Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Administration and Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Postdoctoral and Senior Postdoctoral Resident Research Associateship Program and Research Management Associateship Program for the National Aeronautics and Space Administration

Information on the status of all Resident Research Associated and Research Management Associates is provided. All Associated whose tenure continued as of June 1, 1985 are listed alphabetically by laboratory. Also included are their countries of citizenship and dates of tenure. The status of reporting obligations are summarized. A list of progress reports received during this reporting period is also provided. All Associates who terminated during the reporting period are listed.

Source record↗

Concept of Operations for Interval Management Arrivals and Approach

This paper presents the concept of operations for interval management operations to be deployed in the US National Airspace System (NAS) by the Federal Aviation Administration (FAA) Interval Management Program. The arrivals and approach operations are explored in detail including the primary operation and variations. The use of interval management operations is described that begin in en route airspace and continue to a termination point inside the arrival terminal area in the highly automated terminal environment that includes other arrival management tools such as arrival metering, Ground-based Interval Management - Spacing (GIM-S), and Terminal Sequencing and Spacing (TSAS). The roles of Air Traffic and Pilots and the ground automation tools that are used by Air Traffic Controllers to enable the operations are explored.

Hicok, Daniel S.↗

Analysis of At-Altitude LTE Power Spectra for C2 Communications for UAS Traffic Management

The National Aeronautics and Space Administration’s (NASA) Unmanned Aircraft Systems Traffic Management (UTM) project works to develop tools and technologies essential for safely enabling civilian low-altitude small Unmanned Aerial Systems (sUAS, also known as drones) operations. This paper presents results of work completed in the paper [1] presented at the 2018 ICNS conference where proposed approaches were explored for evaluating and analyzing sUAS Command and Control (C2) links based on commercial cellular networks. This paper focuses on the UTM Project’s Technology Capability Level 3 (TCL-3) test results which address the communications portion identified within the same paper. A software defined radio (SDR) was flown as a sUAS payload to capture received signal spectrum in Long Term Evolution (LTE) frequency bands of interest. The purpose was to measure the RF environment at UTM altitudes to characterize the interference potential. The SDR payload was flown at various stationary altitudes where the LTE over-the-air complex (I/Q) samples were captured by the SDR and later post-processed. The SDR received inputs through an omnidirectional antenna. The complex samples captured were an aggregate of transmissions received from all line-of-sight (LOS) towers within the geographic area for the specific radio frequency bandwidth the SDR is programmed to capture. Using this approach, the complex samples captured do not distinguish between the various eNodeB's (Long Term Evolution (LTE) transmitting towers). The complex samples were post processed via a Discrete Fourier Transform (DFT) algorithm to view the captured spectrum along with the power levels across the captured LTE bandwidth. This SDR payload process of capturing complex samples was done at two different regions within the US: 1) NASA's Ames Research Center (ARC) in Moffett Field, CA, and 2) Griffiss Airfield in Rome, NY. The data capture at the ARC site was done at two physical locations within the Ames campus where many stationary altitude captures where done as high as 800 ft. above ground level (AGL). The data captured at the Griffiss Airport (also known as the NY Corridor Site) were acquired at one location with three specific stationary altitude levels – {Ground Level (GL), 300 ft., and 400 ft.}. The LTE spectrum power levels were captured for two LTE carriers, AT&T and Verizon, at both sites where their respective spectra and power levels were measured and compared at various altitudes. The overall results show that there is an increase in LTE spectrum power levels at higher altitudes for drones. A detailed analysis of this data and conclusions drawn from the results are presented in this paper.

Kerczewski, Robert J.↗

A Framework for Managing Inter-Site Storage Area Networks using Grid Technologies

The NASA Goddard Space Flight Center and the University of Maryland Institute for Advanced Computer Studies are studying mechanisms for installing and managing Storage Area Networks (SANs) that span multiple independent collaborating institutions using Storage Area Network Routers (SAN Routers). We present a framework for managing inter-site distributed SANs that uses Grid Technologies to balance the competing needs to control local resources, share information, delegate administrative access, and manage the complex trust relationships between the participating sites.

Kobler, Ben↗

A Framework for Managing Inter-Site Storage Area Networks using Grid Technologies

The NASA Goddard Space Flight Center and the University of Maryland Institute for Advanced Computer Studies are studying mechanisms for installing and managing Storage Area Networks (SANs) that span multiple independent collaborating institutions using Storage Area Network Routers (SAN Routers). We present a framework for managing inter-site distributed SANs that uses Grid Technologies to balance the competing needs to control local resources, share information, delegate administrative access, and manage the complex trust relationships between the participating sites.

