Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Advanced Test Reactor”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Evaluation of an Accident Tolerant Fuel Leak in the Advanced Test Reactor

Accident Tolerant Fuels (ATF), which are nuclear fuel sources designed to withstand operational irregularities and incidents, have been a topic of interest in the nuclear industry for several decades. Interest in ATF technology surged following the 2011 accident at Fukushima Daiichi in Japan. At the Advanced Test Reactor (ATR), one of Idaho National Laboratory’s (INL) four operating nuclear reactors, the ATF program is a collaborative effort between the national laboratory and various stakeholders within the nuclear industry. This program focuses on the research and development of novel fuel compositions, cladding, and component materials with enhanced accident-resistant properties. During one of ATR’s 60-day operating cycles in 2024, the reactor experienced five unplanned shutdowns. Following the fifth shutdown, radiation monitors detected an increase in radiation levels coming from the loop piping. Subsequent water samples confirmed the cause was a leak of fission products from the ATF experiment, designated as ATF-2C. The source of the leak was identified as the instrumented section of the test train. The primary discussions in this paper are 1) the design of the ATF test train, 2) the operating parameters leading up to and following the detection of the leak, and 3) the quantification and characterization of the released fission products.

Accident Tolerant Fuels↗

Evaluation of an Accident Tolerant Fuel Leak in the Advanced Test Reactor

Accident Tolerant Fuels (ATF), which are nuclear fuel sources designed to withstand operational irregularities and incidents, have been a topic of interest in the nuclear industry for several decades. Interest in ATF technology surged following the 2011 accident at Fukushima Daiichi in Japan. At the Advanced Test Reactor (ATR), one of Idaho National Laboratory’s (INL) four operating nuclear reactors, the ATF program is a collaborative effort between the national laboratory and various stakeholders within the nuclear industry. This program focuses on the research and development of novel fuel compositions, cladding, and component materials with enhanced accident-resistant properties. During one of ATR’s 60-day operating cycles in 2024, the reactor experienced five unplanned shutdowns. Following the fifth shutdown, radiation monitors detected an increase in radiation levels coming from the loop piping. Subsequent water samples confirmed the cause was a leak of fission products from the ATF experiment, designated as ATF-2C. The source of the leak was identified as the instrumented section of the test train. The primary discussions in this presentation are 1) the design of the ATF test train, 2) the operating parameters leading up to and following the detection of the leak, and 3) the quantification and characterization of the released fission products.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Scoping Study for Fast Flux Testing in the Advanced Test Reactor

The value of fast spectrum reactors remains prominent in the nuclear technology portfolio. The performance of these reactors can be maximized with advancements in nuclear fuel technologies, but development of these technologies is currently held back by lack of fast spectrum test reactors available to the United States. Spectral modification of experiment positions in the thermal spectrum Advanced Test Reactor (ATR) has long been used to support fast reactor fuel development, but these methods have not been progressed to their full potential. This study investigated the use of concentric rings of aluminum-clad fuel plates in ATR flux traps and thermal neutron absorbing filters to increase fast neutron flux on test specimens. This concept was termed the Boosted Energy Advanced Spectrum Test (BEAST). This approach will enable irradiation of advanced fuel designs in prototypic-length fuel pins and representative flux environment to support post irradiation exams, enable transient testing, and produce the type of data that will permit lead test assembly irradiations in true Sodium Fast Reactors (SFRs) when they become available. Neutronic predictions were performed to investigate BEAST design options and thermal hydraulic models were produced to ensure feasibility of BEAST. Two versions were considered based on the geometric limitations of ATR’s small and large flux traps. The small version was found to be preferable due to slightly higher fast flux and fast-to-thermal neutron ratio. Perhaps more influentially, the small flux trap option was also preferred to avoid conflict with ongoing very high temperature reactor fuel irradiation programs in ATR’s large northeast flux trap. The small flux trap option provided less than half the test volume of the large version, but still had adequate volume for seven SFR pins in cross section which could be stacked two-high in ATR’s 1.2m long core to accommodate up to 14 EBR-II size pins. The preference for the small flux trap configuration should be revisited if additional collaborative test programs emerge with the need to irradiate a significant volume of additional specimens. Calculations were performed regarding a lithium deuteride ring to convert thermal neutrons into 14 MeV fusion neutrons. At the time this report was written these calculations were partially complete and it remains to be seen whether the concept would be worth including in BEAST. Given the preference for the small flux trap option, which does not afford enough room for the 14 MeV ring, it was concluded to defer future work on the lithium deuteride ring. This decision could be revisited if fusion material research programs emerge for collaborative testing in BEAST. A cadmium-lined specimen holder design was found to be adequate in filtering thermal neutrons and preferred over other neutron absorbers based on past experience with cadmium baskets. It was acknowledged that cadmium-bearing hardware would become depleted and need to be replaced occasionally, which appeared feasible from a mechanical design perspective. Neutronic studies investigated different enrichment levels in the booster fuel using uranium-molybdenum alloy dispersion fuel which has performed well in past ATR irradiations. Both options were able to drive fuel pins to SFR-like fission heating rates. The high enriched booster fuel option outperformed the low enriched option by ~20% on key metrics including fast flux and fast-to-thermal ratio, but the low enriched option was favored in order to broaden options for potential fuel suppliers. The preferred BEAST design options including cadmium filter with low enriched booster fuel in the small flux trap configuration was predicted to achieve 6.2E14 n/cm2sec fast flux (>0.1 MeV) with a fast-to-thermal ratio of 44.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Conceptual Neutronics Scoping for Ramp Testing in the Advanced Test Reactor

