Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Case Studies”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Evaluation of integrated daylighting and electric lighting design projects: Lessons learned from international case studies

This article presents and discusses the lessons learned from the monitoring of 25 integrated daylighting and electric lighting international case study projects. The case studies consist of real occupied buildings that have been monitored as part of the International Energy Agency (IEA) SHC Task 61/EBC Annex 77 Programme. The general goal of the case studies was to balance lighting energy use with occupants’ visual and non-visual requirements. This was achieved using innovative solutions for daylighting and electric lighting with advanced controls, but also implementing simple and out-of-the-box strategies. The findings suggest that energy demands for lighting can significantly be reduced by combining sensible daylight provision, efficient lighting sources, and advances in controls. Yet, the effective achievement of project goals requires adequate monitoring, fine-tuning, and verification. The findings also suggest that the adoption of “integrative” lighting – that is, lighting systems that address both visual and non-visual responses – is getting increasingly popular. Catering to non-visual requirements will likely drive further innovation in lighting technology. Currently, there is limited investment available for developing daylighting systems for integrative lighting, and the current related electric strategies often come at the risk of energy rebound effects. Overall, providing daylighting and understanding user requirements are fundamental steps towards achieving quality projects, with potential benefits beyond saving energy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of a software safety process and a case study of its use

The goal of this research is to continue the development of a comprehensive approach to software safety and to evaluate the approach with a case study. The case study is a major part of the project, and it involves the analysis of a specific safety-critical system from the medical equipment domain. The particular application being used was selected because of the availability of a suitable candidate system. We consider the results to be generally applicable and in no way particularly limited by the domain. The research is concentrating on issues raised by the specification and verification phases of the software lifecycle since they are central to our previously-developed rigorous definitions of software safety. The theoretical research is based on our framework of definitions for software safety. In the area of specification, the main topics being investigated are the development of techniques for building system fault trees that correctly incorporate software issues and the development of rigorous techniques for the preparation of software safety specifications. The research results are documented. Another area of theoretical investigation is the development of verification methods tailored to the characteristics of safety requirements. Verification of the correct implementation of the safety specification is central to the goal of establishing safe software. The empirical component of this research is focusing on a case study in order to provide detailed characterizations of the issues as they appear in practice, and to provide a testbed for the evaluation of various existing and new theoretical results, tools, and techniques. The Magnetic Stereotaxis System is summarized.

Knight, John C.↗

JPL Fault Protection Experiences - Case Studies

This slide presentation shows several case studies for fault protection. The cases involve a discovery-class mission to excavate material from a comet, rendezvous with two asteroids and develop a prototype system for a next-generation Deep Space Network consisting of ndca large array of small antennas.

fault protection↗

National Environmental Change Information System Case Study

The Global Hydrology and Climate Center and NASA's Marshall Space Flight Center conducted a fact-finding case study for the Data Management Working Group (DMWG), now referred to as the Data and Information Working Group (DIWG), of the U.S. Global Change Research Program (USGCRP) to determine the feasibility of an interagency National Environmental Change Information System (NECIS). In order to better understand the data and information needs of policy and decision makers at the national, state, and local level, the DIWG asked the case study team to choose a regional water resources issue in the southeastern United States that had an impact on a diverse group of stakeholders. The southeastern United States was also of interest because the region experiences interannual climatic variations and impacts due to El Nino and La Nina. Jointly, with input from the DIWG, a focus on future water resources planning in the Apalachicola-Chattahoochee-Flint (ACF) River basins of Alabama, Georgia, and Florida was selected. A tristate compact and water allocation formula is currently being negotiated between the states and U.S. Army Corps of Engineers (COE) that will affect the availability of water among competing uses within the ACF River basin. All major reservoirs on the ACF are federally owned and operated by the U.S. Army COE. A similar two-state negotiation is ongoing that addresses the water allocations in the adjacent Alabama-Coosa-Tallapoosa (ACT) River basin, which extends from northwest Georgia to Mobile Bay. The ACF and ACT basins are the subject of a comprehensive river basin study involving many stakeholders. The key objectives of this case study were to identify specific data and information needs of key stakeholders in the ACF region, determine what capabilities are needed to provide the most practical response to these user requests, and to identify any limitations in the use of federal data and information. The NECIS case study followed the terms of reference developed by the interagency DIWG. The case study "lessons learned" and "key findings" offer guidelines and considerations to the DMWG for the development and implementation of a NECIS that would support the data and information needs of policy and decision makers at the national, state, and local level.

