Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONTRACT MANAGEMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

HANFORD SITE WELDING PROGRAM SUCCESSFULLY PROVIDING A SINGLE SITE FUNCTION FOR USE BY MULTIPLE CONTRACTORS

The Department of Energy, Richland Operations (DOE-RL) recently restructured its Hanford work scope, awarding two new contracts over the past several months for a total of three contracts to manage the sites cleanup efforts. DOE-RL met with key contractor personnel prior to and during contract transition to ensure site welding activities had appropriate oversight and maintained code compliance. The transition also provided an opportunity to establish a single site-wide function that would provide welding and materials engineering services to the Hanford site contractors: CH2M HILL Plateau Remediation Company (CHPRC); Mission Support Alliance (MSA); Washington River Protection Solutions (WRPS); and Washington Closure Hanford (WCH). Over the years, multiple and separate welding programs (amongst the several contractors) existed at the Hanford site leading to inefficiencies resulting from duplication of administrative efforts, maintenance of welding procedures, welder performance certifications, etc. The new, single program eliminates these inefficiencies. The new program, co-managed by two of the sites' new contractors, the CHPRC ('owner' of the program and responsible for construction welding services) and the MSA (provides maintenance welding services), provides more than just the traditional construction and maintenance welding services. Also provided, are welding engineering, specialty welding development/qualification for the closure of radioactive materials containers and materials evaluation/failure analysis. The following describes the new Hanford site welding program.

42 ENGINEERING↗

The enduring role of contracts for difference in risk management and market creation for renewables

Governments procure renewables through a variety of mechanisms. Contracts for difference (CfDs) have been used for more than 50% of the global offshore wind supply. The payments awarded through CfDs are sometimes labelled subsidies, suggesting that they support uneconomic activity. Here, in this study, we argue that the primary role of CfDs is rather risk management by creating a market for electricity supply at stable long-term prices. Similar to its use in other sectors of the economy, this contract type transforms a variable to a fixed price to reallocate volatility risks. Such long-term contracts are often necessary for renewables financing due to limited hedging options in existing markets. Our perspective could imply a shift in perception towards CfDs as a fundamental and lasting market feature. We hope to stimulate a timely discussion about the impact of greater CfD diffusion on electricity market mechanisms, risk allocation and the potential for combining fragmented streams of energy finance, market and policy research.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Total Power Factor Smart Contract with Cyber Grid Guard Using Distributed Ledger Technology for Electrical Utility Grid with Customer-Owned Wind Farm

In modern electrical grids, the numbers of customer-owned distributed energy resources (DERs) have increased, and consequently, so have the numbers of points of common coupling (PCC) between the electrical grid and customer-owned DERs. The disruptive operation of and out-of-tolerance outputs from DERs, especially owned DERs, present a risk to power system operations. A common protective measure is to use relays located at the PCC to isolate poorly behaving or out-of-tolerance DERs from the grid. Ensuring the integrity of the data from these relays at the PCC is vital, and blockchain technology could enhance the security of modern electrical grids by providing an accurate means to translate operational constraints into actions/commands for relays. This study demonstrates an advanced power system application solution using distributed ledger technology (DLT) with smart contracts to manage the relay operation at the PCC. The smart contract defines the allowable total power factor (TPF) of the DER output, and the terms of the smart contract are implemented using DLT with a Cyber Grid Guard (CGG) system for a customer-owned DER (wind farm). This article presents flowcharts for the TPF smart contract implemented by the CGG using DLT. The test scenarios were implemented using a real-time simulator containing a CGG system and relay in-the-loop. The data collected from the CGG system were used to execute the TPF smart contract. The desired TPF limits on the grid-side were between +0.9 and +1.0, and the operation of the breakers in the electrical grid and DER sides was controlled by the relay consistent with the provisions of the smart contract. The events from the real-time simulator, CGG, and relay showed a successful implementation of the TPF smart contract with CGG using DLT, proving the efficacy of this approach in general for implementing electrical grid applications for utilities with connections to customer-owned DERs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Taming the Wild World of Management, Performance and Communication - 13459

