot task plans, real-time operating system for robots, execution monitoring of a mobile robot system, statistical mechanics models for motion and force planning, global kinematics for manipulator planning and control, exploration of unknown mechanical assemblies through manipulation, low-level representations for robot vision, harmonic functions for robot path construction, simulation of dual behavior of an autonomous system. Also discussed are: control framework for hand-arm coordination, neural network approach to multivehicle navigation, electronic neural networks for global optimization, neural network for L1 norm linear regression, planning for assembly with robot hands, neural networks in dynamical systems, control design with iterative learning, improved fuzzy process control of spacecraft autonomous rendezvous using a genetic algorithm.

Rodriguez, Guillermo↗

Intelligent Agent Architectures: Reactive Planning Testbed

An Integrated Agent Architecture (IAA) is a framework or paradigm for constructing intelligent agents. Intelligent agents are collections of sensors, computers, and effectors that interact with their environments in real time in goal-directed ways. Because of the complexity involved in designing intelligent agents, it has been found useful to approach the construction of agents with some organizing principle, theory, or paradigm that gives shape to the agent's components and structures their relationships. Given the wide variety of approaches being taken in the field, the question naturally arises: Is there a way to compare and evaluate these approaches? The purpose of the present work is to develop common benchmark tasks and evaluation metrics to which intelligent agents, including complex robotic agents, constructed using various architectural approaches can be subjected.

Rosenschein, Stanley J.↗

Additive Construction using Basalt Regolith Fines

Planetary surfaces are often covered in regolith (crushed rock), whose geologic origin is largely basalt. The lunar surface is made of small-particulate regolith and areas of boulders located in the vicinity of craters. Regolith composition also varies with location, reflecting the local bedrock geology and the nature and efficiency of the micrometeorite-impact processes. In the lowland mare areas (suitable for habitation), the regolith is composed of small granules (20 - 100 microns average size) of mare basalt and volcanic glass. Impacting micrometeorites may cause local melting, and the formation of larger glassy particles, and this regolith may contain 10-80% glass. Studies of lunar regolith are traditionally conducted with lunar regolith simulant (reconstructed soil with compositions patterned after the lunar samples returned by Apollo). The NASA Kennedy Space Center (KSC) Granular Mechanics & Regolith Operations (GMRO) lab has identified a low fidelity but economical geo-technical simulant designated as Black Point-1 (BP-1). It was found at the site of the Arizona Desert Research and Technology Studies (RATS) analog field test site at the Black Point lava flow in adjacent basalt quarry spoil mounds. This paper summarizes activities at KSC regarding the utilization of BP-1 basalt regolith and comparative work with lunar basalt simulant JSC-1A as a building material for robotic additive construction of large structures. In an effort to reduce the import or in-situ fabrication of binder additives, we focused this work on in-situ processing of regolith for construction in a single-step process after its excavation. High-temperature melting of regolith involves techniques used in glassmaking and casting (with melts of lower density and higher viscosity than those of metals), producing basaltic glass with high durability and low abrasive wear. Most Lunar simulants melt at temperatures above 1100 C, although melt processing of terrestrial regolith at 1500 C is not uncommon. These temperatures are achievable by laser heating or by using solar concentrators. Similar to volcanic magma, the cooling rate determines the crystallite size - slower cooling develops larger crystals, and rapid quenching can result in fully amorphous glass.

