Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Acceptance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Nevada National Security Site Waste Acceptance Criteria (NNSS/WAC)

This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO), Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept the following: DOE low-level radioactive waste (LLW); DOE mixed low-level waste (MLLW); DOE classified waste/matter; U.S. Department of Defense (DOD) classified waste/matter The LLW and MLLW listed above may also be classified waste. Non-radioactive classified waste is accepted for disposal and shall meet the waste acceptance criteria for radioactive waste as specified in this document. Classified matter may be shipped to the NNSS for permanent burial as classified waste in accordance with the provisions in Section 3.1.18 of this document.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Development of the Pooled Rideshare Acceptance Model (PRAM)

Due to the advancements in real-time information communication technologies and sharing economies, rideshare services have gained significant momentum by offering dynamic and/or on-demand services. Rideshare service companies evolved from personal rideshare, where riders traveled solo or with known individuals, into pooled rideshare (PR), where riders can travel with one to multiple unknown riders. Similar to other shared economy services, pooled rideshare is beneficial as it efficiently utilizes resources, resulting in reduced energy usage, as well as reduced costs for the riders. However, previous research has demonstrated that riders have concerns about using pooled rideshare, especially regarding personal safety. A U.S. national survey with 5385 participants was used to understand human factor-related barriers and user preferences to develop a novel Pooled Rideshare Acceptance Model (PRAM). This model used a covariance-based structural equation model (CB-SEM) to identify the relationships between willingness to consider PR factors (time/cost, privacy, safety, service experience, and traffic/environment) and optimizing one’s experience of PR factors (vehicle technology/accessibility, convenience, comfort/ease of use, and passenger safety), resulting in the higher-order factor trust service. We examined the factors’ relative contribution to one’s willingness/attitude towards PR and user acceptance of PR. Privacy, safety, trust service, and convenience were statistically significant factors in the model, as were the comfort/ease of use factor and the service experience, traffic/environment, and passenger safety factors. The only two non-significant factors in the model were time/cost and vehicle technology/accessibility; it is only when a rider feels safe that individuals then consider the additional non-significant variables of time, cost, technology, and accessibility. Privacy, safety, and service experience were factors that discouraged the use of PR, whereas the convenience factor greatly encouraged the acceptance of PR. Despite the time/cost factor’s lack of significance, individual items related to time and cost were crucial when viewed within the context of convenience. This highlights that while user perceptions of privacy and safety are paramount to their attitude towards PR, once safety concerns are addressed, and services are deemed convenient, time and cost elements significantly enhance their trust in pooled rideshare services. This study provides a comprehensive understanding of user acceptance of PR services and offers actionable insights for policymakers and rideshare companies to improve their services and increase user adoption.

dynamic rideshare system↗

Development of Performance Acceptance Test Guidelines for Large Commercial Parabolic Trough Solar Fields: Preprint

Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the EPC contractor or owners. In lieu of the present absence of engineering code developed for this purpose, NREL has undertaken the development of interim guidelines to provide recommendations for test procedures that can yield results of a high level ofaccuracy consistent with good engineering knowledge and practice. The fundamental differences between acceptance of a solar power plant and a conventional fossil-fired plant are the transient nature of the energy source and the necessity to utilize an analytical performance model in the acceptance process. These factors bring into play the need to establish methods to measure steady stateperformance, potential impacts of transient processes, comparison to performance model results, and the possible requirement to test, or model, multi-day performance within the scope of the acceptance test procedure. The power block and BOP are not within the boundaries of this guideline. The current guideline is restricted to the solar thermal performance of parabolic trough systems and hasbeen critiqued by a broad range of stakeholders in CSP development and technology.