Management has evolved a long way from its original meaning of 'governing a horse'. The industrial revolution fostered 'scientific management'; 1930's Hawthorne studies discovered that people's social interactions could alter productivity; and the dawn of the computer age in the post-war 1950's brought general systems theory into management thinking. Today, mobile wireless connectivity aims to transform ever-changing networks of players, mandates, and markets into something that can be 'managed'. So why is there no clear and simple recipe for how to practice management? We talk about financial management, safety management, and operations management, but surely the 'management' part of those endeavors will share the same set of practices. Instead, we are still arguing for 'management' to include everything from developing people to negotiating contracts. A manager's job may include many things, but one of them, the job of management, needs to be nailed down. Three standard practices for managing in a network are developed: (a) support the dialogues that connect people vital to accomplishing a goal or objective; (b) develop and sustain the scoreboards that serve as a road-map to reach the goal; and (c) control the feedback to 'govern the horse'. These three practices are useful for more than reaching goals, as they also support coordinating across boundaries and running productive meetings. The dialogues for productive relationships, scoreboards for goals and deliverables, and feedback for performance together constitute a recipe for managing in a networked world. (authors)

99 GENERAL AND MISCELLANEOUS↗

Recipe for Success: Digital Viewables

The Engineering Services Contract (ESC) and Information Management Communication Support contract (IMCS) at Kennedy Space Center (KSC) provide services to NASA in respect to flight and ground systems design and development. These groups provides the necessary tools, aid, and best practice methodologies required for efficient, optimized design and process development. The team is responsible for configuring and implementing systems, software, along with training, documentation, and administering standards. The team supports over 200 engineers and design specialists with the use of Windchill, Creo Parametric, NX, AutoCAD, and a variety of other design and analysis tools.

design and process development↗

Program Direction FY 2017 Budget At-A-Glance

Program Direction enables EERE to maintain and support a world-class federal workforce to accomplish its mission of creating and sustaining American leadership in the sustainable transportation, renewable power, and energy efficiency sectors. The FY 2017 Program Direction budget request provides resources for program and project management, administrative support, contract administration, human capital management, headquarters and field site non-laboratory facilities and infrastructure, and contractor support.

