Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONTROL ROOMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Development and evaluation of the conceptual design for a liquid radiological waste system in an advanced hybrid control room

As the current fleet of nuclear power plants are maintaining outdated or obsolete equipment it is common practice to replace worn-out equipment on an as-needed basis resulting in a series of like-for-like replacements of components on the control boards addressing an immediate need to replace equipment. Such upgrades rarely represent an encompassing or systematic vision for control room modernization and do not add the additional benefit of enhanced support for operators in the control room, which tend to overlook the opportunity to reduce operations and maintenance costs through enhanced efficiency. The purpose of the research is to provide guidance on how to realize these opportunities by designing control room human-system interfaces with advanced capabilities in mind. Further, the research seeks to ensure that control room modernizations are undertaken with a sound understanding of the impacts to human operators and are designed based on state-of-the art human factors principles. This report describes the conceptual design of the liquid radiological waste system and several research activities conducted to inform the design philosophy. The report also provides recommended updates to the original design philosophy (published by the researchers in 2018) based on the findings.

99 GENERAL AND MISCELLANEOUS↗

Report for 2.2.1 Task 5: Develop and Document a State-Based Alarm System for a Nuclear Power Plant Control Room Using Machine Learning. Light Water Reactor Sustainability Program report

In legacy control rooms the operators might have 20 to 30 alarms to deal with on 12 control boards, during a reactor trip. The new digital alarm system in the upgraded control room will display between 150 and 200 alarm points on a single screen. This overload of information prevents the operators from identifying any abnormal alarms quickly without having to scroll through the alarm list looking for the abnormal alarms. One way to tackle this problem could be to attempt to create a state-based alarm system which would identify plant states and would identify which alarms are expected in those states and suppress them from the alarm screen so that any unexpected alarms would be displayed and easily identified to the operators. This can be done today but is very labor intensive in that an operator or training instructor would be required to run scenarios and log the alarms to be suppressed. The hope is that Machine Learning (ML) can provide an alternative solution with less manual effort required.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Prototype Design, Analysis, and Results for a Liquid Radiological Waste Control Room

Human factors researchers at Idaho National Laboratory are collaborating with a utility partner to address human factors in the modernization of their radiological waste control room. The collaborating utility, Palo Verde, plans to remove all control boards associated with the liquid radiological waste system, which include controls, indicators, and alarm systems, and replace them with modernized digital instrumentation and controls and displays. To be sure the new system either supports current operational performance or enhances it, researchers have carried out three planning and analysis activities: expert operator review, function allocation analysis, and human factor principles and design applications. Researchers utilized access to expert operators to gain information about the system. Operators were asked to detail a procedure exemplifying typical interactions with the liquid radiological waste system and provide it to Idaho National Laboratory with a list of functionalities to incorporate (Section 4.1). Later, operators were asked to provide additional feedback to inform a prototype with adequate realism to support sound analysis of the system design (Section 4.2). Other operators not associated with the utility partner were also involved in experiment design and prototype evaluation (Section 4.2). Due to the extent of the upgrade, care was given to measure the change in the operator’s role (Section 7). As part of the modernization, some plant systems are expected to be equipped with automation or sensors that send information directly to the control where previously operators were required to enter controlled areas to find the information. Such updates made slight changes to operator role requirements, but the impact was negligible. The way the system is operated will remain largely the same, but operator convenience and safety is expected to increase. Additionally, to map operator tasks during the selected procedure, an Operational Sequence Diagram was created (Section 7.1). The diagram helped to account for every interaction and piece of equipment needed to create the prototype design. Alternatively, the diagram can be created following the final design to identify any function reallocations due to redesign. Human factors principles were also applied to the design. An ergonomic assessment was performed on the workspace resulting in various recommendations for placing and designing the new workstation (Section 6). A 3 D mockup of the control room was created to depict the options available with in-depth descriptions of each. Furthermore the prototype design incorporates well known human factors principles. However, to be sure the principles are sound in the control room context, the researches have designed an experiment to measure the impact design decision has on operator performance. The experiment is described in detail in Section 5. Lastly, a tool emerged as this effort began called the NUREG 0711 Crosswalk (Section 8). The tool has multiple uses, but it was primarily intended to communicate how the researcher’s action directly mapped to specific results suggested in the Nuclear Regulatory Commission review guideline. The tool also maps how current results impact future decisions in the modernization process.

47 OTHER INSTRUMENTATION↗

First-of-A-Kind Control Room Modernization Project Plan

This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results and documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Testing Efficiency Improved by Addition of Remote Access Control Room

The NASA Lewis Research Center's Remote Access Control Room (RACR) uses off-the-shelf video conferencing software integrated with existing facility data systems to provide access to the test data by networking from virtually anywhere in the country. The system allows research engineers in remote locations to participate in tests and monitor data in real time just as if they were present in the control room.