14 SOLAR ENERGY↗

A step towards the final frontier: Lessons learned from acceptance testing of the first HPE/Cray EX 3000 system at ORNL

Summary In this article, we summarize the deployment of the Air Force Weather (AFW) HPC11 system at Oak Ridge National Laboratory (ORNL) including the process followed to successfully complete acceptance testing of the system. HPC11 is the first HPE/Cray EX 3000 system that has been successfully released to its user community in a federal facility. HPC11 consists of two identical 800‐node supercomputers, Fawbush and Miller, with access to two independent and identical lustre parallel file systems. HPC11 is equipped with Slingshot 10 interconnect technology and relies on the HPE Performance Cluster Manager software for system configuration. ORNL has a clearly defined acceptance testing process used to ensure that every new system deployed can provide the necessary capabilities to support user workloads. We worked closely with HPE and AFW to develop a set of tests that used the United Kingdom's Meteorological Office's Unified Model and 4‐dimensional variational data assimilation. We also included benchmarks and applications from the Oak Ridge Leadership Computing Facility portfolio to fully exercise the HPE/Cray programming environment and evaluate the functionality and performance of the system. Acceptance testing of HPC11 required parallel execution of each element on Fawbush and Miller. In addition, careful coordination was needed to ensure successful acceptance of the newly deployed lustre file systems alongside the compute resources. In this work, we present test results from specific system components and provide an overview of the issues identified, challenges encountered, and the lessons learned along the way.

Melesse Vergara, Verónica G.↗

Modeling of a Parabolic Trough Solar Field for Acceptance Testing: A Case Study

As deployment of parabolic trough concentrating solar power (CSP) systems ramps up, the need for reliable and robust performance acceptance test guidelines for the solar field is also amplified. Project owners and/or EPC contractors often require extensive solar field performance testing as part of the plant commissioning process in order to ensure that actual solar field performance satisfies both technical specifications and performance guaranties between the involved parties. Performance test code work is currently underway at the National Renewable Energy Laboratory (NREL) in collaboration with the SolarPACES Task-I activity, and within the ASME PTC-52 committee. One important aspect of acceptance testing is the selection of a robust technology performance model. NREL1 has developed a detailed parabolic trough performance model within the SAM software tool. This model is capable of predicting solar field, sub-system, and component performance. It has further been modified for this work to support calculation at subhourly time steps. This paper presents the methodology and results of a case study comparing actual performance data for a parabolic trough solar field to the predicted results using the modified SAM trough model. Due to data limitations, the methodology is applied to a single collector loop, though it applies to larger subfields and entire solar fields. Special consideration is provided for the model formulation, improvements to the model formulation based on comparison with the collected data, and uncertainty associated with the measured data. Additionally, this paper identifies modeling considerations that are of particular importance in the solar field acceptance testing process and uses the model to provide preliminary recommendations regarding acceptable steady-state testing conditions at the single-loop level.

14 SOLAR ENERGY↗

SU-E-T-60: A Plan Quality Index in IMRT QA That Is Independent of the Acceptance Criteria

Purpose: In IMRT QA, plan quality evaluation is made based on pass rate under preset acceptance criteria, mostly using gamma-values. This method is convenient but, its Result highly depends on what the acceptance criteria are and suffers from the lack of sensitivity in judging how good the plan is. In this study, we introduced a simple but effective plan quality index of IMRT QA based on dose difference only to supplement such shortcomings, and investigated its validity. Methods: The proposed index is a single value which is calculated mainly based on point-by-point comparison between planned and measured dose distributions, and it becomes “1” in an ideal case. A systematic evaluation was performed with one-dimensional test dose distributions. For 3 hypothetical dose profiles, various displacements (in both dose and space) were introduced, the proposed index was calculated for each case, and the behavior of obtained indices was analyzed and compared with that of gamma evaluation. In addition, the feasibility of the index was assessed with clinical IMRT/VMAT/SBRT QA cases for different sites (prostate, head & neck, liver, lung, spine, and abdomen). Results: The proposed index showed more robust correlation with the amount of induced displacement compared to the gamma evaluation method. No matter what the acceptance criteria are (e.g., whether 3%/3mm or 2%/2mm), it was possible to clearly rank every case with the proposed index while it was difficult to do with the gamma evaluation method. Conclusion: IMRT plan quality can be evaluated quantitatively by the proposed index. It is considered that the proposed index would provide useful information for better judging the level of goodness of each plan and its Result is independent of the acceptance criteria. This work was supported by the Radiation Technology R&D program (No. 2013M2A2A7043498) and the Mid-career Researcher Program (2014R1A2A1A10050270) through the National Research Foundation of Korea funded by the Ministry of Science, ICT&Future Planning.

