Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Airport”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Airport Ground Support Equipment Infrastructure & Logistics Electrification Assessment Tool: 2025 Data Development, Modeling and Analysis for DFW

The aviation industry is increasingly turning to modernize freight facilities by integrating electric Ground Support Equipment (eGSE) to enhance operational efficiency of freight facility moving vehicles and equipment. Airports worldwide are adopting eGSE to streamline cargo movement, reduce fuel and maintenance costs, and improve logistics coordination.1 North America, with its advanced aviation infrastructure, leads this transition, leveraging Internet of things (IoT)-enabled automation and zero emission technologies to boost reliability and reduce human errors.2 Electrification of freight facility moving vehicles and equipment boosts turnaround times, improves equipment reliability, and optimizes logistics coordination, giving operators a competitive advantage. With rising fuel price volatility and the pressure to meet stringent performance benchmarks, airports are focusing on cost-effective, scalable solutions for long-term financial and operational gains. To further accelerate electrification, airports are integrating Zero Emission Vehicles (ZEVs) into rental car fleets and deploying electric baggage carts, requiring strategic investments in charging infrastructure. 3 The shift, however, presents challenges, such as limited technical expertise, high capital costs, and complex procurement processes. By forging strategic partnerships, leveraging advanced technologies, and optimizing infrastructure investments, airports can create a resilient, future-ready ecosystem that enhances the movement of people and goods through electrification-driven efficiency. Supported by the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO), this electrification effort provides a scalable, cost-effective solution to improve airport freight operations. Through targeted investments and innovation, airports enhance efficiency, reduce costs, and meet performance benchmarks while advancing toward a resilient, electrified future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data on noise environments at different times of day around airports

Sources of information about noise environments at different times of the day at civilian and military airports are identified. Information about movements of scheduled flights are available in machine readable form from the Official Airline Guide. Information about permanent noise monitoring sites is readily obtained from individual airports. Limited data on the timing of flights are available at centralized locations for military airports. An examination of scheduled flights at commercial airports leads to the conclusion that differences between daytime and nighttime noise levels (measured in Equivalent Continuous Noise Level, LEQ) vary from 7 to 15 decibels. Data from 128 permanent noise monitoring sites at 11 airports are also examined. Differences between daytime and nighttime noise levels at these 128 noise monitoring sites vary from 3 to 17 decibels (LEQ). Preliminary analyses suggest that accurate estimates of time-of-day weights could not be obtained from conventional social surveys at existing airports.

Fields, J. M.↗

Noise-Induced Sleep Disturbance in Residences Near Two Civil Airports

A large-scale field study of noise-induced sleep disturbance was conducted in the vicinities of Stapleton International Airport (DEN) and Denver International Airport (DIA) in anticipation of the closure of the former and opening of the latter. Both indoor and outdoor measurements of aircraft and other nighttime noises were made during four time periods. Measurements were made in 57 homes located as close as feasible to the runway ends of the two airports. Sleep disturbance was measured by several indices of behaviorally confirmed awakening (button pushes upon awakening) and body movement (as measured with wrist-worn actimeters). A total of 2717 subject-nights of observations were made over the course of the study. Although average noise event levels measured outdoors decreased markedly at DEN after closure of the airport and increased slightly at DIA after its opening, indoor noise event levels varied much less in homes near both airports. No large differences were observed in noise-induced sleep disturbance at either airport. Indoor sound exposure levels of noise events were, however, closely related to and good predictors of actimetrically defined motility and arousal.