McCall, Fritz↗

Software for Managing Inventory of Flight Hardware

The Flight Hardware Support Request System (FHSRS) is a computer program that relieves engineers at Marshall Space Flight Center (MSFC) of most of the non-engineering administrative burden of managing an inventory of flight hardware. The FHSRS can also be adapted to perform similar functions for other organizations. The FHSRS affords a combination of capabilities, including those formerly provided by three separate programs in purchasing, inventorying, and inspecting hardware. The FHSRS provides a Web-based interface with a server computer that supports a relational database of inventory; electronic routing of requests and approvals; and electronic documentation from initial request through implementation of quality criteria, acquisition, receipt, inspection, storage, and final issue of flight materials and components. The database lists both hardware acquired for current projects and residual hardware from previous projects. The increased visibility of residual flight components provided by the FHSRS has dramatically improved the re-utilization of materials in lieu of new procurements, resulting in a cost savings of over $1.7 million. The FHSRS includes subprograms for manipulating the data in the database, informing of the status of a request or an item of hardware, and searching the database on any physical or other technical characteristic of a component or material. The software structure forces normalization of the data to facilitate inquiries and searches for which users have entered mixed or inconsistent values.

Salisbury, John↗

Space Research Data Management in the National Aeronautics and Space Administration

Space related scientific research has passed through a natural evolutionary process. The task of extracting the meaningful information from the raw data is highly involved and will require data processing capabilities that do not exist today. The results are presented of a three year examination of this subject, using an earlier report as a starting point. The general conclusion is that there are areas in which NASA's data management practices can be improved and recommends specific actions. These actions will enhance NASA's ability to extract more of the potential data and to capitalize on future opportunities.

Ludwig, G. H.↗

Assessing C2 Communications for UAS Traffic Management

The National Aeronautics and Space Administration's (NASA) Unmanned Aircraft Systems (UAS) Traffic Management (UTM) project works to develop tools and technologies essential for safely enabling civilian low-altitude UAS operations. Currently there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. The UTM technical challenge will develop comprehensive and validated airspace operations and integration requirements to safely enable large-scale persistent access to visual line of sight and autonomous beyond visual line of sight small UAS in low-altitude airspace. Within the UTM project, a number of communications technologies to support UTM command and control (C2) are under investigation. In particular, commercial networked cellular systems are being tested and assessed for their ability to meet the reliability, scalability, cybersecurity and redundancy required. NASA Glenn Research Center is studying some of the aspects of employing such networks for UTM C2 communications. This includes the development of a test platform for sensing and characterizing the airborne C2 communications environment at various altitudes and in various terrains and topologies, measuring such aspects as received signal strength and interference. System performance aspects such as latency in the link, handover performance, packet error loss rate, drop outs, coverage gaps and other aspects impacting UTM operation will also be assessed. In this paper we explore some of the C2 approaches being proposed and demonstrated in the UTM project, the reliability, availability and other general C2 performance requirements, and approaches to evaluating and analyzing UTM C2 links based on commercial cellular networks.

air traffic control↗

National Aeronautics and Space Administration (NASA) Earth Science Research for Energy Management: Overview of Energy Issues and an Assessment of the Potential for Application of NASA Earth Science Research - Part 1

Effective management of energy resources is critical for the U.S. economy, the environment, and, more broadly, for sustainable development and alleviating poverty worldwide. The scope of energy management is broad, ranging from energy production and end use to emissions monitoring and mitigation and long-term planning. Given the extensive NASA Earth science research on energy and related weather and climate-related parameters, and rapidly advancing energy technologies and applications, there is great potential for increased application of NASA Earth science research to selected energy management issues and decision support tools. The NASA Energy Management Program Element is already involved in a number of projects applying NASA Earth science research to energy management issues, with a focus on solar and wind renewable energy and developing interests in energy modeling, short-term load forecasting, energy efficient building design, and biomass production.

Atmospheric models↗

Reducing Departure Delays for Adjacent Center Airports using Time-Based Flow Management Scheduler: Checkbox On or Off?