Budget, Finance, FY 2017, Direction, Program↗

Lawrence Livermore National Laboratory 2007 Annual Report

Lawrence Livermore National Laboratory's many outstanding accomplishments in 2007 are a tribute to a dedicated staff, which is shaping the Laboratory's future as we go through a period of transition and transformation. The achievements highlighted in this annual report illustrate our focus on the important problems that affect our nation's security and global stability, our application of breakthrough science and technology to tackle those problems, and our commitment to safe, secure, and efficient operations. In May 2007, the Department of Energy (DOE) awarded Lawrence Livermore National Security, LLC (LLNS), a new public-private partnership, the contract to manage and operate the Laboratory starting in October. Since its inception in 1952, the Laboratory had been managed by the University of California (UC) for the DOE's National Nuclear Security Administration (NNSA) and predecessor organizations. UC is one of the parent organizations that make up LLNS, and UC's presence in the new management entity will help us carry forward our strong tradition of multidisciplinary science and technology. 'Team science' applied to big problems was pioneered by the Laboratory's co-founder and namesake, Ernest O. Lawrence, and has been our hallmark ever since. Transition began fully a year before DOE's announcement. More than 1,600 activities had to be carried out to transition the Laboratory from management by a not-for-profit to a private entity. People, property, and procedures as well as contracts, formal agreements, and liabilities had to be transferred to LLNS. The pre-transition and transition teams did a superb job, and I thank them for their hard work. Transformation is an ongoing process at Livermore. We continually reinvent ourselves as we seek breakthroughs that impact emerging national needs. An example is our development in the late 1990s of a portable instrument that could rapidly detect DNA signatures, research that started with a view toward the potential threat of terrorist use of biological weapons. As featured in our annual report, activities in this area have grown to many important projects contributing to homeland security and disease prevention and control. At times transformation happens in large steps. Such was the case when nuclear testing stopped in the early 1990s. As one of the nation's nuclear weapon design laboratories, Livermore embarked on the Stockpile Stewardship Program. The objectives are to ensure the safety, security, and reliability of the nation's nuclear weapons stockpile and to develop a science-based, thorough understanding of the performance of nuclear weapons. The ultimate goal is to sustain confidence in an aging stockpile without nuclear testing. Now is another time of major change for the Laboratory as the nation is resizing its nuclear deterrent and NNSA begins taking steps to transform the nuclear weapons complex to meet 21st-century national security needs. As you will notice in the opening commentary to each section of this report, the Laboratory's senior management team is a mixture of new and familiar faces. LLNS drew the best talent from its parent organizations--Bechtel National, UC, Babcock & Wilcox, the Washington Group Division of URS, and Battelle--to lead the Laboratory. We are honored to take on the responsibility and see a future with great opportunities for Livermore to apply its exceptional science and technology to important national problems. We will work with NNSA to build on the successful Stockpile Stewardship Program and transform the nation's nuclear weapons complex to become smaller, safer, more secure, and more cost effective. Our annual report highlights progress in many relevant areas. Laboratory scientists are using astonishing computational capabilities--including BlueGene/L, the world's fastest supercomputer with a revolutionary architecture and over 200,000 processors--to gain key insights about performance of aging nuclear weapons. What we learn will help us sustain the stockpile without nuclear testing. Preparations are underway to start experiments at the National Ignition Facility (NIF), the world's largest laser. They will help us resolve the most important questions we still have about nuclear weapons performance. Future NIF experiments will also explore the promise of an essentially inexhaustible source of clean energy from nuclear fusion. In addition, we have begun the process of eliminating significant quantities of special nuclear materials from the Livermore site. We will carry forward Livermore's tradition of exceptional science and technology. This is the S&T that led to the design and construction of NIF and leadership in an international consortium that is developing the Gemini Planet Imager. When the Imager comes on line in 2010 at an observatory in Chile, the Imager will bring into sharp focus planets that are 30 to 150 light years from our solar system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An analysis of cost overruns on defense acquisition contracts

This article examines the history of cost overruns reported on 64 completed defense contracts. Its purpose is to formally test the observation of the Under Secretary. Results confirm the observation at the 95 percent level of confidence, and were generally insensitive to the contract type (price, cost), the contract phase (development, production), the type of weapon system (air, ground, sea), and the armed forces service (Air Force, Army, Navy) that managed the contract. After a review of terminology, concepts, and related research for those unfamiliar with the area, the methodology, results, and managerial implications are described.

Christensen, David S.↗

A technique for lowering risks during contract negotiations

In this day and age of sophisticated weapon and space system procurements, negotiations of the statement of work, technical requirements, and schedule may be as protracted as the negotiation of costs and profit. A major problem facing the program manager during contract negotiations is what affect changes in schedule, technical requirements, and contract terms have on the price. In many instances, after the statement of work has been redrafted, the contractor will be obliged to reprice the work, either on the spot or after a short recess in the negotiations. In this paper, a method for organizing the negotiation process is presented to reduce the risks incurred by the seller. The method is built upon regression analysis and two illustrative examples of its use are provided.