Goodman, S. J.↗

Carl T. Hayden Veterans Affairs Medical Center: Smart Buildings Case Study

The purpose of this smart buildings case study is to showcase a leading example of a GEB renovation project in the federal buildings space and provide key information on the technology and control upgrades, costs, and energy and utility bill savings. This case study also provides information and recommendations for selecting energy conservation measures (ECMs) and choosing energy and cost reduction strategies from the energy management team at the site. The findings from this successful GEB project can be used to help pave the way for additional GEB retrofits in the future. The Carl T. Hayden Veterans Affairs (VA) Medical Center in Phoenix, Arizona, demonstrates that GEB strategies and technologies can be realistically deployed today across buildings with substantial energy and cost savings. The project implemented both ECMs and grid-interactive technologies and controls strategies, making it a leading example of a smart, sustainable, and efficient commercial building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

System Safety in Early Manned Space Program: A Case Study of NASA and Project Mercury

This case study provides a review of National Aeronautics and Space Administration s (NASA's) involvement in system safety during research and evolution from air breathing to exo-atmospheric capable flight systems culminating in the successful Project Mercury. Although NASA has been philosophically committed to the principals of system safety, this case study points out that budget and manpower constraints-as well as a variety of internal and external pressures can jeopardize even a well-designed system safety program. This study begins with a review of the evolution and early years of NASA's rise as a project lead agency and ends with the lessons learned from Project Mercury.

Hansen, Frederick D.↗

GSA Oklahoma City Federal Building: Smart Buildings Case Study

The purpose of this smart buildings case study is to showcase a leading example of a GEB renovation project in the federal buildings space and provide key information on the project roles, processes, costs, and benefits. The findings from this successful GEB project can be used to help pave the way for additional GEB-ready retrofits in the future. The General Services Administration’s (GSA’s) Oklahoma City (OKC) Federal Building, located in downtown Oklahoma City, Oklahoma, demonstrates that GEB-ready strategies and technologies can be realistically deployed today across buildings with minimal investment. The project team implemented nine energy conservation measures (ECMs) and/or smart building technologies, making it a leading example of a smart, sustainable, and efficient commercial building. The case study highlights the challenges and the lessons learned throughout the project design and execution in addition to some of the best practices and considerations when implementing GEB technologies.

Butrico, Mark↗

Enhancing Systems Engineering Education Through Case Study Writing

Developing and refining methods for teaching systems engineering is part of Systems Engineering grand challenges and agenda for research in the SE research community. Retention of systems engineering knowledge is a growing concern in the United States as the baby boom generation continues to retire and the faster pace of technology development does not allow for younger generations to gain experiential knowledge through years of practice. Government agencies, including the National Aeronautics and Space Administration (NASA), develop their own curricula and SE leadership development programs to "grow their own" systems engineers. Marshall Space Flight Center (MSFC) conducts its own Center-focused Marshall Systems Engineering Leadership Development Program (MSELDP), a competitive program consisting of coursework, a guest lecture series, and a rotational assignment into an unfamiliar organization engaged in systems engineering. Independently, MSFC developed two courses to address knowledge retention and sharing concerns: Real World Marshall Mission Success course and its Case Study Writers Workshop and Writers Experience. Teaching case study writing and leading students through a hands-on experience at writing a case study on an SE topic can enhance SE training and has the potential to accelerate the transfer of experiential knowledge. This paper is an overview of the pilot experiences with teaching case study writing, its application in case study-based learning, and identifies potential areas of research and application for case study writing in systems engineering education.

Stevens, Jennifer Stenger↗

Influence of Cultural, Organizational, and Automation Capability on Human Automation Trust: A Case Study of Auto-GCAS Experimental Test Pilots

This paper discusses a case study that examined the influence of cultural, organizational and automation capability upon human trust in, and reliance on, automation. In particular, this paper focuses on the design and application of an extended case study methodology, and on the foundational lessons revealed by it. Experimental test pilots involved in the research and development of the US Air Force's newly developed Automatic Ground Collision Avoidance System served as the context for this examination. An eclectic, multi-pronged approach was designed to conduct this case study, and proved effective in addressing the challenges associated with the case's politically sensitive and military environment. Key results indicate that the system design was in alignment with pilot culture and organizational mission, indicating the potential for appropriate trust development in operational pilots. These include the low-vulnerability/ high risk nature of the pilot profession, automation transparency and suspicion, system reputation, and the setup of and communications among organizations involved in the system development.

trust↗

Shuttle Case Study Collection Website Development

As a continuation from summer 2012, the Shuttle Case Study Collection has been developed using lessons learned documented by NASA engineers, analysts, and contractors. Decades of information related to processing and launching the Space Shuttle is gathered into a single database to provide educators with an alternative means to teach real-world engineering processes. The goal is to provide additional engineering materials that enhance critical thinking, decision making, and problem solving skills. During this second phase of the project, the Shuttle Case Study Collection website was developed. Extensive HTML coding to link downloadable documents, videos, and images was required, as was training to learn NASA's Content Management System (CMS) for website design. As the final stage of the collection development, the website is designed to allow for distribution of information to the public as well as for case study report submissions from other educators online.