60 APPLIED LIFE SCIENCES↗

SU-F-J-20: Commissioning and Acceptance Testing of the C-Rad CatalystHD Surface Imaging System

Introduction: With the increasing use of surface-based, nonionizing image-guided radiotherapy (IGRT) systems, a comprehensive set of clinical acceptance and commissioning procedures are needed to ensure correct functionality and proper clinical integration. Although TG-147 provides a specific set of parameters, measurement methodologies have yet to be described. The aim of this study was to provide a comprehensive overview of the commissioning and acceptance analysis performed for the C-Rad CatalystHD imaging system. Methods and Materials: Methodology for the commissioning and acceptance of the C-Rad CatalystHD imaging system was developed using commercially available clinical equipment. Following TG-147 guidelines, the following tests were performed: integration of peripheral equipment, system drift, static spatial reproducibility and localization accuracy, static end-to-end analysis, static rotational accuracy, dynamic spatial accuracy, dynamic temporal accuracy, dynamic radiation delivery and a comprehensive end-to-end analysis. Results: The field of view (FOV) of the CatalystHD was 105×109×83 cm3 in the lateral, longitudinal and vertical directions. For thermal equilibrium and system drift, a thermal drift of 1.0mm was noted. A 45 min warmup time is recommended if the system has been shut off an extended period of time (>24 hours) before the QA procedure to eliminate any thermal drift. Spatial reproducibility was found to be 0.05±0.03 mm using a rigid phantom. For the static localization accuracy, system agreement with couch shifts was within 0.1±0.1 mm and positioning agreement with kV-CBCT was 0.16±0.10 mm. For static rotational accuracy, system agreement with a high precision rotational stage (0.01 deg precision) was within 0.10±0.07 deg. Dynamic spatial and temporal localization accuracy was found to be within 0.2±0.1 mm. Conclusion: A comprehensive commissioning and acceptance study was performed using commercially available phantoms and in-house methodologies to provide a performance evaluation of the CatalystHD imaging system.

60 APPLIED LIFE SCIENCES↗

SLUDGE BATCH 7 ACCEPTANCE EVALUATION: RADIONUCLIDE CONCENTRATIONS IN TANK 51 SB7 QUALIFICATION SAMPLE PREPARED AT SRNL

Presented in this report are radionuclide concentrations required as part of the program of qualifying Sludge Batch Seven (SB7) for processing in the Defense Waste Processing Facility (DWPF). The SB7 material is currently in Tank 51 being washed and prepared for transfer to Tank 40. The acceptance evaluation needs to be completed prior to the transfer of the material in Tank 51 to Tank 40. The sludge slurry in Tank 40 has already been qualified for DWPF and is currently being processed as SB6. The radionuclide concentrations were measured or estimated in the Tank 51 SB7 Qualification Sample prepared at Savannah River National Laboratory (SRNL). This sample was prepared from the three liter qualification sample of Tank 51 sludge slurry (HTF-51-10-125) received on September 18, 2010. The sample was delivered to SRNL where it was initially characterized in the Shielded Cells. With consultation from the Liquid Waste Organization, the qualification sample was then modified by several washes and decants, which included addition of Pu from H Canyon and sodium nitrite per the Tank Farm corrosion control program. This final slurry now has a composition expected to be similar to that of the slurry in Tank 51 after final preparations have been made for transfer of that slurry to Tank 40. Determining the radionuclide concentrations in this Tank 51 SB7 Qualification Sample is part of the work requested in Technical Task Request (TTR) No. HLW-DWPF-TTR-2010-0031. The radionuclides included in this report are needed for the DWPF Radiological Program Evaluation, the DWPF Waste Acceptance Criteria (TSR/WAC) Evaluation, and the DWPF Solid Waste Characterization Program (TTR Task I.2). Radionuclides required to meet the Waste Acceptance Product Specifications (TTR Task III.2.) will be measured at a later date after the slurry from Tank 51 has been transferred to Tank 40. Then a sample of the as-processed SB7 will be taken and transferred to SRNL for measurement of these radionuclides. The results presented in this report are those necessary for DWPF to assess if the Tank 51 SB7 sample prepared at SRNL meets the requirements for the DWPF Radiological Program Evaluation, the DWPF Waste Acceptance Criteria evaluation, and the DWPF Solid Waste Characterization Program. Concentrations are given for thirty-four radionuclides along with total alpha and beta activity. Values for total gamma and total gamma plus beta activities are also calculated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLURRY MIX EVAPORATOR BATCH ACCEPTABILITY AND TEST CASES OF THE PRODUCT COMPOSITION CONTROL SYSTEM WITH THORIUM AS A REPORTABLE ELEMENT

