ADMS Evaluation Platform

Deploying an ADMS or looking to optimize its value? NREL offers a low-cost, low-risk evaluation platform for assessing ADMS performance. The National Renewable Energy Laboratory (NREL) has developed a vendor-neutral advanced distribution management system (ADMS) evaluation platform and is expanding its capabilities. The platform uses actual grid-scale hardware, large-scale distribution system models, and advanced visualization to simulate realworld conditions for the most accurate ADMS evaluation and experimentation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ADMS and DER Coordinated Capability Demonstrations to Assist Utilities to Increase Resilience and Reliability

The proliferation of distributed energy resources (DERs) presents opportunities and challenges to distribution grid operators. The National Renewable Energy Laboratory (NREL) and Survalent are collaborating to demonstrate advanced distribution management system (ADMS) and DER coordinated capability to assist utilities to increase resilience and reliability. ADMS and Distributed Energy Resource Management System (DERMS) Coordination for Peak Load Management (PLM). Fault Location, Isolation, and Service Restoration (FLISR) in the Presence of DERs. Grid-Edge Intelligent Distribution Automation System for Self-Healing Distribution Grids. These laboratory demonstrations use NREL's ADMS Test Bed.

ADMS↗

Model Quality and Measurement Density Impact on Volt/Volt Ampere Reactive Optimization Performance

The operation of the utility grid is being reshaped by the continuous addition of distributed energy resources and advanced metering infrastructure, which challenge existing grid control strategies. Some utilities deploy advanced distribution management systems (ADMS) to assist with the consolidation of various applications and to augment situational awareness in response to the new power delivery dynamics. An ADMS is an integrated software platform that provides utilities with a way to enhance their reliability, control, and optimization with advanced applications, such as volt/VAR optimization (VVO). A VVO application could serve as a vehicle to deliver cost savings by providing the utility with a method to reduce rates by controlling the voltage and decreasing the energy usage in their service territory. Some utilities are reluctant to integrate an ADMS, because it is a significant investment that requires approval from the public regulatory commission and/or their customers. This paper evaluates the impact on VVO performance when using a lower-quality network model supplemented with additional measurements, which could provide an implementation for cost savings. The results show that a better model quality would provide the highest energy savings; however, some level of telemetry is necessary in all scenarios to prevent voltage exceedances.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance Evaluation of Next-Generation Grid Automation and Controls with High PV Penetration

This paper presents a hardware-in-the-loop (BIL) simulation to evaluate the performance of an advanced grid automation architecture, referred to as data-enhanced hierarchical control (DEHC), in achieving voltage regulation and conservation voltage reduction (CVR) in distribution networks with very high photovoltaic (PV) generation. This architecture comprises an advanced distribution management system (ADMS), a distributed energy resource management system (DERMS), and grid-edge devices working synergistically to provide the grid benefits. The HIL setup used for the evaluation includes ADMS, DERMS, and grid-edge devices. The DEHC performance is evaluated in two representative scenarios considering loose and tight constraints of the power factor at the substation. The results show that the DEHC architecture is effective in achieving voltage regulation and CVR and thus enables the grid integration of high levels of PV generation.

ADMS↗

Performance Evaluation of Data-Enhanced Hierarchical Control for Grid Operations

This paper presents a hardware-in-the-loop (HIL) simulation to evaluate the performance of voltage regulation of Data-Enhanced Hierarchical Control (DEHC). This DEHC uses an advanced distribution management system (ADMS) for grid operations to control legacy and grid-edge devices and coordinate with distributed energy management systems (DERMS) to manage high penetrations of photovoltaics (PV) on a utility distribution system. The HIL platform provides realistic laboratory testing, including accurate modeling (legacy devices, grid-edge devices, and PV) of the real-world distribution system from a utility partner, a real controller (ADMS), software controller DERMS, hardware grid-edge devices, and standard communications protocols. The test results demonstrate functionalities of the integrated platform and the performance of voltage regulation of the coordinated control systems. Based on laboratory testing, the utility can set up the same grid-automation system to manage DERs, legacy devices, and grid-edge devices to achieve their system-level control and operation objectives (e.g., voltage regulation), thus de-risking potential issues such as instability for field deployment.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Evaluation of Centralized Model Based FLISR in a Lab Setup