Source record↗

Ontology to guide scenario design to evaluate new technologies for control room modernization - 127

Modernization of nuclear power plants (NPPs) are introducing new human-system interface (HSI) technology that may have unanticipated impact on control room operations. Introduction of HSI thus requires careful evaluation and integrated system validation involving human-in-the-loop experiments with high-fidelity simulation and realistic scenarios. To support the technology evaluation in modernization of NPPs, this paper reports our research on constructing an 'scenario development ontology' for the nuclear industry. We conducted a literature review to produce a preliminary flow chart of the scenario development process and verified the flow chart through interviews with ten domain professionals. The interviews confirmed the key steps in the process flow chart and provided a compendium of approximately 100 scenario attributes, which were divided according to their relevance to HSI evaluation. The next step will be to conduct additional interviews to expand and generalize the ontology that can facilitate vendor and industry evaluation of current and future control room modernization projects. This ontology is particularly intended to facilitate vendor and industry evaluation of current and future control room modernization projects. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Control Room Training for the Hyper-X Program Utilizing Aircraft Simulation

The NASA Dryden Flight Research Center flew two Hyper-X Research Vehicles and achieved hypersonic speeds over the Pacific Ocean in March and November 2004. To train the flight and mission control room crew, the NASA Dryden simulation capability was utilized to generate telemetry and radar data, which was used in nominal and emergency mission scenarios. During these control room training sessions, personnel were able to evaluate and refine data displays, flight cards, mission parameter allowable limits, and emergency procedure checklists. Practice in the mission control room ensured that all primary and backup Hyper-X staff were familiar with the nominal mission and knew how to respond to anomalous conditions quickly and successfully. This paper describes the technology in the simulation environment and the mission control center, the need for and benefit of control room training, and the rationale and results of specific scenarios unique to the Hyper-X research missions.

Lux-Baumann, Jessica R.↗

Control Room Training for the Hyper-X Project Utilizing Aircraft Simulation

The NASA Dryden Flight Research Center flew two Hyper-X research vehicles and achieved hypersonic speeds over the Pacific Ocean in March and November 2004. To train the flight and mission control room crew, the NASA Dryden simulation capability was utilized to generate telemetry and radar data, which was used in nominal and emergency mission scenarios. During these control room training sessions personnel were able to evaluate and refine data displays, flight cards, mission parameter allowable limits, and emergency procedure checklists. Practice in the mission control room ensured that all primary and backup Hyper-X staff were familiar with the nominal mission and knew how to respond to anomalous conditions quickly and successfully. This report describes the technology in the simulation environment and the Mission Control Center, the need for and benefit of control room training, and the rationale and results of specific scenarios unique to the Hyper-X research missions.

Lux-Baumann, Jesica↗

The overview in safety review of human factors engineering and control room design in chinese AP1000 nuclear power plant - 174

The first AP1000 nuclear power plant is constructed in Sanmen county in Zhejiang Province in China, which has creative and distinctive design characteristics. Human factors engineering disciplines are applied to the design of the AP1000. In addition to the elements of the program review model(including human factors engineering program management, operating experience review, functional requirements analysis and allocation, task analysis, staffing, integration of human reliability analysis with human factors engineering, human system interface design, procedure development, training program development, human system interface verification and validation, design implementation, human performance monitoring),the minimum inventory of controls, displays, and alarms present in the main control room and at the remote shutdown workstation. These contents mentioned above are reviewed according to standards, rules and regulations. This article introduces review process, and several important issues during the reviewing are described in detail. These issues include many elements, such as operating experience review, task analysis, human system interface design, verification and validation,and so on. This paper emphasizes on the main control room design(including environment and layout). Background noise in the actual main control room may exceed too much to design value. Another important issue is about main control room habitability systems(VES) changes to satisfy post-actuation performance requirements in AP1000 design change proposal. All the wall panel displays will be closed in this design change proposal. Review process and proposal are described in the paper. Since the AP1000 unit in China is the first constructed all over the world, verification and validation are especially important and necessary. The plan of verification and validation, the results summary report of verification and validation, the report of human engineering discrepancies are focus attention. Verification and validation in human factors engineering include HSI task support verification, HFE design verification and integrated system validation. This paper introduces the review process of verification and validation, the issues found in verification and validation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Design and Validation of Control Room Upgrades Using a Research Simulator Facility

