Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Advanced Utility Rate Inputs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

60 records · Page 4

Equipment List Comparing Balance of Plant Containing a Heat Pump against a Reference Electricity Generating Plant

Approximately two-thirds of U.S. energy consumption in the industrial and transportation sectors relies on fossil fuels. These sectors require high-quality heat, i.e., thermal energy at very high temperatures, for molecular transformation processes. The Integrated Energy Systems (IES) program aims to assess the economic potential of utilizing nuclear-grade heat from Advanced Reactors (ARs) to meet the high-quality heat demands. By having industrial processes (IPs) supplied with nuclear-generated heat, manufacturers could benefit from more stable and potentially lower energy costs, reducing reliance on volatile fossil fuel markets. The main outcome of the FY24 research was the thermodynamic assessment and gap analysis of steam generation for IP applications. The study completed in June 2024 demonstrated that the required steam temperatures could be achieved by integrating a heat pump into an AR power plant. After identifying the thermal demands of target IPs, multiple balance of plant configurations for the Xe-100 reactor by X-energy, incorporating a heat pump, were analyzed. Their technical feasibilities were assessed, including the design of suitable axial compressors for these applications. Comparative performance analysis showed that thermal efficiency alone is insufficient to evaluate system suitability. To address this, a new indicator (heat factor) was introduced in the report released in September 2024 to quantify the low-quality thermal power needed to produce one unit of high-quality heat for the IP. Results showed that integrating heat pumps into Rankine cycles enables higher steam temperatures, though at the expense of increased thermal energy input. This report builds upon and completes the foundational work previously undertaken. It focuses on the design of two Balance of Plant (BOP) configurations, both based on Rankine energy conversion cycles: “Case 1”, which involves electricity generation only, and “Case 2”, which combines electricity and high-temperature heat generation for industrial use. For each configuration, a comprehensive equipment list was developed, detailing all major components such as turbines, compressors, heat exchangers, pumps, and control systems. These lists will serve as the basis for future comparative cost analyses, with the goal of assessing the number and type of components required to integrate a heat pump into the Rankine cycle and to establish a heat transport system capable of delivering thermal energy from the nuclear plant to an industrial facility. Using the constitutive equations presented in the June 2024 milestone, the operating conditions of all BOP components for both “Case 1” and “Case 2” were evaluated. These parameters—such as temperature, pressure, mass flow rate, and steam quality—served as the basis for calculating the associated thermal and mechanical power flows. The net power required from the heat pump to raise the steam temperature to the target level was also determined. The thermodynamic performance of the configuration was then assessed using the heat factor metric. The key outcome of this analysis is a comparative table that presents the equipment that was used in the “Case 1” and “Case 2” configurations. This study offers a preliminary comparison of the two designs, providing insight into the impact of integrating a heat pump in terms of component requirements and thermal efficiency. This equipment list, together with the evaluated operating conditions, also serves as a foundation for the economic analyses scheduled for the current fiscal year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Height Above Nearest Drainage (HAND) and Hydraulic Property Table for CONUS - Version 0.21 (20200601)

The continental flood inundation mapping (CFIM) framework is a high-performance computing (HPC)-based computational framework for the Height Above Nearest Drainage (HAND)-based inundation mapping methodology. Using the 10m Digital Elevation Model (DEM) data produced by U.S. Geological Survey (USGS) 3DEP (the 3-D Elevation Program) and the NHDPlus hydrography dataset produced by USGS and the U.S. Environmental Protection Agency (EPA), a hydrological terrain raster called HAND is computed for HUC6 units in the conterminous U.S. (CONUS). The value of each raster cell in HAND is an approximation of the relative elevation between the cell and its nearest water stream. Derived from HAND, a hydraulic property table is established to calculate river geometry properties for each of the 2.7 million river reaches covered by NHDPlus (5.5 million kilometers in total length). This table is a lookup table for water depth given an input stream flow value. Such lookup is available between water depth 0m and 25m at 1-foot interval. The flood inundation map is then computed by using HAND and this lookup table based on the near real-time water forecast from the National Water Model (NWM) at the National Oceanic and Atmospheric Administration (NOAA). HAND and the Hydraulic Property Table version v0.21 is an upgrade to v0.2. Version 0.21 applies NHD HR etching to DEMs for all HUC6 units before running the HAND workflow. This new version also fixed the issue of void areas along HUC boundary. This dataset comprises 331 HUC6 units for CONUS (excluding the five great lakes units), each is a downloadable zip file. Version 0.1 was computed at the National Center for Supercomputing Applications (NCSA) at the University of Illinois at Urban-Champaign in 2016 and is currently hosted at the Texas Advanced Computing Center (TACC). Please cite this data DOI and the following publications and data DOIs when you use HAND and the hydraulic property table: Liu, Yan Y. Height Above Nearest Drainage (HAND) and Hydraulic Property Table for CONUS - Version 0.2. (20200301). Oak Ridge Leadership Computing Facility. (2020). DOI: 10.13139/ORNLNCCS/1608331 Liu, Yan Y., David R. Maidment, David G. Tarboton, Xing Zheng, and Shaowen Wang. 'A CyberGIS integration and computation framework for high-resolution continental-scale flood inundation mapping.' JAWRA Journal of the American Water Resources Association 54, no. 4 (2018): 770-784. DOI: 10.1111/1752-1688.12660 Zheng, Xing, David G. Tarboton, David R. Maidment, Yan Y. Liu, and Paola Passalacqua. 'River channel geometry and rating curve estimation using height above the nearest drainage.' JAWRA Journal of the American Water Resources Association 54, no. 4 (2018): 785-806. DOI: 10.1111/1752-1688.12661 Liu, Y. (2018). Height Above Nearest Drainage (HAND) for CONUS, HydroShare, https://doi.org/10.4211/hs.69f7d237675c4c73938481904358c789 LICENSE FOR USE -- MAPS AND DATA DISCLAIMER This resource is shared under the Creative Commons Attribution CC BY, http://creativecommons.org/licenses/by/4.0/ MAPS AND DATA DISCLAIMER The Oak Ridge National Laboratory (ORNL) shall not be held liable for improper or incorrect use of the data described or information contained on this map or associated series of maps. The data and related map graphics are not legal, land survey or engineering documents and are not intended to be used as such. ORNL gives no warranty, express or implied, as to the accuracy, reliability, utility or completeness of this information. The user of these maps and data assumes all responsibility and risk for the use of the maps and data. ORNL disclaims all warranties, representations or endorsements either express or implied, with regard to the information contained in this map product, including, but not limited to, all implied warranties of merchantability, fitness for a particular purpose or non-infringement. This preliminary map product is for research and review purposes only. It is not intended to be used for emergency management operational or life safety decisions at the local or regional governmental level or by the general public. Users requiring information regarding hazardous conditions or meteorological conditions for specific geographic areas should consult directly with their city or county emergency management office.