Additive↗

Overview of NASA ISRU Plans, Priorites, and Activities

Introduction:The National Aeronautics andSpace Administration (NASA) of the United States ofAmerica (US) has initiated the Artemis Moon to Marsprogram to send astronauts (the first woman andperson of color) back to the lunar surface, create asustainable human lunar exploration program, andlead the first human exploration mission to the Marssurface in the 2030’s [1]. A major objective of thisprogram is to characterize the resources that exist onthe Moon and Mars, and learn how to utilize them forsustained and affordable exploration. Commonlyknown as In Situ Resource Utilization (ISRU), thesearch for, acquisition, and processing of resources inspace has the potential to greatly reduce thedependency on transporting mission consumables andinfrastructure from Earth, thereby reducing missioncosts, risks, and dependency on Earth.ISRU is Enabling: Through the extraction andprocessing of resources into mission commoditiessuch as rocket propellants, life support consumables,and fuel cell reactants, ISRU enhances and evolvesthe cis-lunar, lander, and surface transportationsystems required for human exploration; expandingand enhancing HOW humans can explore and returnfrom the Moon. Through the extraction andprocessing of resources into metals, silicon, and othermanufacturing and construction feedstock, ISRUenhances and allows for the expansion of criticalinfrastructure using in situ manufacturing andconstruction capabilities that influence WHAT humanscan do on the Moon and in cis-lunar space. Becauseof this, ISRU supports and enables commercialinvolvement beyond NASA and governmentalagencies by both lowering the cost of sustainedtransportation to/from/on the Moon as well assupporting the market required for needing thesetransportation systems. Strategic Framework:To achieve this vision,NASA’s Space Technology Mission Directorate(STMD) ensures the coordinated development ofISRU and other critical space and surfaceinfrastructure elements such as propulsion, power,manufacturing, construction, and robotics through theStrategic Technology Architecture Roundtable(STAR) process. Through STAR, an integratedframework and process has been created allowing forcapabilities and technologies to be linked andassessed, gaps to be identified, specifications andmetrics to be established, and provide a means toprioritize and implement technology development andmissions. A critical part of the STAR effort has beenthe establishment of the Strategic Framework thatorganizes all work under four major Thrusts (Go,Land, Live, and Explore) and identifies the drivingOutcomes for each of these Thrusts. From the Thrustsand Outcomes, all work can be categorized and linkedbetween Capability Areas, and Technology Gaps canbe identified and addressed (Figure 1.)Figure 1. Strategic Framework and STAR FrameworkISRU Envisioned Future: To drive thedevelopment of technologies and capabilities, theSTAR process starts with establishing a ‘grand vision’of where each Outcome and Capability is aiming tobe considered complete. For ISRU, the EnvisionedFuture is “Scalable ISRU production/utilizationcapabilities including sustainable commodities on thelunar and Mars Surface”. This involves starting with10’s of metric tons of products, but evolves into 100’sto 1000’s of metric tons of water, oxygen, propellants,construction and manufacturing feedstock, andcommodities for habitat and food production andoperations. For ISRU, the ‘Prospect to Product’philosophy starts with Destination Reconnaissance &Resource Assessment, followed by ResourceAcquisition, Isolation, and Preparation, leading intoResource Processing (which is further subdivided intomission consumables and feedstocks for constructionand manufacturing). The ISRU Envisioned Futurealso considers what resources are available andattempts to address what and when these resourceswill be evaluated and harnessed, as well asconsidering which products/commodities can beobtained for early use and which ones require moretime and/or users of refined products.It Takes an Architecture: ISRU does not existon its own. By definition, it requires customers/users SHORT TITLE HERE: A. B. Author and C. D. Authorto use the products/commodities produced by ISRUsystems. Also, for an ISRU capability to exist, itmust obtain products and services from other systemsand infrastructure. An important aspect of the STARprocess and the ISRU Envisioned Futures Prioritiesstrategy is to identify and link all of these systems andcapabilities to achieve the desired end state (Figure2).Figure 2. ISRU as Part of a Larger ArchitectureISRU Capability Drivers: The guidingprinciples for NASA’s Space TechnologyDevelopment for Artemis are to develop criticaltechnologies and capabilities that enable (i) asustainable Lunar surface presence, (ii) the future goalof sending humans to Mars, and (iii) promotingcritical technologies to enable future science andcommercial missions. It is a major goal of theArtemis campaign to establish some sort of base campat the lunar South Pole by approximately the end ofthe decade. The ISRU Envisioned Futures Prioritiesstrategy is aligned with the Artemis campaign todevelop and demonstrate ISRU capabilities in thistimeframe that could lead to sustained surfaceoperations, infrastructure growth, and commercialoperations in the next decade (Figure 3).Figure 3. ISRU Dual Path to Full Implementation and CommercializationState of the Art and Gaps: To achieve theenvisioned future, an extensive effort was performedto understand the State of the Art (SOA) for ISRUgoing back decades, and to assess the SOA against thenear and long-term goals and objectives of the ISRUStrategic Outcome objectives. While the releasedISRU Envisioned Futures Priorities only includes atop-level definition of both the SOA and Gaps, furtherinformation on these for ISRU can be found in theISRU Gap Assessment Study performed for theInternational Space Exploration Coordination Group(ISECG) [2]. To provide further guidance to industryand academia, a top level assessment was performedand provide that divides critical areas of ISRUcapabilities and technologies into 3 categories:Significant Funding, Partially Covered/MoreRequired, and Limited/No Funded Activities.Envisioned Future Priorities- Next Steps forISRU: While a significant amount of work over abroad range of technology areas has been performedover the last several years for lunar ISRU, to reach theenvisioned future for ISRU, a lot more work isrequired at the technology level leading to bothsystems and technology demonstrations in the nearfuture. To guide investments within NASA, industry,and academia, 5 specific areas of high priority wereidentified. These are:1.Complete development of the Water and Oxygen Mining Paths and close technology gaps, with emphasis on oxygen extraction from Highland regolith and parallel paths for polar water mining.2.Expand development of metal extraction and feedstock for manufacturing and construction, with emphasis on aluminum and initial/easy to obtain/make construction feedstocks leading to more refined metals and other regolith resources. Also, evaluate biologically inspired/derived technologies in bio-mining, bio-plastic, and other feedstock commodities.3.Ensure the resource assessment needed for future ISRU commercial operations is coordinated with both near/long-term science objectives as well as Artemis mission locations of interest.4.Initiate NASA and industry-led system-level analyses, integration, and testing activities for ISRU capabilities. While significant work has been performed at the technology and subsystemlevel, it is now important to understand how these technology investments can be leveraged and utilized in actual systems and applications5.Initiate lunar ISRU technology flight demonstrations leading to initial ‘Pilot Plant’ end-to-end production capability demonstrations, led by industry