The Federal Aviation Administration (FAA) has enhanced the Time-Based Flow Management (TBFM) scheduling tool with a "Checkbox ON" vs. "OFF" function which allows Traffic Management Coordinators (TMCs) to make room in a crowded arrival stream for a departure. When scheduling a departure, having the checkbox ON can delay the Scheduled Times of Arrivals (STAs) of the airborne flights upstream of the TBFM freeze horizons and can compress these flights to their minimum required spacing, thereby creating a slot for a departure. Hence, having the checkbox ON can reduce the frequent ground delays of aircraft departing near high volume airports but can increase delays for airborne arrivals. A Human-in-the-Loop (HITL) simulation compared arrival and departure delays to Newark Airport (EWR) with the checkbox ON vs. OFF as the default position. Three other conditions in this HITL involved various National Airspace System (NAS)-wide approaches for timely delivery of aircraft to the TBFM region. These conditions were: Baseline, using current Mile-in-Trail (MIT) spacing restrictions; Integrated Demand Management (IDM), where all aircraft were given departure times (Expect Departure Clearance Times, or EDCTs), ultimately based on the EWR Airport Arrival Rate; and IDM plus Required Time of Arrival (RTA), a flight deck tool which allowed some aircraft to meet a controlled time of arrival to the TBFM area more precisely. Results showed that the checkbox tool was powerful: with the checkbox ON, departure delays decreased and airborne delays increased, as predicted. However, assuming that the cost ratio of a minute of airborne delay to a minute of departure delay is in the range of 1.2 to 3, as commonly indicated by the literature, checkbox ON and checkbox OFF conditions showed approximately equal total delay costs, i.e., the cost of delays in the air balanced the cost of the delay on the ground. The three scheduling conditions also had approximately equal total delay costs, although a simulation artifact may have reduced the delays in the Baseline condition. In the debrief following the simulation, the TMCs concluded that the checkbox should be used flexibly depending on the current delay situation, and suggested modifications to the checkbox tool which would help them use it in this way, along with enhanced training. The relatively similar total cost of both checkbox default options in this simulation indicates that this might be a fruitful approach, and replace the necessity to have the checkbox rigidly set to either ON or OFF.

departure delay↗

NASA-evolving to Ada: Five-year plan. A plan for implementing recommendations made by the Ada and software management assessment working group

At their March 1988 meeting, members of the National Aeronautics and Space Administration (NASA) Information Resources Management (IRM) Council expressed concern that NASA may not have the infrastructure necessary to support the use of Ada for major NASA software projects. Members also observed that the agency has no coordinated strategy for applying its experiences with Ada to subsequent projects (Hinners, 27 June 1988). To deal with these problems, the IRM Council chair appointed an intercenter Ada and Software Management Assessment Working Group (ASMAWG). They prepared a report (McGarry et al., March 1989) entitled, 'Ada and Software Management in NASA: Findings and Recommendations'. That report presented a series of recommendations intended to enable NASA to develop better software at lower cost through the use of Ada and other state-of-the-art software engineering technologies. The purpose here is to describe the steps (called objectives) by which this goal may be achieved, to identify the NASA officials or organizations responsible for carrying out the steps, and to define a schedule for doing so. This document sets forth four goals: adopt agency-wide software standards and policies; use Ada as the programming language for all mission software; establish an infrastructure to support software engineering, including the use of Ada, and to leverage the agency's software experience; and build the agency's knowledge base in Ada and software engineering. A schedule for achieving the objectives and goals is given.

Source record↗

MCC/shuttle test plan. Volume 1: Philosophy and guidelines

The Mission Control Center/Shuttle Test Plan is defined from development through operations to a level of detail which will support the National Aeronautics and Space Administration and contractor management in the following areas: test management, test tool development, and resource and schedule planning.

Source record↗

Advanced Cardiac Life Support (ACLS) utilizing Man-Tended Capability (MTC) hardware onboard Space Station Freedom

Because of the time and distance involved in returning a patient from space to a definitive medical care facility, the capability for Advanced Cardiac Life Support (ACLS) exists onboard Space Station Freedom. Methods: In order to evaluate the effectiveness of terrestrial ACLS protocols in microgravity, a medical team conducted simulations during parabolic flights onboard the KC-135 aircraft. The hardware planned for use during the MTC phase of the space station was utilized to increase the fidelity of the scenario and to evaluate the prototype equipment. Based on initial KC-135 testing of CPR and ACLS, changes were made to the ventricular fibrillation algorithm in order to accommodate the space environment. Other constraints to delivery of ACLS onboard the space station include crew size, minimum training, crew deconditioning, and limited supplies and equipment. Results: The delivery of ACLS in microgravity is hindered by the environment, but should be adequate. Factors specific to microgravity were identified for inclusion in the protocol including immediate restraint of the patient and early intubation to insure airway. External cardiac compressions of adequate force and frequency were administered using various methods. The more significant limiting factors appear to be crew training, crew size, and limited supplies. Conclusions: Although ACLS is possible in the microgravity environment, future evaluations are necessary to further refine the protocols. Proper patient and medical officer restraint is crucial prior to advanced procedures. Also emphasis should be placed on early intubation for airway management and drug administration. Preliminary results and further testing will be utilized in the design of medical hardware, determination of crew training, and medical operations for space station and beyond.