54 ENVIRONMENTAL SCIENCES↗

NASA Earth Systems Digital Twins (ESDT)

"Similarly to artificial intelligence, which is now revolutionizing many aspects of our daily lives, Earth system digital twin technologies have the potential to revolutionize the way Earth Science research will be conducted in the future, and how results and knowledge from this research will provide information to support decision making and yield impactful societal benefits. An Earth System Digital Twin or ESDT is a dynamic and interactive information system that first provides a digital replica of the past and current states of the Earth or Earth system as accurately and timely as possible; second, allows for computing forecasts of future states under nominal assumptions and based on the current replica; and third, offers the capability to investigate many hypothetical scenarios under varying impact assumptions. In other words, an ESDT provides the integrated What-Now, What-Next, and What-If pictures of the Earth or Earth system, by continuously ingesting newly observed data and by leveraging multiple interconnected models, machine learning as well advanced computing and visualization capabilities. Digital twins have been developed in engineering since 2002, but the interest in digital twins for the Earth domain is more recent and stems from the convergence of several developments: - The huge amount of diverse data that has now been collected continuously for more than 50 years, and that is becoming more and more difficult to access, understand, and utilize. - At the same time, because of climate change and its impacts the information produced by all of this data is becoming of interest to many new non-traditional users for analyzing and predicting various phenomena. - Because of advances in computational and visualization capabilities and the parallel unprecedented development of machine learning (ML), extracting relevant information from these large amounts of data and running complex models faster has become possible. As a result, it is becoming necessary and possible to build intuitive and interactive frameworks that will enable users with various skill levels and/or organizational hierarchy levels to easily access large amounts of targeted information along with the relevant tools and models (Earth system and human activity models), to support them in analyzing and visualizing this information, to help them understand interactions among models, to visualize the potential outcomes of various impacts, and to support decision or policy making. The full power of digital twins is that, through an integrated representation and standardized tools and software technologies, the same digital replica can address the needs of multiple users at various resolutions (spatial and temporal) and for various applications (science, economic, policy, etc.) – “from farmer to scientist”. With all these interests at stake, the challenges of building optimal digital twins are many and complex. The first challenge is to determine if a Digital Twin should be global or local, and multi-domain or thematic. For example, some domains such as Climate or Weather will require a global Digital Twin or Digital Twin capabilities while science areas such as Biodiversity might be more local. We can also envision that multiple thematic ESDTs, e.g., Air Quality, Wildfires, Hydrology could be federated or provide input to other ESDTs, either on a regional level or to a more global ESDT. Overall, we can imagine a future “web” of Digital Twins co-existing in a hierarchy or in a network, and capable of being connected or federated depending on the needs. This last point brings up the very important challenge of interoperability, including standards and protocols that will need to be built into these systems from the beginning. Each individual digital twin would have full flexibility in internal construction but would need standards-based interfaces (input and output) or hooks to make it compatible with others. Another challenge when building digital twins will be to decide how to organize each digital replica. Based on the applications targeted by the DT under implementation, various amounts and types of raw data, Analysis Ready Data (ARD) and information will need to be incorporated. Depending on the required latencies and needs of the users, various solutions can be considered, including Data Cubes, Data Lakes, pointers, or computing information on demand. We envision that each ESDT will choose a solution adapted to its specific objectives. Another important challenge is the type(s) of visualization that will be used, as well as the level of interactivity and refresh rate that will be required. Again, this will depend on the objectives of the ESDT, but also on the various users’ needs. In most cases, several types of visualizations and human interfaces will need to be offered depending on the projected users of that system. In parallel to the challenges highlighted above, there are also many tools and technologies that will need to be developed or improved for all types of digital twins. Among those are improved machine learning technologies, for example providing explainability, but also ML techniques for causality and providing a better integration of physics models. Additionally, reliable uncertainty quantification methods will be needed for all ESDT components, from validating data fusion and assimilation to assessing the accuracy of ML models and weighing the values of decisions supported by those systems. This presentation introduces the ESDT concept, presents several ESDT use cases, and a proposed ESDT architecture framework, as well as various technologies being developed by the Advanced Information Systems Technology (AIST) Program."