ISRU↗

Summary of Research

The Center for High Technology's journey to the competition named For Inspiration of Science and Technology, or FIRST began on Monday December 16, 1996 when there was a meeting with officials and engineers to discuss the FIRST competition. The task was to research, design, and construct a robot to take inner tubes from- designated places or the human player and place the inner tubes on a goal during a two minute period. The goal had nine branches and a place on the top for the inner tubes and was later described as looking like a giant coat hanger. The human player, who could either hand the robot inner tubes or could throw the inner tubes on the goal, had to stand in a certain area during the competition and could only move in a certain parameter. The playing field which was described by the rules, was a carpeted, hexagon shaped area and allowed each team to have one side between them. Around the perimeter were the stations for the robot, the robot's controller, and the other human player.

May, Philip J.↗

The Stellar Imager (SI)"Vision Mission"

The Stellar Imager (SI) is a "Vision" mission in the Sun-Earth Connection (SEC) Roadmap, conceived for the purpose of understanding the effects of stellar magnetic fields, the dynamos that generate them, and the internal structure and dynamics of the stars in which they exist. The ultimate goal is to achieve the best possible forecasting of solar/stellar magnetic activity and its impact on life in the Universe. The science goals of SI require an ultra-high angular resolution, at ultraviolet wavelengths, on the order of 100 micro-arcsec and thus baselines on the order of 0.5 km. These requirements call for a large, multi-spacecraft (less than 20) imaging interferometer, utilizing precision formation flying in a stable environment, such as in a Lissajous orbit around the Sun-Earth L2 point. SI's resolution will make it an invaluable resource for many other areas of astrophysics, including studies of AGN s, supernovae, cataclysmic variables, young stellar objects, QSO's, and stellar black holes. ongoing mission concept and technology development studies for SI. These studies are designed to refine the mission requirements for the science goals, define a Design Reference Mission, perform trade studies of selected major technical and architectural issues, improve the existing technology roadmap, and explore the details of deployment and operations, as well as the possible roles of astronauts and/or robots in construction and servicing of the facility.