Ransom, Khadijah S.↗

A Scalable and Cost-Effective Solution to the U.S. Housing Crisis: A Case Study on Locally Manufactured Modular Multifamily Housing

This case study assesses waste management efficiencies in modular buildings compared to traditional construction methods. We focus on the modular 1-bedroom Model/Z unit by Model Z Modular, LLC. As part of the collaboration between Model Z Modular and the National Renewable Energy Laboratory, we analyzed waste metrics from design through construction, contrasting these findings against conventional stick-built and site-built multifamily buildings. The Model/Z unit is part of a strategic effort to address affordable housing shortages in South Los Angeles, where household income challenges are pronounced. The unit is produced in a state-of-the-art 150,000 sq. ft. modular manufacturing facility located within the city it is serving, and has so far supported the production of over 1,500 affordable housing units. Model/Z units have been used in projects with as many as 195 units, achieving large economies of scale and time. Our analysis demonstrates that modular construction reduces waste compared to traditional methods. This reduction is achieved through precise prefabrication techniques, the implementation of new framing methods, the concentration of workforce expertise, and streamlined logistics, which optimize material use and greatly reduce on-site handling. Additionally, local manufacturing minimizes transportation needs, improving overall project efficiency. The Model/Z unit exemplifies a scalable solution for enhancing housing affordability by optimizing resource utilization and minimizing associated costs. These methods support the delivery of high-quality units at reduced expenses, addressing critical urban housing shortages effectively. This case study underscores Model Z Modular's commitment to producing affordable, quality housing while fostering economic opportunities through job creation and training programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Linking climate change and human systems: a case study of Arctic pipelines

This case study estimates the potential economic risk from permafrost thaw on oil and gas pipelines in the Russian Arctic as part of a larger effort to better understand complex interactions between human and earth systems in the Arctic. Pan-Arctic simulations of permafrost thaw-depth from the Community Land Model version 4.5 and ground ice characteristics were used to generate ground subsidence projections over the period 2020 to 2040 with a quantification of uncertainty. Russian oil and gas transmission pipeline networks were then overlaid on the permafrost thaw projections in ArcGIS to identify pipelines vulnerable to damage from permafrost thaw. Recent pipeline construction costs were used to estimate the total replacement costs for at-risk pipelines under several thaw scenarios. The results indicate that permafrost thaw poses a major threat to pipeline infrastructure, especially gas pipelines, in the Russian Arctic. Over the twenty-year study period, total replacement costs for oil and gas pipelines were estimated at $\$$110 billion in 2020 USD. Reduced economic viability of pipelines under climate change will likely trigger major shifts in the Russian oil and gas industry, which would have impacts on markets, emissions, and geopolitics.

54 ENVIRONMENTAL SCIENCES↗

STS Case Study Development Support

The Shuttle Case Study Collection (SCSC) has been developed using lessons learned documented by NASA engineers, analysts, and contractors. The SCSC provides educators with a new tool to teach real-world engineering processes with the goal of providing unique educational materials that enhance critical thinking, decision-making and problem-solving skills. During this third phase of the project, responsibilities included: the revision of the Hyper Text Markup Language (HTML) source code to ensure all pages follow World Wide Web Consortium (W3C) standards, and the addition and edition of website content, including text, documents, and images. Basic HTML knowledge was required, as was basic knowledge of photo editing software, and training to learn how to use NASA's Content Management System for website design. The outcome of this project was its release to the public.

Rosa de Jesus, Dan A.↗

Engineering Company Recognized for Advanced Use of Lighting Sensors and Controls - Case Study: IMEG Corp, IL

This case study describes the implementation of several emerging lighting techniques at the new Chicago offices of IMEG Corp, an engineering and design consulting firm. IMEG collaborated with Pacific Northwest National Lab as part of a study to better understand the physiological and psychological impacts of advanced lighting strategies on occupant comfort, well-being, and energy savings. The project was recognized as part of DOE's Integrated Lighting Campaign.

integrated lighting, lighting, controls, tunable, ↗

Networked Microgrids for Improved Resilient Operation: A Case Study in Adjuntas Puerto Rico

This paper presents a case study of a network microgrid orchestrator designed to allow coordinated operation of microgrids. Through Control Hardware in the Loop (CHIL), the proposed microgrid orchestrator was validated using, as case study two community-owned microgrids in Adjuntas, Puerto Rico. These two microgrids in Adjuntas were designed to provide affordable and reliable access to electricity to 14 businesses located in the town square. In its current design, these two microgrids operate independently from each other. This paper studies how networking them would increase their resiliency metrics while operating as an island. A distributed optimization is implemented in the microgrid orchestrator due to its superior scalability compared to centralized approach as well as to maintain data privacy. Two operational modes are considered in this study to showcase the advantages of networking microgrids: a) normal island, and b) degraded island. CHIL simulations are performed to validate the proposed microgrid orchestrator. CHIL results show meaningful resiliency improvements obtained by networking microgrids during contingencies such as loss of PV generation.

Ferrari Maglia, Max↗