Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Benchmarking processes for managing large international space programs

The relationship between management style and program costs is analyzed to determine the feasibility of financing large international space missions. The incorporation of management systems is considered to be essential to realizing low cost spacecraft and planetary surface systems. Several companies ranging from large Lockheed 'Skunk Works' to small companies including Space Industries, Inc., Rocket Research Corp., and Orbital Sciences Corp. were studied. It is concluded that to lower the prices, the ways in which spacecraft and hardware are developed must be changed. Benchmarking of successful low cost space programs has revealed a number of prescriptive rules for low cost managements, including major changes in the relationships between the public and private sectors.

Mandell, Humboldt C., Jr.↗

NECAP - NASA's Energy Cost Analysis Program. Operations manual

The use of the NASA'S ENERGY COST ANALYSIS PROGRAM (NECAP) is described. Supplementary information on new capabilities and program options is also provided. The Control Data Corporation (CDC) NETWORK OPERATING SYSTEM (NOS) is discussed. The basic CDC NOS instructions which are required to successfully operate NECAP are provided.

Miner, D. L.↗

NECAP 4.1: NASA's Energy-Cost Analysis Program fast input manual and example

NASA's Energy-Cost Analysis Program (NECAP) is a powerful computerized method to determine and to minimize building energy consumption. The program calculates hourly heat gain or losses taking into account the building thermal resistance and mass, using hourly weather and a response factor method. Internal temperatures are allowed to vary in accordance with thermostat settings and equipment capacity. NECAP 4.1 has a simplified input procedure and numerous other technical improvements. A very short input method is provided. It is limited to a single zone building. The user must still describe the building's outside geometry and select the type of system to be used.

Jensen, R. N.↗

Vision 2030 Aircraft Propulsion Grand Challenge Problem: Full-engine CFD Simulations with High Geometric Fidelity and Physics Accuracy

In 2014 NASA published the outcome of the 2030 CFD Vision study: “CFD Vision 2030: A path to Revolutionary Computational Aerosciences” (Slotnick et al., 2014). The study provided a comprehensive review of the state of the art of CFD in 2014 for aerospace applications including, but not limited to, numerical algorithms, physics models, MDAO and HPC hardware. The study also proposed four conceptual ideas of Grand Challenge problems that would benefit from advances outlined in the roadmap including “off-design turbofan engine transient simulation”. The proposed challenges served as a starting point for more detailed problem descriptions that would benefit from advances in simulation. The objective of this paper is to build upon the NASA 2030 CFD Vision study and provide a detailed overview of what needs to take place to enable accurate and efficient simulation of flow through an aircraft engine at off-design condition for transient operation . Execution of the proposed roadmap would significantly advance aircraft engine development by reducing program cost, reducing program development timelines and enabling design objectives associated with Specific Fuel Consumption (SFC), noise, weight and durability.

compressor↗

Assembly-line Simulation Program

Costs and profits estimated for models based on user inputs. Standard Assembly-line Manufacturing Industry Simulation (SAMIS) program generalized so useful for production-line manufacturing companies. Provides accurate and reliable means of comparing alternative manufacturing processes. Used to assess impact of changes in financial parameters as cost of resources and services, inflation rates, interest rates, tax policies, and required rate of return of equity. Most important capability is ability to estimate prices manufacturer would have to receive for its products to recover all of costs of production and make specified profit. Written in TURBO PASCAL.

Chamberlain, Robert G.↗

Liquid Rocket Booster (LRB) for the Space Transportation System (STS) systems study. Volume 1: Executive summary

The feasibility of replacing the Space Transportation System (STS) Solid Rocket Boosters (SRBs) with Liquid Rocket Boosters (LRBs) was studied. Feasibility required acceptable technical risk, program costs, and a program plan which supports STS requirements. Three major goals were identified to direct booster design and operation: increased STS safety and reliability; STS/LRB integration with minimum impact; and increased STS performance. Two booster engine designs were studied. The first engine design was a turbopump-fed engine with state-of-the-art design, and the second was a pressure-fed engine which might provide a lower cost alternative to the pump-fed concept. Both booster concepts were carried through to completion of conceptual design and all system impacts and program costs were identified. Applications for LRB use in the Advanced Launch System (ALS) program were studied using the pump-fed LRB baseline concept and variations on the baseline concept. Support for the Pressure-Fed Booster Test Bed (PFBTB) included test program planning and costs and technical support.

Source record↗

Integrated orbital servicing study for low-cost payload programs. Volume 1: Executive summary

Various operating methodologies to achieve low-cost space operations were investigated as part of the Space Transportation System (STS) planning. The emphasis was to show that the development investment, initial fleet costs, and supporting facilities for the STS could be effectively offset by exploiting the capabilities of the STS to satisfy mission requirements and reduce the cost of payload programs. The following major conclusions were reached: (1) the development of an on-orbit servicer maintenance system is compatible with many spacecraft programs and is recommended as the most cost-effective system, (2) spacecraft can be designed to be serviceable with acceptable design, weight, volume, and cost effects, (3) use of on-orbit servicing over a 12 year period results in savings ranging between four and nine billion dollars, (4) the pivoting arm on-orbit servicer was selected and a preliminary design was prepared, (5) orbital maintenance has no significant impact on the STS.

