Results for “Boiler plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Creating an Advanced Sensor Network to calculate real-time, mass-weighted flue gas composition and air heater leakage of a coal-fired utility boiler under dynamic operating conditions

Utilization of renewable energy sources to minimize the environmental impact of energy production has changed the way utility boilers operate, requiring frequent load cycling between full load and partial loads as low as 30%. Dynamic operation of coal-fired utility boilers significantly reduces boiler efficiency when compared to steady state at full load. Data-driven plant optimization has shown success with coal-fired utility boilers under dynamic operating conditions. The purpose of this work was to create an Advanced Sensor Network (ASN) to provide more extensive real-time data to inform dynamic plant optimization of Net Unit Heat Rate (NUHR). The ASN consists of gas sampling grids in the convective pass of the boiler and downstream of the air heater. These sampling grids allow for quantification of spatial variation of flue gas within the boiler and calculation of mass-weighted composition of flue gas through the combination of composition, velocity, and temperature measurements. The comparison of O 2 between the inlet and outlet of the air heater is used to calculate air leakage in real time. Flue gas composition and air heater leakage are both important factors in boiler efficiency and NUHR. Further, the results of this work support the value of mass-weighted averages for determining flue gas composition accurately. The measurements from the ASN show increased composition stratification during dynamic operation, with an average standard deviation 38% higher than observed during steady-state operation. Air heater leakage was also observed to increase from 2.8% to 5.1% following a load change. Prior to the installation of the ASN, these data would not have been available for dynamic control. These real-time data will be leveraged to calculate and optimize for NUHR during dynamic operation in future work.

42 ENGINEERING↗

Minimizing grid energy consumption in wastewater treatment plants: Towards green energy solutions, water sustainability, and cleaner environment

Wastewater treatment plants (WWTPs) consume significant amount of energy to sustain their operation. From this point, the current study aims to enhance the capacity of these facilities to meet their energy needs by integrating renewable energy sources. The study focused on the investigation of two primary solar energy systems in As Samra WWTP in Jordan. The first system combines parabolic trough collectors (PTCs) with thermal energy storage (TES). This system primarily serves to fulfill the thermal energy demands of the plant by reducing the demands from boiler units, which allows more biogas for electricity generation. The second system is a photovoltaic (PV) system with Lithium-Ion batteries, which directly produces electricity that will be used to cover part of the electrical energy demands of plant. To assess the optimal configuration, two distinct scenarios have been formulated and compared to the current case scenario (SC#1). The first scenario focuses on maximizing the net present value (NPV) and minimizing the levelized cost of electricity (LCOE). The second scenario is centred on minimizing the levelized cost of heat (LCOH). The findings indicate that both scenarios succeeded in reducing the reliance on the grid to a value that reach 1 %. Moreover, they both reduced biogas percentage in energy production from 88 % to approximately 65 % through the integration of the PV system. In terms of thermal demand, SC#2 reduced the reliance on biogas boiler units from 100 % to 25 %, while SC#3 achieved an even more impressive reduction to just 8 %. The best LCOE value was attained in SC#2, at 0.0895 USD/kWh, with an NPV of 10.54 million USD. Conversely, SC# 3 yielded an LCOH value of 0.0432 USD/kWh th compared to 0.0534 USD/kWh th USD for SC#2. In conclusion, despite their relatively high capital and operating costs, SC#2 and SC#3 managed to substantially decrease the annual electricity expenditure from approximately 2 million USD to 86,000 USD and 0 USD, respectively.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of novel dynamic machine learning-based optimization of a coal-fired power plant

The increasing fraction of intermittent renewable energy in the electrical grid is resulting in coal-fired boilers now routinely ramp up and down. The current state-of-the-art operation for such boilers is to apply steady-state, neural network-based optimization to make control decisions in real-time, and this report demonstrates the feasibility of extending this to dynamic, neural network-based optimization using a long short-term memory neural network. A simplified numerical simulation of a t-fired coal boiler and supporting equipment is used to represent a real plant subjected to both steady-state, neural network-based optimization and dynamic, neural network-based optimization. Using the same intervals and a particle swarm optimization algorithm, the dynamic optimization outperforms the steady-state optimization and realizes up to 4.58% improvement in thermal efficiency. Dynamic optimization with a long short-term memory neural network is shown to both be feasible and beneficial for operation of a coal-fired boiler under changing load.