Carpenter, Ken↗

Contour Crafting Simulation Plan for Lunar Settlement Infrastructure Build-Up

Economically viable and reliable building systems and tool sets are being sought, examined and tested for extraterrestrial infrastructure buildup. This project focused on a unique architecture weaving the robotic building construction technology with designs for assisting rapid buildup of initial operational capability Lunar and Martian bases. The project aimed to study new methodologies to construct certain crucial infrastructure elements in order to evaluate the merits, limitations and feasibility of adapting and using such technologies for extraterrestrial application. Current extraterrestrial settlement buildup philosophy holds that in order to minimize the materials needed to be flown in, at great transportation costs, strategies that maximize the use of locally available resources must be adopted. Tools and equipment flown as cargo from Earth are proposed to build required infrastructure to support future missions and settlements on the Moon and Mars.

Infrastructure↗

In Situ Resource Utilization (ISRU) Envisioned Future Priorities

The National Aeronautics and Space Administration (NASA) of the United States of America (US) has initiated the Artemis Moon to Mars program to send astronauts (the first woman and person of color) back to the lunar surface, create a sustainable human lunar exploration program, and lead the first human exploration mission to the Mars surface in the 2030’s. A major objective of this program is to characterize the resources that exist on the Moon and Mars, and learn how to utilize them for sustained and affordable exploration. Commonly known as In Situ Resource Utilization (ISRU), the search for, acquisition, and processing of resources in space has the potential to greatly reduce the dependency on transporting mission consumables and infrastructure from Earth, thereby reducing mission costs, risks, and dependency on Earth. Through the extraction and processing of resources into mission commodities such as rocket propellants, life support consumables, and fuel cell reactants, ISRU enhances and evolves the cis-lunar, lander, and surface transportation systems required for human exploration; expanding and ehancing HOW humans get to, explore, and return from the Moon. Through the extraction and processing of resources into metals, silicon, and other manufacturing and construction feedstock, ISRU enhances and allows for the expansion of critical infrastructure through in situ manufacturing and construction capabilities needed for WHAT humans do on the Moon and in cis-lunar space. Because of this, ISRU supports and enables commercial involvement beyond NASA and governmental agencies by both lowering the cost of sustained transportation to/from/on the Moon as well as supporting the market required for needing these transportation systems. To achieve this vision, NASA’s Space Technology Mission Directorate (STMD) ensures the coordinated development of ISRU and other critical space and surface infrastructure elements such as propulsion, power, manufacturing, construction, and robotics through the Strategic Technology Architecture Roundtable (STAR) process. Through STAR, an integrated framework and process has been created allowing for capabilities and technologies to be linked and assessed, gaps to be identified, specifications and metrics to be established, and provide a means to prioritize and implement technology development and missions. For lunar ISRU, three primary areas of development have been initiated, (1) understanding, mapping, extracting, and processing water and other volatiles found in polar permanently shadowed regions (PSRs), (2) methods, technologies to extract oxygen from regolith, and (3) methods, technologies, and use cases for metals, silicon, and other feedstock commodities extracted and produced from lunar resources. This presentation will briefly discuss the STAR process and elaborate on the current status and future plans for ISRU development, demonstration, and architecture implementation of NASA’s Envisioned Future Priorities plan for ISRU.

In Situ Resource Utilization↗

Hardware Systems and EDU Demonstration of the Tall Lunar Tower Project

The Tall Lunar Tower (TLT) project developed a robotic tower assembly system (RTAS) and TLT Truss engineering development units (EDUs) to perform a ground demonstration of supervised semi-autonomous robotic assembly of a truss-based tall tower. Truss structures provide exceptional strength-to-weight ratios for payload capabilities supporting large masses. On the lunar surface, tall towers are a critical structural system that will enable significant solar power generation by supporting vertical solar arrays and beyond-the-horizon communications at the lunar south pole, supporting the Artemis mission architecture, as well as a lunar economy. Tall towers, greater than 30-meters-tall, provide the elevation needed for more consistent solar power generation due to low inclination sunlight and deep shadowing from surface features on the lunar surface at the poles. The robotic structural assembly technologies developed for truss-based tall towers will also enable other large-scale functional lunar structures to be built, including launch plume deflectors, lunar safe havens for astronauts and assets, surface transportation for cargo, and other critical infrastructure. Robotic assembly of truss structures for lunar surface infrastructure is near-term enabling for future Artemis mission campaign and Moon to Mars Objectives needs for power and communication. The project team designed, fabricated, tested, and demonstrated the RTAS EDU by assembling a TLT Truss EDU in a laboratory environment. The hardware systems and the supervised semi-autonomous assembly process for a TLT assembled EDU design, along with descriptions of a hardware demonstration are presented.