The Defense Waste Processing Facility (DWPF), which is operated by Savannah River Remediation, LLC (SRR), has recently begun processing Sludge Batch 6 (SB6) by combining it with Frit 418 at a nominal waste loading (WL) of 36%. A unique feature of the SB6/Frit 418 glass system, as compared to the previous glass systems processed in DWPF, is that thorium will be a reportable element (i.e., concentrations of elemental thorium in the final glass product greater than 0.5 weight percent (wt%)) for the resulting wasteform. Several activities were initiated based upon this unique aspect of SB6. One of these was an investigation into the impact of thorium on the models utilized in DWPF's Product Composition and Control System (PCCS). While the PCCS is described in more detail below, for now note that it is utilized by Waste Solidification Engineering (WSE) to evaluate the acceptability of each batch of material in the Slurry Mix Evaporator (SME) before this material is passed on to the melter. The evaluation employs models that predict properties associated with processability and product quality from the composition of vitrified samples of the SME material. The investigation of the impact of thorium on these models was conducted by Peeler and Edwards [1] and led to a recommendation that DWPF can process the SB6/Frit 418 glass system with ThO{sub 2} concentrations up to 1.8 wt% in glass. Questions also arose regarding the handling of thorium in the SME batch acceptability process as documented by Brown, Postles, and Edwards [2]. Specifically, that document is the technical bases of PCCS, and while Peeler and Edwards confirmed the reliability of the models, there is a need to confirm that the current implementation of DWPF's PCCS appropriately handles thorium as a reportable element. Realization of this need led to a Technical Task Request (TTR) prepared by Bricker [3] that identified some specific SME-related activities that the Savannah River National Laboratory (SRNL) was requested to conduct. SRNL issued a Task Technical and Quality Assurance (TT&QA) plan [4] in response to the SRR request. The conclusions provided in this report are that no changes need to be made to the SME acceptability process (i.e., no modifications to WSRC-TR-95-00364, Revision 5, are needed) and no changes need to be made to the Product Composition Control System (PCCS) itself (i.e. the spreadsheet utilized by Waste Solidification Engineering (WSE) for acceptability decisions does not require modification) in response to thorium becoming a reportable element for DWPF operations. In addition, the inputs and results for the two test cases requested by WSE for use in confirming the successful activation of thorium as a reportable element for DWPF operations during the processing of SB6 are presented in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EVALUATION OF ARG-1 SAMPLES PREPARED BY CESIUM CARBONATE DISSOLUTION DURING THE ISOLOK SME ACCEPTABILITY TESTING