42 ENGINEERING↗

The Staged, Pressurized Oxy-Combustion Technology: Status and Application to Boiler Retrofits to Yield Carbon-Negative Power via Biomass

Recognizing the benefits of pressurization and fuel staging on the efficiency of oxy-combustion, the staged, pressurized oxy-combustion (SPOC) process was introduced in 2012. The combination of fuel staging and pressurized oxy-combustion results in a more compact plant, a higher plant efficiency and reduced costs for pollutant and greenhouse gas removal compared with plants equipped with conventional carbon capture. This approach to power generation enables a modular boiler design and optimizes the plant for flexible operation, which is essential to meet the demands of the modern grid when it contains intermittent power sources. Originally designed to burn coal, the SPOC process is well-suited for biomass because the combustion of biomass leads to a high moisture content in the flue gas and the SPOC process is able to recover the latent heat of this moisture, enhancing system performance over that of traditional biomass combustion at atmospheric pressure. The present work is focused on evaluating the potential for utilizing the SPOC process in retrofit applications wherein the boilers of an existing plant are replaced with the SPOC process, and woody biomass is used as the fuel to yield carbon-negative power. Two applications are considered: power generation and cogeneration (heat and power). Modeling these systems in Aspen Plus demonstrates that the SPOC process surpasses the performance of baseline plants with post-combustion capture (PCC) for both power generation and cogeneration. Specifically, compared to a PCC equipped plant, the SPOC power plant has 33% higher efficiency, and the SPOC cogeneration plant reaches 42% higher net energy. Experimentally, the existing SPOC facility was fired for the first time with 100% biomass and after minor improvements were made to the feeding system, the facility demonstrated excellent performance during startup, steady-state operation and turndown.

Carbon capture and storage↗

Investigation of Cycling Coal-Fired Power Plants Using High-Fidelity Models

The project delivers a well-integrated and validated simulation platform for cycling operation analysis in coal-fired power plant. Two critical mechanical components of the boiler island were analyzed through mechanical integrity assessment and economic benefit analysis. The current phase of the project focuses on the development of the integrated simulation infrastructure and prove its feasibility and effectiveness using two typical use cases. This integrated platform can help save a lot of engineering efforts for model development and simulation analysis. Through the real simulation scenarios in this document, it was demonstrated that using this platform, an analysis can be completed in approximately 2 days, while it could cost several weeks before using this platform. Going forward, the platform built in this project can be used for more boiler service applications, and it can be further enhanced with more functions/features to maximize its usage and benefits. 1) Extend component-level analysis with more use cases to cover all the major critical components of boiler island under cycling operations. A library of critical components can be developed and validated for typical pulverized coal-fired subcritical boiler units. 2) Develop predictive maintenance features based on the integrated models (Digital Twins) and engineering analysis procedures. Predictive maintenance enables each asset to be serviced based on forecast on life consumption and cost profile for replacing/welding the critical mechanical parts of the boiler. This minimizes the chance of unscheduled shutdowns and emergency services at much higher costs and prevent the fatal accidents in unit operations. 3) Develop and maintain a standard library for critical component analysis under flexible plant operations, which will include libraries of: process models, MI models for typical pressure parts, and economic models with typical plant operating data and ISO power trade data.

01 COAL, LIGNITE, AND PEAT↗

Advanced Coating Compositions and Microstructures to Improve Uptime and Operational Flexibility in Cyclic, Low-Load Thermal Utility Plants