With the closer of the Halden Boiling Water Reactor in 2018, the global capacity for in-reactor power ramp testing has been lost. As such tests provide valuable data for understanding pellet-cladding interaction (PCI) phenomena, finding new facilities for ramp testing is of interest to the United States Accident-Tolerant Fuel (ATF) Program. Several options at Idaho National Laboratory (INL) are being evaluated for adding ramp test capabilities. In the Transient Reactor Test Facility (TREAT), one option is testing inside a Transient Water Irradiation System in TREAT (TWIST) capsule. In the Advanced Test Reactor (ATR), one option under consideration is testing in an I-Loop toward the outer edge of the core. Another is testing in Loop-2A, located in the Center Flux Trap (CFT) of the ATR. In this paper, we examine the conceptual scoping for the Loop-2A experiment known as ATF-2Ramp.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Conceptual Neutronics Scoping for Ramp Testing in the Advanced Test Reactor

With the closure of the Halden Boiling Water Reactor in 2018, the global capacity for in-reactor power ramp testing has been lost. As such tests provide valuable data for understanding pellet-cladding interaction (PCI) phenomena, finding new facilities for ramp testing is of interest to the United States Accident-Tolerant Fuel (ATF) Program. Several options at Idaho National Laboratory (INL) are being evaluated for adding ramp test capabilities. In the Transient Reactor Test Facility (TREAT), one option is testing inside a Transient Water Irradiation System in TREAT (TWIST) capsule. In the Advanced Test Reactor (ATR), one option under consideration is testing in an I-Loop toward the outer edge of the core. Another is testing in Loop-2A, located in the Center Flux Trap (CFT) of the ATR. In this paper, we examine the conceptual scoping for the Loop-2A experiment known as ATF-2Ramp.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Thermal Modelling of Advanced Test Reactor Fuel in a Generalized Dry Storage System

Star-CCM+, a computational fluid dynamics (CFD) software was used to conduct modeling and simulation of the thermal performance of a dry storage configuration consisting of Department of Energy Standardized Canisters (DOESCs) loaded with aluminum-clad spent nuclear fuel (ASNF.) The configuration includes nine DOESCs loaded with Advanced Test Reactor ASNF contained within a stainless steel overcanister centered in a ventilated, concrete overpack. The simulations were used to estimate the maximum temperatures reached by backfill gases inside the overcanister and DOESCs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Feasibility of Power Ramp Testing in the Advanced Test Reactor

For decades, the Halden Boiling Water Reactor (HBWR) in Norway was an international resource for assessing nuclear fuels and materials behavior and its unexpected shutdown in 2018 represented a significant loss in experimental capability for prototypical irradiation testing. In the aftermath of the closure, a study was performed to assess capability gaps related to the Accident Tolerant Fuels (ATF) program. It was concluded that the primary capability gaps left by the closure of the HBWR were the loss of prototypic in-pile Light Water Reactor (LWR) loops that provide operational transient testing and in-pile Loss-of-Coolant Accident (LOCA) testing capabilities. The study also concluded that the Advanced Test Reactor (ATR) and Transient Reactor Test Facility (TREAT) likely have the necessary key capabilities to absorb the breadth of the HBWR mission gaps related to the ATF program, but additional investments in experimental infrastructure were needed. One such investment is the design and installation of additional pressurized water loops in the medium-I positions of the ATR, hereafter referred to as I-Loops, to support power ramp testing and testing in Boiling Water Reactor (BWR) conditions. This paper gives an overview of the planned ATR I-Loops and assesses the feasibility of performing power ramp testing inside such a loop.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Advanced Test Reactor Neutron Dosimetry Report

Results of neutron dosimetry measurements in ATR for cycle 173A-1 are presented. Cobalt and nickel wires were installed in numerous irradiation locations for the duration of the cycle. The specific activity of these wire segments can be used in conjunction with the presented cycle history information to determine the thermal- and fast-neutron fluence rates for each irradiation position during the cycle using the referenced standard test methods.