Utilities are installing advanced distribution management systems (ADMS) around the globe to improve the sensing and control of distribution systems. ADMS is becoming a critical component to improve the resiliency and reliability of distribution systems. These management systems host a multitude of applications that can be used to sense, control, and operate distribution systems. Fault location, isolation, and service restoration (FLISR) is one of the ADMS applications that is critical to improving resilience during fault conditions. FLISR applications use smart, controllable devices that are installed in the distribution system for FLISR operation. These controllable devices include distributed energy resources (DER) and reclosers. Evaluating such ADMS applications before installation in the field can help de-risk the field implementation and avoid costly failures in the field. This paper presents a background on experimental setup that are typically used to evaluate ADMS applications. This is followed by briefly presenting the setup used to evaluate the FLISR application in an off-the-shelf ADMS tool. Finally, results from the evaluation experiments are presented.

94 GMLC - Grid Modernization Laboratory Consortium↗

Evaluation of Centralized Model-Based FLISR in a Lab Setup: Preprint

Utilities are installing advanced distribution management systems (ADMS) around the globe to improve the sensing and control of distribution systems. ADMS is becoming a critical component to improve the resiliency and reliability of distribution systems. These management systems host a multitude of applications that can be used to sense, control, and operate distribution systems. Fault location, isolation, and service restoration (FLISR) is one of the ADMS applications that is critical to improving resilience during fault conditions. FLISR applications use smart, controllable devices that are installed in the distribution system for FLISR operation. These controllable devices include distributed energy resources (DER) and reclosers. Evaluating such ADMS applications before installation in the field can help de-risk the field implementation and avoid costly failures in the field. This paper presents a background on experimental setup that are typically used to evaluate ADMS applications. This is followed by briefly presenting the setup used to evaluate the FLISR application in an off-the-shelf ADMS tool. Finally, results from the evaluation experiments are presented.

94 GMLC - Grid Modernization Laboratory Consortium↗

A Framework to Demonstrate a DNP3 Interface With a CIM-Based Data Integration Platform: Preprint

The contemporary electrical grid is characterized by its complexity and abundance of data. A control-rich environment supported by information and communication technologies within an Advanced Distribution Management System (ADMS) presents a viable and cost-effective option for utility companies aiming to implement advanced real-time analytical schemes for monitoring and remotely controlling distribution feeders. Modular platform-based approaches to distribution operations require a structured framework for acquiring field device measurements, performing analytics, converting the setpoint to the correct protocol, and sending it on the appropriate communications network to the field devices. We present the development and deployment of an application service to integrate an open-source standardsbased platform with an ADMS test bed with field devices using the Distributed Network Protocol (DNP3) for data exchange. The step-by-step procedure for establishing the DNP3-Master service on an open-source distribution platform is outlined, comprehensively explaining the Master setup process. Moreover, sample use case results highlight the capabilities of the DNP3- Master service setup. Results demonstrate the scalability and configurability of the DNP3-Master service, making it adaptable for integration with other relevant applications, thus providing potential opportunities for real-world field trials and real-time assessments.

ADMS↗

Defining a Use Case for the ADMS Test Bed: Fault Location, Isolation, and Service Restoration with Distributed Energy Resources

Advanced distribution management systems (ADMS) integrate multiple enterprise-level functions into a single platform and offer advanced applications such as fault location, isolation, and service restoration (FLISR), to utilities to meet their operational needs for a modernized grid. These applications need to operate reliably even as distributed energy resource (DER) penetration increases on distribution systems. The ADMS test bed at the National Renewable Energy Laboratory offers utilities and vendors the opportunity to evaluate the performance of such advanced applications on distribution feeders of the future and to understand their potential benefits for a specific utility. This is done through defining use cases that address specific questions. This paper presents the definition of a use case on the performance of a commercially-available FLISR application on a feeder of an electric cooperative with DERs. After experiments are completed, results from this use case will be disseminated to the electric utility and research community to improve understanding of the challenges and benefits that DERs present to ADMS applications and the operation of a modernized grid.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Defining a Use Case for the ADMS Test Bed: Fault Location, Isolation, and Service Restoration with Distributed Energy Resources: Preprint