Fidell, Sanford↗

Wireless Channel Characterization in the Airport Surface Environment

Given the anticipated increase in air traffic in the coming years, modernization of the National Airspace System (NAS) is a necessity. Part of this modernization effort will include updating current communication, navigation, and surveillance (CNS) systems to deal with the increased traffic as well as developing advanced CNS technologies for the systems. An example of such technology is the integrated CNS (ICNS) network being developed by the Advanced CNS Architecture and Systems Technology (ACAST) group for use in the airport surface environment. The ICNS network would be used to convey voice/data between users in a secure and reliable manner. The current surface system only supports voice and does so through an obsolete physical infrastructure. The old system is vulnerable to outages and costly to maintain. The proposed ICNS network will include a wireless radio link. To ensure optimal performance, a thorough and accurate characterization of the channel across which the link would operate is necessary. The channel is the path the signal takes from the transmitter to the receiver and is prone to various forms of interference. Channel characterization involves a combination of analysis, simulation, and measurement. My work this summer was divided into four tasks. The first task required compiling and reviewing reference material that dealt with the characterization and modeling of aeronautical channels. The second task involved developing a systematic approach that could be used to group airports into classes, e.g. small airfields, medium airports, large open airports, large cluttered airports, etc. The third task consisted of implementing computer simulations of existing channel models. The fourth task entailed measuring possible interference sources in the airport surface environment via a spectrum analyzer.

Neville, Joshua T.↗

Initial Investigation of Operational Concept Elements for NASA's NextGen-Airportal Project Research

The NextGen-Airportal Project is organized into three research focus areas: Safe and Efficient Surface Operations, Coordinated Arrival/Departure Operations Management, and Airportal Transition and Integration Management. The content in this document was derived from an examination of constraints and problems at airports for accommodating future increases in air traffic, and from an examination of capabilities envisioned for NextGen. The concepts are organized around categories of constraints and problems and therefore do not precisely match, but generally reflect, the research focus areas. The concepts provide a framework for defining and coordinating research activities that are, and will be, conducted by the NextGen-Airportal Project. The concepts will help the research activities function as an integrated set focused on future needs for airport operations and will aid aligning the research activities with NextGen key capabilities. The concepts are presented as concept elements with more detailed sub-elements under each concept element. For each concept element, the following topics are discussed: constraints and problems being addressed, benefit descriptions, required technology and infrastructure, and an initial list of potential research topics. Concept content will be updated and more detail added as the research progresses. The concepts are focused on enhancing airportal capacity and efficiency in a timeframe 20 to 25 years in the future, which is similar to NextGen's timeframe.

Lohr, Gary↗

Expanding Regional Airport Usage to Accommodate Increased Air Traffic Demand

Small regional airports present an underutilized source of capacity in the national air transportation system. This study sought to determine whether a 50 percent increase in national operations could be achieved by limiting demand growth at large hub airports and instead growing traffic levels at the surrounding regional airports. This demand scenario for future air traffic in the United States was generated and used as input to a 24-hour simulation of the national airspace system. Results of the demand generation process and metrics predicting the simulation results are presented, in addition to the actual simulation results. The demand generation process showed that sufficient runway capacity exists at regional airports to offload a significant portion of traffic from hub airports. Predictive metrics forecast a large reduction of delays at most major airports when demand is shifted. The simulation results then show that offloading hub traffic can significantly reduce nationwide delays.

Russell, Carl R.↗

C-Band Airport Surface Communications System Standards Development. Phase II Final Report. Volume 1: Concepts of Use, Initial System Requirements, Architecture, and AeroMACS Design Considerations

This report is provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-Band and L-Band Communications Standard Development and was based on direction provided by FAA project-level agreements for New ATM Requirements-Future Communications. Task 7 included two subtasks. Subtask 7-1 addressed C-band (5091- to 5150-MHz) airport surface data communications standards development, systems engineering, test bed and prototype development, and tests and demonstrations to establish operational capability for the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2 focused on systems engineering and development support of the L-band digital aeronautical communications system (L-DACS). Subtask 7-1 consisted of two phases. Phase I included development of AeroMACS concepts of use, requirements, architecture, and initial high-level safety risk assessment. Phase II builds on Phase I results and is presented in two volumes. Volume I (this document) is devoted to concepts of use, system requirements, and architecture, including AeroMACS design considerations. Volume II describes an AeroMACS prototype evaluation and presents final AeroMACS recommendations. This report also describes airport categorization and channelization methodologies. The purposes of the airport categorization task were (1) to facilitate initial AeroMACS architecture designs and enable budgetary projections by creating a set of airport categories based on common airport characteristics and design objectives, and (2) to offer high-level guidance to potential AeroMACS technology and policy development sponsors and service providers. A channelization plan methodology was developed because a common global methodology is needed to assure seamless interoperability among diverse AeroMACS services potentially supplied by multiple service providers.