173A↗

Thermal-Hydraulic Analysis of the AFIP-7 Irradiation Test in the Advanced Test Reactor - Oxide Growth Prediction and Correlation

Knowing the thickness of the oxide layer on the surface of aluminum fuel cladding is vitally important for predicting fuel temperature due to the low thermal conductivity of the oxide layer. Several correlation models for predicting oxide growth can be found in the literature. In previous research, the correlations were combined with heat transfer simulations in Abaqus, a finite element analysis code, to forecast the oxide growth. However, this approach requires heat transfer coefficients for modeling heat exchanges with the external flow field, and such coefficients were obtained through empirical equations. Since different empirical equations yield varying heat transfer coefficients, the cladding temperature and predicted oxide thickness both carry a high degree of uncertainty. Here, this research develops a new approach that integrates the fluid flow, fluid and solid heat transfer, and oxide growth correlation(s) into a single computational fluid dynamics model. We demonstrate this approach’s ability to predict oxide development on the AFIP-7 plates during two Advanced Test Reactor (ATR) irradiation cycles. The projected oxide thickness falls within the experimental measurements taken during post irradiation examination.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advanced Test Reactor Neutron Dosimetry Report - 173B

Results of neutron dosimetry measurements in ATR for cycle 173B-1&2 are presented. Cobalt and nickel wires were installed in numerous irradiation locations for the duration of the cycle. The specific activity of these wire segments can be used in conjunction with the presented cycle history information to determine the thermal- and fast-neutron fluence rates for each irradiation position during the cycle using the referenced standard test methods.

173B↗

Advanced Test Reactor Neutron Dosimetry Report - Cycle 175A-1

Results of neutron dosimetry measurements in ATR for cycle 175A-1 are presented. A single set of cobalt and nickel wires were installed in numerous irradiation locations for the duration of the cycle. The specific activity of these wire segments can be used in conjunction with the presented cycle history information to determine the thermal- and fast-neutron fluence rates for each irradiation position during the cycle using the referenced standard test methods.

175A↗

Fluid structural interaction simulation of the MP-1 plate performance irradiated in the advanced test reactor

Due to the high neutron fluxes they generate and increased heat transfer performance, plate type fuels are used in the U.S. high-performance research reactors. During irradiation, a significant amount of fission energy (i.e., ~200 MeV per atom) is released by the U-235 chain reaction that is carried away by the coolant. Through thermal hydraulic analysis, the coolant’s heat transfer capability is investigated to ensure that the desired fuel temperature can be maintained. At high temperatures, the plate undergoes elastic/plastic deformation, creep, and swelling as a result of both the temperature gradients and the fission gas production within the fuel. These effects are studied via fuel performance analysis. When the plate deformation is small enough that the coolant flow remains relatively unchanged, conducting these two types of analyses independently will suffice. But at high fuel burnups, the swollen plates may encroach into the coolant channels that separate the fuel plates from each other and cause these channels to narrow. Large reductions in channel gap size imperil cooling performance, causing fuel temperatures to rise. Further, if the plate deformation is asymmetric, the fuel centerline will shift toward one side of the channel, causing an uneven reduction in coolability. In addition, a boehmite (oxide) layer will, over time, grow on the plate surface, further obstructing the heat transfer process. To precisely predict fuel temperatures/deformation, a complete coupled analysis that considers coolant flow, heat transfer, oxide growth, elastic/plastic deformation, creep, and swelling is needed; however, this type of analysis method is not available in the literature. To fill the gap, this research developed a fluid structure interaction (FSI) approach to the fuel plate analysis, then successfully applied it to the Mini-Plate (MP)-1 experiment, which was irradiated in the Advanced Test Reactor (ATR) for both one and two cycles. The complete analysis coupled STAR-CCM+, a computational fluid dynamic (CFD) software for calculating flow, with Abaqus, a finite element analysis code for calculating plate deformation. Improvements in the results were found when comparing the fully coupled analysis to the independently conducted analyses but they were not significant due to the miniature size of the plates and the relatively short irradiation time. In the future, the fully coupled approach presented herein will be applied to full-size fuel plates with longer irradiation cycles once additional experiments become available.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advanced Test Reactor Neutron Dosimetry Report - 173B (Rev. 1)

Results of neutron dosimetry measurements in ATR for cycle 173B-1&2 are presented. Cobalt and nickel wires were installed in numerous irradiation locations for the duration of the cycle. The specific activity of these wire segments can be used in conjunction with the presented cycle history information to determine the thermal- and fast-neutron fluence rates for each irradiation position during the cycle using the referenced standard test methods.