Since 1981, the United States (U.S.) Nuclear Regulatory Commission (NRC) [1] requires a plant- specific simulator facility for use in training at U.S. nuclear power plants (NPPs). These training simulators are in near constant use for training and qualification of licensed NPP operators. In the early 1980s, the Halden Man-Machine Laboratory (HAMMLab) at the Halden Reactor Project (HRP) in Norway first built perhaps the most well known set of research simulators. The HRP offered a high- fidelity simulator facility in which the simulator is functionally linked to a specific plant but in which the human-machine interface (HMI) may differ from that found in the plant. As such, HAMMLab incorporated more advanced digital instrumentation and controls (I&C) than the plant, thereby giving it considerable interface flexibility that researchers took full advantage of when designing and validating different ways to upgrade NPP control rooms. Several U.S. partners—the U.S. NRC, the Electrical Power Research Institute (EPRI), Sandia National Laboratories, and Idaho National Laboratory (INL) – as well as international members of the HRP, have been working with HRP to run control room simulator studies. These studies, which use crews from Scandinavian plants, are used to determine crew behavior in a variety of normal and off-normal plant operations. The findings have ultimately been used to guide safety considerations at plants and to inform advanced HMI design—both for the regulator and in industry. Given the desire to use U.S. crews of licensed operators on a simulator of a U.S. NPP, there is a clear need for a research simulator facility in the U.S. There is no general-purpose reconfigurable research oriented control room simulator facility in the U.S. that can be used for a variety of studies, including the design and validation of control room upgrades.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Human factors aspects of control room design

A plan for the design and analysis of a multistation control room is reviewed. It is found that acceptance of the computer based information system by the uses in the control room is mandatory for mission and system success. Criteria to improve computer/user interface include: match of system input/output with user; reliability, compatibility and maintainability; easy to learn and little training needed; self descriptive system; system under user control; transparent language, format and organization; corresponds to user expectations; adaptable to user experience level; fault tolerant; dialog capability user communications needs reflected in flexibility, complexity, power and information load; integrated system; and documentation.

Jenkins, J. P.↗

Development of human machine interface (HMI) for digital control rooms in nuclear power plants - 119

The analog control systems of traditional Nuclear Power Plants (NPPs) are being replaced by digital systems due to the fact that analog Instrumentation and Control (I and C) systems are becoming obsolete and such technology is no longer supported by manufacturers. The purpose of this study is to jointly evaluate the performance of an operator with a Human Machine Interface (HMI) in a NPP digital control room ensuring the efficiency and the safety of the NPP. The validity and the accuracy of the operators' actions are the primary goals that have to be preserved through the emergence of the HMI based in digital systems. The transition from analog to digital control systems leads to a more advanced support of the NPP; Video Display Units (VDUs) are used for monitoring the state of the NPP while alarm systems help for directing attention. The operators, in order to monitor information from the different VDUs, have to switch attention between different screens (alarms systems and control systems). Therefore, a well-established HMI is a significant challenge to the overall operation of the NPP, that actually helps the operators to learn from the available information in detecting possible anomalies and making the right decisions, to ensure safety, and in parallel to diminish the human error. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A HUMAN FACTORS META MODEL FOR U.S. NUCLEAR POWER PLANT CONTROL ROOM MODERNIZATION

Over the last several years, the United States (U.S.) Department of Energy (DOE) has sponsored human factors research and development (R&D) and human factors engineering (HFE) activities through its Light Water Reactor Sustainability (LWRS) program to modernize the main control rooms (MCR) of commercial nuclear power plants (NPP). Idaho National Laboratory (INL), in partnership with numerous commercial nuclear utilities, has conducted some of this R&D to enable the life extension of NPPs (i.e., provide the technical basis for the long-term reliability, productivity, safety, and security of U.S. NPPs). From these activities performed to date, a human factors meta model for U.S. NPP control room modernization can now be formulated. This paper discusses this emergent HFE meta model for NPP control room modernization, with the goal of providing an integrated high level roadmap and guidance on how to perform human factors R&D and HFE for those in the U.S. nuclear industry that are engaging in the process of upgrading their MCRs.

99 GENERAL AND MISCELLANEOUS↗

A human factors meta model for U.S. nuclear power plant control room modernization - 350

Over the last several years, the United States (U.S.) Department of Energy (DOE) has sponsored human factors research and development (R and D) and human factors engineering (HFE) activities through its Light Water Reactor Sustainability (LWRS) program to modernize the main control rooms (MCR) of commercial nuclear power plants (NPP). Idaho National Laboratory (INL), in partnership with numerous commercial nuclear utilities, has conducted some of this R and D to enable the life extension of NPPs (i.e., provide the technical basis for the long-term reliability, productivity, safety, and security of U.S. NPPs). From these activities performed to date, a human factors meta model for U.S. NPP control room modernization can now be formulated. This paper discusses this emergent HFE meta model for NPP control room modernization, with the goal of providing an integrated high-level road map and guidance on how to perform human factors R and D and HFE for those in the U.S. nuclear industry engaged in the process of upgrading their MCRs. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Human Factors Engineering Design Phase Report for Control Room Modernization