Hall, Edward↗

C-Band Airport Surface Communications System Standards Development. Phase II Final Report. Volume 2: Test Bed Performance Evaluation and Final AeroMACS Recommendations

This report is provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-Band and L-Band Communications Standard Development and was based on direction provided by FAA project-level agreements for New ATM Requirements-Future Communications. Task 7 included two subtasks. Subtask 7-1 addressed C-band (5091- to 5150-MHz) airport surface data communications standards development, systems engineering, test bed and prototype development, and tests and demonstrations to establish operational capability for the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2 focused on systems engineering and development support of the L-band digital aeronautical communications system (L-DACS). Subtask 7-1 consisted of two phases. Phase I included development of AeroMACS concepts of use, requirements, architecture, and initial high-level safety risk assessment. Phase II builds on Phase I results and is presented in two volumes. Volume I is devoted to concepts of use, system requirements, and architecture, including AeroMACS design considerations. Volume II (this document) describes an AeroMACS prototype evaluation and presents final AeroMACS recommendations. This report also describes airport categorization and channelization methodologies. The purposes of the airport categorization task were (1) to facilitate initial AeroMACS architecture designs and enable budgetary projections by creating a set of airport categories based on common airport characteristics and design objectives, and (2) to offer high-level guidance to potential AeroMACS technology and policy development sponsors and service providers. A channelization plan methodology was developed because a common global methodology is needed to assure seamless interoperability among diverse AeroMACS services potentially supplied by multiple service providers.

Hall, Edward↗

Static and Motion-Based Visual Features Used by Airport Tower Controllers: Some Implications for the Design of Remote or Virtual Towers

Visual motion and other visual cues are used by tower controllers to provide important support for their control tasks at and near airports. These cues are particularly important for anticipated separation. Some of them, which we call visual features, have been identified from structured interviews and discussions with 24 active air traffic controllers or supervisors. The visual information that these features provide has been analyzed with respect to possible ways it could be presented at a remote tower that does not allow a direct view of the airport. Two types of remote towers are possible. One could be based on a plan-view, map-like computer-generated display of the airport and its immediate surroundings. An alternative would present a composite perspective view of the airport and its surroundings, possibly provided by an array of radially mounted cameras positioned at the airport in lieu of a tower. An initial more detailed analyses of one of the specific landing cues identified by the controllers, landing deceleration, is provided as a basis for evaluating how controllers might detect and use it. Understanding other such cues will help identify the information that may be degraded or lost in a remote or virtual tower not located at the airport. Some initial suggestions how some of the lost visual information may be presented in displays are mentioned. Many of the cues considered involve visual motion, though some important static cues are also discussed.

Ellis, Stephen R.↗

Predicting Airport Runway Configurations for Decision-Support Using Supervised Learning

One of the most challenging tasks for air traffic controllers is runway configuration management (RCM). It deals with the optimal selection of runways to operate on (for arrivals and departures) based on current and forecast of traffic, surface wind speed, wind direction, other environmental variables, noise constraints, and several other airport-specific factors. In this paper, a methodology using supervised learning is developed to build a predictive model for RCM decision-support from large volumes of historical data. Data from two full years (2018 and 2019) related to current and forecast weather, demand/capacity, etc. is collected, analyzed, and fused together. A variety of supervised learning algorithms are tested for predicting runway configuration and hyperparameter tuning is carried out to select the best performing model. The validation process involves two airports of low (Charlotte Douglas International Airport, CLT) and high (Denver International Airport, DEN) complexity of configuration decision-making. The results show significant promise for the two airports with test accuracy of 93% (CLT) and 73% (DEN). The methodology is scalable and generalizable to other airports across the U.S. National Airspace System.

air traffic management↗

Predicting Airport Runway Configuration for Decision-Support Using Supervised Learning