Derocher, W. L., Jr.↗

Application study of filamentary composites in a commercial jet aircraft fuselage

A study of applications of filamentary composite materials to aircraft fuselage structure was performed. General design criteria were established and material studies conducted using the 727-200 forebody as the primary structural component. Three design approaches to the use of composites were investigated: uniaxial reinforcement of metal structure, uniaxial and biaxial reinforcement of metal structure, and an all-composite design. Materials application studies for all three concepts were conducted on fuselage shell panels, keel beam, floor beams, floor panels, body frames, fail-safe straps, and window frames. Cost benefit studies were conducted and developmental program costs estimated. On the basis of weight savings, cost effectiveness, developmental program costs, and potential for early application on commercial aircraft, the unaxial design is recommended for a 5-year flight service evaluation program.

Johnson, R. W.↗

Study of alternate space shuttle concepts

A study of alternate space shuttle concepts was conducted to examine the stage-and-one-half concept and its potential for later conversion and use in the two stage reusable shuttle system. A study of external hydrogen tank concepts was conducted to determine the issues involved in the design and production of a low-cost expendable tank system. The major objectives of the study were to determine: (1) realistic drop tank program cost estimates, (2) estimated drop tank program cost for selected specific designs, and (3) change in program cost due to variations in design and manufacturing concepts and changes in program assumptions.

Source record↗

Cost estimation model for advanced planetary programs, fourth edition

The development of the planetary program cost model is discussed. The Model was updated to incorporate cost data from the most recent US planetary flight projects and extensively revised to more accurately capture the information in the historical cost data base. This data base is comprised of the historical cost data for 13 unmanned lunar and planetary flight programs. The revision was made with a two fold objective: to increase the flexibility of the model in its ability to deal with the broad scope of scenarios under consideration for future missions, and to maintain and possibly improve upon the confidence in the model's capabilities with an expected accuracy of 20%. The Model development included a labor/cost proxy analysis, selection of the functional forms of the estimating relationships, and test statistics. An analysis of the Model is discussed and two sample applications of the cost model are presented.

Spadoni, D. J.↗

The Space Station program

Cost constraints to a large degree control the functionality and form of the IOC of the Space Station. Planning of Station missions must be delayed to retain flexibility, a goal also served by modular development of the Station and by multi-use laboratory modules. Early emphasis on servicing other spacecraft is recommended, as is using available Shuttle flight time for R&D on Space Station technologies and operations.

Hinners, N. W.↗

Program Tracks Cost Of Travel

Travel Forecaster is menu-driven, easy-to-use computer program that plans, forecasts cost, and tracks actual vs. planned cost of business-related travel of division or branch of organization and compiles information into data base to aid travel planner. Ability of program to handle multiple trip entries makes it valuable time-saving device.

Mauldin, Lemuel E., III↗

An Alternative to the Continued Accumulation of Separated Plutonium in Japan: Dry Cask Storage of Spent Fuel

As of the end of 2017, Japan had a stockpile of 48 tons of separated plutonium. It will take more than a decade for Japan to convert most of that plutonium into “mixed-oxide” (MOX) fuel and load it into power reactors licensed to use such fuel. This is a very costly program. Including the cost of reprocessing, MOX fuel costs about ten times more than the low-enriched-uranium fuel that otherwise would be used by these reactors. Yet Japan has a policy to start separating more plutonium from spent reactor fuel as soon as the Rokkasho Reprocessing Plant can be put into operation – currently projected for 2021 after 24 years of delay due to a variety of technical problems and upgrades in safety requirements. Japan’s government remains committed to this costly and troubled program primarily because, pending the availability of additional spent-fuel storage space on or off site, reprocessing is seen as the only way to get spent fuel out of reactor pools that are getting full. Because of concerns about the safety of dense-packed spent-fuel pools, however, the prefectures and towns hosting Japan’s power reactors are beginning to accept on-site storage of spent fuel in dry casks. This is the option the United States and many other countries chose after they cancelled their reprocessing programs and their powerplant pools filled up. Its increasing availability in Japan, if backed by a determined policy to accelerate its introduction, should make it possible to cancel reprocessing in Japan as well.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Single stage earth orbital reusable vehicle. Volume 6: Resources

The results of a conceptual study of the resource requirements for a single-stage earth-orbital vehicle are presented. All aspects of program costs for the design, manufacture, test, transportation, launch, and facility modifications were considered. The following program costs are discussed: configuration definition, cost groundrules and assumptions, program requirements, work breakdown structure, cost estimation methods, and cost analysis. High cost areas are identified.

Source record↗