Smith, M.↗

NASA space life sciences research and education support program

USRA's Division of Space Life Sciences (DSLS) was established in 1983 as the Division of Space Biomedicine to facilitate participation of the university community in biomedical research programs at the NASA Johnson Space Center (JSC). The DSLS is currently housed in the Center for Advanced Space Studies (CASS), sharing quarters with the Division of Educational Programs and the Lunar and Planetary Institute. The DSLS provides visiting scientists for the Johnson Space Center; organizes conferences, workshops, meetings, and seminars; and, through subcontracts with outside institutions, supports NASA-related research at more than 25 such entities. The DSLS has considerable experience providing visiting scientists, experts, and consultants to work in concert with NASA Life Sciences researchers to define research missions and goals and to perform a wide variety of research administration and program management tasks. The basic objectives of this contract have been to stimulate, encourage, and assist research and education in the NASA life sciences. Scientists and experts from a number of academic and research institutions in this country and abroad have been recruited to support NASA's need to find a solution to human physiological problems associated with living and working in space and on extraterrestrial bodies in the solar system.

Jones, Terri K.↗

Mass Storage Performance Information System

The purpose of this task is to develop a data warehouse to enable system administrators and their managers to gather information by querying the data logs of the MDSDS. Currently detailed logs capture the activity of the MDSDS internal to the different systems. The elements to be included in the data warehouse are requirements analysis, data cleansing, database design, database population, hardware/software acquisition, data transformation, query and report generation, and data mining.

Scheuermann, Peter↗

Situational Leadership in Air Traffic Control

In high-risk environments such as air traffic control, leadership on different levels plays a certain role in establishing, promoting, and maintaining a good safety culture. The current study aimed to investigate how leadership styles, leadership style adaptability, and over and under task leadership behavior differed across situations, operative conditions, leadership structures, and working tasks in an air traffic control setting. Study locations were two air traffic control centers in Sweden with different operational conditions and leadership structures, and an administrative air traffic management unit. Leadership was measured with a questionnaire based on Leader Effectiveness and Adaptability Description (LEAD; Blanchard, Zigarmi & Zigarmi, 2003; Hersey & Blanchard, 1988). The results showed that the situation had strong impact on the leadership in which the leadership behavior was more relationship oriented in Success and Group situations than in Hardship and Individual situations. The leadership adaptability was further superior in Success and Individual situations compared with Hardship and Group situations. Operational conditions, leadership structures and working tasks were, on the other hand, not associated with leadership behavior.

Arvidsson, Marcus↗

L-Band Digital Aeronautical Communications System Engineering - Initial Safety and Security Risk Assessment and Mitigation

This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." ITT has completed a safety hazard analysis providing a preliminary safety assessment for the proposed L-band (960 to 1164 MHz) terrestrial en route communications system. The assessment was performed following the guidelines outlined in the Federal Aviation Administration Safety Risk Management Guidance for System Acquisitions document. The safety analysis did not identify any hazards with an unacceptable risk, though a number of hazards with a medium risk were documented. This effort represents a preliminary safety hazard analysis and notes the triggers for risk reassessment. A detailed safety hazards analysis is recommended as a follow-on activity to assess particular components of the L-band communication system after the technology is chosen and system rollout timing is determined. The security risk analysis resulted in identifying main security threats to the proposed system as well as noting additional threats recommended for a future security analysis conducted at a later stage in the system development process. The document discusses various security controls, including those suggested in the COCR Version 2.0.

Zelkin, Natalie↗

C-Band Airport Surface Communications System Engineering-Initial High-Level Safety Risk Assessment and Mitigation

This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." ITT has completed a safety hazard analysis providing a preliminary safety assessment for the proposed C-band (5091- to 5150-MHz) airport surface communication system. The assessment was performed following the guidelines outlined in the Federal Aviation Administration Safety Risk Management Guidance for System Acquisitions document. The safety analysis did not identify any hazards with an unacceptable risk, though a number of hazards with a medium risk were documented. This effort represents an initial high-level safety hazard analysis and notes the triggers for risk reassessment. A detailed safety hazards analysis is recommended as a follow-on activity to assess particular components of the C-band communication system after the profile is finalized and system rollout timing is determined. A security risk assessment has been performed by NASA as a parallel activity. While safety analysis is concerned with a prevention of accidental errors and failures, the security threat analysis focuses on deliberate attacks. Both processes identify the events that affect operation of the system; and from a safety perspective the security threats may present safety risks.

Zelkin, Natalie↗