One of the most challenging tasks for air traffic controllers is runway configuration management (RCM). It deals with the optimal selection of runways to operate on (for arrivals and departures) based on current and forecast of traffic, surface wind speed, wind direction, other environmental variables, noise constraints, and several other airport-specific factors. In this paper, a methodology using supervised learning is developed to build a predictive model for RCM decision-support from large volumes of historical data. Data from two full years (2018 and 2019) related to current and forecast weather, demand/capacity, etc. is collected, analyzed, and fused together. A variety of supervised learning algorithms are tested for predicting runway configuration and hyperparameter tuning is carried out to select the best performing model. The validation process involves two airports of low (Charlotte Douglas International Airport, CLT) and high (Denver International Airport, DEN) complexity of configuration decision-making. The results show significant promise for the two airports with test accuracy of 93% (CLT) and 73% (DEN). The methodology is scalable and generalizable to other airports across the U.S. National Airspace System.

air traffic management↗

Airport Delay Prediction with Temporal Fusion Transformers

Since flight delay hurts passengers, airlines, and airports, its prediction becomes crucial for the decision-making of all stakeholders in the aviation industry and thus has been attempted by various previous research. However, previous delay predictions are often categorical and at a highly aggregated level. To improve that, this study proposes to apply the novel Temporal Fusion Transformer model and predict numerical airport arrival delays at quarter hour level for U.S. top 30 airports. Inputs to our model include airport demand and capacity forecasts, historic airport operation efficiency information, airport wind and visibility conditions, as well as en-route weather and traffic conditions. The results show that our model achieves satisfactory performance measured by small prediction errors on the test set. In addition, the interpretability analysis of the model outputs identifies the important input factors for delay prediction.

Liu, Ke [University of California Berkeley]↗

O’Hare Airport Short-Term Ground Transportation Modal Demand Forecast Using Gaussian Processes

Here, the principal objective of this study is to analyze the spatial and temporal variation of ground transportation airport demand and provide demand forecast to inform planning capability and explore alternatives for investments to accommodate airport growth. Because of its good adaptability and strong generalization ability for dealing with high-dimensional input, small-sample, and nonlinear spatial data, Gaussian process (GP) regression is used to provide forecast estimates using data from transportation network company (TNC) trips and urban rail passengers at Chicago's O'Hare International Airport. TNC airport trips differ significantly, with three times more distance, more than twice the travel time, and half of the share requests compared with nonairport trips. This highlights the need for separate demand models. Hourly analysis of the rail service indicates that this is likely heavily used by airport workers, whereas TNC services focus on travelers because of variations in the peak demand hours. Heteroscedastic GP regression is implemented because of differences in trip variance between night and day hours. Estimates are given for weekdays and weekend trips, and the 95% confidence intervals are calculated. The introduction of flight schedule information into the models shows marginal improvements in their performance. However, fitting a GP regression becomes computationally expensive with increased sample size and the introduction of spatial components. Transportation planners and policymakers can use the results and methods implemented in this study to optimize transportation assets and provide long-range simulations of the current and future conditions in the area.

42 ENGINEERING↗

Data-Driven Simulation-Based Planning for Electric Airport Shuttle Systems: A Real-World Case Study

Many airports are adopting battery electric buses in their shuttle fleets due to concerns over air quality and regulations. This study proposes a simulation-based optimization modeling framework to help airport shuttle operators effectively deploy electric buses. We evaluated a planned airport electric shuttle system with an event-driven simulator. Empirical data collected from existing systems were used to drive the simulations. We then proposed a simulation-based optimization model to determine the battery capacity, charging power, and number of chargers so that predefined objective(s) (e.g., minimizing total capital cost, minimizing emissions) are optimized. Compared to existing studies, the primary contribution of the proposed method is that it can model the real-world stochastic nature of operations in an electric bus system with much higher fidelity. To demonstrate the proposed modeling framework, we study a real-world shuttle system at the Dallas-Fort Worth International Airport, and present extensive numerical studies. When considering partial fleet electrification, the model can provide a set of Pareto optimal solutions. When considering full fleet electrification, the optimal solution requires a 50-kWh battery capacity and four 210-kW chargers, resulting in a total capital cost of $26,744,000. The results demonstrate that the proposed modeling framework can effectively optimize the planning of electric airport shuttle systems with partial or full fleet electrification.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

H2@Airports (Workshop Summary Report)