Lehman, D. H.↗

Ion Thruster Used to Propel the Deep Space 1 Spacecraft to Comet Encounters

The NASA Solar Electric Propulsion Technology Applications Readiness (NSTAR) Project provided a xenon ion propulsion system to the Deep Space 1 (DS1) spacecraft to validate the propulsion system as well as perform primary propulsion for asteroid and comet encounters. The On-Board Propulsion Branch of the NASA Glenn Research Center at Lewis Field developed engineering model versions of the 30-cm-diameter ion thruster and the 2.5-kW power processor unit (PPU). Glenn then transferred the thruster and PPU technologies to Hughes Electron Dynamics and managed the contract, which supplied two flight sets of thrusters and PPU s to the Deep Space 1 spacecraft and to a ground-based life verification test at the Jet Propulsion Laboratory (JPL). In addition to managing the DS1 spacecraft development, JPL was responsible for the NSTAR Project management, thruster life tests, the feed system, diagnostics, and propulsion subsystem integration. The ion propulsion development team included NASA Glenn, JPL, Hughes Electronics, Moog Inc., and Spectrum Astro Inc. The overall NSTAR subsystem dry mass, including thruster, PPU, controller, cables, and the xenon storage and feed system, is 48 kg. The mass of the xenon stored onboard DS1 was about 81 kg, and the spacecraft wet mass was approximately 500 kg.The DS1 spacecraft was launched on October 24, 1998, and on July 29, 1999, it flew within 16 miles of the small asteroid Braille (formerly 1992KD) at a relative speed of 35,000 mph. As of November 1999, the ion propulsion system had performed flawlessly for nearly 149 days of thrusting. NASA has approved an extension to the mission, which will allow DS1 to continue thrusting to encounters with two comets in 2001. The DS1 optical and plasma diagnostic instruments will be used to investigate the comet and space environments. The spacecraft is scheduled to fly past the dormant comet Wilson- Harrington in January 2001 and the very active comet Borrelly in September 2001, at which time approximately 500 days of ion engine thrusting will have been completed.

Sovey, James S.↗

Quality New Mexico Performance Excellence Award Roadrunner Application 2016

The Human Resources (HR) Division is a critical part of Los Alamos National Laboratory, an internationally recognized science and R&D facility with a specialized workforce of more than 10,000. The Laboratory’s mission is to solve national security challenges through scientific excellence. The HR Division partners with employees and managers to support the Laboratory in hiring, retaining, and motivating an exceptional workforce. The Laboratory is owned by the U.S. Department of Energy (DOE), with oversight by the DOE’s National Nuclear Security Administration (NNSA). In 2006, NNSA awarded the contract for managing and operating the Laboratory to Los Alamos National Security, LLC (LANS), and a for-profit consortium. This report expounds on performance excellence efforts, presenting a strategic plan and operations.

99 GENERAL AND MISCELLANEOUS↗

Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

54 ENVIRONMENTAL SCIENCES↗

Organizational Conflicts of Interest Disclosure Update Statement (FY2019)

The National Technology & Engineering Solutions of Sandia, LLC (NTESS) Prime Contract department manages an organizational conflicts of interest (OCI) program that is designed to provide NTESS employees an accessible means to assist in identifying potential OCI risk and providing development support services to avoid, neutralize, or mitigate the risk. The OCI program is responsible for maintaining a regulatory infrastructure, such as corporate OCI policy and training content, to comply with NTESS's obligations set forth in prime contract clauses H-4: ORGANIZATIONAL CONFLICT OF INTEREST (OCI) — SPECIAL PROVISION and Section I Department of Energy Acquisition Regulation 952.209-72, Organizational Conflicts of Interest, Alternate I, paragraph (c)(1), Disclosure After Award. Risk identification is a key OCI program priority. Providing employees with a straight-forward, accessible and navigable mechanism to identify potential OCI risk will assist the OCI program in meeting this priority.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Simulating Secure Data Exchange and Storage for Urban Air Mobility Environments