Earth Science Remote Sensing; Information Systems↗

Fundamental Studies of the Vibrational, Electronic, and Photophysical Properties of Tetrapyrrolic Architectures

The ability to capture and utilize light in the near-ultraviolet (NUV), visible and near-infrared (NIR-I and NIR-II) spectral regions (i.e., 320–400, 400–700, 700–1000, 1000–1700 nm) is essential for any solar-energy conversion scheme. Nature employs chlorophylls and bacteriochlorophylls in light-harvesting architectures to absorb light in the blue and red/NIR regions. Accessory pigments (carotenoids, bilins) augment absorption of the (bacterio)chlorophylls in the green region. The harvested energy is funneled to a reaction center protein, where charge separation occurs. Subsequent migration of the electron and the hole stabilizes and stores the energy from light via redox chemistry. The long-term objective of the Bocian/Holten&Kirmaier/Lindsey research program under this DOE grant has been to develop tetrapyrrole-based molecular architectures that absorb sunlight, funnel energy and separate charge with high efficiency. Integral to the program has been iterative cycles of design, synthesis and characterization that provided deep insights into the relationships between chemical composition, electronic structure, and key static and dynamic properties (vibrational, redox, photophysical, energy/charge transfer) of tetrapyrrolic systems. Such architectures included monomers, dyads, larger arrays, and complexes with accessory components. The objective was to develop molecular designs and guiding principles to enhance current and future energy-conversion schemes. Molecular arrays targeted to address one or more fundamental questions concerning light harvesting and energy/charge transfer were constructed from analogues of the naturally occurring hemes, chlorophylls and bacteriochlorophylls. Diverse, tunable synthetic building blocks were prepared that spanned the three respective tetrapyrrole families, which are the porphyrins, chlorins and bacteriochlorins. Thus, the research focused on porphyrins as well as synthetic surrogates for chlorophylls (chlorins, 13 1 -oxophorbines and chlorin-imides) and bacteriochlorophylls (bacteriochlorins, bacterio-13 1 -oxophorbines and bacteriochlorin-imides), generically termed hydroporphyrins. Although the three tetrapyrrole classes (porphyrins, chlorins and bacteriochlorins) absorb light strongly in the violet-blue spectral region, the long-wavelength absorption band typically lies in the green-orange, red, and NIR regions, respectively, with increasing intensity. Understanding the spectra, electronic structure, and energy/charge-transfer properties of such tetrapyrrolic macrocycles is of central importance for the rational design of molecular architectures for solar-energy conversion. Our integrated program of molecular design and synthesis coupled with a variety of spectroscopic, electrochemical, and computational studies have probed from first principles how structural and electronic properties of tetrapyrrolic macrocycles dictate spectral properties as well as the rates of ground-state hole/electron transfer and excited-state energy flow in multicomponent architectures. Individual molecules and multicomponent architectures were designed to test ideas of fundamental importance, often requiring the development of new synthetic methodology. The members of the collaborative team had almost daily discussions by phone and/or e-mail concerning design of molecules, flow of compounds between the labs, planning of physical characterization studies, discussing results and analysis and integrating into design of next generation architectures, and the preparation of manuscripts. Furthermore, students and postdocs in the different labs routinely communicated with one another to facilitate the advancement of the research activities. In short, a highly integrated and collaborative research program was well established among the groups. The research effort involved molecular design and synthesis of synthetic molecular architectures by the Lindsey group integrated with physicochemical and photophysical characterization by the Bocian group and the Holten&Kirmaier group (Figure 2). The Bocian group carried out electrochemical, electron paramagnetic resonance (EPR), resonance Raman (RR), and Fourier-transform infrared (FT-IR) studies, as well as density functional theory (DFT) calculations and the time-dependent extension (TDDFT) to gain insight into excited-state properties. The Holten&Kirmaier group carried out static and time-resolved absorption and fluorescence spectroscopy studies and simulated absorption spectra using molecular orbital (MO) energies from DFT as input to the four-orbital model to complement the TDDFT calculations. The combined measurements provided understanding of the vibrational/electronic properties of the individual molecules and the changes that occur upon incorporation into multicomponent architectures. This information underpinned elucidating the mechanisms and timescales of ground-state hole/electron transfer and excited-state energy and charge transfer.

14 SOLAR ENERGY↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