GE, the University of Tennessee, and Oak Ridge National Laboratory collaborated from 2020 to 2023 developing two key technologies for improving the viability of fuel switching and load following in thermal utility plants: a) cost-effective weld overlay compositions for boiler tubing b) cathodic arc coatings that deliver improvements in both erosion resistance and oxidation resistance in high temperature steam for HP turbine blades The team worked through a robust, logical project map to de-risk these two technologies and advance them from TRL 3 to TRL 6. For the cost-effective weld overlay, the team developed a ferritic filler material which was fabricated at a vendor for 18% the average market cost of Inconel 625 wire, had a corrosion rate 3x lower in conditions simulating a biomass-fired superheater and 10x lower in conditions simulating a coal-fired superheater, and was fabricated into prototype overlaid tubing that passed ASME requirements including transverse bending, dye penetrant inspection, and ASTM G-76 evaluation. For the cathodic arc coatings applied to steam turbine blades, the team developed a novel composition that was successfully transferred to a qualified vendor. The vendor was able to produce coated prototypes with 4x the as-deposited erosion resistance and 10.4x the post-steam-exposure erosion resistance of the TiN coating the vendor currently applies on GE steam turbine components, without significantly increasing process cost. These coated prototypes also passed a GE inspection and showed favorable performance in high temperature erosion, nanoindentation, sliding wear, scratch adhesion, and high cycle fatigue testing. If successfully deployed by GE, it is anticipated that the technologies will enable the following: • 25%-50% increase in time between outages for both boilers and HP turbines. • 50% decrease in cost for weld overlay on a per foot basis relative to todays NiCr alloys. • Adequate oxidation resistance and erosion for HP turbine inlet steam at >620°C and >220 bar. • No need for changes in component supply chain or any notable Capital Expenditures. 5 Decreasing component cost, increasing performance, and extending time between outages represent direct value propositions to GE and their customers. For the American consumer, these objectives translate into increased grid reliability (fewer unexpected outages), decreased Levelized Cost of Electricity, and improved environmental health (low-loading/load following to accelerate penetration of renewables). The results also have implications for wear resistant tooling, wire arc additive manufacturing, more durable components for syngas cleanup, and deployment of more efficient thermochemical pathways for carbon negative fuel production

09 BIOMASS FUELS↗

Boiler Health Monitoring Using a Hybrid First Principles-Artificial Intelligence Model

Due to increased penetration of the intermittent renewables to the grid, pulverized coal (PC) plants are being forced to cycle their load frequently and rapidly, operate at low load condition for sustained period, and start up and shut down several hundred times in a year in the worst case. These severe operations are causing substantial damage to the boiler components compromising the reliability of PC plants. An online health monitoring tool can be instrumental in understanding the impacts of load-following and can eventually help PC plants to develop advanced process control strategies for improved flexibility without compromising safety nor reliability.

20 FOSSIL-FUELED POWER PLANTS↗

Energy Saving Estimation of ASHRAE Guideline 36 Supervisory Setpoint Reset Controls in a Commercial Large Office Building

Designing, commissioning, and retrofitting HVAC control systems for energy efficiency is crucial, but the use of ad-hoc control sequences by designers and contractors, based on scattered information, results in diverse and sub-optimal sequences. ASHRAE Guideline 36 (G36) addresses the challenge by providing standardized, rule-based HVAC control sequences that prioritize energy efficiency. However, there is limited evaluation of their energy performance at the building level, with only a few studies primarily focused on HVAC airside systems in small-to-medium-sized commercial buildings. In this study, the energy performance of ASHRAE Guideline 36 control sequences was assessed using a large office building emulator in Chicago. The emulator features a central plant system with multiple chillers and boilers as well as multiple variable air volume (VAV) systems with terminal reheat. To achieve a high-fidelity representation, we developed a Spawn-of-EnergyPlus-based model for the large office building, maintaining the DOE prototype large office building setup but substituting the HVAC system with its Modelica counterpart. This substitution ensures that the building thermal load, HVAC system's dynamics, and detailed control sequences are all accurately represented. The study involved evaluating and implementing control strategies outlined in ASHRAE Guideline 36-2021 to replace conventional controls. These strategies include the demand-based supply air temperature and duct static pressure setpoint reset and the request logic for demand-based reset of chilled/hot water supply temperature setpoints and pipe static pressure setpoints. Energy performance was evaluated under various load conditions, including cooling, heating, and transitional seasons, both for individual control strategies and in combination. The results indicate that the collective control strategies retrofit yield greater energy savings than the sum of individual strategies, highlighting the synergistic benefits of incorporating both airside and plant-side control retrofits. Additionally, energy savings of up to 41% in the heating season, 18% in the shoulder season, and 20 % in the cooling season were observed compared to baseline control while maintaining the thermal comfort level.