Evaluation of Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) cycle time identified several opportunities to improve the CPC processing time. The Mechanical Systems & Custom Equipment Development (MS&CED) Section of the Savannah River National Laboratory (SRNL) recently completed the evaluation of one of these opportunities - the possibility of using an Isolok sampling valve as an alternative to the Hydragard valve for taking DWPF process samples at the Slurry Mix Evaporator (SME). The use of an Isolok for SME sampling has the potential to improve operability, reduce maintenance time, and decrease CPC cycle time. The SME acceptability testing for the Isolok was requested in Task Technical Request (TTR) HLW-DWPF-TTR-2010-0036 and was conducted as outlined in Task Technical and Quality Assurance Plan (TTQAP) SRNLRP-2011-00145. RW-0333P QA requirements applied to the task, and the results from the investigation were documented in SRNL-STI-2011-00693. Measurement of the chemical composition of study samples was a critical component of the SME acceptability testing of the Isolok. A sampling and analytical plan supported the investigation with the analytical plan directing that the study samples be prepared by a cesium carbonate (Cs{sub 2}CO{sub 3}) fusion dissolution method and analyzed by Inductively Coupled Plasma - Optical Emission Spectroscopy (ICP-OES). The use of the cesium carbonate preparation method for the Isolok testing provided an opportunity for an additional assessment of this dissolution method, which is being investigated as a potential replacement for the two methods (i.e., sodium peroxide fusion and mixed acid dissolution) that have been used at the DWPF for the analysis of SME samples. Earlier testing of the Cs{sub 2}CO{sub 3} method yielded promising results which led to a TTR from Savannah River Remediation, LLC (SRR) to SRNL for additional support and an associated TTQAP to direct the SRNL efforts. A technical report resulting from this work was issued that recommended that the mixed acid method be replaced by the Cs{sub 2}CO{sub 3} method for the measurement of magnesium (Mg), sodium (Na), and zirconium (Zr) with additional testing of the method by DWPF Laboratory being needed before further implementation of the Cs{sub 2}CO{sub 3} method at that laboratory. While the SME acceptability testing of the Isolok does not address any of the open issues remaining after the publication of the recommendation for the replacement of the mixed acid method by the Cs{sub 2}CO{sub 3} method (since those issues are to be addressed by the DWPF Laboratory), the Cs{sub 2}CO{sub 3} testing associated with the Isolok testing does provide additional insight into the performance of the method as conducted by SRNL. The performance is to be investigated by looking to the composition measurement data generated by the samples of a standard glass, the Analytical Reference Glass - 1 (ARG-1), that were prepared by the Cs{sub 2}CO{sub 3} method and included in the SME acceptability testing of the Isolok. The measurements of these samples were presented as part of the study results, but no statistical analysis of these measurements was conducted as part of those results. It is the purpose of this report to provide that analysis, which was supported using JMP Version 7.0.2.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Acceptance Calculation and Study of Fault Scenarios in the PIP-II Linac

The Proton Improvement Plan (PIP)-II is a proposed high intensity proton facility being developed at the Fermilab. The PIP-II is primarily based on construction of a new superconducting radio frequency (SRF) linear accelerator (linac) that would deliver an average beam current of 2mA with output energy up to 800 MeV. The acceptance of an accelerator outlines its sensitivity against deviations from its nominal design parameters. Consequently, a higher acceptance minimizes possibility of the beam loss. This paper presents longitudinal and transverse acceptance of the PIP-II SRF linac. Furthermore, paper also discusses implications of fault scenarios, such as the cavity failure, on the beam optics and acceptances.

43 PARTICLE ACCELERATORS↗

Measurement Acceptance Region (MAR) Assessment Results Based On Sludge Batch 10 Projections from December 2021, February 2022 and August 2022

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SAS4A/SASSYS-1 Verification Testing for Sodium Fast Reactor Applications: Acceptance Testing Report

SAS4A/SASSYS-1 (SAS) is a simulation tool used to perform deterministic analyses of anticipated events as well as design basis and beyond design basis accidents for advanced liquid-metal-cooled nuclear reactors. With its origin as SAS1A in the late 1960s, the SAS series of codes has been under continuous use and development for over forty-five years and represents a critical investment in safety analysis capabilities for the U.S. Department of Energy. To support demonstration of software pedigree and confirm key functional requirements, this report has been generated to provide detailed verification of the software. Although SAS was developed to support the analysis of any liquid-metal-cooled nuclear reactor, the acceptance testing described in this document focuses on the verification of SAS capabilities as they relate to pool-type Sodium Fast Reactors (SFRs). This report includes documentation of the test problem definition, analytical solution(s), computational solution(s), acceptance criteria, comparisons of analytical/computational solutions, and determination of acceptance of the computational solution(s). Deviations from acceptance criteria are noted.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SAS4A/SASSYS-1 Verification Testing for Sodium Fast Reactor Applications (Acceptance Testing Report)