173B↗

Advanced Test Reactor Neutron Dosimetry Report - Cycle 175B-1

Results of neutron dosimetry measurements in ATR for cycle 175B-1 are presented. A single set of cobalt and nickel wires were installed in numerous irradiation locations for the duration of the cycle. The specific activity of these wire segments can be used in conjunction with the presented cycle history information to determine the thermal- and fast-neutron fluence rates for each irradiation position during the cycle using the referenced standard test methods.

175B↗

Future TRISO fuel irradiations in the Advanced Test Reactor

AGR-5/6/7 was thought to be the last experiment in the AGR series and the last experiment directly sponsored by DOE. Over the last five years three developments have caused a reevaluation of that assumption. First is that interest in TRISO fueled reactors has spiked dramatically. Virtually all of the new reactor designs are for SMRs or micro-reactors . Some of these reactors use new fuel designs with higher concentrations of U235. This results in changes to the particle design and even fuel pellet design. Second, a design flaw in AGR-5/6/7 Capsule 1 produced a large number of particle failures which resulted in the loss of data from Capsule 1. An additional irradiation could fill in this lost data set. Thirdly, many reactor developers have decided to use AGR spec fuel but different irradiation goals have been identified.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Test Reactor Loop Activity Report: Gamma-Ray Emitting Radionuclides Concentrations and Decontamination Factors of ATR Loop Liquid Samples for ATR Cycle 175B-1

The gamma-ray emitting radionuclide concentration and decontamination factor results from gamma-ray spectrometry measurements of ATR loop liquid samples by the Radiation Measurements Laboratory (RML) are contained in this report for ATR Cycle 175B-1 from August 4, 2025 to October 6, 2025.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Test Reactor Loop Activity Report: Gamma-Ray Emitting Radionuclides Concentrations and Decontamination Factors of ATR Loop Liquid Samples Cycle 173C-1

The gamma-ray emitting radionuclide concentration and decontamination factor results from gamma-ray spectrometry measurements of ATR loop liquid samples by the Radiation Measurements Laboratory (RML) are contained in this report for ATR Cycle 173C-1 from November 22, 2024, to January 21, 2025.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Modernizing the Legacy Fission Wire Measurement System for the Advanced Test Reactor-Critical Facility

Operational lifetime extensions of existing research reactors have emphasized the need for refurbishment, replacements, and upgrades to supporting equipment and instrumentation. The Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), which entered service in 1967, has recently completed the sixth core internals change-out and has scheduled operations until at least 2040. Reactor maintenance and operational risk management is critically important in the research reactor community, however supporting measurement systems sometimes get overlooked when maintenance is planned. The Fission Wire Measurement System (FWMS) is a custom measurement system designed in the 1960s to measure the beta-particle activity of irradiated uranium-aluminum fission wires. This measurement is conducted to determine the fission rate profile of the Advanced Reactor Test Critical (ATR-C) facility. The ATR-C is an open-pool, low-power test reactor that was purpose driven to resemble ATR and is used to qualify experiment configurations and verify core models prior to full-power experiment irradiations in ATR. A power distribution measurement in ATR-C uses uranium-aluminum wires that are distributed throughout the ATR-C core to validate simulation and modeling results. These measurements require 340 to 1500 wires to be irradiated and measured within a 12-hour window. The activity of the wires is measured in the required time with the FWMS, which was put into service in 1965 at the Radiation Measurements Laboratory (RML). The system consists of 4 measurement channels and one reference channel, each with a 2-pi proportional gas flow detector and the measurement channels each have an automated sample changer. This legacy system is crucial to the continued operations of ATR and has undergone some minor hardware upgrades since 1965, however the system presently relies on custom control boards, custom gas ion chambers, analog amplifiers/discriminators, and a user interface (UI) for the system written in outdated code. Much of the equipment and software is custom with no commercial replacements or support and limited documentation. The existing control software requires an operating system that is no longer supported, creating more vulnerabilities to continued operations. A project is underway with a third-party vendor to design, build, and document a new control and data acquisition system (CDAS) for the FWMS. The new upgrade will replace the control system, computer, UI, sample changer motors, and main power supply while maintaining the interface with existing detector hardware. The upgraded system will be operated in parallel with the current hardware and software to conduct validation testing. This equipment upgrade demonstrates the commitment at ATR to ensuring successful operations and potential future research reactors at INL.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