ASHRAE Guideline 36, Commercial buildings, Control↗

The Co-Firing of Pine Biomass and Waste Coal in 100 and 600 MW Power Plants: A Sustainable Approach to Reduce GHG Emissions

Climate change is a global issue that has gained much attention recently. Co-firing biomass with coal/waste coal reduces the electricity sector’s GHG emissions sustainably. This study uses commercial software to model waste coal and biomass co-firing in 100 MW and 600 MW power plants. The objective is to assess the effects of fluid types (subcritical and supercritical), plant capacities (100 MW and 600 MW), boiler types (pulverized coal and circulating fluidized bed boilers), biomass and waste coal co-firing ratios (0:100, 20:80, 40:60, 60:40, 80:20, and 100:0), and carbon capture and storage efficiencies (0%, 90%, 95%, and 97%) on performance parameters such as net plant efficiency, heat rate, net plant CO2 and SO2, and particulate matter emissions. The feedstocks selected for this investigation include anthracite waste coal and loblolly pine biomass. As the biomass fraction increases from 0% to 100%, co-fired power plants net efficiency increases by 3–8%. Supercritical plants had a 6% higher net plant efficiency than the subcritical plants. The study found that the biomass’s high heating value decreased the fuel flow rate and reduced plant CO2 emissions by 10–16%. With 100% biomass power plant feed and 90% carbon capture and storage efficiency, CO2 emissions drop by 83% and SO2 and PM emissions drop to zero.

Bhoi, Prakashbhai R. (ORCID:0000000333104888)↗

Environmental Validation of Materials and Design Concepts to Enable Operational Flexibility of Existing Coal Power Plants

Increasingly, coal-fired power plants are required to balance power grids by compensating for the variable electricity supply from renewable energy sources. Fossil-fueled power plants, originally designed to be base loaded, will increasingly need to operate on a load following or cyclic basis. This demanding requirement for operational flexibility will need to be evaluated for resilience to frequent start-ups, meeting major and rapid load changes, and providing frequency control duties. Our research objective was to evaluate and improve flexibility of existing power plants by improving and redesigning components and defining new operational strategies, with acceptable impacts on component life, efficiency and emissions.

20 FOSSIL-FUELED POWER PLANTS↗

Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant Conceptual Design Engineering Report (CDER)

The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating

Source record↗

AOI [1] Advanced Manufacturing of Ceramic Anchors with Embedded Sensors for Process and Health Monitoring of Coal Boilers

Researchers at West Virginia University (WVU) developed methods to fabricate and test ceramic anchors with an embedded sensor technology for monitoring the health and processing conditions within pulverized coal (PC) and fluidized-bed combustion (FBC) boiler systems. The technology included the development of advanced manufacturing processes for 2D/3D printing electroceramic (conductive ceramic) sensor designs within the ceramic anchor microstructure during the manufacturing process. This advanced manufacturing process would allow for the precise control of local microstructure and composition in order to engineer layer-by-layer any protective and electrically active materials within the refractory anchor. This 3D printing technology would permit the rapid and controlled design of the refractory microstructure and embedded sensor design throughout the volume of the ceramic anchor. The work also included a method to interconnect the sensors to boiler shell through the anchor clamp, where the sensor signals will be processed by low-power electronics and transmitted wirelessly to a central processing hub. The end-goal of the program was to produce a ceramic anchor sensor system which would be ready for implementation within a coal boiler, and/or other similar refractory liner systems (such as that in the glass and metal manufacturing areas). The project objectives were to: 1) Define the chemical and microstructural stability, in addition to the electrical properties, of oxide and non-oxide ceramic composites to be embedded within the ceramic anchor compositions that may operate up to 1400ºC; 2) Develop and implement the 2D/3D printing technology to pattern and control the microstructure of the ceramic anchor and embedded sensor circuits; 3) Develop an interconnect technology which will permit easy installation of the ceramic anchors and signal collection at the boiler shell; 4) Develop low power analog electronics and wireless communication hardware to efficiently collect the sensor signal at each processing unit and transmit data to a central hub for data analysis; 5) Demonstrate the smart ceramic anchor system for temperature and liner fracture within a high-temperature processing unit, such as a boiler furnace or glass melting furnace floor/wall liner.

20 FOSSIL-FUELED POWER PLANTS↗

A. Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development for a PC-Fired Unit

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