SAS4A/SASSYS-1 (SAS) is a simulation tool used to perform deterministic analyses of anticipated events as well as design basis and beyond design basis accidents for advanced liquid-metal- cooled nuclear reactors. With its origin as SAS1A in the late 1960s, the SAS series of codes has been under continuous use and development for over fifty years and represents a critical investment in safety analysis capabilities for the U.S. Department of Energy. To support demonstration of software pedigree and confirm key functional requirements, this report has been generated to provide detailed verification of the software. Although SAS was developed to support the analysis of any liquid-metal-cooled nuclear reactor, the acceptance testing described in this document focuses on the verification of SAS capabilities as they relate to pool-type Sodium Fast Reactors (SFRs). This report includes documentation of the test problem definition, analytical solution(s), computational solution(s), acceptance criteria, comparisons of analytical/computational solutions, and determination of acceptance of the computational solution(s). Deviations from acceptance criteria are noted.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Human Factors and Technologies Design to Improve User Acceptance of Pooled Rideshare for Increasing Transportation System Energy Efficiency

This multi-year project delivered a comprehensive, human-factors-driven framework to understand, model, and improve pooled rideshare (PR) adoption in the United States. Through three large-scale national survey studies involving more than 16,000 participants across multiple cities and demographic groups, the research established one of the most extensive datasets to date on user perceptions, behavioral barriers, and service expectations related to pooled rideshare. These data revealed key human factors barriers of user acceptance of PR and suggested potential actionable experience optimizations that could lead to increased PR usage. This foundational knowledge guided the development of novel human-factors models and behavioral choice models that quantify how psychological, demographic, and trip-level factors influence willingness to pool. Building on these empirical insights, the project developed advanced behavioral modeling tools, including mixed logit and integrated choice and latent variable models, to capture both observable and latent influences on PR adoption. These models significantly improved the ability to predict riders’ acceptance of pooled trips, explaining choice heterogeneity through latent constructs such as safety, service experience, privacy concerns, time sensitivity, and environmental attitudes. Together, these models provide a robust analytical foundation for designing PR systems that more effectively meet user needs. The project translated human-factors insights and behavioral models into actionable technology innovations by extending POLARIS—an agent-based, activity-based travel simulation platform—into a fully functional pooled rideshare simulation environment. New PR modules, acceptance models, and regional scenarios were implemented for Greenville, SC and Austin, TX, enabling high-fidelity validation of algorithmic strategies under realistic demand and traffic conditions. The simulation platform supported the development and evaluation of adaptive discount-based assignment algorithms, enhanced willingness-to-pay formulations, demographic-aware incentive mechanisms, and a proactive joint assignment and repositioning strategy. Simulation results demonstrated substantial gains in pooling uptake, average vehicle occupancy, energy efficiency, and fleet profitability. In Greenville, pooling adoption more than doubled, while reductions in vehicle-miles traveled and energy consumption were significant. In Austin, pooling improvements were achieved with minimal service-quality trade-offs, and profitability increased across all fleet sizes. Through this research, we developed a comprehensive understanding of the human factors barriers that limit user acceptance of pooled rideshare services. These insights enabled the design of human-factors-aware pooled rideshare technologies that more effectively address user concerns and improve adoption rates. By integrating these models into an advanced agent-based simulation framework, we demonstrated that higher adoption of pooled rideshare can lead to measurable improvements in energy efficiency and system performance. Together, these contributions establish a validated pathway from human-centered analysis to technology development and energy-saving outcomes, supporting national goals for more sustainable and efficient mobility systems.

Jia, Yunyi↗

Technical Basis For Radiological Acceptance Criteria For Uranium At The Y-12 National Security Complex