In-space Assembly↗

Hardware Systems and EDU Demonstration of the Tall Lunar Tower Project

The Tall Lunar Tower (TLT) project developed a robotic tower assembly system (RTAS) and TLT Truss engineering development units (EDUs) to perform a ground demonstration of supervised semi-autonomous robotic assembly of a truss-based tall tower. Truss structures provide exceptional strength-to-weight ratios for payload capabilities supporting large masses. On the lunar surface, tall towers are a critical structural system that will enable significant solar power generation by supporting vertical solar arrays and beyond-the-horizon communications at the lunar south pole, supporting the Artemis mission architecture, as well as a lunar economy. Tall towers, greater than 30-meters-tall, provide the elevation needed for more consistent solar power generation due to low inclination sunlight and deep shadowing from surface features on the lunar surface at the poles. The robotic structural assembly technologies developed for truss-based tall towers will also enable other large-scale functional lunar structures to be built, including launch plume deflectors, lunar safe havens for astronauts and assets, surface transportation for cargo, and other critical infrastructure. Robotic assembly of truss structures for lunar surface infrastructure is near-term enabling for future Artemis mission campaign and Moon to Mars Objectives needs for power and communication. The project team designed, fabricated, tested, and demonstrated the RTAS EDU by assembling a TLT Truss EDU in a laboratory environment. The hardware systems and the supervised semi-autonomous assembly process for a TLT assembled EDU design, along with descriptions of a hardware demonstration are presented.

Lunar Infrastructure↗

Kinematics and the implementation of an elephant's trunk manipulator and other continuum style robots

Traditionally, robot manipulators have been a simple arrangement of a small number of serially connected links and actuated joints. Though these manipulators prove to be very effective for many tasks, they are not without their limitations, due mainly to their lack of maneuverability or total degrees of freedom. Continuum style (i.e., continuous "back-bone") robots, on the other hand, exhibit a wide range of maneuverability, and can have a large number of degrees of freedom. The motion of continuum style robots is generated through the bending of the robot over a given section; unlike traditional robots where the motion occurs in discrete locations, i.e., joints. The motion of continuum manipulators is often compared to that of biological manipulators such as trunks and tentacles. These continuum style robots can achieve motions that could only be obtainable by a conventionally designed robot with many more degrees of freedom. In this paper we present a detailed formulation and explanation of a novel kinematic model for continuum style robots. The design, construction, and implementation of our continuum style robot called the elephant trunk manipulator is presented. Experimental results are then provided to verify the legitimacy of our model when applied to our physical manipulator. We also provide a set of obstacle avoidance experiments that help to exhibit the practical implementation of both our manipulator and our kinematic model. c2003 Wiley Periodicals, Inc.

Non-NASA Center↗

Analysis and experiments with an elephant's trunk robot

The area of tentacle and trunk type biological manipulation is not new, but there has been little progress in the development and application of a physical device to simulate these types of manipulation. Our research in this area is based on using an 'elephant trunk' robot. In this paper, we review the construction of the robot and how it compares to biological manipulators. We then apply our previously designed kinematic model to describe the kinematics of the robot. We finish by providing some examples of motion planning and intelligent manipulation using the robot.

Non-NASA Center↗

Concurrent planning and execution for autonomous robots

The Task Control Architecture (TCA) provides communication and coordination facilities to construct distributed, concurrent robotic systems. The use of TCA in a system that walks a legged robot through rugged terrain is described. The walking system, as originally implemented, had a sequential sense-plan-act control cycle. Utilizing TCA features for task sequencing and monitoring, the system was modified to concurrently plan and execute steps. Walking speed improved by over 30 percent, with only a relatively modest conversion effort.

Simmons, Reid G.↗