Urban Air Mobility (UAM) defines an environment for managing operations of vertical takeoff and landing (VTOL) and short takeoff and landing (STOL) vehicles in an urban environment. Within a UAM environment, UAM operators manage fleets of vehicles, relying on Providers of Services for UAM (PSUs) for managing flights in a region of airspace. Flight plan deconfliction is primarily performed by the Discovery and Synchronization Service (DSS), and the Federal Aviation Administration (FAA) maintains control over the UAM space via the FAA-Industry Exchange Protocol (FIDXP). UAM is a federated environment with many different entities owning and operating vehicles, PSUs, and other services. These entities often need to interoperate or access data generated by other organizations. This paper demonstrates the feasibility of using blockchain to facilitate a secure data exchange and storage for this flight information in a UAM environment. In particular, this paper is focused on flight plans and telemetry data. A blockchain network was developed with a set of smart contracts for managing relevant flight data. Hyperledger Fabric was chosen as it is performent, scalable, and allows organizations to reuse existing public key infrastructure (PKI) for identity management. A set of simulated UAM services were also developed. These services propose flight plans and negotiate with other UAM services for airspace access. All interactions between UAM services, as well as vehicle telemetry data, is recorded onto the blockchain. Vehicle telemetry data is generated by a vehicle flight simulation service. This paper successfully demonstrates the feasibility of using blockchain as a secure data exchange and storage mechanism in a UAM environment.

UAM↗

Oak Ridge National Laboratory Annual Sustainability Report 2023

ORNL, managed under contract by UT-Battelle LLC, is DOE’s largest science and energy laboratory and, as such, executes the widest range of mission capabilities. Diverse expertise spans a broad range of scientific and engineering disciplines, enabling research and science achievements to accelerate the delivery of solutions to the marketplace. ORNL supports DOE’s national missions of scientific discovery, clean energy, and security. To execute these activities, ORNL has grown significantly over 80 years of continuous operations, consisting of facilities with commissioning dates ranging from the 1940s to the present—an extraordinary set of distinctive scientific facilities and equipment. The complexities of such a variety of facilities require teamwork among divisions, a wide variety of conservation projects, and creative strategies to achieve the desired energy and water savings. Such a diverse and unique set of major facilities, totaling over 5.5 million square feet, with 6,000 employees, requires an innovative plan to accomplish advancements in operational efficiencies. ORNL is tasked with the management of an extraordinary set of distinctive scientific facilities and equipment for DOE. ORNL is mission-driven, and its mission has grown substantially over the decades. ORNL’s core research capabilities provide broad science and technology support for DOE in the areas of energy, environment, and national security. Currently, ORNL is a world leader in materials, neutron, and nuclear science and engineering, and in high-performance computing and data analytics. ORNL’s vast portfolio of research facilities must be maintained and carefully upgraded to protect the nation’s investment in scientific analysis. The goal of sustainable and resilient operations is to enable more effective execution of ORNL’s science and technology mission. Sustainable operational practices and enhanced resilience strive for excellent results while remaining diligent in energy conservation, environmental stewardship, asset management, and community engagement. The Sustainable ORNL Program (Sustainable ORNL) Continuous improvements in operational and business processes must be integrated into the fabric of the ORNL culture to maximize the return from the investment made in modernizing facilities and equipment. The Sustainable ORNL program promotes the legacy of system-wide best practices, management commitment, and employee engagement that will lead ORNL into a future of efficient, resilient, and sustainable operations. ORNL leadership and Sustainable ORNL champions receive regular status reports on the progress of each project and focus area (i.e., roadmap) and periodic summary reports. More information can be found at the program’s website. The Sustainable ORNL roadmap structure endorses 15 vital roadmaps. The figure below summarizes the current project assignments and demonstrates that each project contributes to the wellbeing of the whole. Continuous employee engagement and regular status reports confirm the ideals of the program. The roadmap structure is not static; as the science mission advances and the needs of the organization evolve, the Sustainable ORNL roadmap structure elements are modified to align with developing priorities. In 2022, Sustainable ORNL made roadmap changes to better align ORNL to support new federal requirements that have been issued.