The purpose of this report is to establish radiological acceptance criteria for uranium. Other factors for acceptance not considered include criticality safety concerns, contaminants to the process stream, and impacts to the Safety Basis for the affected facilities. Three types of criteria were developed in this report. They include limits on external penetrating and non-penetrating radiation and on the internal hazard associated with inhalation of the material. These criteria are intended to alleviate the need for any special controls beyond what are normally utilized for worker protection from uranium hazards. Any proposed exceptions would require case-by-case evaluations to determine cost impacts and feasibility. Since Y-12 has set rigorous ALARA goals for worker doses, the external limits are based on assumptions of work time involved in the movement of accepted material plus the desire that external doses normally received are not exceeded, and set so that no special personnel monitoring would be required. Internal hazard controls were established so that dose contributions from non-uranium nuclides would not exceed 10% of that expected from the uranium component. This was performed using a Hazard Index (HI) previously established for work in areas contaminated with non-uranium nuclides. The radiological acceptance criteria for uranium are summarized in Table 1. Note that these limits are based on the assumption that radioactive daughter products have reached equilibrium.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

SLUDGE BATCH 6 ACCEPTANCE EVALUATION: RADIONUCLIDE CONCENTRATIONS IN TANK 51 SB6 QUALIFICATION SAMPLE PREPARED AT SRNL

Presented in this report are radionuclide concentrations required as part of the program of qualifying Sludge Batch Six (SB6) for processing in the Defense Waste Processing Facility (DWPF). The SB6 material is currently in Tank 51 being washed and prepared for transfer to Tank 40. The acceptance evaluation needs to be completed prior to the transfer of the material in Tank 51 to Tank 40. The sludge slurry in Tank 40 has already been qualified for DWPF and is currently being processed as SB5. The radionuclide concentrations were measured or estimated in the Tank 51 SB6 Qualification Sample prepared at Savannah River National Laboratory (SRNL). This sample was prepared from the three liter sample of Tank 51 sludge slurry (HTF-51-09-110) taken on October 8, 2009. The sample was delivered to SRNL where it was initially characterized in the Shielded Cells. Under the direction of the Liquid Waste Organization it was then modified by eight washes, nine decants, an addition of Pu from Canyon Tank 16.3, and an addition of NaNO{sub 2}. This final slurry now has a composition expected to be similar to that of the slurry in Tank 51 after final preparations have been made for transfer of that slurry to Tank 40. Determining the radionuclide concentrations in this Tank 51 SB6 Qualification Sample is part of the work requested in Technical Task Request (TTR) No. HLW-DWPF-TTR-2009-0014. The work with this qualification sample is covered by a Task Technical and Quality Assurance Plan and an Analytical Study Plan. The radionuclides included in this report are needed for the DWPF Radiological Program Evaluation, the DWPF Waste Acceptance Criteria (TSR/WAC) Evaluation, and the DWPF Solid Waste Characterization Program (TTR Task I.2). Radionuclides required to meet the Waste Acceptance Product Specifications (TTR Task II.2.) will be measured at a later date after the slurry from Tank 51 has been transferred to Tank 40. Then a sample of the as-processed SB6 will be taken and transferred to SRNL for measurement of these radionuclides. The results presented in this report are those necessary for DWPF to assess if the Tank 51 SB6 sample prepared at SRNL meets the requirements for the DWPF Radiological Program Evaluation, the DWPF Waste Acceptance Criteria evaluation, and the DWPF Solid Waste Characterization Program. The sample is the same as that on which the chemical composition was reported. Concentrations are given for thirty-four radionuclides along with total alpha and beta activity. Values for total gamma and total gamma plus beta activities are also calculated. Results also indicate that 99% of the Tc-99 and at least 90% of the I-129 that could have been in this sludge batch have been removed by chemical processing steps in the SRS Canyons or Tank Farm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing acceptance limits for measured bearing wear of the Space Shuttle Main Engine high pressure oxidizer turbopump

The probabilistic design approach currently receiving attention for structural failure modes has been adapted for obtaining measured bearing wear limits in the Space Shuttle Main Engine high-pressure oxidizer turbopump. With the development of the shaft microtravel measurements to determine bearing health, an acceptance limit was neeed that protects against all known faiure modes yet is not overly conservative. This acceptance criteria limit has been successfully determined using probabilistic descriptions of preflight hardware geometry, empirical bearing wear data, mission requirements, and measurement tool precision as an input for a Monte Carlo simulation. The result of the simulation is a frequency distribution of failures as a function of preflight acceptance limits. When the distribution is converted into a reliability curve, a conscious risk management decision is made concerning the acceptance limit.

Genge, Gary G.↗