This report serves as the proceedings of the H2@Airports Workshop held virtually by the U.S. Department of Energy (DOE) in collaboration with the U.S. Department of Transportation (DOT) and Department of Defense (DOD), November 4-6, 2020. Presentations from the workshop can be found at H2@Airports Workshop: https://www.energy.gov/eere/fuelcells/h2airports-workshop. The workshop was held to assess the state of the art for electric aircraft and airport applications specifically using hydrogen fuel cells, to discuss operational requirements and lessons learned on early fuel cell aviation and airport projects, to understand current technology gaps, to identify collaborative research and development (R&D) opportunities, to highlight codes, standards, safety, and regulatory challenges, and to identify potential actions that address them. Experts and stakeholders from industry, government, and academia met to discuss the current state of the art of hydrogen and fuel cell technologies and the requirements for using these technologies in aviation applications and land-based applications at airports. This report summarizes the discussions and diverse opinions expressed at the workshop.

08 HYDROGEN↗

Model predictive control for optimal dispatch of chillers and thermal energy storage tank in airports

Cost of energy consumption is one of the biggest operational cost for airports, and it is increasing from time to time as airports expand to support growing number of passengers. Various factors affect the energy consumption including efficiency of airport Heating Ventilation and Air conditioning (HVAC) systems, which in turn depends on the efficiency of individual subsystems. Here, in this paper, we present an optimal scheduling method for the central plant system at Dallas Fort Worth airport, involving chillers, pumps, and a thermal energy storage (TES) system. A model predictive control (MPC) problem is formulated to minimize both energy and demand charge costs while satisfying the cooling needs of the airport. The proposed Mixed-Integer Nonlinear Programming (MINLP) formulation includes performance curve based models for chillers and pumps and a simplified state of charge model for TES. The formulation also includes predictions of cooling load and chilled water return temperature. Simulation results for a month in summer show savings around 10% compared to the baseline. Initial recommendations based on insights from simulation results to the manual operation procedures resulted in significant savings. Field test results show a 7% chiller efficiency improvement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Electrifying Airport GSE: Monte Carlo Grid Impacts

Airports globally are shifting from ICE-powered to electric Ground Support Equipment (eGSE) to enhance efficiency, reduce operational costs, and improve operator health. Leveraging predictable routes, flat terrain, and low operational speeds, airports provide ideal conditions for electrification. This study evaluates freight GSE electrification at Dallas-Fort Worth International Airport (DFW), USA, using the Agile@ platform, which integrates three analytical methods: Freight Facility Model (FFM), Activity-Structure-Intensity-Fuel (ASIF), and Monte Carlo simulations. Results from 10,000 simulations indicate modest but critical increases in electricity demand and significant variability in GSE energy consumption. These insights emphasize the importance of data-driven scheduling, targeted maintenance, and strategic infrastructure planning. For high-uncertainty scenarios, airports are advised to deploy buffer energy storage systems (battery banks), implement demand-response charging strategies, schedule flexible workforce shifts, and prioritize proactive maintenance-particularly for equipment with higher operational uncertainty, such as tug tractors with trailers. Agile@ thus offers a robust, scalable, and data-driven framework to optimize long-term GSE planning and enhance reliability across diverse airport environments.

Bose, Ranjan [ORNL] (ORCID:0009000791026327)↗

Feasibility and Qualitative Risk Assessment of Fuel Cell Electric Bus Use for Emergency Backup Power for Airport Applications

Airports rely on robust backup power systems to maintain critical operations during emergencies. This paper investigates the feasibility of using hydrogen fuel cell electric buses (FCEBs) as emergency backup power sources, focusing on their technical specifications, operational challenges, and associated risks. Using Portland International Airport as a case study, the analysis evaluates the power output and hydrogen consumption of New Flyer’s 40’ Xcelsior Charge fuel cell buses, to provide power for key airport systems. Additionally, the paper explores the design and layout of how FCEBs can be connected to airport facilities, and addresses safety considerations, hydrogen supply logistics, and electrical compatibility. While FCEBs present significant advantages in terms of sustainability and resilience, their implementation requires careful planning, infrastructure investment, and adherence to safety standards. This research provides actionable insights for airport stakeholders seeking to transition to hydrogen-based backup power system.

08 HYDROGEN↗