54 ENVIRONMENTAL SCIENCES↗

Management of government quality assurance functions for NASA contracts

This handbook sets forth requirements for NASA direction and management of government quality assurance functions performed for NASA contracts and is applicable to all NASA installations. These requirements will standardize management to provide the minimum oversight and effective use of resources. This handbook implements Federal Acquisition Regulation (FAR) Part 46, NASA FAR Supplement 18-46, Quality Assurance, and NMI 7410.1. Achievement of established quality and reliability goals at all levels is essential to the success of NASA programs. Active participation by NASA and other agency quality assurance personnel in all phases of contract operations, including precontract activity, will assist in the economic and timely achievement of program results. This involves broad participation in design, development, procurement, inspection, testing, and preventive and corrective actions. Consequently, government, as well as industry, must place strong emphasis on the accomplishment of all functions having a significant bearing on quality and reliability from program initiation through end-use of supplies and services produced. For purposes of implementing NASA and other agency agreements, and to provide for uniformity and consistency, the terminology and definitions prescribed herein and in a future handbook shall be utilized for all NASA quality assurance delegations and subsequent redelegations.

Source record↗

Department of Energy – Office of Science: Pacific Northwest Site Office Environmental Monitoring Plan for the DOE-SC PNNL Site

The Pacific Northwest Site Office (PNSO) manages the contract for operations at the U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site in Richland, Washington. Radiological operations at the DOE-SC PNNL Site expanded in 2010 with the completion of facilities at the Physical Sciences Facility. As a result of the expanded radiological work at the site, the Washington State Department of Health (WDOH) has required that offsite environmental surveillance be conducted as part of the PNNL Site Radioactive Air Emissions License. The environmental monitoring and surveillance requirements of various orders, regulations, and guidance documents consider emission levels and subsequent risk of negative human and environmental impacts. This Environmental Monitoring Plan (EMP) describes air surveillance activities at the DOE-SC PNNL Site. The determination of offsite environmental surveillance needs evolved out of a Data Quality Objectives process (Barnett et al. 2010) and Implementation Plan (Snyder et al. 2010). The entire EMP is a compilation of several documents, which include: - the Main Document, this text, (PNNL-20919), - Attachment 1, Sampling and Analysis Plan (SAP) (PNNL-20919-1), - Attachment 2, Data Management Plan (DMP) (PNNL-20919-2), and - Attachment 3, Dose Assessment Guidance (DAG) (PNNL-20919-3). Although the EMP is considered the compilation of these documents, each covers topics that can be updated independently. As a result, each may have different publication dates. Current version dates can be verified with Effluent Management staff. The procedures, forms, and data management activities described herein may change with radiological research projects at the DOE-SC PNNL Site. The scope of this EMP will evolve as needed, during routine reviews or in response to changes in facility operations. This document provides the SAP, DMP, and DAG effective at the time of publication. Updates to this document will be published at the discretion of the Effluent Management group of PNNL.

54 ENVIRONMENTAL SCIENCES↗

Environmental Compliance and Protection Program Description Oak Ridge, Tennessee

The objective of the Environmental Compliance and Protection (EC and P) Program Description (PD) is to establish minimum environmental compliance requirements and natural resources protection goals for the Bechtel Jacobs Company LLC (BJC) Oak Ridge Environmental Management Cleanup Contract (EMCC) Contract Number DE-AC05-98OR22700-M198. This PD establishes the work practices necessary to ensure protection of the environment during the performance of EMCC work activities on the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee, by BJC employees and subcontractor personnel. Both BJC and subcontractor personnel are required to implement this PD. A majority of the decontamination and demolition (D and D) activities and media (e.g., soil and groundwater) remediation response actions at DOE sites on the ORR are conducted under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). CERCLA activities are governed by individual CERCLA decision documents (e.g., Record of Decision [ROD] or Action Memorandum) and according to requirements stated in the Federal Facility Agreement for the Oak Ridge Reservation (DOE 1992). Applicable or relevant and appropriate requirements (ARARs) for the selected remedy are the requirements for environmental remediation responses (e.g., removal actions and remedial actions) conducted under CERCLA.

54 ENVIRONMENTAL SCIENCES↗