Advanced distribution management systems (ADMS) integrate multiple enterprise-level functions into a single platform and offer advanced applications such as fault location, isolation, and service restoration (FLISR), to utilities to meet their operational needs for a modernized grid. These applications need to operate reliably even as distributed energy resource (DER) penetration increases on distribution systems. The ADMS test bed at the National Renewable Energy Laboratory offers utilities and vendors the opportunity to evaluate the performance of such advanced applications on distribution feeders of the future and to understand their potential benefits for a specific utility. This is done through defining use cases that address specific questions. This paper presents the definition of a use case on the performance of a commercially-available FLISR application on a feeder of an electric cooperative with DERs. Results from this use case will be disseminated to the electric utility and research community to improve understanding of the challenges and benefits that DERs present to ADMS applications and the operation of a modernized grid.

61 RADIATION PROTECTION AND DOSIMETRY↗

Experimental Test Bed to Enable Realistic Evaluations for Direct Transfer Trip Relaying via Private Wireless LTE Communications

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.

900-MHz LTE network↗

Experimental Test Bed to Enable Realistic Evaluations for Direct Transfer Trip Relaying via Private Wireless LTE Communications: Preprint

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.

900 MHz LTE network↗

Experimental Test Bed to Enable Realistic Evaluations for Direct Transfer Trip Relaying via Private Wireless LTE Communications

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Improving the Performance of Integrated Power-Hardware-in-the-Loop and Quasi-Static Time-Series Simulations

This paper introduces a novel multirate cosimulation architecture that overcomes previous challenges integrating faster real-time, microseconds-scale, power-hardware-in-the-loop (PHIL) with larger scale but slower, real-time, seconds-scale, quasi-static time-series (QSTS) simulation. Specifically, an intermediate reduced-equivalent electromagnetic transient (EMT) model duplicates the key power system topology to capture high-speed dynamics and converge hardware-power system interactions between QSTS updates. Exchanging multidimensional parameter vectors (loads, control status, etc.) between the QSTS and EMT models enables capturing the interactions of the rich, high-node-count (thousands of electrical nodes) QSTS model with the hardware. This architecture offers full spatial resolution from QSTS, including individual load dynamics, actual distribution management system controls, and nodal voltages. Simultaneously, the intermediate EMT model provides more detailed high-speed transients of key distributed energy resource hardware interactions. In addition, we use careful PHIL interface design and the exchange of complex power data, rather than current, to further improve performance. This cosimulation architecture is demonstrated by testing a simulated distribution system with an interconnected 500-kVA advanced photovoltaic (PV) inverter in PHIL. In conclusion, the architecture successfully captured PV local volt-volt ampere reactive (volt-VAR) control interactions with the larger network under time-varying electrical and weather conditions.

42 ENGINEERING↗

Optimization-Based Deconfliction of Distribution System Applications

Power distribution systems are transitioning towards a future with large numbers of controllable grid-edge devices and distributed generation, as well as more complex operational objectives. This evolution requires a new distribution management approach, and modular applications can play a significant role. Thus, new strategies to coordinate independent applications with diverging operational goals are necessary. In this paper, we propose a novel optimization-based deconflictor to facilitate coordination in future advanced distribution management systems.

application deconfliction, power system optimizati↗

GridAPPS-D Conceptual Design v1.0

The purpose of this document is to provide a conceptual design of the distribution system application development platform being developed for the U.S. Department of Energy’s Advanced Distribution Management System (ADMS) Program by the Grid Modernization Laboratory Consortium project GM0063. The platform will be referred to as GridAPPS-D. This document provides a high level, conceptual view of the platform and provides related background and contextual information. This document is intended to both educate readers about the technical work of the project and to serve as a point of reference for the project team. The document will be updated as the project progresses.

97 MATHEMATICS AND COMPUTING↗

GridAPPS-D Conceptual Design (V.1.0)

The purpose of this document is to provide a conceptual design of the distribution system application development platform being developed for the U.S. Department of Energy’s Advanced Distribution Management System (ADMS) Program by the Grid Modernization Laboratory Consortium project GM0063. The platform will be referred to as GridAPPS-D. This document provides a high level, conceptual view of the platform and provides related background and contextual information. This document is intended to both educate readers about the technical work of the project and to serve as a point of reference for the project team. The document will be updated as the project progresses.

24 POWER TRANSMISSION AND DISTRIBUTION↗