In this report, we review recent work performed at the Human System Simulation Laboratory (HSSL) at the Idaho National Laboratory. The U.S. Department of Energy has sponsored work under the Light Water Reactor Sustainabilty (LWRS) program to assist U.S. utilities in extending the operating life of the U.S. fleet of commercial reactors. Control room modernization is a key research and demonstration area within LWRS. The U.S. Nuclear Regulatory Commission’s Human Factors Engineering Program Review Model (NUREG-0711) outlines four phases of developing a new human-system interface (HSI). One of the key steps in NUREG-0711 is the design phase. In this report, we outline the process and findings from several simulator workshops, which centered on early design phase activities. Prototypes for a turbine control system upgrade for a main control room at a commercial nuclear power plant were developed and evaluated using licensed reactor operators at the HSSL. This iterative design-evaluation cycle succeeded in refining the design of the HSI and readying it for final implementation and formal validation and verification exercises. This report serves as a useful template to explicate design steps that are not currently required by NUREG-0711 but that ensure a usable and safe control room replacement system.

99 GENERAL AND MISCELLANEOUS↗

eGridGPT: Trustworthy AI in the Control Room

This report outlines the synergy between human decision making and generative artificial intelligence (GenAI), where GenAI supports power system operators by analyzing procedures, suggesting actions, simulating scenarios with physics-based digital twins, and recommending optimal decisions. This report is the first research effort to apply large language models (LLMs), a type of GenAI, in the power grid control room. The authors describe the Electric Grid Generative Pretrained Transformer (eGridGPT), an LLM that virtually assists system operators. Developed with cybersecurity and regulatory requirements in mind, eGridGPT represents an opportunity to responsibly evolve control room technologies to meet the needs of a rapidly changing grid. As an innovative concept, eGridGPT seeks to spearhead productive discussions about the advanced technologies in the control room of the future amid the transition to clean energy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bridging the Gap Between Modern UX Design and Particle Accelerator Control Room Interfaces

Accelerator control systems often represent relatively complex and safety-sensitive human-machine interfaces within process control industries. These systems are technically robust and reflect the cumulative integration of solutions built and adapted across decades. One of the regular, unfortunate casualties of provisional accelerator control system updates is their human-system interfaces (HSIs) which often lag behind modern usability and design standards. An additional challenge is that although there is a multitude of established human factors (HF), and user experience (UX) principles for everyday digital applications, there are very few (if any) established principles for complex and safety-critical applications for an accelerator. This paper argues for the importance of established HF and UX principles (herein referred to as human-centered design principles) into the development of accelerator HSIs, emphasizing the need for clarity, consistency, responsiveness, and cognitive accessibility. Drawing from HF/UX best practices and human-centered design, this paper discusses how these approaches can enhance operator performance, reduce human error, and improve accelerator personnel collaboration. Case studies from Accelerator Control Operations Research Network (ACORN) at Fermilab are explored to demonstrate how interfaces built with human-centered design principles can scale with system complexity while remaining intuitive and efficient for diverse user roles including operators, machine experts, and engineers. By bridging the gap between traditional control system design and modern human-centered design methods, this paper provides a roadmap for evolving accelerator HSIs into more usable, maintainable, and effective tools.

Hill, Rachael [Idaho Natl. Lab.]↗

Migration of Older to New Digital Control Systems in Nuclear Power Plant Main Control Rooms

The United States (U.S.) Department of Energy (DOE) Office of Nuclear Energy (NE) has the primary mission to advance nuclear power by resolving socio-technical issues through research and development (R&D). One DOE-NE activity supporting this mission is the Light Water Reactor Sustainability (LWRS) program. LWRS has the overall objective to sustain the operation of existing commercial nuclear power plants (NPPs) through conducting R&D across multiple “pathways,” or R&D focus areas. The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway conducts targeted R&D to address aging and reliability concerns with the legacy instrumentation and control (I&C) and related information systems in operating U.S. NPPs. This work involves (1) ensuring that legacy analog II&C systems are not life-limiting issues for the LWR fleet, and (2) implementing digital II&C technology in a manner that enables broad innovation and business improvement in the NPP operating model. Under the LWRS Advanced II&C pathway, Human Factors experts at Idaho National Laboratory (INL) have been conducting R&D in support of NPP main control room (MCR) modernization activities. Work in prior years has focused on migrating analog I&C systems to new digital I&C systems (). In fiscal year 2016 (FY16), one new focus area for this research is migrating older digital I&C systems to new and advanced digital I&C systems. This report summarizes a plan for conducting a digital-to-digital migration of a legacy digital I&C system to a new digital I&C system in support of control room modernization activities.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